Page 1: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Scisat Test Readiness Review

Ground Support Equipment Status

University of Toronto29 January 2003

Page 2: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

GSE Components

• TVAC system (includes LN2 shroud and LHe target)

• Collimator system (includes 3 sources to simulate sunlight to test Scisat in TVAC)

• Laser Assembly

• QI - Spectralon Assembly

• Solar Simulator

• EGSE

Page 3: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

TVAC system

Page 4: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

TVAC system status• Good pumpdown performance during MAESTRO baseline

tests• Temperature and Pressure monitoring systems work fine• LN2 shroud tested successfully • He target tested successfully• Baseplate handling system tested successfully• New thermal bath to be implemented ?• Gate valve is currntly under repair

• BaF2 and ZnSe windows have never been tested with the tank

Page 5: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Collimator System

(Not shown: Attenuator Wheel , 3000K blackbody, QI lamp)

Page 6: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Collimator System Alignment Mechanism

Page 7: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Collimator System Status • Alignment system complete, works fine• Xe & QI configurations tested with MAESTRO during

baseline tests (Oct 2002)• NO2 handling process in place and tested• Succesful gas absorption measurements taken during

baseline tests. • Ozone cell remains untested with collimator system• Cell temperature and pressure monitoring to be

implemented• FTS gas cell not tested • 3000K black body not tested• Nitrogen purge tent not finished • Hybrid attenuators for FTS testing not built yet• Polarizers not tested with MAESTRO

Page 8: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Integrated Laser Platform

3 0 0 0 KB lack b o d y

C o llim a to rm irro r

X elam p

A l m irro r

G e b eam sp litte r

G o ld m irro r

fie ld s to p

O z o n e c e ll

F T S

M A E S T R O

S cisa t-1b ase p la te

g ra ting

He C d la se r

re m o va b le m irro r

Page 9: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Integrated laser platform status

• 4 beam expanded lasers (325nm, 532nm, 670nm and 830nm) are combined using a holographic grating

• Laser platform has been assembled & partially tested during MAESTRO baseline tests

• Laser assembly needs to be re-aligned and tested with MAESTRO

Page 10: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

QI - Spectralon calibration jig

• This unit has been used many times by MSC for absolute radiance calibration

• A new current control algorithm is part of the EGSE & has been used successfully

Page 11: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

Solar simulator

• Was used for MOPITT characterization, the plan is to use it for FTS imager field tests

• All parts seem to be present, but it hasn't been used in several years

Page 12: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

EGSE Network

M AESTRO

C & t se ria l [1 ]

BM se ria l [2 ]

Sc ie nc e h ig h sp e e d

2-a xis m irro rTra nsla tio nsta g e c o ntro l

Se ria l O G SE

TITLE: PC NAM E: Ap rilUSER: DDUDP PO RT: 4001LO C ATIO N: IC FFUNC TIO N: Se nd s c om m a nd s to o the r PC ’s,run exp erim ent sc rip ts

M ASTER

TITLE: TVAC Inte rfa c ePC NAM E: O g reUSER:EMUDP PO RT: 4003LO C ATIO N: IC FFUNC TIO N:M o nito r tem p era ture & p re ssure on ta nk,re la y info rm a tion to M a ste r up o n req uest

TITLE: M AESTRO c ontro lle rPC NAM E:Tsuna m iUSER:DDUDP PO RT: 4004LO C ATIO N: c lea n roomFUNC TIO N:rec e ive c om m a nd s fro m M a ste r, c om m unic a tewith M a estro, log M a e stro d a ta , send M a estro Sc ienc e &Te lem e try to M a e stro Sc ie nc e Disp la y & Winshow

TITLE: Sc ienc e Disp la yPC NAM E: M a yUSER:C NUDP PO RT: 4005LO C ATIO N: IC FFUNC TIO N: Disp la y & sto re sc ienc e d a ta & te lem e try re c e ived fro mM a estro c o ntro lle r, log a ll d a ta

TITLE: Winsho wPC NAM E: winshowUSER:M SC use rUDP PO RT: 4006LO C ATIO N: IC FFUNC TIO N:rec e ives sc ienc e d a ta a nd d isp la ysusing Winsho w

TITLE: PC NAM E: Fe taUSER:VHUDP PO RT:4002LO C ATIO N:c le a n roo mFUNC TIO N:rec e ives c om m a nd s fro m M a ste r to c o ntro l O G SE, send s to m a ste r O G SE c o nfig ura tion

O G SE C ontro lle r

TITLE: FTS G SEPC NAM E: FTSG SEUSER:Bo m em use rUDP PO RT:4007LO C ATIO N:c le a n roo mFUNC TIO N:link to FTS G SE

SRSR

M UXV M

The rm o c o up leThe rm o c o up leThe rm isto rs (60)

Se ria l

Q I so urc ep o we r sup p ly

se ria l

se ria l

Ta nk syste m sg p ibg p ib

TITLE: Pe ta b itPC NAM E: Pe ta b itUSER:UDP PO RT:N/ALO C ATIO N:7th floo rFUNC TIO N:lArc hive FTS Sc ie nc e d a ta whe nc o m m a nd ed b y M ASTER

Page 13: Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003

EGSE Status

• EGSE was successfully used for MAESTRO baseline testing (MAESTRO controller , OGSE controller and TVAC Interface PC's)

• PC Anywhere has been installed on all PC's

• Some scripts need to be revised

• UDP interface with FTS EGSE has not yet been tested

• Sending scripts to MAESTRO and FTS simultaneously has not been tested