target value design - lean construction institute
Post on 09-Feb-2022
5 Views
Preview:
TRANSCRIPT
Please comply with the Lean Construction Institute’s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf
when using this file. Thank you.
Riley Hospital for Children, Simon Family Tower Phase 5
Simon Family Tower 10 Stories 675,000 square feet Total Project $475,000,000 Project Began in the Summer of 2006 Stopped Construction in 2009
Riley Hospital for Children, Simon Family Tower Phase 5
Construction resumed in 2010 Scope Changed for the Existing Team Research Group formed with IU Health Messer Construction Co BSA LifeStructures Baker & Daniels New IPD team selected in September 2010.
Riley Hospital for Children, Simon Family Tower Phase 5
November 2010 IPD team had their kick off meeting January 2011 Medical/ Surgical Floors opened on floors 7, 8, and 9.
Riley Hospital for Children, Simon Family Tower Phase 5
Project Divided into 3 Sequences of Work : Must be Complete by December 2013
Sequence 1 + Infrastructure
Sequence 2 + Misc Support
Sequence 3
Management Structure
Executive Team
Hospital Operations
Building Interiors
Building Systems
Building Exteriors
Building Structure
Project Management Team Leads
Project Management
Team
Why Target Value Design?
Commitment from Project Team to Design and Build according to scope and budget. Committed Target Cost for Design and Construction Basis of Financial Management and Value Decisions Lowest Product Cost and Highest Customer Value
Quality in a product or service is not what the supplier puts in. It is what the customer puts out and is willing to pay for. A product is not quality because it is hard to make and costs a lot of money, as manufacturers typically believe. This is incompetence. Customers pay only for what is of use to them and gives them value. Nothing else constitutes quality. -Peter Drucker.
Where do you lose the VALUE in a project?
The Design/ Estimate/ Redesign and VE Cycle is full of waste for all players. Communication break downs and hand offs in a project are also a contributor to waste on a project. Not having a strong Value Statement and Operational Plan in a Healthcare setting opens opportunities for bad, or non value adding decisions during design and mind changing during the project.
Value gained in IPD
• IPD contract – one contract, one insurance carrier, one profit pool. We thrive or die together.
• Integrated design with owner and constructor involvement
• The studio – chemistry and communication
• Over the shoulder reviews vs. traditional submittal processes
• Budget development – everyone owns and is expected to have a voice.
• Schedule development – everyone participates
• 3-D coordination and clash detection • Prefabrication
Value lost in Behaviors
When traditional barriers (silos) go away, opportunities for value creation arise. The point is, TVD requires investment of time, $ and an acceptance of change mentality to overcome the inefficient processes that have become usual and customary in our business. Change and innovation are very scary to our business – for some reason.
Integrated Project Team’s Contract
Multi Party Agreement Developed by research group IU Health Messer Baker Daniels BSA LifeStructures Had first meeting to review on October 7, 2010 Contract Signed June 24 , 2011
Integrated Project Team’s Contract
All signatories agreed to share profit in a profit pool. Defining Profit, Direct Cost, and Overhead was the difficult task.
Target Value Terms in Contract
Cost of Work Direct and Indirect Costs of IPD Team
Fee Profit of the IPD
Team
VA
LID
ATE
D E
XP
ECTE
D
CO
ST
ALLOWABLE COST
BU
DG
ET
Reimbursable Costs
Direct and Indirect Costs of IPD Team
Project Reserve Contingent
Monetary Risks
Fee Profit of the IPD
Team TA
RG
ET C
OST
IU Health Capital Budget for SFT
TARGET COST
TVD GOAL
IU CONTRACT TERMS: WHAT YOU MAY HAVE SEEN:
Conditions of Satisfaction
Developed by the Team A Portion of our Fee is at Risk depending on scores. Both Construction, Design, and Operational Goals will be evaluated- Long and Short term. This is a VALUE Proposition for the team.
Target Value Design Implementation
All Team Members read the Target Value Design Manual. After 10 Minutes of Study we all worked perfect and harmoniously together . We were able to save $98M on our $100M budget and finished the project 2 years early. We interrupted our tropical vacation to be here with you today.
Target Value Design Constraints
Contract Signed June 24, Final Budget Approved July 29
Integrated Contract took 8 months to Negotiate The Final Budget, COS, Portion of Fee at Risk was tied into the Contract Terms We had to base our plan on our assumptions.
Target Value Design Constraints
What is in the Target Cost? Project Reserve-Owner Costs Reimbursable Cost for the Team:
LABOR/ OVERHEAD COST OF TEAM
EXPENSES TO DO WORK
PAYMENTS TO TRADES
ALL OWNER EQUIPMENT
MATERIALS AND EQUIPMENT FOR CONSTRUCTION
How we Accomplished Target Value Design Despite Constraints
Entire Team Worked on the Original IU Health Project Budget All signatories are working on the same BIM connected to a remote server at Riley Hospital for Children. We spend 50% of our time working together in a Big Room environment.
We have huddle meetings at the beginning of every day.
How we Accomplished Target Value Design Despite Constraints
A3’S from every user meeting captured all information that was shared. This served as a meeting report, user review, basis of the program, start of equipment list, and was a valuable tool in cost estimation.
How we Accomplished Target Value Design Despite Constraints
Messer- Harmon Developed Detailed Budgets with IPD Team. Trades that issued on Earlier portions of work met weekly to discuss budget. Had very high tech CONVERSATIONS about where we thought the money is and where we thought it should go. Had honest conversations with user groups on where we were with budget.
How we Accomplished Target Value Design Despite Constraints
Design Members of the Team are included in interviews with non signatory trade selection. Design Members of the Team reviewed the early bids of the non signatory trades for mistakes, misunderstandings and explored opportunities. Trades part of the IPD contract were able to discuss opportunities directly with the PM team before they were implemented to save cost, or adjust costs where they were needed.
What is going well
Team Chemistry We finally put the guns away. Collaboration People are stepping out of their silos and shooting without cover. User Buy In The staff participating in the design effort is owning it.
What did not go so well
New Idea for many team members Team members know they are supposed to do something different but don’t know what to do. It is easier to do what you have been doing for the last 5, 10, 15, 30 …years without having to rethink EVERYTHING. How are drawings/ information issued when I still think any minute I am going to get sued? Always ask yourself, who is your audience for any drawing issue or information exchange and what is the value in it.
Opportunities
The hospital has done extensive Operational Improvement work and has determined their Ideal State for Operations. The design was based on that, and they will continue to model their operations and transitional plan on those studies. We have been able to validate the existing design and eliminate possible change orders through scenario testing.
Opportunities
How we Communicate on the project- Owner, IPD Team Member- Patient How we are Evaluated- COS, Value Path Score Card How we are Compensated- Shared Profit Our Motivation:
Opportunities
Because we are doing this over 3 times, we can evaluate what worked and didn’t work and improve every process. Industry Needs to Evolve More Success More Fun
Where we Stand on Sequence 1
Construction underway on the Infrastructure. Construction will start on the Patient Floors in September. Sequence 1 has a $45 Million Target Cost, nearly 2 million dollars in savings, we are hoping to not touch the Project Reserve. All money under Target Cost 50% to owner for added value, 50% to the IPD Team.
Questions?
Thanks for letting us tell our story. It is just a beginning…stay tuned for more… Graphics blatantly stolen from Messer’s Integrated Project Delivery Implementation Guide- Sue Me.
top related