Document type:
B CABLE B.3 ENGINEERING-CABLES
Project:
Westermost Rough Offshore Wind Farm 34 kV Submarine Cable Supply
Nexans document number:
12.31.050-B.3-002
Issue:
AB1
Document title:
Technical Data for the 36kV Submarine Cable System
Pages:
9 including this cover sheet
excluding attachments
Category:
EXT
Scope: This Document shows an overview of the technical dates for all 36kV submarine cable systems Nexans is able to deliver.
AB1 18.12.2013 Issued for As-Built MD DS DS PW Issue: Date: Document Status: Prepared: Checked: Approved: Released: Company:
Westermost Rough Limited
Company’s contract no.:
48 0000 8640
Array Cables / WMR
CONFIDENTIAL. All rights reserved. Passing on or
copying of this document, use and communication of its contents are not permitted without prior written
authorization from Nexans Germany
Communication Note / RDS-PP:
CN 0110
WMR01V20AAF EDA101
RReevviissiioonn DDeessccrriippttiioonn SShheeeett
Rev. Para. Revision Description
AB1
First release, Issued for As-Built, Final Documentation