unlocking and developing the potential of exciting core plays

Post on 12-Sep-2021

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

12006 Capital Markets Day 1

Unlocking and Developing the Potential of Exciting Core Plays

Manu WopeSouth and East Africa

22006 Capital Markets Day

Tullow’s Footprint in South and East Africa

Overview□ Largest exposure to fledging East

African Rift exploration

□ Well placed to capture opportunities arising in the area

Uganda□ Mputa/Waraga discoveries and early

signs from Kingfisher are encouraging

□ Nzizi-1 well to spud in November

□ Proven Hydrocarbon system

Madagascar□ Resurgent region for exploration

□ Significant footprint gained with additional New Ventures opportunities

Hardman Acquisition□ Operational synergies in Uganda

□ Operatorship of Block 2

□ Exposure to Rovuma Basin in Tanzania which Tullow would operate

32006 Capital Markets Day

Leveraging Experience and Knowledge

□ Albert Graben (Uganda) & Cambay Basin (India) to Morondava (Madagascar)

□ Mboundi (Congo) to Stratigraphic Play (Albert Graben)

□ Rio Muni (EG) to Kudu

42006 Capital Markets Day

ScreenScreen Evaluate/ValidateEvaluate/Validate DeliverDeliver

Uganda Block 2: Butiaba

Congo (DRC) Blocks I & II

Madagascar 3109 & 3111

Uganda Block 1

Congo (DRC) & Tanzania

Lake Albert

Basal Sand Albert Graben

Lindi/Mtwara Blocks

(Rovuma Basin, Tanzania)

Ngambua

Kaiso – Tonya Leads

Pelican, Ngassa

Butiaba Leads

Mputa

Waraga

Nzizi

Kingfisher

Kudu upside

Rift BasinOnshore

Rift BasinOffshore

StratigraphicTrap

Current South and East Africa Opportunity Funnel

52006 Capital Markets Day

Leading Position: >50% of the Albertine Rift Basin

Basin-wide Strategy□ Leverage knowledge and influence□ Quickly discover basin potential□ Appraise in parallel □ Scaled development options

Hardman Deal □ Increases influence and materiality

□ 100% and Operatorship of Block

Latest News□ Tullow to operate Block I & II in Congo (DRC)□ Encouraging results from Kingfisher □ Heightened HC potential of Lake Albert

Forward Plan□ Kingfisher well test and sidetrack

□ Accelerated exploration and appraisal of the Albert Graben

□ Evaluation of Blocks I & II in Congo (DRC)

62006 Capital Markets Day

Albertine Rift Basin Physical Setting

Lake Albert140km SW-NE and 40 km wideMax water depth 60 metres

D.R.C.

Uganda

Kaiso - Tonya

Butiaba

Kingfisher-1 Well

Semliki River

Lake Albert

Albert Nile

Victoria Nile

72006 Capital Markets Day

Albertine Rift Basin: Basin-Wide Full Cycle Campaign

Kaiso-Tonya Area

Appraisal of Discoveries

Mputa & Waraga well testing

Kaiso-Tonya 3D seismic planning

Mputa appraisal wells 2007

Further Exploration Drilling

Nzizi (Nov-Dec 2006)

Ngambwa (using 3D seismic)

Development Concepts

Studies launched

Regional and basin-wide / modular

82006 Capital Markets Day

Butiaba-Paara Area

Exploration surveys

Gravity and magnetic surveys 2006

2D seismic planning

Exploration wells

Preparing drill-worthy prospects

Rig options study

Albertine Rift Basin: Basin-Wide Full Cycle Campaign

92006 Capital Markets Day

Lake Albert

Exploration surveys

2D seismic planning− Congo (DRC) Blocks I & II

Metocean and ESIA studies

Exploration drilling

Bugoma (Kingfisher & Pelican)

Lake operations (Ngassa plans)

Albertine Rift Basin: Basin-Wide Full Cycle Campaign

102006 Capital Markets Day

Kingfisher-1 has Encountered Hydrocarbons

□ Drilled through fault into basement (TD 2125m) – on prognosis

□ Oil shows, log and pressure data indicate occurrence of oil in upper section secondary objectives

□ Four potential pay zones intersected that will now be production tested

□ Operator indicates 37m of net pay− Two firm tests (two of 10m)

− Two contingent tests

□ Results so far indicate regional seal works, sands are developed and a trap is charged with oil

112006 Capital Markets Day

Ngassa-Mputa-Nzizi Schematic

Analogous to Kingfisher

122006 Capital Markets Day

Kingfisher-1 Testing and Sidetrack

□ Why test now?− Well needs to be sidetracked to reach

primary targets at 3,000m – 4,000m

− Opportunity to test these sands at this location

□ Production test will establish− Flow potential of accumulations

− If section is a viable future target

− Fluid properties through sampling

− Other important reservoir properties

□ Sidetracking required to move outboard from the basement fault

□ Timetable− Set up test facilities – 1 month

− Test Programme – 3 weeks

− Sidetrack to primary targets ~ 60 days

132006 Capital Markets Day

□ Exploration results so far are excellent in the Albert Graben

−Mputa & Waraga oil discoveries

−Encouraging results from Kingfisher-1 drilling that enhance Lake Albert potential

□ Very aggressive exploration programme for the remainder of 2006 / 2007

−2D seismic at Butiaba and on the DRC side of Lake Albert

−3D onshore and transition seismic at Kaiso-Tonya and Bugoma

−Onshore wells drilling (Nzizi-1, Kaiso Tonya & Butiaba)

−Gear up to drilling offshore wells in Uganda.

