kannada.bmrc.co.inkannada.bmrc.co.in/english/pdf/rti/01) rti-recd-dispd... · web viewhyma vijayan...
Post on 12-Mar-2018
223 Views
Preview:
TRANSCRIPT
JANAURY 2014RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
Sl.NoName of the
Applicant/Brief Subject
Application Dated
Inward Regn.No. Received on
Information sought/Filed
Opened
Information Recd. on
Reply sent to Applicant on/Filed Closed
No of Note
Sheets
No. of Corspdt. Sheets
1 DR. GEORGE D.A 01.01.2014 6 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 12/08.01.2014 1 4
2 DR. GEORGE D.A 01.01.2014 7 01.01.2014 CE (Ph-2) / 02.01.2013 08.01.2014 21/09.01.2014 2 5
3 DR. GEORGE D.A 01.01.2014 8 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 14/08.01.2014 1 4
4 DR. GEORGE D.A 01.01.2014 9 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 17/08.01.2014 1 4
5 DR. GEORGE D.A 01.01.2014 10 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 11/08.01.2014 1 4
6 DR. GEORGE D.A 01.01.2014 11 01.01.2014 CE (Ph-2) / 02.01.2013 08.01.2014 19/09.01.2014 2 4
7 DR. GEORGE D.A 01.01.2014 12 01.01.2014 CE (Ph-2) / 02.01.2013 08.01.2014 20/09.01.2014 2 4
8 DR. GEORGE D.A 01.01.2014 13 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 10/08.01.2014 1 5
9 DR. GEORGE D.A 01.01.2014 14 01.01.2014 CE (Ph-2) / 02.01.2013 25-1-2014 27-1-2014 1 4
10 DR. GEORGE D.A 01.01.2014 15 01.01.2014 CE (Ph-2) / 02.01.2013 07.01.2014 13/08.01.2014 1 4
11 SANGHAMITRA BISWAS 02.01.2014 16 02.01.2014 GM(LA&E) 04.01.2014 06/04.01.2014 2 5
12 MALINI SRIRAMA 30.12.2013 17 02.01.2014 GM(LA&E) 03.01.2014 02/04.01.2014 1 6
13
T.K. VENKATTESH NAIDU - CONNECTED TO PREVIOUS RTI APPLICATION NO.204 DTD 16.12.2013
29.12.2013 18 03.01.2014 Information sent in
RTI No.204 dt.16.12.13
14 PARVEEN KUMAR MEHTA 30.12.2013 19 03.01.2014 Documents
enclosed 05/04.01.2014
15 R. PREM KUMAR 03.01.2014 20 03.01.2014 GM(LA&E) 04.01.2014 08.01.2014 25/09.01.2014 2 5
16 AKASH KUMAR 3/-1-2014 21 ######### DGM(HR) 24-1-2014 24-1-2014 1 21
17 DR. GEORGE D.A 04.01.2014 22 04.01.2014 CE (Ph-2) / 06.01.2014
GM(LA&E) 07.01.2014 08/07.01.2014 2 4
18DR. GEORGE D.AGeotechnical report
04.01.2014 23 04.01.2014 CE (Ph-2) / 06.01.2014 07.01.2014 15/08.01.2014 2 4
19 Vijay.N 06.01.2014 24 06.01.2014 GM(LA&E) 06.01.2014 07.01.2014 07/07.01.2014 1 6
20 Vijay.N 06.01.2014 25 06.01.2014 GM(LA&E) 06.01.2014 08.01.2014 24/19.01.2014 1 10
21 Syed Fayaz @ Babu 06.01.2014 26 06.01.2014 Transmitted to KIADB Under 6(3) 09/07.01.2014 1 5
22 H. Nagaraj 04.01.2014 27 06.01.2014 GM(LA&E) 06.01.2014 07.01.2014 16/08.01.2014 1 6
23 Naresh Chandra Pokhriyal 06.01.2014 28 07.01.2014 CE(R-1) 9-1-2014 ######## 02-03-2014 1 9
24 S. Khaleelur Rahman 07.01.2014 29 07.01.2014 GM(LA&E)
08.01.2014 10.01.2014 28/10.01.2014 1 4
25 P.V. Siddalingaiah 07.01.2014 30 07.01.2014 GM(LA&E) 9-1-2014 27-1-2014
28-1-2014 1 20
26 B.C. Sujatha 07.01.2014 31 07.01.2014 GM(LA&E) 9-1-2014 27-1-2014
29-1-2014 1 22
27 S.M. Kuttappa 07.01.2014 32 07.01.2014 GM(LA&E) 09.01.2014 15.01.2014 32/16.01.2014 2 8
28 S.M. Kuttappa 07.01.2014 33 07.01.2014 GM(LA&E) 09.01.2014 15.01.2014 32/16.01.2014 1 9
29 Ramachandra 06.01.2014 34 07.01.2014 GM(LA&E) 09.01.2014 10.01.2014 29/10.01.2014 1 4
30 Manjula 08.01.2014 35 08.01.2014 GM(LA&E) 09.01.2014 10.01.2014 26/10.01.2014 1 8
31 Y.S. Prakasham 07.01.2014 36 08.01.2014 GM(LA&E) 09.01.2014 09.01.2014 27/10.01.2014 1 5
32 Yogista Raju 08.01.2014 37 08.01.2014 GM(LA&E) 09.01.2014 15.01.2014 34/16.01.2014 1 4
33 Yogista Raju 08.01.2014 38 08.01.2014 GM(LA&E) 09.01.2014 15.01.2014 33/16.01.2014 2 4
34 Venkattesh Naidu. T.K 08.01.2014 39 08.01.2014 GM(LA&E)
09.01.2014 15.01.2014 36/17.01.2014 2 58
35 Rachana 07.01.2014 40 09.01.2014 GMLA&E 15.1.2014 18.1.2014 2 5
36 Kusuma 7/9-1-2014 41 29-1-2014 GM (HR) 10-1-2014 29-1-2014 02-03-2014 2 22
37 Rachana 03.01.2014 42 09.01.2014 GMLA&E 15.1.2014 18.1.2014 2 2
38 S. Kumar 04.01.2014 43 09.01.2014 CE.Ph.2 16.1.14 20.1.2014 2 2
39 M.Manjappa 08.01.2014 44 09.01.2014 GM(LA&E) 10.01.2014 22.01.2014 By hand 22.01.2014 2 38
40 Muninarayana 09.01.2014 45 09.01.2014 GM(LA&E) 10.01.2014 15.01.2014 35/16.01.2014 2 7
41 Akash Kumar R 04.01.2014 46 09.01.2014 This application does not pertain to RTI and it is mere representation Just filed
42 C.V. Dhruvakumar 04.01.2014 47 09.01.2014 GM(LA&E) 10.01.2014 13.01.2014 37/17.01.2014 2 10
43 Naveen . T. V 10.01.2014 48 10.01.2014 GM(LA&E) 11.01.2014 11.01.2014 31/13.01.2014 1 4
44 K. Bhavani Pradeep 13-1-2014 49 13-1-2014 DCE(Tel) 13-1-2014 31-1-2014 02-01-2014 3 6
45 A. Vinayak 13.01.2014 50 13.01.2014 DGM(HR) 13.01.2014 18.01.2014 38/18.01.2014 1 4
46 A. Vinayak 13.01.2014 51 13.01.2014 DGM(HR) 13.01.2014 18.01.2014 39/18.01.2014 1 4
47 R. Prem Kumar 13.01.2014 52 13.01.2014 GM(LA&E) 13.01.2014 13.01.2014 Given by hand
15.01.2014 1 7
48 G. Vishwanath Rao 16.01.2014 53 16.01.2014 GM(LA&E) 17.01.2014 18.01.2014 Given by hand
18.01.2014 2 5
49 Vijay.N 16.01.2014 54 16.01.2014 GM(LA&E) 17.01.2014 15.02.2014 72/17.02.2014 5 12
50 Naveen.T.V 17.01.2014 55 17.01.2014 GM(LA&E) 18.01.2014 22.01.2014 41/22.01.2014 2 5
51 K. Nagaraj 17.01.2014 56 17.01.2014 GM(LA&E) 18.01.2014 18.01.2014 Given by hand
18.01.2014 1 7
52 A. Ramlingam 17-1-2014 57 18-1-2014 DGM-(HR) 18-1- 2014 20-1-2014 21-1-2014 1 5
53 Rachana 17-1-2014 58 20-1-2014 DGM(HR) 21.01.2014 ######## 02-03-2014 1 5
54 Rachana 18-1-2014 59 20-1-2014 DGM(HR) 21-2-2014 30-1-2014 30-1-2014 1 6
55 Jayakumar BM 21/22-1-2014 60 22-1-2014 GM(LA&E) 22-1-2014 ######## 02-05-2014 2 10
56 C Gopal 22-1-2014 61 22-1-2014 GM)HR) 22-1-2014 22-2-2014 22-1-2014 1 5
57 Rajesh Chandra Mouli Nil 62
58 W.P. No. 33768 63
59 CV Dhruvakumar 23.1.2014 64 23.1.2014 GM(LA&E) 24.1.2014 31.1.2014 31-1-2014 1 9
60 CV Dhruvakumar 23.1.2014 65 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 5
61 CV Dhruvakumar 23.1.2014 66 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 9
62 CV Dhruvakumar 23.1.2014 67 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 81
63 CV Dhruvakumar 23.1.2014 68 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 13
64 CV Dhruvakumar 23.1.2014 69 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
65 CV Dhruvakumar 23.1.2014 70 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
66 CV Dhruvakumar 23.1.2014 71 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
67 CV Dhruvakumar 23.1.2014 72 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
68 CV Dhruvakumar 23.1.2014 73 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
69 CV Dhruvakumar 23.1.2014 74 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
70 CV Dhruvakumar 23.1.2014 75 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
71 CV Dhruvakumar 23.1.2014 76 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
72 CV Dhruvakumar 23.1.2014 77 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
73 CV Dhruvakumar 23.1.2014 78 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
74 CV Dhruvakumar 23.1.2014 79 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
75 CV Dhruvakumar 23.1.2014 80 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
76 CV Dhruvakumar 23.1.2014 81 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
77 CV Dhruvakumar 23.1.2014 82 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 6
78 CV Dhruvakumar 23.1.2014 83 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
79 CV Dhruvakumar 23.1.2014 84 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 7
80 CV Dhruvakumar 23.1.2014 85 23.1.2014 GM(LA&E) 24.1.2014 31-1-2014 31-1-2014 1 17
81 Samar Abbas 13.01.2014 86 24.01.2014 CEE (Traction) 25.01.2014 01.02.2014 01.02.2014 1 8
82 Doddabhadre Gowda 30-1-2014 87 ######### GM(LA&E) 11.02.2014 13-2-2014 1 21
83 PV Siddaloingaiah 30-1-2014 88 24-1-2014 GM(LA&E) 07.02.2014 08.02.2014 1 16
84 B.C.Sujatha 30-1-2014 89 24-1-2014 GM(LA&E) 07.02.2014 08.02.2014 1 18
85 P.V. Siddalingaiah 30.01.2014 90 30.01.2014 GM(LA&E) 07.02.2014 08.02.2014 1 17
86 B.C.Sujatha 30/1/2014 91 30-1-2014 GM(LA&E) 31.01.2014 11.02.2014 13.02.2014 1 15
87 Rachana 26.01.2014 92 30.01.2014 DGM(HR) 19.02.2014 19.02.2014 1 5
88 K.N.Nagaraja 31-1-2014 93 ######### GM(O) -3-2-2014 05.01.2014 02.02.2014 2 4
89 K.N.Nagaraja 31-1-2014 94 ######### GM(O) & GM(F) 12.02.2014 13-2-2014 2 4
ABSTRACT- JAN 2014
Receipts 89Replied/Disposed 89Balance Nil
FEBRUARY-2014RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
Sl. No. Name of the Applicant Application
Dated
Inward Regn. No.
