tender nts july 2020 - swindon

Post on 05-Feb-2022

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

G

104.46

CL:104.51

LC

104.53

104.67

1

0

5

.

1

1

105.18

105.05

1

0

4

.

8

5

104.34

1

0

4

.

9

2

104.98

104.85

1

0

4

.

6

5

Bench

104.61

Post

Post

Post

Post

Post

Post

Post

Post

Post

D=

0.6

0

D=

0.7

0

D

=0

.5

0

D=

0.3

5

D=

0.4

0

D

=

0

.

4

0

D

=

0

.

7

0

D

=

0

.

3

0

D

=

0

.

3

0

D

=

0

.

2

5

UN

K (G

PR

)

40

P

E G

as F

ro

m R

eco

rd

s

100Ø

MH FW

CL=104.51

IL=103.42

U

G

-

B

T

UG

-B

T

UG

-B

T

GY

CL=104.46

Silt=104.45

Blocked

104.62

104.40

104.59

G

104.75

104.72

1

0

4

.

5

8

104.73

104.79

104.82

104.82104.79

104.78

105.87105.87

105.75

104.42104.73

104.46

1

0

4

.

3

3

1

0

4

.

0

8

104.22

1

0

4

.

3

1

104.57

1

0

4

.

4

3

1

0

4

.

2

1

104.31

G

104.22

Post

104.11

104.23

104.24

Post

Post

Post

Post

LC

Post

Post

Post

PostPost

PostPost

Bench

D=

0.6

0

D=

0.7

0

D=

0.7

5

D

=

0

.

6

0

D

=

0

.

4

5

D

=

0

.

6

0

D=

0.3

5D

=0

.4

5

D=

0.3

5

D=

0.3

0

D=

0.4

0

D=

0.3

5

D

=

0

.

3

0

D=0.35

D

=0

.3

5

D=

0.4

5

D

=

0

.

4

0

GY

CL=104.62

Silt=103.85

GY

CL=104.22

Silt=103.70

1

0

0

Ø

I

L

=

1

0

4

.

1

3

1

0

0

Ø

I

L

=

1

0

4

.

2

0

1

0

0

Ø

I

L

=

1

0

3

.

7

9

100Ø

IL

=1

03

.7

3

P

O

S

S

I

B

L

E

P

I

P

E

B

R

I

C

K

O

P

E

N

I

N

G

I

L

=

1

0

3

.

9

0

U

G

-

L

V

UG-LV

U

G

-

T

V

UG

-B

T

103.75

103.67

103.70

103.73

104

.0

8

1

0

4

.

0

6

103.87

1

0

3

.

6

4

103.69

1

0

4

.

1

4

103.96

103.84

103.74

1

0

3

.

7

3

LC

104.82

104.65

104.23

10

3.6

7

Post

Post

UN

K (G

PR

)

D=

0.5

0

D=

0.5

5

D

=

0

.

6

0

D=

0.3

0

D=

0.4

0

D=

0.4

0

D=

0.3

5

UN

K (G

PR

)

40

P

E G

as F

ro

m R

eco

rd

s

UG

-L

V

UG

-T

V

UG

-T

V

UG

-B

T

0m 1 2 3

E3.3.1 002.4 (n.t.s.) - PLAN DETAIL OF REFURBISHED PLANTING BED IN PEDESTRIAN AREA

no

rth

E3.3.1 002.5 (n.t.s.) - PLAN DETAIL OF REFURBISHED PLANTING BED ADACENT TO COMMUNITY CENTRE MAIN ENTRANCE

north

0m 1m 2m 3m

E3.3.1 002.3 (n.t.s.) - PLAN DETAIL OF NEW /REFURBISHED PLANTING ALONGSIDE SOUTHERN ELEVATION OF COMMUNITY CENTRE

north

8No. Cupressus sempervirens 'Pyramidalis'; 300-350cm High

39No. Hylotelephium 'Herbstfreude'

21No. Betula utilis var. jacquemontii 'Doorenbos' (closely planted at 600mm centres)

57No. Calamagrostis × acutiflora 'Karl Foerster'

72No. Salvia nemorosa 'Caradonna'

4m 5m

78No. Hylotelephium 'Herbstfreude'

5No. TIMBER POSTS TO BE REMOVED

1No. REMOVED BENCH

54No. Hedera helix 'Sagittifolia'

