ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR TINJA(IPLT)

DI TPAS KARAG REJO KOTA METRO

OLEH

ROBI SETIAWAN

NPM. 13510050

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH METRO

2020

Page 2: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …
Page 3: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR TINJA(IPLT)

DI TPAS KARANGREJO KOTA METRO

SKRIPSI

Diajukan Untuk Memenuhi Salah Satu Persyaratan

dalam Menyelesaikan Program Sarjana

Teknik Sipil

OLEH

ROBI SEIAWAN

NPM. 13510050

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH METRO

2020

Page 4: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

iv

ABSTRAK

Setiawan, Robi 2019. Analisis Efektifitas Instalasi Pengolahan Lumpur Tinja(IPLT)Di TPAS Karang Rejo Kota Metro Skripsi. Jurusan TeknikSipil, Fakultas Teknik Universitas Muhammadiyah Metro.Pembimbing (I) Dr. Eri Prawati S.T,.M.T Pembimbing (II) Ir.AgusSurandono,M.T

Pentingnya pembangunan instalasi pengolahan lumpur tinjamengantisipasi dampak yang lebih buruk akibat adanya peningkatan volumelumpur dan sekaligus sebagai upaya penangan masalah lumpur tinja yang lebihefektif dan higienis (multiguna). Mengetahui apakah efektifitas desain eksistingmengenai instalasi pengolahan lumpur tinja sudah memenuhi syarat yang berlakudi Pedoman Perencanan Teknik Terinci Instalasi Pengolahan Lumpur Tinja(IPLT)/ 2018 .Penelitian ini untuk menghitung Pertumbuhan pendudukmenggunakan Metode Geometrik, penentuan kapasitas debit IPLTdan DesainBaguan IPLT menggukan Pedoman Perencanan Teknik Terinci InstalasiPengolahan Lumpur Tinja (IPLT)/ 2018 .Hasil penelitian Proyeksi Jumlahpenduduk yang dilayani pada tahun 2033 adalah 15023 jiwa dan debit lumpurtinja yang akan di olah oleh IPLT pada tahun 2033 sebanyak 87 m3/hari. Danmenggunkan desain bagunan Tangki Imhoff, Kolam Stabilisasi Anarobik 1 ,Kolam Stabilisasi Anarobik 2, Kolam Fakultatif, Kolam Maturasi, Bak Kontroldan Bak Penampung Padatan Kering

Kata Kunci : Desain, Instalasi Pengolahan Lumpur Tinja

Page 5: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

ABSTRACT

Setiawan, Robi 2019. Effectiveness Analysis of Feces Waste Treatment Plant(IPLT) in Karang Rejo TPAS Metro City Thesis. Civil Engineering Department,Engineering Faculty, Muhammadiyah University of Metro. Advisor (I) Dr. EriPrawati S.T, .M.T Advisor (II) Ir.Agus Surandono, M.T

The importance of building feces waste treatment plants anticipates aworse impact due to an increase in feces waste volume and at the same time as amore effective and hygienic (multipurpose) handling problem for feces waste.Determine whether the effectiveness of the existing design of the sewagetreatment plant has met the applicable requirements in the Detailed EngineeringPlanning Guidelines for Feces waste Treatment Plant (IPLT) / 2018. DetailedTechnique for feces waste Treatment Plant (IPLT) / 2018. The results of theProjection Study The number of residents served in 2033 is 15023 souls and thedischarge of feces waste to be treated by IPLT in 2033 is 87 m3 / day. And usingthe building design of the tangki imhoff, stabilization poll anaerobic 1,Stabilization poll anaerobic 2, Maturation Pool, Control Tub and Dry SolidCollecting Tub.

Keywords: The Design, Sewage Tratment Plants.

