Henrico County Public Schools | School BoardFebruary 28, 2019

Schematic Design PresentationBrookland Area Elementary School

Agenda

• The Project Mission• The Process• Site Plans• Floor Plans• Phasing• Next Steps

Agenda

The Project Mission

Construct a 1 or 2-story new school adjacent to Holladay ES

Explore opportunities to share space between both schools

Maximize building flexibility with new spaces

The ProcessCommunity Input June 7, 2018 Community Input Meeting at Johnson ES June 7, 2018 Community Input Meeting at Holladay ES June 14, 2018 Community Input Meeting at Holladay ES June 14, 2018 Community Input Meeting at Johnson ES August 6, 2018 Community Input Meeting at Libbie Mill Library

Pre-Design May 10, 2018 1st School Board Update August 8, 2018 2nd School Board Update

Design Award September 13, 2018 Award of A/E Contract to Moseley Architects

Process

Design Process with A/E Team

• November 2, 2018: Initial Project & Programming Meeting

• November 28, 2018: Design Workshop #1• December 6, 2018: Design Workshop #2• December 13, 2018: Design Workshop #3• January 10, 2019: Design Workshop #4

• January 3, 2019: Follow-Up Programming Meeting• January 25, 2019: Phasing Meeting

Process

Project Steering Committee

• Kim Olsen – Principal, Holladay Elementary School

• Dr. Beth Teigen – Deputy Superintendent

• Dr. Rich Hall – Director of Elementary Education

• Al Ciarochi – Assistant Superintendent for Operations

• Susan Moore – Director of C&M

• Dr. Nicole Olivencia – Capital Projects Manager

Process Highlights

• Shannon Hyman• Robin Robins• Peggy Gordon• Elizabeth Kirk• Val Gooss• Pamela Bell• Christine Bailor• Rich Hall• Andrea Ross• Kim Olsen

• Gwen Miller• Charles Davis• Kevin Roye• Don Large• Susan Moore• Nicole Olivencia• Rachel Haislip• Lauri DiMatteo• Paige Pumphrey• Jennifer Barak

Process Highlights

Brookland Area Elementary School Design Committee

Process: Design Workshop #1

Process: Design Workshop #1

Process: Design Workshop #1

Process: Design Workshop #1

“The mission of HCPS in constructing the new Brookland Area Elementary School is to build a bright and

beautifully designed building where students are the center. This will be a state of the art facility with flexible,

open spaces designed for student collaboration. This school will allow students to innovate through STEAM

and acquire 21st century skills, all while feeling safe and a part of a larger community. In the end, the result of

this project will provide a school that is a complement of Holladay Elementary where students become life-long

learners.”

Process: Design Workshop #1

Site• One bus loop • One school entrance from bus loop or entrance to each school• Service off bus loop• May not need to connect bus loop to Galaxie Road

Building• One reception/waiting area with shared space• Pod approach preferred• Library and gym• Learning stair to be included

Consensus

Process: Site Plans

Process: Floor Plans

Process: Site Plans

5.1

8.1

Process: Floor Plans

5.1

8.1

Proposed Site Plan

Site Plan

Proposed Floor Plans

Ground Floor

Upper Floor

Proposed Phasing

Phasing

Phase 1

• Complete new dining room, kitchen and mechanical room

• Begin 2-story classroom portion of expansion

Phasing

Phase 2

• Demolition of existing kitchen

• Begin renovation of existing dining room and platform

• Electrical service transition during summer of 2020

• Continue 2-story classroom portion of expansion

Phasing

Phase 3

• Holladay students use new dining room

• Completion of 2-story classroom portion of expansion

• Completion of balance of expansion

Next Steps

Next Steps

• March – April 2019: Design Development

• April 2019: POD Submittal

• June – August 2019: Bid Documents

• September – October 2019: Bid and Award

• November 2019 – June 2021: Construction

• September 2021: School Opening

Henrico County Public Schools | School BoardFebruary 28, 2019

Schematic Design PresentationBrookland Area Elementary School