Received on Information sought on
Information Recd. on
Reply sent to Applicant on
No of Note
sheets
No. of Corspd sheets
Remarks
1 K.N.Nagaraja 31-1-2014 93 02-01-2014 GM(O) -3-2-2014 05.01.2014 02.02.2014 2 4
2 K.N.Nagaraja 31-1-2014 94 02-01-2014 GM(O) & GM(F) 12.02.2014 13-2-2014 2 4
3 S.Nagaraj, Adv. 02-02-2014 95 02-02-2014 GM LA&E)-10-2-14 17-2-14 17-2-14 2 4
4 Rachana Old-162/13-11-13 8//2//2014 96 02-02-2014 GM (HR) 13-02-2014 16/12/2013 2 27
5 S. Kumar 161/13/11/2013 02-02-2014 97 GM(HR)
15/11/13 20/2/2014 21/2/2014 2 25
6 Akashkumar.R 3/4-1-1498
(Original No.21)
3/4/-1-14 DGM-HR-4-1-14 24-1-14 2 26
7 Kuttappa 02-02-2014 99 02-02-2014 GM(LA&E) 12-2-14 14-2-14 17-2-14 2 11
8 Kuttappa 02-02-2014 100 02-02-2014 GM(LA&E) 12-2-14 14-2-14 17-2-14 2 9
9 M.K.Sathyamurthy 13-02-2014 101 DCE(PPC) 13-2-14 14-2-14 22-2-14 2 9 RTI-115 clubbed
10 CH Sreenivasa Murthy 02-02-2014 102 CE (R4) 13-2-14 14-2-14 14-2-14 2 3
11 Pramila Nesargi 13-2-2014 103 13-2-2014 GM HR- 14-2-14 03-06-2014 02-07-2014 1 14
12 PP Ravidnra kuamr 12-2-1014 104 14-2-2014 CE (Design) 03-11-2014 03-12-2014 2 4
13 Shradha Srinath, Adv. 13-2-14 105 15-2-14 GM(LA&E) 15-2-14 17-2-14 18-2-14 2 4
14 KN Sai Venkatesh 18-2-14 106 18-2-14 GM(LA&E) 19-2-14 19-2-14 20-2-14 2 12
15 Keshav Shekhar. H.E 19-2-2014 107 19.02.2014 GM(LA&E) 20.02.2014 01-03-2014 07-03-2014 2 14
16 Ramesh. P. Patil 19-02-2014 108 19.02.2014 GM (LA&E) 05-03-2014 06-03-2014 2 4 17 Amruth. P. Patil 109 19.02.2014 GM (LA&E) 05-03-2014 06-03-2014 2 4
18 M.C. Vasudha 12-22014 110 21.02.2014 GM(HR) 21.02.2014 06-03-2014 07-03-2014 1 5
19 Malini Sriram 17-2-2014 111 20.2.2014 GM(LA&E) 21-2-2014 03-01-2014 13/3/2014 1 6 Recd.PO & Reply
sent on 13-3-14
20 Geetha Devaraj 18-02-2014 112 21-02-2014 22-02-2014 - -PO not enclosed returned original
appln.21 Lavanya Lava Kumar 18-2-2014 113 21-2-2014 GM(LA&E) 2 3
22 Manjesh. L 01-02-2014 114 21-2-2014 GM-LA&E 22-2-14 03-03-2014 3 8
24 MK Sathyamurthy 115 Linked to RTI-101
25 M.K. Lokesh 116 24.02.2014 CE(Phase-II) 25.02.2014 14/3/2014 17/3/2014 1 1 Final reply sent
26 Leela Ramachandran 27/2/2014 117 27/2/2014 GM (LA&E) 27/2/14 15/3/2014 17/3/2014 1 2 Req.to pay amt.
27 Leela Ramachandran 27/2/2014 118 27/2/2014 GM (LA&E) 27/2/14 15/3/2014 17/3/2014 1 2 Req.to pay amt.
29 Leela Ramachandran 27/2/2014 119 27/2/2014 GM (LA&E) 27/2/14 13/3/2014 17/3/2014 1 2
30 Leela Ramachandran 27/2/2014 120 27/2/2014 GM (LA&E) 27/2/14 2 3
31 C.D. Medappa 27/2/2014 121 27/2/2014 GM (LA&E) 27/2/14 15/3/2014 17/3/2014 Req.to pay amt.
32 C.D. Medappa 27/2/2014 122 27/2/2014 GM (LA&E) 27/2/14 03-12-2014 03-12-2014 2 3
33 C.D. Medappa 27/2/2014 123 27/2/2014 GM (LA&E) 27/2/14 13/3/2014 17/3/2014 2 11
34 C.D. Medappa 27/2/2014 124 27/2/2014 GM (LA&E) 27/2/14 15/3/2014 17/3/2014 2 11 Req.to pay amt.
35 Leela Ramachandran 27/2/2014 125 27/2/2014 GM (LA&E) 27/2/14 21-3-2014 1 Nil Rreq.tos end fresh
appln.
36 C.D. Medappa 27/2/14 126 27/2/2014 GM LA&E) 27-2-14 21-3-2014 1 Nil Req.tos end fresh
appln.
37 T.Rajappa 17/2/2014 KIC-16 25/2/2014 LAW sec. CE (DG)
26 & 27-2-2014 03-01-2014
Submission Note sent to KIC - hearing
on 25-3-14- 11.00 am sent on 12-3-14
ABSTRACT- FEB 2014
Receipts 37Replied/Disposed 37Balance Nil
MARCH 2014RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
Sl No
Name of the Applicant
Application Dated
Inward
Regn. No.
Received on Information sought on
Information Recd. on
Reply sent to Applicant on
No of Note
Sheets
No. of Corspdt. Sheets Remarks
1 S. KHALEELUR REHAMAN 03-03-2014 127 03-03-2014 GM (LA&E)
3-3-2014 13/3/2014 17/3/2014 2 3
2 MALINI SRIRAMA 14-02-2014 128 03-03-2014 GM(LA&E) 4-3-2014 15/3/2014 17/3/2014 1 2
3 MALINI SRIRAMA 03-03-2014 129 03-03-2104 GM(LA&E) 4-3-2014 15/3/2014 17/3/2014 1 2
4 GEETHA DEVARAJ 04-03-2014 130 04-03-2014 GM (LA&E) - 5/3/2014 ######### 11-03-2014 2 8
5 DEEPAK DEVARAJ 03-03-2014 131 05-03-2014 GM (LA&E) - 5/3/2014 ######### 11-03-2014 2 6
6 KIRAN KUMAR 05-03-2014 132 03-05-2014 CE (UG) 5-3-2014 05-03-2014 06-03-2014 1 3
7 MOHANR RAJ B. 04-03-2014 133 03-03-2014 GM-LA&E 7-3-2014 ######### 11-03-2014 3 10
8 B.MOHAN RAJ 04-03-2014 134 03-03-2014 GM-LA&E ######### 11-03-2014 2 4
9 RAJKUMAR BHEEMROY 03-03-2014 135 03-07-2014 ------- -------- -------------- -------- -------
Details not clear appln.
Return back
ABSTRACT- MAR 2014
Receipts 9Replied/Disposed 9Balance Nil
APRIL -2014RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
Application Dated
(3)
Inward Regn. No.
(4)
Received on
(5)
Information sought on
(File Opened)
(6)
Information Recd. On
(7)
Reply sent to Applicant
on(Closing File)
(8)
No of Note Sheet
(9)
No. of
Corr spdt. Sheet(10)
Remarks/Status
(11)
1
STANLEYCOPY OF INITIAL ORIGINAL ALIGNMENT DRAWINGPERTAINING TO BMRCL PHASE-II
03-04-2014 150 03-04-2014 3-4-2014CE (R1)
4-42014 05-04-2014 2 5
2
K.V.PADMANABHAEXTENT OF LAND ACQUIRED FOR METROL WORK SHOP, AMT VALUED AWARDED OLD SY.NO.2/2P2
05-04-2014 151 05-04-20145/4/14GM(LA&E) 09-04-2014 11-04-2014 2 4
3
MANJUNATH.H.VBMRCL HAS ENTERED AGREEMENT WITH PRIVATE PARTY FOR PROCUREMENT OF ANY PRODUCTS/SERVICES?
08-04-2014MD Estt.