Page 6: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

HALAMANPERSETUJUAN

Skripsi oleh ROBI SETIA WAN ini, Telah diperbaiki dan disetujui untuk diujii

Pembi ---

Pembimbing II

Dr. Eri Prawati, S.T., M.T �N. 021 202 7 401

vi

Page 7: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

HALAMAN PENGESAHAN

Skripsi oleh ROBI SETIA WAN ini, Telah dipertahankan di depan Tim Penguji Pada tanggal, 27 Ja�uari 2020

Tim Penguji ---- ..

Ir. Agus Surandono, M.T. NIDN. 001 808 5 701

) e etans � &.,. Skr .

Dr. Eri Prawati, S.T., M.T. NIDN. 0212027401

Ir. Ida Hadijah, M.T. NIDN. 020 602 6 601

- -_r 'emas Ridwan, S.T.,M.Eng

. JON. 020 602 6 601

vii

Penguji Utam

Page 8: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

SURAT PERNYATAN

Yang bertanda tangan dibawah ini :

Nama

NPM

Jurusan

Fakultas

Judul

: Roby Setiawan

: 13510050

: Teknik Sipil

: Teknik

: Analisis Efektifitas Pengolahan Lumpur Tinja (IPL T)

Di TP AS Karang Rejo Kota Metro

Dengan ini saya menyatakan bahwa skripsi ini benar-benar karya saya sendiri, dan

sepanjang pengetahuan saya tidak terdapat karya yang ditulis atau diterbitkan orang

lain kecuali yang secara tertulis diacu dalam skripsi ini sebagaimana disebutkan

dalam daftar pustaka.

Apabila pemyataan saya tidak benar, maka saya bersedia dikenai sanksi sesuai

dengan hukum yang berlaku.

Yang membuat p

Page 9: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

vii

Motto

#Rummahku,Alamku

Page 10: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

vii

PERSEMBAHAN

Dengan mengucap syukur Alhamdulillah kepada Allah SWT, atas segala

nikmat yang tercurahkan kupersembahkan skripsi ini kepada :

1. Ayahanda dan Ibunda tercinta Bapak Naazar Nuri dan Ibu Suwartun yang

telah membimbing dan selalu mendo’akan untuk keberhasilan dan

kesuksesanku.

2. Seluruh jajaran dosen Fakultas Teknik Jurusan Universitas Muhammadiyah

Metro , yang senantiasa memberikan dorongan dan semangat kepadaku.

3. Pembimbing I dan Pembimbing II yang telah banyak membantu dan

memotivasi dalam segala hal dalam pengerjaan penelitian saya.

4. Kelurga Besar Mahasiswa Fakultas Teknik Universitas Muhammadiyah

Metro, yang selalu memberikan motivasi dan bantuan.

5. Keluarga Besar Mapala Matrix Universitas Muhammadiyah Metro, yang

memberikan pelajaran untuk ber-organisasi.

6. Almamaterku tercinta Universitas Muhammadiyah Metro, yang selalu

kubanggakan sampai akhir hayatku.

Page 11: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

ix

KATA PENGANTAR

Alhamdulillahirobbil’alamin. Puji dan syukur penulis panjatkan kehadirat Allah

SWT yang telah melimpahkan kekuatan, kesehatan, rahmat dan karunianya sehingga

penulis dapat menyusun dan menyelesaikan skripsi ini yang berjudul “ Analisis

Efektifitas Instalasi Pengolahan Lumpur Tinja (IPLT) Di Tpas Karang Rejo Kota”

Dalam menyelesaikan penyusunan skripsi ini, penulis banyak menerima saran ,

bimbingan dan bantuan dari berbagai pihak, karena itu pada kesempatan ini penulis

akan menyampaikan ucapan terima kasih kepada yang terhormat :

1. Bapak Kemas Ridhuan, S.T.,M.Eng. selaku Dekan Fakultas Teknik

Universitas Muhammadiyah Metro.

2. Ibu Leni Sriharyani, S.T,M.T. selaku Ketua Jurusan Teknik Sipil Universitas

Muhammadiyah Metro.