5.8Lin.m. NEW RAISED BRICK RETENTION 1.3Lin.m. REMOVED BRICK EDGE

1.4Lin.m. REMOVED BRICK EDGE

11Lin.m. NEW RAISED BRICK RETENTION

1.5Lin.m. REMOVED BRICK EDGE

NB: ALL PLANTING AREAS TO BE MULCHED WITH 50mm DEPTH 5-35mm BARK MULCH

1No. REPLACED LAMP AND COLUMN

15No. Betula utilis var. jacquemontii 'Doorenbos' (closely planted at 600mm centres)

50No. Hedera helix 'Sagittifolia' (0.5L)

10No. Perovskia 'Blue Spire' 2L

24No. Hedera helix 'Sagittifolia' (0.5L)

4 5m

28No. Calamagrostis × acutiflora 'Karl Foerster'

5No. Verbena bonariensis

12No. Verbena bonariensis

15No. Hylotelephium 'Herbstfreude'

10No. Hedera helix 'Sagittifolia'

14No. Hedera helix 'Sagittifolia'

10No. Kniphofia uvaria

8No. Hedera helix 'Sagittifolia'

14Lin.m. p/t s/w TIMBER KNEE RAIL

20No. Calamagrostis × acutiflora 'Karl Foerster'

38No. Cotoneaster salicifolius 'Gnom' (0.5L)

40No. Hylotelephium 'Herbstfreude'

40No. Geranium 'Dragon Heart'

30No. Hedera helix 'Sagittifolia'

10No. Geranium 'Dragon Heart'

78No. Artemisia ludoviciana 'Silver Queen'

26No. Artemisia ludoviciana 'Silver Queen'

20No. Salvia nemorosa 'Caradonna'

20No. Artemisia ludoviciana 'Silver Queen'

30No. Salvia nemorosa 'Caradonna'

300No. Allium 'Round n' Purple' (IN GROUPS OF 3No.)

0m 1 2 3 4 5m

114No. Allium 'Round n' Purple' (IN GROUPS OF 3No.)

E3.3.1 002.7 - PLANTING SCHEDULE

32.5Lin.m. ReRoot 2000/RootStop ROOT BARRIER

GreenBlueUrban Ref: RER210X0.6A / Thickness:1mm / Depth:600mm

DO NOT SCALE FROM DRAWINGS

Drawn

Designed

Drawing no.

Date Scale Revision

Checked

CLIENT: SBC

E3.3.1 002.1

APN

APN

STEVE JORDEN

DIRECTOR OF COMMUNITIES AND HOUSING

WAT TYLER HOUSE

SWINDON SN1 2JH

TELEPHONE (01793) 463000

R.N. WEYMOUTH, CMLI

HEAD OF LANDSCAPE SERVICE

ELDENE LANDSCAPE REFURBISHMENT

PLANTING DETAILS 2 OF 2

NTS JULY 2020

StatusTENDER

50No. Sanguisorba 'Tanna' 9cm/

140No. Sanguisorba 'Tanna' 9cm/

EXISTING PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 16m3 FIRMED

SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW RELEASE FERTILISER, SPENT

EXISTING TOPSOIL TAKEN TO TIP FOR RECYCLING

NEW PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 5m3 FIRMED

SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW RELEASE FERTILISER,

ARISINGS TAKEN TO TIP

NEW PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 11m3 FIRMED

SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW RELEASE FERTILISER,

ARISINGS TAKEN TO TIP

EXISTING PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 18.5m3 FIRMED

SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW RELEASE FERTILISER, SPENT

EXISTING TOPSOIL TAKEN TO TIP FOR RECYCLING

1 No. Magnolia Stellata

70No. Sanguisorba 'Tanna' 9cm

/

EXISTING PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 16m3 FIRMED

SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW RELEASE FERTILISER, SPENT

EXISTING TOPSOIL TAKEN TO TIP FOR RECYCLING

EXISTING PLANTING AREA EXCAVATED TO 700mm DEPTH AND FILLED WITH 20m3

WELL FIRMED SOURCED TOPSOIL TO BS 3882:2015 AND GRANULAR SLOW

RELEASE FERTILISER, SPENT EXISTING TOPSOIL TAKEN TO TIP FOR RECYCLING

/

top related