No.1908-04-2014 GM (HR)
8-4-2014 09-04-2014 09-04-2014 2 4
4GURUDATH KINIREG LAND ACQUISITION IN SY.NO.25/2B DASANAPURA HOBLI, MADAVARA VILLAGE
NIL 152 21-04-2014GM(LA&E) 23/4/14
24-04-2014 25-04-2014 2 4
5NARESH CHANDRA POKHRIYALC/w. FAA No.154 & 158REG TECH.DETAILS OF FASTENING SYSTEM ETC;
19-04-2014 153 22-04-2014 FAA 4/6/14 Dispsoed on 4/6/14
6NARESH CHANDRA POKHRIYALREG TECH.DETAILS OF FASTENING SYSTEM ETC;
19-04-2014 154 22-04-2014 FAA 4/6/14 Dispsoed on 4/6/14
7 G.AVAJIJA REDDY 21-4-14 155 22-4-14 CE-Phase-224-4-14
25/4/14 25/4/2014 2 5
8 DELPHIN ALEXANDERREG ACQUISITION OF PROPERTY ON OLD MADRAS ROAD NEAR GOKULA PETROL BUNK
09-04-2014 156 23-04-2014GM(LA&E) 24/4/14
25-04-2014 2 4
9 NARESH CHANDRA POKHRIYALREG TECH.DETAILS OF FASTENING SYSTEM ETC;
22-04-2014 157 25-04-2014 CS/FAA 25-4-14
Appeal Disposed 4/6/14
10 NARESH CHANDRA POKHRIYALREG TECH.DETAILS OF FASTENING SYSTEM ETC;
22-04-2014 158 25-04-2014 CS/FAA 25-4-14
Appeal disposed on 4/6/14
11SHRI SOMASHEKAR H.G.ALIGNWMNT MAP BETWEEN PEENYA AND BIEC AQUISTION OF LAND IN SY.NO.25/2B MADAVARA VILLAGE.
26-4-2014 159 26-4-2014 GM(LA&E)28-4-2014
2-5-2014 2-5-2014 2 6
ABSTRACT- APR 2014
Receipts 11Replied/Disposed 11Balance Nil
l.No.
(1)
Name of the Applicant/Brief Subject
(2)
Application Dated
(3)
Inward Regn. No.
(4)
Received on
(5)
Information sought on
(6)
Information Recd. On
(7)
Reply sent to Applicant
on
(8)
No of Note Sheet
(9)
No. of Corre spond
ent Sheet
(10)
Remarks/Status
(11)
1SOMANATH NATHREG-DETAILS OF STATIONS/ROUTES/STOP DETAILS ETC;
5-5-2014 160 5-5-2014 GM(O &M)6-5-23014
15/5/14 17/5/14 2 5
2
RAMU.SPRESIDENT, WELFARE PANCHAYATH ASSN, PERIYANAGAR, BANGALOREREG-SHIFTING TANNERY ROAD STATION
29.4.2014 161 12.5.2014 GM(LA&E)14-5-2014
15-5-2014 15-5-2014 2 4
3
K.B.PRADEEP R/O. FLAT D 117 SUMADHURA SNDOVAL, SY.NO.70 THUBARAHALLI BANGALORE-66RECEIVED THRO MOUD N.DELHI DIRECTOR & PIOREG- DRINKING WATER FACILITY ETC; AT METRO STATIONS, BANGALORE
Ltr.No.K-14011.17.29120MRTS/Coord, GOI dt. 29.4.2014
162 12.5.2014 GM(O&M)13/5/2014
16-5-2014 17-5-2014 2 5
4
K.B.PRADEEP R/O. FLAT D 117 SUMADHURA SNDOVAL, SY.NO.70 THUBARAHALLI BANGALORE-66RECEIVED THRO MOUD N.DELHI DIRECTOR & 7 PIOREG- DRINKING WATER FACILITY ETC; AT METRO STATIONS, BANGALORE
Ltr.No.K-14011.17.29120MRTS/Coord, GOI dt. 29.4.2014
163 12.5.2014 GM(O&M)13/5/2014
19/5/14 20/5/14 2 6
File linked to RTYI/307/2014Same person
5
K.RAVI , R/O. E-237 HANUMAN MANDIR LANDE GGP COLONY BHUBANDESHWARRECEIVED THRO MOUD N.DELHI DIRECTOR & PIOREG- AMOUNT RELEASE UTILIZED UNSPENT ETC; FROM 1-4-2013 TO 31-10-2014 ETC;
Ltr.No.K-14011.17.29120MRTS/Coord, GOI dt. 29.4.2014
164 12.5.2014 GM(F)13/5/2014
20/5/14 20/5/14 2 8
MAY 2014
RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
6
THOMAS .C.CKAVALBYRASANDRA, BNAGALOREREG-TERMS OF APPOINTMENT AND RULES ETC;
5-5-2014 165 13-5-2014 GM (HR)13/5/2014
5/6/14 5/6/14 1 7
7
B.A.SOWMYASARAKKI INDUSTIRAL LAYOUTJP NAGAR , BANGALOREREG-PROPERTY ON THE SERVICE DIAGONALLY OPPOSITE TO DR.AGARWAL’S EYE HOSPITAL ETC;
--NIL--- 166 15-5-2014
GM (LA&E)15-5-2014ToCE Ph-2
20/5/14 23/5/14 2 6
8
SHARADA KOPPAD, ADVOCATEPRIMROSE ROAD BANGALOREREG-BDA PROCEEDINGS TO ACQUIRE LAND IN SY.NO. 118 AND SEVERAL OTHER SY.NOS. OF HIRANDAHALLI VILALGE, BIDARAHALLI HOBLI, BANGALROE EAST.
15-5-2014DIRECT
167 15-5-2014 PIO to BDA 15-5-2014Transferred to BDA on 16.5.2014
1 5
9 GOVT OF INDIA CIRCULAR ON RTI 6-5-2014 168 17-5-2014 ------------ ---------- -------------- ----- -----CIRCULAR FROM MOUD. DELHI
10
PRAKASHMUNESHWARANAGAR ULLAL MAIN ROADBANGALOREREG-PROVISIONS OF LAW/BUILDINGS BYELAWS ‘RURAL SANTHE SHOPS’ ETC;
17-5-2014 169 17-5-2014 GM(F)17-5-2014
12/6/14 13/6/14 2 5
11
GURUDATH KINI,SARJAPURA ROAD, BANGALOREREG-Sy.no.25/2B Dasanapura Hobli, Madavara village, Blore North Reg: Geo Technical Survey details etc;
170 19-5-2014 CE-Ph-220/5/2014
9/6/14 11/6/14 2 5
1`2
G.AVANIJA REDDY, INNMAR HOTEL WHITEFILED BANGALOREREG-ALIGNMENT ON BOTH SIDES OF METRO RAIL TRACK 1 KM AFTER POSITION OF THE PROPOSED KUNDANAHALLI STATION.
171 19-5-2014 CE(Ph-2)20/5/14
7/6/14 11/6/14 1 13
13 T.SAI SOWMYA D.NO.54, PLOT NO.33, DEVI NAGAR NERDMET
172 19-5-2014 Law Officer20/5/14
21/5/14 23/5/14 2 6
14HYMA VIJAYAN D/O DAMODHARA NAIRYELAHANDA BANGALOREREG- DETAILS OF HER HUSBAND PAY AND
173 19-5-2014 GM(F)21/5/14
10/6/14 10/6/14 3 4
ALLOWANCES WORKING IN GC OF bmrcl
15
M.PUSHPAMBA7TH CROSS PEENYA BANGALOREREG-VALUA DETAILS OF BMRCL/LA/09-10 LAND BUILDING-VALUATION REPORT
174 24-5-2-14 GM(LA&E)26/5/2014
26/5/2014 26/5/2014 2 6
16
SHAIK ANWAR BASHAQTR.NO.B2/13, ISRO HOUSING COLONYINDIRANAGAR, BANGALOREREG-DETAILS W/R TO NOTIFICATIO N No.BMRCL/21/ADM/2013/EX-S DT.17/6/2013 –SLECTION LIST
21-5-2014 175 26-5-2014 GM (HR)26-5-2014
5/6/14 5/6/14 2 12
17YELLAPPA SRINVIASA, BANGALOREREG- ACQUISITION OF PROPERTY NO.56 AND 124 IN SINGASANDRA VILLAGE.
NIL 176 27-5-2014 GM(HR)28-4-2014
18/5/14 21/5/14 2 4
18
G.MANJUSAINATHSENIOR REPORTER DECCAN HERALADREG-BOULVEYARD IN MG ROAD APPROVAL FOR SHOPS AND ESTT.
BBMP LETTER DATED 27.5.2014
14096 29/5/2014GM (T&R)30/5/14
12/6/14 13/6/14 2 5
GM T & R
19N.THAMMAIAH, BANGALOREREG-ACQUISITION OF PROPERTY IN 231/1, IST Cross, BBMP Ward 54, Bangalore
30-5-2014 177 30-5-2014 GM(LA&E)2/6/14
2/6/2014 2/6/2014 1 2
20DR.NIRMALA SRINVIASANREG- RESERVATIONS OF JOBS FOR PHYSICALLY HANDICAPPED.
UDD LETTER DT. 17.5.2014
14143 30-5-2014 DGM(HR)31/5/14
4/6/14 5/6/14 1 8
ABSTRACT - MAY 2014
Receipts 20Replied/Disposed 20Balance Nil
Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
Application Dated
(3)
Inward Regn. No.
(4)
Received on
(5)
Information sought on
(6)
Information Recd. On
(7)
Reply sent to Applicant
on
(8)
No of Note Sheet
(9)
No. of Corre spond
ent Sheet
(10)
Remarks/Status
(11)
1PRAKASH BANGALOREREG ACQUISITION OF PROPERTY IN MANVARATHE KAVAL VILLAGE
4/6/2014 178 5/6/2014 GM (LA&E)5/6/14 7/6/14 11/6/14 2 10
2
VAJEER M.C. SOMARPET REG DETAILS OF POSTS FILLED UP IN BMRCL AGAINST ADVT. NO.BMRCL 29 ADM 2012 AND ALSO PUBLCIATION IN NEWSPAPER
4-6-2014 179 6/6/2014 DGM (HR)6/6/14 12/6/14 13/6/14 2 4
3VAJEER M.C. SOMVARPETREG SHAMEEL C.W. (1242093) SC/TO -COPY OF MEDICAL REPORT
4/6/14 180 6/6/14 DGM(HR)6/6/14 12/6//14 13/6/14 2 4
4VAJEER M.C. SOMWARPETREG- TILL NOW HOW MANY SC/TO WRITTEN AND ORAL TEST HAVE PASSED
4/6/14 181 6/6/14 DGM(HR)6/6/14 12/6/14 13/6/14 2 4
5 G.M.BABUBANGALOREREG- NO.9 SUBRAMANYAPURA ACQUISTION 966.43 SFT.FT. FIXATION OF
nil 182 9/6/14 GM (LA&E)9/6/14
24/6/14 25/6/14 2 3
COMPENSATION ETC;
6
YESHWANTH JAINMAMULEPT BANGALOREREG UDNERGROUND MAP BET MAJESTIC TO CHICKPET
11-6-2014 183 11/6/14 CE(UG)11/6/14 11/6/14 24/6/14 2 6
7 BMTF ADDRESSED TO MD BMRCL.REG RTI INFORMATION IN HIS EARLIER DEPTT
11/6/2014 184 12/6/2014 MDs per.estt. 12/6/14 12/6/14 2 7
Reply has to be sent by
MD per.estt.