3. Ibu Dr.Eri Prawati,ST,.M.T selaku pembimbing I yang telah memotivasi

penulis dan selalu memberikan saran.

4. Bapak Ir. Agus Surandono.,M.T. selaku pembimbing II yang memberikan

arahan dan semangat kepada penulis.

5. Kedua Orang Tua saya yaitu Bapak Nazar Nuri dan Ibu Suwartun yang selalu

memberikan semangat dan doa.

Page 12: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

x

6. Keluarga Besar Mahasiswa Fakultas Teknik Universitas Muhammadiyah

Metro yang selalu mendorong untuk kemajuan.

7. Keluarga Besar Mapala Matrix yang sudah mengajarkan saya tentang

Organisasi dan Olahraga Alam Bebas.

Penulis berharap semoga penyusunan skripsi ini dapat bermanfaat bagi

semua pihak khususnya mahasiswa Fakultas Teknik Universitas

Muhammadiyah Metro. Penulis menyadari dalam penyusunan skripsi ini

masih jauh dari sempurna, sehingga saran dan koreksi serta pendapat yang

bersifat membangun sangat penulis harapkan demi perbaikan dimasa

mendatang. Semoga skripsi ini dapat bermanfaat bagi penulis sendiri

khususnya dan berguna bagi semua pihak pada umumnya.

Akhirul kalam semoga skripsi ini dapat dijadikan sebagai sumber referensi

ilmu pengetahuan yang bermanfaat.

Metro, 28 Agustus 2019

Robi SetiawanNPM. 13510050

x

Page 13: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xi

DAFTAR ISI

HALAMAN JUDUL I.......................................................................................... iii

ABSTRAK............................................................................................................. iv

HALAMAN PERSETUJUAN.............................................................................. v

HALAMAN PENGESAHAN .............................................................................. vi

MOTTO................................................................................................................ vii

PERSEMBAHAN............................................................................................... viii

KATA PENGANTAR ......................................................................................... ix

DAFTAR ISI......................................................................................................... xi

DAFTAR GAMBAR .......................................................................................... xiv

DAFTAR GERAFIK........................................................................................... xv

DAFTAR NOTASI DAN ISTILAH.................................................................. xvi

DAFTAR TABEL............................................................................................. xviii

DAFTAR RUMUS............................................................................................... xx

BAB I PENDAHULUAN

1.1 Latar Belakang........................................................................................ 1

1.2 Rumusan Masalah................................................................................... 3

1.3 Tujuan Penelitian .................................................................................... 4

1.4 Manfaat Penelitian .................................................................................. 4

1.5 Batasan Masalah ..................................................................................... 5

BAB II LANDASAN TEORI

2.1 Instalasi Pengolahan Lumpur Tinja ........................................................ 6

2.2 Karakteristik Jenis Lumpur Tinja ........................................................... 7

Page 14: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xii

2.3 Penentuan Kapasitas Pengolahan Lumpur Tinja ................................... 8

2.4 Unit Yang Digunakan Pada IPLT........................................................... 9

2.5 Teknologi Pengolahan Lumpur Tinja/2018........................................... 10

2.5.1 Penjelasaan Tiap Bagunan IPLT dan Mekanis........................... 12

2.6 Unit Tekknologi Pengolahan pada IPLT .............................................. 14

2.6.1 Tangki Inhoff............................................................................... 14

2.6.2Kolam Anaerobik ......................................................................... 19

2.6.3Kolam fakulatif............................................................................. 22

2.6.4 Kolam Maturasi ......................................................................... 24

2.6.5Unit Pengering Lumpur ................................................................ 27

2.6 Unit Tekknologi Pengolahan pada IPLT .............................................. 34

2.8 Pelayanan Lumpur Tinja........................................................................ 35

2.8.1 perhitungan Tarif Dasar Pelayanan Lumpur Tinja ...................... 36

2.8.2 perhitungan Tarif Dasar .............................................................. 37

