scisat test readiness review ground support equipment status university of toronto 29 january 2003

Post on 20-Jan-2016

220 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Scisat Test Readiness Review

Ground Support Equipment Status

University of Toronto29 January 2003

GSE Components

• TVAC system (includes LN2 shroud and LHe target)

• Collimator system (includes 3 sources to simulate sunlight to test Scisat in TVAC)

• Laser Assembly

• QI - Spectralon Assembly

• Solar Simulator

• EGSE

TVAC system

TVAC system status• Good pumpdown performance during MAESTRO baseline

tests• Temperature and Pressure monitoring systems work fine• LN2 shroud tested successfully • He target tested successfully• Baseplate handling system tested successfully• New thermal bath to be implemented ?• Gate valve is currntly under repair

• BaF2 and ZnSe windows have never been tested with the tank

Collimator System

(Not shown: Attenuator Wheel , 3000K blackbody, QI lamp)

Collimator System Alignment Mechanism

Collimator System Status • Alignment system complete, works fine• Xe & QI configurations tested with MAESTRO during

baseline tests (Oct 2002)• NO2 handling process in place and tested• Succesful gas absorption measurements taken during

baseline tests. • Ozone cell remains untested with collimator system• Cell temperature and pressure monitoring to be

implemented• FTS gas cell not tested • 3000K black body not tested• Nitrogen purge tent not finished • Hybrid attenuators for FTS testing not built yet• Polarizers not tested with MAESTRO

Integrated Laser Platform

3 0 0 0 KB lack b o d y

C o llim a to rm irro r

X elam p

A l m irro r

G e b eam sp litte r

G o ld m irro r

fie ld s to p

O z o n e c e ll

F T S

M A E S T R O

S cisa t-1b ase p la te

g ra ting

He C d la se r

re m o va b le m irro r

Integrated laser platform status

• 4 beam expanded lasers (325nm, 532nm, 670nm and 830nm) are combined using a holographic grating

• Laser platform has been assembled & partially tested during MAESTRO baseline tests

• Laser assembly needs to be re-aligned and tested with MAESTRO

QI - Spectralon calibration jig

• This unit has been used many times by MSC for absolute radiance calibration

• A new current control algorithm is part of the EGSE & has been used successfully

Solar simulator

• Was used for MOPITT characterization, the plan is to use it for FTS imager field tests

• All parts seem to be present, but it hasn't been used in several years

EGSE Network

M AESTRO

C & t se ria l [1 ]

BM se ria l [2 ]

Sc ie nc e h ig h sp e e d

2-a xis m irro rTra nsla tio nsta g e c o ntro l

Se ria l O G SE

TITLE: PC NAM E: Ap rilUSER: DDUDP PO RT: 4001LO C ATIO N: IC FFUNC TIO N: Se nd s c om m a nd s to o the r PC ’s,run exp erim ent sc rip ts

M ASTER

TITLE: TVAC Inte rfa c ePC NAM E: O g reUSER:EMUDP PO RT: 4003LO C ATIO N: IC FFUNC TIO N:M o nito r tem p era ture & p re ssure on ta nk,re la y info rm a tion to M a ste r up o n req uest

TITLE: M AESTRO c ontro lle rPC NAM E:Tsuna m iUSER:DDUDP PO RT: 4004LO C ATIO N: c lea n roomFUNC TIO N:rec e ive c om m a nd s fro m M a ste r, c om m unic a tewith M a estro, log M a e stro d a ta , send M a estro Sc ienc e &Te lem e try to M a e stro Sc ie nc e Disp la y & Winshow

TITLE: Sc ienc e Disp la yPC NAM E: M a yUSER:C NUDP PO RT: 4005LO C ATIO N: IC FFUNC TIO N: Disp la y & sto re sc ienc e d a ta & te lem e try re c e ived fro mM a estro c o ntro lle r, log a ll d a ta

TITLE: Winsho wPC NAM E: winshowUSER:M SC use rUDP PO RT: 4006LO C ATIO N: IC FFUNC TIO N:rec e ives sc ienc e d a ta a nd d isp la ysusing Winsho w

TITLE: PC NAM E: Fe taUSER:VHUDP PO RT:4002LO C ATIO N:c le a n roo mFUNC TIO N:rec e ives c om m a nd s fro m M a ste r to c o ntro l O G SE, send s to m a ste r O G SE c o nfig ura tion

O G SE C ontro lle r

TITLE: FTS G SEPC NAM E: FTSG SEUSER:Bo m em use rUDP PO RT:4007LO C ATIO N:c le a n roo mFUNC TIO N:link to FTS G SE

SRSR

M UXV M

The rm o c o up leThe rm o c o up leThe rm isto rs (60)

Se ria l

Q I so urc ep o we r sup p ly

se ria l

se ria l

Ta nk syste m sg p ibg p ib

TITLE: Pe ta b itPC NAM E: Pe ta b itUSER:UDP PO RT:N/ALO C ATIO N:7th floo rFUNC TIO N:lArc hive FTS Sc ie nc e d a ta whe nc o m m a nd ed b y M ASTER

EGSE Status

• EGSE was successfully used for MAESTRO baseline testing (MAESTRO controller , OGSE controller and TVAC Interface PC's)

• PC Anywhere has been installed on all PC's

• Some scripts need to be revised

• UDP interface with FTS EGSE has not yet been tested

• Sending scripts to MAESTRO and FTS simultaneously has not been tested

top related