JUNE 2014
8FROM BDA ADDTL.LAND ACQUISITION OFFICER. COPY OF RPLY SENT TO SHARADA KOPPAD ADV. BANGALORE.
9/6/14 185 12/6/2014Copy of reply
to RTI/167/2014
-- -- 1 13
9DR.RAJEEV SHARMA, NEW DELHIREG NO.OF ACCIDENTS/DEATHS AND HEALH AND SAFTY MEASURE IN BMRCL SICNE 2005.
10/6/14 186 16/6/14 DCE(P&P)16/6/14 8/7/14 14/7/14 2 10
10 A.VENKATESHREG PROPERTY MARKED FOR PHASE-2 18/6/14 187 19/6/14 GM(LA&E)
20/6/14 1/7/14 1/7/14 2 4
11S.T.VIJAYAREG GAZTEE NOTIFICATION FOR PHASE-2DETAILS
18/6/14 188 19/6/14 GM(LA&E)20/6/14 23/6/14 23/6/14 2 6
12YESHWANTHA.V.REG PAYMENT OF COMPENSATION AS PER KRISHNAPPA COMMITTE -DETAILS
18/6/14 189 19/6/14 GM(LA&E)20/6/14 23/6/14 23/6/14 2 4
13G.AVANIJA REDDYREGARD RECEIPT OF PO OF RS.30/- REQUESTING DOCUMENTS.
18/6/14 190(171/14) 19/6/14 --- -- 23/6/14 2 12
File linked to RT/171/14
14D.SPATIL, ANAD NAGAR BNAGALOREREG BANGALROE SANTHE SANCTION PLANS ETC;
19/6/14 191 19/6/14 GM(T&R)21/6/14/ 16/7/14 16/7/14 2 4
15PRAKASH JNANBHARATHI ULLAL RD BANGALOREREG SANCTION PLANS ETC;
19/6/14 192 19/6/14 GM(T&R)21/6/14 9/7/14 14/7/14 3 4
Linked with RTI/169/14
16
SURAJ SHEKAR, BANGALOREDETAILS OF PHASE-2 STATIONS IN KR PURAM WHITEFIELD ETC. 19/6/14 193 21/6/14 CE Phase-2
23/6/14 30/6/14 30/6/14 2 5
17SURAJ SHEKAR BANGALOREREG-BMRCL PHASE-2 STATION DETAILS FROM SILK BOARD TO BOMMASANDRA
19/6/14 194 21/6/14 CE-Phase-223/6/14 7/7/14 8/7/14 2 4
18VIKAS CHOWDHRY GURGAONREG VARIOUS TECHNICAL/ENGG INFORMATION ETC.
20/6/14 195 23/6/2014 CE(R-1)23/6/2014 3/7/14 16/7/14 2 7
19VIKAS CHOWDHRY GURGAONREG VARIOUS TECHNICAL/ENGG INFORMATION ETC.
20/6/2014 196 23/6/14 CE(R-I)23/6/2014 3/7/14 16/7/14 2 7
20THOMAS.C.C.RULES 7 REGUALTION SOF DIRECT RECRUITMENT AND NON EXECUTIVE POSTS
24/6/14 197 25/6/14 DGM(HR)26/6/14 10/7/14 14/7/14 2 7
21
SMT.H.R.ROOPINI H.D.KOTEREG- PAY SLIP OF D.K.SHVIAKUMAR WORKING IN BMRCL.
Nil 198 28/6/14 SENT BACK 30/6/14 30/6/14 2 5
APPLN. HAS NO DETAILS
22
VIJAYAKUMAR D.JP NAGARREG DETAILS OF PAYMENT OF IOCBUSINESS
28/6/14 199 28/6/14 GM(L&E)1/7/14 1/7/14 2/7/14 2 5
ABSTRACT - JUNE 2014
Receipts 22Replied/Disposed 22Balance Nil
Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
Application Dated
(3)
Inward Regn. No.
(4)
Received on
(5)
Information sought on
(6)
Information Recd. On
(7)
Reply sent to Applicant
on
(8)
No of Note Sheet
(9)
No. of Corre spond
ent Sheet
(10)
Remarks/Status
(11)
1K.VINCENT BANGALOREREG HIS SELECTION NOT SHORTLISTED..? 25/6/14 200 4/7/14 DGM (HR)
4/7/14 11/7/14 13/7/14 1 6
2C.G.SRINIVAS, BANGALOREREG DETAILS OF LIAISON OFFICER DUTIES ETC;
2/7/14 633 2/7/14 GM(HR)2/7/14 26/7/14 26/7/14 1 8
3R.SIDDALINGAPPA, BANGALOREREG-ENDROSEMENT COPY DATED 24.10.2009 ISSUED BY BMRCL.
6/7/14 201 7/7/14 GM(LA&E)8/7/14 16/7/14 16/7/14 1 4
4M.A.JAYAKUMAR, BANGALOREREG ACQUISITION NOTIFICATION OF SY.NO. 33/8 JARAGANAHALLI, KANAKAPURA ROAD
7/7/14 202 9/8/14 GM (LA&E)9/7/2014 14/7/14 14/7/14 1 5
5DIVYA .M BANGALOREREGARDING SALARY AND ALL MISC DETAILS OF BMRCL
7/7/14 203 9/7/14 PIO 14/7/14 14/7/14 14/7/14 1 12
6R.SRIDHAR BANGALOREREG ACQUISITON OF PROPERTY IN MAHALAKSHMI LAYOUT
9/7/14 204 10/7/14 GM (LA & E)11/7/14 14/7/14 25/7/14 8 7
7YESHWANTH S.JAINREG UG DETAILS MAJESETIC TO JM LANE ETC.
7/7/14 205 10/7/14 CE (UG)14/7/14 20/7/14 22/7/14 1 10
JULY 2014
8NAVEENRAJ BANGALOREREG-PROEPRTY 18/1 AT CMH ROAD ULSOOR DETAILS OF DEMOLITION ETC.
8/7/14 205 11/7/14 GM(LA&E)13/7/14 4/8/14 4/8/14 4 4
9 N.NANJUNDAIAH BANGALOREREG –REQUEEST FOR MAP OF PHASE-2 10/7/14 207 11/7/14 GM(LA&E)
13/7/14 15/7/14 15/7/14 1 6
10
SUNIL.S BANGALORE REG SY.NO.38 HOSAHALLI, GOLLARAPALYA, YESHWATNPURA ANY ACQUISITION BY METRO.
18/7/14 208 18/7/14 GM (LA &E)21/7/14 31/7/14 4/8/14 1 5
11KUMAR BANGALOREREG DETAILS OF SOME OF THE EMPLOYEES IN BMRCL
15/7/14 209 23/7/14 DGM(HR)23/7/14 11/8/14 11/81/14 2 6
12PUSHPAMBA BANGALOREREQUEST FOR VALAUTION CERTIFIED COPIES OF PROPERTY
23/7/14 210 23/7/14 GM(LA&E)24/7/14 31/7/14 4/8/14 1 5
13
G.N.PANDURGA BANGALOREREG ANJANAPURA TO BANNERGHATTA ROAD GAZETTE NOTIFICATION AND APPROVED PLAN
25/7/14 211 25/7/14 GM(LA&E)26/7/14 26/7/14 26/7/14 1 4
14
G.N.PANDURGA, BANGALOREREG –GAZETTE NOTIFCATION FROM BMICAPPA NOC BMICSame as above
25/7/14 212 25/7/14 GM(LA&E)26/7/14 26/7/14 26/7/14 1 4
15ABDUL QUASHIM CHOUDHURY CHENNAIREG HIS SELCTION FOR POST OF STATION CONTROLLER/TRAIN OPERATOR
25/7/14 213 25/7/14 DGM(HR0 26/7/14 12/8/14 13/8/14 1 13
16SHUEB AHMED BANGALOREREQUEST FOR DETAILS OF MEDICAL CERTIFICATE FROM MAIYA HOSPITAL
25/7/14 214 25/7/14 DGM(HR)26/7/14 11/8/14 18/8/14 1 17
17DR.RAJEEV SHARMA UNDER SECRETARYSAFETY MEASURES IN METRO ACCIDENTS ETC;
23/7/14 215 26/7/14 GM-O&M)2/8/14 4/8/14 4/8/14 2 10
RECEIVED POSTAL RPLY
SENT
18
K.N.NAGARAJ BANGALOREDETAILS OF ADVERTISEMENT DISPLAY BOARDS AT METRO STATIONS ETC; 28/7/14 216 28/7/14 GM HR
28/7/14 4/8/14 4/8/14 1 5
19ABDUL QUASHIM CHOUDHURY, CHENNAIREG- HIS MEDICAL REPORT DETAILS ETCAPPLEID FOR SO/TC IN BMRCL
22/7/14 217 28/7/14 ---------------- ----------------- REPLY SENT ON 31/7/14 1 1
20
MALLARI GOUDA S.PATIL EX-MINISTERREQUEST FOR VARIOUS INFORMATION ABOUT EMPLOYEES WORKING/ENQY ETC;
28/7/14 295Md Estt. 28/7/14 DGM(HR)
31/7/14 1/8/14 1/8/14 1 8
ABSTRACT - JULY 2014
Receipts 20Replied/Disposed 20Balance Nil
AUGUST 2014Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
Application
Date
(3)
InwardRegn. No.(4)
Receivedon
(5)
Information sought
on(6)
Information Received
on
(7)
Information/Reply sent on
(8)
No. of Note
Sheets(9)
No. ofCorrespt
pages(10)
Remarks
(11)