2.8.3 Analisis Perhitungan Perncanan Pembiayan Layaan................... 38

BAB III METODE PENELITIAN

3.1 Lokasi Penelitian .................................................................................. 40

3.2 Pengumpulan Data................................................................................ 42

3.3 Pengolahan Data ................................................................................... 42

3.4 Penentuan Kapasitas Debit IPLT........................................................... 43

3.5 Desain bagunan...................................................................................... 44

3.6 Pelayanan Lumpur Tinja........................................................................ 44

3.7 Diagram Penelitian ................................................................................ 45

Page 15: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xiii

BAB IVHASIL DAN PEMBAHASAN

4.1 Proyeksi Penduduk Kota Metro............................................................ 46

4.1.1 Metode Geometrik....................................................................... 46

4.2 Penentuan Debit Lumpur Tinja Yang Diolah....................................... 49

4.3 Penentuan DimensiUnit IPLT .............................................................. 50

4.3.1 Tangki Imhoff.............................................................................. 51

4.3.2Kolam Anaerobik ......................................................................... 53

4.3.3Kolam Fakulatif ............................................................................ 55

4.3.4Perhitungan Dimensi Kolam Maturasi ......................................... 58

4.3.5Penentuan Kebutuhan dan Dimensi Bak Pengering Lumpur ....... 59

4.3.6 Bak Kontrol ................................................................................ 61

4.3.6 Kolam Badan Air ........................................................................ 61

BAB VPENUTUP

5.1 Kesimpulan ........................................................................................... 67

5.2 Saran ..................................................................................................... 68

DAFTAR PUSTAKA

LAMPIRAN

Page 16: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xiv

DAFTAR GAMBAR

Gambar Halaman

2.1. Alternatif 1 .........................................................................................................

2.2. Alternatif 2 .........................................................................................................

2.3. Alternatif 3 .........................................................................................................

2.4. Teknologi Pengolahan Lumpur Tinja/2018 .....................................................

2.5. tangki Imhoff.....................................................................................................

2.6. Mekanisme Aliran Tangki Imhoff.....................................................................

2.7 Bentuk Penmapang Tangki Imhoff.....................................................................

2.8. Desain Tangki Imhoff........................................................................................

2.9. Skema Kolam Anerobik....................................................................................

2.10 Kolam Anaerobik di PLT Tamban Bali..........................................................

2.11 Kolam Fakulatif di PLT Tamban Bali ................ ..........................................

2.12 . Kolam Maturasi di PLT Tamban Bali............................................................

2.13 Kolam Maturasi...............................................................................................

2.14 Potongan Bak Pengering Lumpur.....................................................................

2.15 Dimensi Bak Pengering Lumpur.....................................................................

2.16 Layout Bak Pengering Lumpur.........................................................................

2.17 Profil Media Pada Bak penegring Lumpur.......................................................

2.18 Bak Pengering Lumpur.....................................................................................

3.1 Peta area Berresiko Sanitasi................................................................................

3.2 Denah IPLT Kota Metro...............................................................................

10

10

11

11

14

16

18

18

19

20

22

25

27

28

29

32

33

34

40

41

Page 17: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xv

DAFTAR GRAFIK

Grafik Halaman

4.1. Grafik pertumbuhan jumlah .............................................................. 48

Page 18: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xvi

DAFTAR NOTASI DAN ISTILAH

Air limbah domestik = Air limbah yang berasal dari usaha dan/atau

kegiatan pemukiman, rumah, makan,

perkantoran, perniagaan, apartemen, dan asrama

SPALD = Sistem Pengelolaan Air Limbah Domestik

IPLT = instalasi pengolahan air limbah yang dirancang

hanya menerima dan mengolah lumpur tinja

yang berasal dari Sub-sistem Pengolahan

Setempat.

