B CABLE B.3 ENGINEERING-CABLES

Project:

Westermost Rough Offshore Wind Farm 34 kV Submarine Cable Supply

Nexans document number:

12.31.050-B.3-002

Issue:

AB1

Document title:

Technical Data for the 36kV Submarine Cable System

Pages:

9 including this cover sheet

excluding attachments

Category:

EXT

Scope: This Document shows an overview of the technical dates for all 36kV submarine cable systems Nexans is able to deliver.

AB1 18.12.2013 Issued for As-Built MD DS DS PW Issue: Date: Document Status: Prepared: Checked: Approved: Released: Company:

Westermost Rough Limited

Company’s contract no.:

48 0000 8640

Array Cables / WMR

CONFIDENTIAL. All rights reserved. Passing on or

copying of this document, use and communication of its contents are not permitted without prior written

authorization from Nexans Germany

Communication Note / RDS-PP:

CN 0110

WMR01V20AAF EDA101

RReevviissiioonn DDeessccrriippttiioonn SShheeeett

Rev. Para. Revision Description

AB1

First release, Issued for As-Built, Final Documentation