1 A.Manohar, BangaloreReg-Drawing & Designs at Jayadeva Fly Over.
14/7/14RTI No.1357Land No.245
15/7/14 Gm-la&e16/7/14
31/7/14 2/8/14 2 5
2 Manjunatha, BangaloreRequest for Bye Laws of BMRCL 30/7/14 218 2/8/14 Cs
4/8/144/8/14 4/8/14 2 4
3 Sreemulu, BangalroeDetails of Land Acquision from City Market-BVK Rd
2/8/14 219 2/8/14 GM (LA&E)4/8/14
11/8/14 11/8/14 2 5
4 K.S.Venkatesh, BangloreDetails of officers/Officials of GOK who are under Lokayukta Investigation
4/8/14 MD No.316RTYI No.2173
4/8/14 DGM (HR)5/8/14
7/8/14 7/8/14 2 10
5 Vikas Choudhury- DelhiFirst Appeal 220 5/8/14 FAA
5/8/14
FAAUnder process
6 Vikas Choudhury – DelhiFirst Appeal 221 5/8/14 FAA
5/8/14
FAAUnder process
7 K.S.Rajanna, BangaloreAcquisition insy.No.34 Kengeri 30/7/14 222 5/8/14 GA-LA&E
5/8/145/8/14 5/8/14 2 6
8 S.C.Jain, BangaloreLand Acquistion in Sy.No.34,Kengeri village
30/7/14 223 5/8/14 GM-LA&E 5/8/14 6/8/14 2 4
-2-
9 K.Suranjan, CaliculatReg his selection for the post of TIO/SO in BMRCL
31/7/14 224 5/8/14 No PO enclosed
//// ////// ///// //// Appln.Returned
10 S.K.Nanda, BangaloreInformation reg PID No.056 No.0024-45-177 sq.ft Belonga to Selvaraju
5/8/14 225 5/8/14 GM-LA&E5/8/14
6/8/14 6/8/14 2 4
11 K.Suranjan, CalicutReg his selection for the post of TO. 31/7/14 226 7/8/14 DGM-HR
8/8/1412/8/14 13/8/14 2 17
12 Vijay Pai, BangaloreLand acquisition in Ward No.177 13/8/14 227 13/8/14 GM-LA&E
13/8/1418/8/14 18/8/14 2 4
13 Pradeep Kumar.M. BangaloreReg Land Aquisition Sy.No.wiseIn Langford Road.
13/8/14 228 13/8/14 GM 0LA&E13/8/14
16/8/14 18/8/14 2 4
14 Shueb Ahmed BangaloreRed.PO of Rs.24/-(Linked to File No.214 –July/14
16/8/14 229 18/8/14 //// //////// 18/8/14 Information sent
15 Lolaksha BangaloreReg SC Officers/Officials in BMRCL 18/8/14 MD-
33918/8/14 DGM-HR
18/8/144/9/14 4/9/14 2 5
16 Kum.Kamala UttarakhandReg-List of Officers/officials in BMRCL
18/8/14 MD-340
18/8/14 DGM-HR18/8/14
20/8/14 22/8/14 2 5
17 Akanksha PrakashReg-Labourers injured etc; in BMRCL project
22/8/14 230 22/8/14 DCE-PPC22/8/14
5/9/14 5/9/14 2 5
18 Kumar C/o. ParvathaiahBalajiangar, Bangalore 21/8/14 231 22/8/14
3/9/14 3/9/14 1 3
19 Abhishek DhyaniSub_ Reg Pending Works and Progress of Namma Metro
21/8/14 232 27/8/14 --------------- ------------- ----------- --------- ---------Subject not clear reply sent on 27/8/14
20 Dr.George.D.A.Land Acquisition of Lowry Memorial College -reg
27/8/14 233 28/8/14 GM LA&E27/8/14
28/8/14 1/9/14 1 4
-3-
21 Dr.George.D.A.Soil Test Report BMRCL to DMRC 27/8/14 234 28/8/14
CE-P228/8/14 3/9/14 3/9/14
1 4
22 Dr.George.D.A.Clerance from Govt.of Karnataka at Lowry College.
27/8/14 235 28/8/14 GM LA&E27/8/14
28/8/14 1/9/141 4
23 Dr.George.D.A.Soil Test done by BMRCL on LMC Land
27/8/14 236 28/8/14 CE-ph-21/9/14
1/9/143/9/14
1 4
24 Dr.George.D.A.Approval of the Geotechnical Investigation agency by BMRCL
28/8/14 237 28/8/14 CE-Ph-21/9/14
3/9/14 3/9/14 1 4
25 D.George D.A.Certified copy of Geotechnical Investigation done in sy.No.78 and 79 of BN.Pur
28/8/14 238 28/8/14 Ce-Ph-21/9/14
3/9/143/9/14
1 4
ABSTRACT - AUG 2014
Receipts 25Replied/Disposed 25Balance Nil
SEPTEMBER 2014Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
ApplicationDate
(3)
InwardRegn. No.(4)
Receivedon
(5)
Information sought
on(6)
Information Received
on
(7)
Information/Reply sent on
(8)
No. of Note
Sheets(9)
No. ofCorrespt
pages(10)
Remarks
(11)
1 Makanahalli.J.Girish, BangaloreDocuments of file No.BMRCL/Phase-2/R2-Extn/R2A-Route & Staions/2014/142
1/9/14 239 1/9/14 CE-Ph-22/9/14
5/9/14 6/9/14 2 2
2 Rahut Baluni, New DelhiDetails of BMRCL stations nameFare etc;
2/9/14 240 3/9/14CPRO(O&M)
3/9/143/9/14 3/9/14 1 2
3 T.Sainath,BangaloreDetails of Govt/Private Land acquired for BMRCL Project
Nil 242 6/9/14 GM LA&E8/9/14
23/9/14 23/9/14 3 5
4 Sayeed Sulaiman, BangaloreDetails about land acquired/to be acquired for Kengeri terminal station.
8/9/14 243 8/9/14 GM LA&E8/9/14
8/9/14 9/9/14 1 3
5 Dr.George.D.A. BangaloreCopy of Approval and Clearance by the Govt. Assembly u/s 28(1) of KIADB Act 1966
5/9/14 244 8/9/14 GM-LA&E9/9/14
10/9/14 10/9/14 2 7
6 Dr.George.D.A. BangaloreAuthorisation Notification issued by KIADB to BMRCL for Geotechnical
8/9/14 245 8/9/14 GM-LA&E12/9/14
26/9/14 30/9/14 3 6
7 K.N.Veeranna, BangaloreRequest for copies of Letters sent to BDA, BDA to BMRCL etc;
10/9/14 246 10/9/14 GM LA &E11/9/14
11/9/14 15/9/14 1 9
8 M.Chandrashekar – Mvm.BangaloreDetails of payment awarded for the land axquired for swastika station by BMRCL
12/9/14 247 12/9/14 GM LA & E12/9/14
26/9/14 30/9/14 2 7
/2/9 Dr.George.D.A. Bangalore
Specific Scientific rocks found in bore holes BP 79...etc.
12/9/14 248 12/9/14 CE-Ph-213/9/14
26/9/14 30/9/14 2 16
10 Dr.George D.A. BangaloreSoil test details of bore wells BN pura for Metro project.
12/9/14 249 12/9/14 CE-Ph-213/9/14
30/9/14 30/9/14 2 5
11 S.Nawab Jan BangaloreReq- Letter No.BMRCL/La/P-58/13/$-3B/2011-13
12/9/14 250 15/9/14 GM LA & E15/9/14
27/9/14 27/9/14 2 7
12 Dr.George D.A. BangaloreCopy of Densities of rocks found in borewells in BN PURA
17/9/14 251 17/9/14 CE-Ph-218/9/14
30/9/14 30/9/14 1 5
13 K.A.Ramachandra BangaloreDetails of Land Acquisition in Sy.Nos. 95/3, 95/9...etc.
18/9/14 252 18/9/14 GM LA&E19/9/14
30/9/14 30/9/14 1 4
14 Pradeep, Thubarahalli,BangaloreRecd from Deen Dayal, US, MOUD, N.Delhi
11/9/14 MD No.200
19/9/14 CE(O&M)19/9/14
1/10/14 6/10/14 2 5
15 Tarun Kumar BangaloreDetails of Metro Project in Brigade road
22/9/14 253 22/9/14 23/9/14 23/91/4 23/9/14 2 5
16 P.P.RavidnrakuamrDetails of acquisition etc; in Sy.No.74 and 74/1. S.V.Road , Ulsoor
23/9/14 254 &272
25/9/14 GM LA&E 25/9/14
6/11/14PO RECD
--- 2 8 Reply sent on 7/11/14
17 Shri Mallikarjuna Siddramappa Khuba, MLA; Basvakalayan, BidarDetails of IT Technollogy use,staff, expr.staff on contract and others.
29/9/2014MD
No.448/20144621/2
014
29/9/14IT Mgr
Mr.Cylesh6/10/14
13/10/14 14/10/14 2 10
18 K.S.Venkatesh- BangaloreInformation reg ppty No.3507/731/490 acquired BMRCL
30/9/14 255 1/10/14 GM(LA&E)3/10/14
8/10/14 8/10/14 2 9
ABSTRACT - SEPT 2014
Receipts 18Replied/Disposed 18Balance Nil
OCTOBER 201401 Guardwell Dectectvies,Bangalore
Details of Tender bidders etc 256 8/10/14 CE (Phase-2)8/10/14 6/10/14 18/10/14 2 4
02 Suheb, BangaloreRegarding details of selection list of SO/TC.
8/10/14 257 9/10/14 DGM (HR)10/10/14 10/10/14 11/10/14 1 6
03 Rajagopalan BangaloreReg-Breakup expr.of maintaince of Metro 1, 3 and 3A etc;
9/10/14 258 10/10/14 CFM11/10/14 3/11/14 4/11/14 1 5
04 Rajagoplan BangaloreReg-Daily and Monthly Expr.of Namma Metro 1, 3 and 3A etc.
9/10/14 259 10/10/14 CFM11/10/14 3/11/14 4/11/14 1 4
05 Dr.George, BangaloreReg-cost of documents of Geotechnical Report etc.
10/10/14 260 10/10/14 CE-Phase-211/0/14 10/11/14 10/11/14 1 5
06 Dr.George BangaloreReg Governor Clearance of Acquisition of of Sy.Nos. 78 and 79 etc. In BN Pura
10/10/14 261 10/10/14 CE-Phase-211/10/14 20/11/14 29/11/14 2 3
07 Dr.George BangaloreRequest for date and time for inspector of documents of metro
10/10/14 262 10/10/14 CE Phase-211/10/14 10/11/14 10/11/14
14
08 Shri Gomini Priya, JournalistLetter from Urban development.Reg-RTI applications received and disposed etc;
5/9/14 4934 10/10/14 PIO14/10/14 14/10/14 14/10/14 1 8
09 Deen Dayala, US GOIRTI Replies -Public Grievances Compilation
11/10/14 MD-252
11/10/14 GM HR13/10/14
13/10/1414/10/14 2 48
File GM HR
10 Adarsh.K.S. Bangalore Details of approved type of materials for concrete and details of contractor of majestic project.