IPALD = Bangunan air yang berfungsi untuk mengolah air

limbah domestic

Nutrien = Nutrien yang terkandung dalam lumpur tinja

berasal dari sisa proses pencernaan makanan

Manusia

Ph = Parameter yang penting dalam pemeriksaan

lumpur tinja yang dapat mempengaruhi tahapan

stabilisasi biologi.

BOD = (Biological Oxygen Demand) parameter yang

mengindikasikan kandungan senyawa organik

yang dapat terdegradasi secara biologis. Lumpur

tinja umumnya memiliki konsentrasi BOD yang

lebih tinggi dari air limbah domestik.

COD = (Chemical Oxygen Demand) merupakan parameter

yang mengindikasikan kandungan senyawa

organik pada lumpur tinja baik yang dapat

terdegradasi secara biologis maupun non

biologis.

Page 19: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xvii

Page 20: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xviii

DAFTAR TABEL

Tabel Halaman

2.1 Karakteristik Lumpur Tinja di Indonesia........................................................

2.2 Demensi.Tangki Imhoff.................................................................................

2.3 Variasi Temperatur dan waktu detensi...........................................................

2.4 Dimensi Bak Pengering Lumpur.....................................................................

2.5 Tujuan dan kegiatan pelayanan lumpur tinja............................................

4.1 Perhitungan Statistika Jumlah Penduduk Kota Metro...................................

4.2 Proyeksi Penduduk Kota Metro 2043 Metode Geometric.............................

4.3 Penetua Jumlah Debit Lumpur Tinja..............................................................

4.4 Penetuan Dimensi Tangki tangki imhoff.........................................................

4.5 Kebutuhan Bak pengering Lumpur.................................................................

4.6 Tabel Volume Unit Tangki Imhoff...............................................................

4.7 Tabel Volume Unit Kolam Anaerobik 1......................................................

4.8 Tabel Volume Unit Kolam Anaerobik 2......................................................

4.9 Tabel Volume Unit Kolam Fakultatif...........................................................

4.10 Tabel Volume Unit Kolam Mautrasi...........................................................

4.11 Tabel Volume Unit Bak Pengering Lumpur.................................................

4.12 Tabel komponen sub sistem pengolahan.....................................................

4.13 Data Pelayanan Lumpur Tinja ......................................................................

4.14 Biaya Pengakutan Lumpur Tinja.................................................................

4.15 Perhitungan Biaya Manajeman......................................................................

7

19

21

30

36

47

48

50

52

60

61

62

62

62

63

63

64

65

65

65

Page 21: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xix

4.16 Perhitungan Biaya pengolahan Lumpur Tinja...............................................

4.17 Tarif Dasar Pelayanan Lumpur Tinja............................................................

66

66

Page 22: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

xx

DAFTAR RUMUS

Rumus HalamanLaju bedan BOD....................................…………………………........... 21

Beban BOD.................................... ...............………………………..... 23

Bakteri coliform..................... .................... ....................……………… 24

Temperatur waktu operasi ....... ……………………………………....... 27

Metode Gemoterik ...................................…………………….............. 46

Tarif Dasar ...........................…………………………………............... 38

Hari Kerja ................... ……………................................................... 38

Jam kerja ............................................................................................. 39

Kebutuhan Truk ................................................................................... 39

Jumlah Truk ......................................................................................... 39

Page 23: ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR …

Swaditya Rizki, S.Si., M.Sc. NIDN. 0224018703

Judul:

'

Metro, 28 April 2020

Kepala Unit,

Unit Publikasi llmiah Universitas Muhammadiyah Metro dengan ini menerangkan bahwa:

Nomor: 1093/11.3.AU/F/UPI-UK/2020

Noma : ROBI SETIAWAN NPM : 13510050 Jenis Dokumen : SKRIPSI

ANALISIS EFEKTIFITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) DI TPAS KARANGREJO