−Mputa-Waraga early development scheme

−Kudu-8 and Kudu-9 exploration wells in Namibia

Uganda: Early Results are Very Encouraging

142006 Capital Markets Day

From the Albert Graben to the Madagascar Failed Rift

□ Four discoveries out of four exploration wells drilled this year in Uganda

□ Basin-wide activities at all stages of exploration running in parallelin 2006 to 2008− Seismic (2D & 3D)

− Drilling onshore and offshore (exploration and appraisal)

− Early Development Scheme

□ Tullow was awarded a 50% interest and operator of Block 3109 (Mandabe) onshore Madagascar

□ Tullow has applied for 100% of Block 3111 (Berenty) adjacent to Block 3109

Tullow’s strategy of basin-wide participation in the Albert Graben is proving successful

We are leveraging our expertise and experience to step out of Uganda into the Morondava Basin of Madagascar and explore the Karoo Rift Basin

152006 Capital Markets Day

Madagascar Blocks 3109 & 3111

IlovoFault

Western Limit of Basement outcrop

Prospective Karoo Trough

Block 3109

TsimororoHeavy oil

Bemolonga Tar SandsJu

rass

ic R

ift

Manandaza Light Oil

Block 3111 □ Proven HC system in MorondavaKaroo Rift

□ Blocks 3109 & 3111 (20,000 km2)− On trend with Tsimiroro Heavy Oil

− On trend with Bemolanga Tar Sands

□ Utilise Ugandan and Indian Experience to unlock the potential

162006 Capital Markets Day

Madagascar Karoo Failed Rift Corridor and Blocks 3109 & 3111

□ Focus is on structures within the Mid-Sakamena Formation

□ Jurassic & Cretaceous to the West are secondary plays

172006 Capital Markets Day

Madagascar Prospectivity Blocks 3109 & 3111

□ Karoo Rift – key challenge is finding reservoir with good preserved quality

□ Jurassic/Cretaceous – key risk is seal

□ Evidence of a working hydrocarbon system

−Bemolanga tar sands and Tsimiroro Heavy Oil deposits (+23 BnBO)

−Light oil (41 deg API) recovered from the Manandaza-1 well North of Block 3109

□ Madagascar acreage is still very early in the exploration cycle−Planned seismic surveys

182006 Capital Markets Day

Kudu Stratigraphic Traps

Proprietary Geological Insights

Fully integrated geosciences dataTwo gas plays proven

Prospect Testing: Two Wells (Q1/Q2 2007)

Kudu East – potential multi-tcf play

Gas field extension and exploration upside

192006 Capital Markets Day

Proposed Kudu-8 Well Designed to firm-up Kudu East Potential

Turonian u/c

Mid Apt u/c

K3 res

Top K1 res

Base Kudu Seq

CFZKMF

Kudu East

Kudu-3 Proposed Kudu-8 (proj)

XLN 2180

Kudu-7

2.5Km

E

Kudu-5

Kudu-3

Kudu EastKudu-4

KMF

Kudu-1 Proposed K-8

K1 TWTstructure

Kudu-7

CFZ

Kudu-2

Kudu-5 testedat 19.2 MMscf/d

Kudu-5 (proj)

202006 Capital Markets Day

Conceptual Geological Model for Kudu Sequence

Kudu East□ Stratigraphic trap & shore line facies

□ K1 reservoir laterally extensive

□ K1 reservoir of poorer quality

□ To be tested by Kudu-8 & 9 wells

Kudu Main Field (KMF)□ Better reservoir quality in sand dunes

Kudu East

212006 Capital Markets Day

Tanzania (Hardman)

2006Q1 Q2 Q3 Q4

2007Q1 Q2 Q3 Q4

2008Q1 Q2 Q3 Q4 Q1

2009

South and East African Exploration

ExplorationDrilling/Seismic activity

Blocks I & II

Block 3109

Block 3111

Kudu (expl only)

Block 1

Block 2

Block 3A

2D

Mandabe-12DMag/Gravity

Kudu-8 Kudu-9

2D

Nizizi-1

Butiaba 2D

Mputa-1

Waraga-1Mputa-2

Ngassa 3D

Kingfisher-1 Kingfisher-23D

Ngassa-1

Pelican-1

Kaiso-Tonya prospects

Pelican-2

Ngassa-2

Drilled well Currently drilling Planned well Probable well

Seismic acq. Seismic proc./reproc. End of current period End of licencePossible seismic acq.

Possible well

Congo (DRC)

Madagascar

Namibia

Uganda

Sep’10

Mputa 3D

Butiaba-1, B2, B3

Aug’09

Jun’12

Oct’09

2D

Mtwara

Lindi

2D

2D

222006 Capital Markets Day

Unlocking the Potential of Kudu and the East African Rift System

Uganda

□ Leveraging our unique position in the Albertine Graben to fully understand the potential of the basin

Madagascar

□ Benefiting from our expertise and experience in Uganda to step out into the Morondava Basin and explore the Karoo Rift Play

Namibia

□ Working to establish the resource base necessary for an export project at Kudu

top related