11/10/14 263 13/0/14 CE(UG)14/10/14 30/10/14 30/10/14 2 4
11 Shri Mallikarjuna Siddramappa Khuba, MLA; Basvakalayan, Bidar Copies of Documents/Inspection/Samples
19/8/14 MD-465
13/10/14 CS16/10/14 7/11/14 8/11/14 1 6
12 Naveed Ahmed, BangaloreReports of Road widening and CDP and whether our property is in acquisition for BMRCL
Nil 264 16/10/2014
GM-LA&E16/10/14 18/10/14 18/10/14
14
13 A. Mohan BangaloreDetails of Land notification Sy.No.2 57/19 4A peenya plantation
18/10/14 265 18/10/14 GM LA&E18/10/14 29/10/14 30/10/14 1 26
14 Kiran.S. Advocate BangaloreCertified copies of details relating to pre-feasibility report reg phse02A and 3 network
20/10/14 266 20/10/14 CE-Ph-21/10/14 30/10/14 30/10/14 1 5
15 Kiran.S. Advocate BangaloreCertified copies of details relating to Through M/s.RITES (GOI Enterpise)with regard to Metro Phase-2A and 3 snetwork
20/10/14 267 20/10/14CE-Ph2
31/10/14 30/10/14 3/11/14 1 5
16 Mugdma Sinha- BangaloreWhy delay in the Metro When it is supposed to completeHow much has completed etc.
21/10/14 268 29/10/14PIO
30/10/14 30/10/1430/10/14 1 7
Rply sent
ABSTRACT - OCT 2014
Receipts 16Replied/Disposed 16Balance Nil
NOVEMBER- 2014Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
ApplicationDate
(3)
InwardRegn. No.
(4)
Receivedon
(5)
Information sought
on
(6)
Information Received
on
(7)
Information/Reply sent on
(8)
No. of Note
Sheets
(9)
No. ofCorrespt
pages
(10)
Remarks
(11)
1 J.Gopal, Challakere thro US, UDD letter dt. 20.10.14Reg No.of posts of Computer Programmer, System Analyst etc;Created, filled and vacant.
27/8/2014 MD-504/14
29/10/14 DGM(HR)3/11/14 3/11/14 4/11/14 1 9
2 Shobha.M. BangaloreLand in Sy.No. 20/9 of Doddakannahalli village acquired ro BMRCL
Nil 269 3/11/14 GM-LA&E3/11/14 7/11/14 10/11/14 3 4
3 Shobha.M. Bangalore reg.Land in Sy.No. 79 of Ward No.49 Puttannachetty road village acquired for BMRCL
Nil 270 3/11/14 GM-LA&E3/11/14
15/11/14 15/11/14 2 3
4 Soumya Chaterjee BengaluruEmployees/death/compensation and existing procedure etc;
29/10/14 271 5/1114 DGM(HR)7/11/14 18/11/14 25/11/14 2 10
5 S.Anand, Journalist, Vishwa Kannada Samaja,Request for Tender Bulletin details(Thro US, UDD letter)
5/11/14 MD-507
7/11/14 10/11/14 11/11/14 11/11/14 2 8
6 PP RamachandraBangaloreRecd.PO
20/9/14 272(254-
Oct.14)20/9/14 GM-LA&E
25/9/148/11/14 8/11/14
313
Clubbed with 254 in Sept 14
7 N.Sri Rama Reddy BangaloreReg-Latest Land Acquisition Notification of Sy.No.33,34/1A etrc Chikkabidarakallu vialge,
7/11/14 273(5388)
8/11/14 GM LA&E8/11/14
15/11/14 15/11/14 2 8
8Devaraj M BangaloreDetails of cheque issued in respect of ppty No.8/1A, chokasandra village, T.Dasarahalli,Belgaluru
10/11/14 274 10/11/14 GM –LA&E10/11/14
19/11/14 19/11/14 6 5
9¥ÀÄlÖgÁdÄ -¨ÉAUÀ¼ÀÆgÀÄ©©JA¦ ¤ªÉñÀ£ÀzÀ°è PÀlÖqÀzÀ ¥ÀjºÁgÀ AiÀiÁªÀ CrAiÀÄ°è ¤ÃqÀ¯ÁVzÉ.
11/11/14 275 12/11/14 GM –LA&E12/11/14 1/12/14 3/12/14 2 9
10¥ÀÄlÖgÁdÄ -¨ÉAUÀ¼ÀÆgÀÄ «.«.¥ÀÄgÀA ¸Àì.¸ÀA.1/1 UÉ ¸ÀA§AzsÀ¥ÀlÖAvÉ PÀ£ÁðlPÀ PÀAmÁæPÀÌgï ¸ÀAWÀzÀ PÀlÖqÀªÀ£ÀÄß vÉgÀªÀÅUÉƽ¹zÀÄÝ EªÀjUÉ AiÀiÁªÀ DzÁgÀzÀ ªÉÄÃ¯É ¥ÀjºÁgÀ ¤ÃqÀ¯ÁVzÉ.
11/11/14 276 12/11/14 GM –LA&E12/11/14
19/11/14 19/11/14 2 9
11 Shankara.T BangaloreDetails of Maps etc of Sy.No.110 of Peenya village acquired by BMRCL
13/11/14 277 14/11/14 GM-LA&E15/1114
21/11/14 21/11/14 2 10
12 Shri S.Sridhar BangalorePpty in 58/1 Singasandra, Hosur Road, Bangalore has it been for acuisiton by BMRCL .
18/11/14 278 19/11/14 GM (LA&E)20/11/14 17/12/14 17/12/14 3 3
13 Savtiha K.G. AdvocateProperties in 3262/3259/3260/42any acquisition by BMRCL
12/11/14 279 19/11/14 GM (LA&E)20/11/14 6/12/14 8/12/14 2 4
14 Savitha.K.G. AdvcoateProperty No.42 in Kasavanahalli village Varthur Hobli any acquisition by BMRCL
12/11/14 280 19/11/14 GM (LA&E)20/11/14 6/12/14 8/12/14 2 4
15 V.Srinivasa Reddy, AdvocateDetails of Cadrewise qualification in notifn. No.BMRCL/ADM/O&M/2010 dt. 14.2.2010
21/11/14 281 22/11/14 GM(HR)24/11/14 19/12/14 19/12/14 1 19
16 President, Save Green BangaloreReg Details of Trees cut down by Metro and replanting etc.
19/11/14 282 24/11/14 PIO25/11/14
25/11/14 25/11/14 1 7
17 A.Venkatesh BangaloreRate of compensation given to Landloosers etc
21/11/4 283 24/11/14 GH HR24/11/14
24/11/14 27/11/14 2 5
18 Yeshwanth.V BangaloreReg acquisition of land for Venkateshpura Metro station Leftover property etc.
21/11/14 284 24/11/14 GM LA&E25/11/14
26/11/14 27/11/14 1 3
19 N.Lohit BangaloreWhat is the compensation of the building acquired by BMRCL etc;
21/11/14 285 24/11/14 GM LA&E25/11/14
26/11/14 27/11/141
3
20 N.Hemanth – BangaloreWhat is the compensation of ppty acquired for Venkateshpura Stn;etc.
21/11/14 286 24/11/1420
GM LA&E25/11/14
26/11/14 27/11/14 1 3
21 N.Narayana BangaloreWhat is the compensation of building in Namma metro Phase-ii Nagavara road etc;
21/11/14 287 24/11/14 GM LA&E25/11/14
26/11/14 27/11/14 1 3
22 P.Narasimharaj BangaloreWaht is the compensation by metro for ppty Reach -3B peenya industry to Nagasandra
21/11/14 288 24/11/14 GM LA&E25/11/14
26/11/14 27/11/14 1 3
23 Mari BangaloreBMRCL to recommend to issue Khata for the ppty loosers for Metro project phase-II
21/11/14 289 24/11/14 PIO --25/11/14 1 4
24 S.T.Vijaya – BangaloreWhat is compensation package by Metro for landloosers at Venakteshpura station.
21/11/14 290 24/11/14 GM LA&E25/11/14
26/11/14 27/11/14 1 3
25 Ashok Kumar BangalorePpty No.17C BBMP No.41/1 Malakshmipuram, Tumkur RoadAny Acquistion Notification
Nil 291 24/11/14 GM-LA&E25/11/14
30/11/1430/11/14 2 4
26 Ashok Kumar BangalorePpty No.11 BBMP No.41/1 Malakshmipuram, Tumkur RoadAny Acquisition Notification
Nil 292 24/11/14 GM-LA&E25/11/14 28/11/14 28/11/14 2
6
27 Devaraj.M. BangaloreDetails of Chek No.317043 for Rs.25,29839 given to Somashekar Reddy of Sy.No.8/1aA Chokasandra village, Yeshwarapura Hobli.
28/11/14 293 28./11/14 GM LA&E29/11/14
8/12/148/12/14 2 8
28 Mallikarjun Siddramappa Khuba, MLA;gÁdå ªÀÄvÀÄÛ f¯Áè À ºÁUÀÆ vÁ®ÆèPÀÄ ªÀÄlÖzÀ PÀbÉÃjAiÀÄ PÉʦrAiÀÄ ¥ÀæwAiÀÄ£ÀÄß PÉÆÃjgÀÄvÁÛgÉ.
24/11/14 6906
MD-546
24/11/14 GM-O&M2/12/14 9/12/14 20/12/14
2 28
ABSTRACT - NOV 2014
Receipts 28Replied/Disposed 28Balance Nil
DECEMBER- 2014Sl.No.
(1)
Name of the Applicant/Brief Subject
(2)
ApplicationDate
(3)
InwardRegn. No.
(4)
Receivedon
(5)
Information sought
on
(6)
Information Received
on
(7)
Information/Reply sent on
(8)
No. of Note
Sheets
(9)
No. ofCorrespt
pages
(10)
Remarks
(11)
1 Thejaswini.K. –BangaloreNumber of trees cut during Metro Project
28/12/14 294 4/12/14 PIO5/12/14
5/12/14 8/12/14 1 16 D
2 Sudeep Jain Reg Vokkaliga community persons working in BMRCL
29/11/147518
MD572 4/12/14 DGM – HR5/12/14
15/12/14 19/12/14 1 9D
3 N.PasdmavathiFacilities provided to Outsource employees in BMRCL
29/11/14 7519MD573
4/12/14 DGM-HR6/12/14
22/12/14 22/12/14 26
D
4 Suresh – BangaloreNrupathunga Road Service StationKengeri Su.No.55/4 & 55/5
3/12/14 295 6/12/14 PIO5/12/14
5/12/14 5/12/14 13
D
5 Devaraj- BangalorePayment of details of compensation to landlord.
5/12/14 296 6/12/14 GM-LA&E22/12/14
29/1/14 29/12/14 2 7D
6 Shued Ahmed- BangaloreEnrolment of SC/TO against Notification No. BMRCL/21/ADM/2013 dt. 17.6.2013
9/12/14 297 10/12/14 GM-LA&E10/12/14
19/12/14 19/12/14 1 6 D
7 Prashanth Kumar – BangaloreReg Acquistion details of ppty No.42/1-1 in Vani vilas Road for BMRCL Project.
9/12/14 298 10/12/14 GM –LA&E10/12/14
11/12/14 30/12/142
4D
8 K.Sudha – BangaloreComplaint Regd.on 17.4.14Peenya Metro Station
17/14/14 299 27/12/14Law Offr18/12/14 8/1/15 8/1/15 4 25
D
9 K. Sudha – BangaloreInformation u/s.4(1) (b) etc; 5/12/14 300 18/12/14 Law offr
18/12/1418/1/14 8/1/15 1 25
D
10 Raghuveer.BT. BangaloreStart and completion of Trinity metro station work by BMRCL
19/12/14 301 19/12/14 CE-R-119/12/14
20/12/14 20/12/14 12 D
11 Devaraj .M.- BangalorePayment details thro Axis Bank Ch.No.317043-25,29,839/-Sy.sketch copy of sy.No.8/1A etc
20/12/14 302 22/12/14 GM-LA&E22/12/14
29/12/14 29/12/14 2 7D
12 Chethan S.P. Adv.Status with regard to High Speed Rail LinkCI 593 SPQ 2009 dt. 18.10.2010.
22/12/14 303314312
22/12/14 CR (R-I)23/12/14 23/12/14 31/12/14 2 11 D
13 Suresh – BangaloreAny acquisition process of Sy.No.55/4 and 55/5 of Kengeri village
23/12/141 304 23/12/14 GM – LA&E29/12/14 2/1/15 5/1/15 1 5 D
14 Amrutha, Adv.BangaloreReg –Acquisition of PPty sy.No.6 in Jakkarayanakere
26/12/14 305 26/12/14 GM-LA&E29/12/14 3/1/15 5/1/15 2 4 D
15 Sitheesh C.RamachandranDetails of Land Acquired by BMRCL in Anchepalya and other informns.
26/12/14 306 26/12/14 GM-LA&E29/12/14 2/1/15 2/1/15 2 6 D
16 K.B.PRADHEEP BANGALOREREG-drinking water facilities in Metro Stations.
30/12/14 307 30/12/1420/1/15 20/1/15 2 7 D
17 SUNIL – GUJARATREG DEMOLITION OF PPTY IN GARUDACHARYPALYA FOR METRO Ph-II
30/12/14 308 30/12/1420/1/15 20/1/15 20/1/15 2 7 D
18 K.BHAVANI PRADHEEP HYDERABADReg-Earthquake resistence in Metro Stations.
30/12/14 309 30/12/14 GM LA&E31/12/14
20/1/15 20/1/15 1 8 D
19 SUNNY PURSWAMIReg-bmrcl project plan, schedule, 7 current s plans/status etc.
30/12/14 310 30/12/14 DPP6/1/15 6/1/15 6/1/15 1 9 D
ABSTRACT - DEC 2014
Receipts 19Replied/Disposed 19Balance Nil
JANUARY- 2015RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
SLNO
FILE NO.DIGITAL LIBRARY NO. NAME OF THE APPLICANT/BRIEF SUBJECT
RECDON
DT.OF OPENING
FILE
REPLY SENT ONDATE OF CLOSING/Disposal
FILE
NO. OF NOTE
SHEETS
NO. OFCORRESPONDENT
PAGES
CLASSIFICATION OF FILES
A/B/C/D
REMARKS
1 BMRCL/RTI/311/2015D.Lib/RTI/001/2015(C.No.6382)(D.lib- Digitiabl Library No.)
G.H.CHANNAGANGAIAH, ADV.BBMP WARD NO.6 SITE NO.59 LEASE CUM SALE AGREEMENT
3/1/15 4/1/15 1 20 D
2 BMRCL/RTI/312/2015D.Lib/RTI/002/2015(C.No.6384)GOK UDD
CHETHAN ADVCOATEREG HIGH SPEED RAIL LINK NETWORK NOTIFICATION CI 593 SPQ 2009 DT. 18.10.2010
5/1/15 5/1/15 1 4 DLinked to
303
3 BMRCL/RTI/313/2015D.Lib/RTI/003/2015(C.No.6385)
RAGHVUEER B.T. GM SERVE & VOLLEY MG ROAD BANGALOREDETAILS OF TRAFFIC MOVEMENT BLOCKED DURIGN METRO PROJECT
5/1/15 5/1/15 1 4 D
4 BMRCL/RTI/314/2015D.Lib/RTI/004/2015(C.No.6386)
CHETHAN ADVCOATEREG HIGH SPEED RAIL LINK NETWORK NOTIFICATION CI 593 SPQ 2009 DT. 18.10.2010
5/1/15 5/1/15 1 4 DLinked to
303
5 BMRCL/RTI/315/2015D.Lib/RTI/005/2015(C.No.6395)
VIJAY N.SHAH BANGALORE REQUEST FOR COPY OF LETTER NO.BMRCL/LND/2011-12/2224 DT.13.10.14 FROM BMRCL TO SPL.DY.COMMR.KIADB, BANGALORE
13/1/15 16/1/15 2 4 D
6 BMRCL/RTI/316/2015D.Lib/RTI/006/2015(C.No.6396)
C.GOPINATH- NEW DELHI DETAILS OF HRA IN BMRC FOR CENTRALGOVT. STAFF ETC; 14/1/15 15/1/15 2 2 D
7 BMRCL/RTI/317/2015D.Lib/RTI/007/2015(C.No.6397)
YNR TARUN KUMAR BANGALORE DETAILS OF WORK CARRIEDOUT IN BRIGADE ROAD ETC 14/1/15 15/1/15 1 3 D
8 BMRCL/RTI/318/2015D.Lib/RTI/008/2015(C.No.6398)
YNR TARUN KUMAR BANGALORE DETAILS OF TRAFFIC DIVERSION IN BRIGADE ROAD ETC 14/1/15 15/1/15 1 3 D
9 BMRCL/RTI/319/2015D.Lib/RTI/009/2015(C.No.6399)
YNR TARUN KUMAR BANGALORE DETAILS OF STAIN ENTRY/EXIT POINTS AT BRIGADE ROAD ETC 14/1/15 15/1/15 1 3 D
10 BMRCL/RTI/320/2015D.Lib/RTI/010/2015(C.No.6400)
YNR TARUN KUMAR BANGALORE DETAILS OF APRKING PLAN IN BRIDAGE RD BY BMRCL ETC 14/1/15 15/1/15 1 3 D
11 BMRCL/RTI/321/2015D.Lib/RTI/011/2015(C.No.6401)
YNR TARUN KUMAR BANGALORE DETAILS OF ACTUAL TIME OF COSNTRUCTION OF METRO IN BRIGADE RD ETC 14/1/15 15/1/15 1 3 D
12 BMRCL/RTI/322/2015D.Lib/RTI/012/2015(C.No.6402)
YNR TARUN KUMAR BANGALORE DETAILS OF ANY STRUCTURAL CHANGES FOR BLDGS SITUATED ACROSS BRIGADE ROAD ETC
14/1/15 15/1/15 1 3 D
13 BMRCL/RTI/323/2015D.Lib/RTI/013/2015(C.No.6403)
YNR TARUN KUMAR BANGALORE DETAILS OF TIMELINE METRO WORK AT BRIGADE TO BE COMPLETED ETC 14/1/15 15/1/15 1 3
D
14 BMRCL/RTI/324/2015D.Lib/RTI/014/2015(C.No.6404)
YNR TARUN KUMAR DETAILS OF SPECIFIC TIME FOR METRO ROAD AMRKET NEEDS TO BE CLOSED ETC 14/1/15 15/1/15 1 3
D
15 BMRCL/RTI/325/2015D.Lib/RTI/015/2015(C.No.6410)
K.S.MARIAPPAN- ERNAKULAM - (NO PO) REG-DETAILS OF ANY PRIVATE LAND OWNED BY METRO ETC; 21/1/15 21/1/15 1 3 D
16 BMRCL/RTI/326/2015D.Lib/RTI/016/2015(C.No.6411)
DR.GEORGE – BANGALORE REQ COPY OF SUPREME COURT ORDER FOR DEMOLITION OF CHURCHES AND COLLEGE BLDGS LMC LAND
21/1/15 23/1/15 1 3 D
17 BMRCL/RTI/327/2015D.Lib/RTI/017/2015(C.No.6412)
DR.GEORGE – BANGALORE REQ FOR COPY OF APPROVAL/ORDER OF GOK APPROVING II PHASE BANGALORE
21/1/15 27/1/15 1 10 D
18 BMRCL/RTI/328/2015D.Lib/RTI/018/2015(C.No.6413)
DR.GEORGE –BANGALORE REG-APPROVAL BY GOK FOR LAND ACQUISITION FOR IIND. PHASE OF METRO 21/1/15 3/2/15 2 10 D
19 BMRCL/RTI/329/2015D.Lib/RTI/019/2015(C.No.6414)
DR.GEORGE – BANGALORE REG-NOTICE ISSUED BY BMRCL TO KIADB FOR ACQUISTION OF ADDTL.LAND OF LMC COLLEGE.
21/1/15 23/1/15 1 3 D
20 BMRCL/RTI/330/2015D.Lib/RTI/020/2015(C.No.6415)
DR.GEORGE- BANGALORE REG- COPY OF ORDER OF GOI FOR IIND.PHAE BYAPPANAHALLI WHTIEFIELD. 21/1/15 27/1/15 1 10 D
21 BMRCL/RTI/331/2015D.Lib/RTI/021/2015(C.No.6416)
DR.GEORGE – BANGALORE REG-SUPREME COURT ORDER FOR DEMOLITION OF CHURCHES OF LMC COLLEGE BUILDINGS
21/1/15 23/1/15 1 3 D
22 BMRCL/RTI/332/2015D.Lib/RTI/022/2015(C.No.6417)
DR.GEORGE- BANGALORE REG-GOI APPROVAL COPY FOR STATIONS OF BYAPPANAHALLI AND MAHADEVAPURA OF IIND.PHASE AND WHITE FIELD.
21/1/15 18/2/152 5 D
23 BMRCL/RTI/333/2015D.Lib/RTI/023/2015(C.No.6418)
MEENAKSHI SINHA BANGALORE MAP SHOWING METRO RAIL ROUTE AND JAI BHEEM NAGAR SLUM ACQUISITION
22/1/15 3/2/15 3/2/15 2 7
24 BMRCL/RTI/334/2015D.Lib/RTI/024/2015(C.No.6419)
C.GOPINATH NEW DELHI- COPY OF BMRCL/FIN/2013-14/2281 DT.30-7-2013 SENT FROM BMRCL TO CAG GOI
23/1/15 25/2/15 1 4 D
25 BMRCL/RTI/335/2015 Karnataka Human Rights Commission (letter directly sent thro MD sec.) not received in RTI --- --- ---- --- --
26 BMRCL/RTI/336/2015D.Lib/RTI/026/2015(C.No.6439)
MEENAKSHI SINHA BANGALOREDOCUMENTS DETAILED PROJECT REPORT OF PHASE –I 28/1/14 10/2/15 1 20 D
27 BMRCL/RTI/337/2015D.Lib/RTI/027/2015(C.No.6440)
MEENAKSHI SINHA BANGALOREDOCUMENTS SHIVAKUMAR BHAT COMMITTE REPORT 28/1/15 28/1/15 1 8 D
28 BMRCL/RTI/338/2015D.Lib/RTI/028/2015(C.No.6441)
H.PRAMOD BANGALOREPLAN COPY OF THE ROUTE, STATIONS LOCATION/PROPERTY ACQUIRED ETC;
28/1/15 28/1/15 1 8 D
29 BMRCL/RTI/339/2015D.Lib/RTI/029/2015(C.No.6442)
TARUN KUMAR –BANGALOREANY FUTURE PROPOSAL THAT METRO LINE WILL COME THROUGH BRIGADE ROAD & CHRUCH STREET.
29/1/15 29/1/15 1 4 D
30 BMRCL/RTI/340/2015 TARUN KUMAR –BANGALOREIMPACT OF BRIGADE ROAD AND PERIPHERY AREA DUE TO PROPOSED METRO LINE.
29/1/1529/1/15 1 6 D
ABSTRACT - JAN 2015
Receipts 19Replied/Disposed 19Balance Nil
FEBRUARY- 2015RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
SLNO
FILE NO.DIGITAL LIBRARY NO. NAME OF THE APPLICANT/BRIEF SUBJECT
RECDON
DT.OF OPENING
FILE
REPLY SENT ONDATE OF CLOSING/Disposal
FILE
NO. OF NOTE
SHEETS
NO. OFCORRESPONDENT
PAGES
CLASSIFICATION OF FILES
A/B/C/D
REMARKS
1 BMRCL/341/RTI/2015D.Lib/RTI/25/2015(C.No.6438)
H.PRAMOD BANGALORECOPIES OF ROAD WIDTH DETAILS PROPOSED TIME OF COMPLETETION OF WORK
2/2/15 2/3/15 1 3 D
2 BMRCL/342/RTI/2015 CHETHAN HM –BANGALOREDETAILED PROJECT REPORT OF PHASE-2 RUNNING FROM IIMB TO GOTTIGERE
7/2/15 10/2/15 1 6 D
3 BMRCL/343/RTI/2015(Link file-RTI/299/2014)
SUDHA .K. BANGALOREENCLSOED PO OF 10/-- 7/2/15
4 BMRCL/344/RTI/2015(Linked to-RTI/300/2015)
SUDHA K. BANGALOREAPPEAL TO FIRST APPEELATE AUTHORITY 7/2/15
5 BMRCL/345/RTI/2015 H.PRAMOD – BANGALORECOPIES OF ROAD WIDTH DETAILS PROPOSED AFTER THE BMRCL WORK
7/2/15 2/3/15 1 4 D
6 BMRCL/346/RTI/2015 DEEPAK R. BANGALOREPROPERTIES ACQURIED AND TO BE ACQUIRED FROM MEENAKSHI TEMPLE TO KOTHNUR DEPOT-
10/2/15 13/2/15 2 4 D
7 BMRCL/347/RTI/2015 A.MANOHAR – BANGALOREREG-ACQUISTION OF PPTY NO. 67 IN BTM L/O. 2ND STAGE.
10/2/15 24/2/15 2 6 D
8 BMRCL/348/RTI/2015 K.MARIAPPAN – ERNAKULAMANY PRIVATE LAND OWNED BY METRO LIKE DEFENCE AREA ETC.
10/2/15 13/2/15 1 5 D
9 BMRCL/349/RTI/2015 PRAKASH- BANGALOREREG-ACQUISITION OF PPTY IN SY.No.18/1A1, 18/1A13 in Uttarahalli
11/2/15 18/2/15 2 9 D
10 BMRCL/350/RTI/2015 SAMUDAYATHA KHAN BANGALORENOTIFICATION NO. LAQ/SR.2/07-08 AND SAM CI 232 SPQ 2014 DT. 29.12.14
11/2/15 25/2/15 2 38 D
11 BMRCL/351/RTI/2015 T. KRISHNAMURTHYDRAWING/SKETCH RV ROAD JN. TO PUTTENHALLI 12/2/15
12 BMRCL/352/RTI/2015 T.SHIVAMMA LAND ACQUIRED BY BMRCL IN SY.NO. 58/3 AND 58/1 Award passed.
17/2/15 3/315 3 7 D
13 BMRCL/353/RTI/2015 T.SHIVAMMALAND ACQUIRE BY BMRCL IN SY.NO. 58/3 AND 58/1 Family tree of K.Thimmaiah
17/2/15 3/3/15 4 8 D
14 BMRCL/354/RTI/2015 SHANSHKANTHA DONGRE, Ex-BMRCLCOPY OF NOTE SHEET PROCESSED FOR RELEASE OF GRATUTITY PAYMENT
17/2/15 7/3/15 1 15 D
15 BMRCL/355/RTI/2015 SHANSHKANTHA DONGRE, Ex-BMRCLIN & OUT PUNCH DETAILS OF NAVEEN KUMAR, DIR. (F) 9.5.2013 TO TILL DATE
17/2/15
16 BMRCL/356/RTI/2015 SHANSHKANTHA DONGRE, Ex-BMRCLBOARD APPROVAL FOR HOUSE ORDERLY ALLOWANCE PAYABLE TO SRI NAVEEN KUMAR DIR. FIN. – 9.5.2013 TO TILL DATE
17/2/15 7/3/15 1 5 D
17 BMRCL/357/RTI/2015 SHANSHKANTHA DONGRE, Ex-BMRCLIN & OUT PUNCH DETAILS OF SHANSHIKANTA DONGRE FROM 16.1.2014 TO 14.8.2014IN & OUT PUNCH DETAILS EXTRA WORK DONE ABOVE 8 HOURS.
17/2/15 14/3/15 1 11 D
18 BMRCL/358/RTI/2015 SHANSHKANTHA DONGRE, Ex-BMRCLCOPY OF BOARD APPROVAL FOR REIMBURSEMENT OF ENTERTAINMENT EXPENSES PAID TO DIR.(f) FROM 9.5.2013 TO TILL DATE.
17/2/15 7/3/15 1 5 D
19 BMRCL/359/RTI/2015MUD. N.Delhi
PRADEEP – HYDERABAD – THRO MINISTRY OF URBAN DEVELOPMENT. N.DELHI.Reg concrete mixture etc; several information.
22/3/15 2/3/15 1 4 D
20 BMRCL/360/RTI/2015MUD, NM.Delhi
ABHIJEET VAIDYA BANGALORE THRO MUD, N.DELHIREG- BRANDOR MAKE OF PUBLIC ANNOUNCEMENT SYSTEM SPEAKERS INSTALLED AT VARIOUS METRO STATIONS
21 BMRCL/361/RTI/2015 SHAMEEL .C.W KODAGU DT. DETAILS O OF HIS MEDICAL CHECKLUP 20/2/15 25/2/15 1 14 D
22 BMRCL/362/RTI/2015Linked to RTI/061/15 and KIC case
MADHUSUDHAN – BANGALOREEX-BMRCL EMPLOYEE PF , SALARY ETC; 20/2/15
23 BMRCL/363/RTI/2015Linked to RTI/360/15From MUD GOI- at Sl.N0.20
ABHIJEET VAIDYA BANGALORE THRO MUD, N.DELHIREG- BRANDOR MAKE OF PUBLIC ANNOUNCEMENT SYSTEM SPEAKERS INSTALLED AT VARIOUS METRO STATIONS.
26/2/15 2/3/15 1 5 D
24 BMRCL/364/RTI/2015 DR.GEORGE –BANGALOREDETAILS OF LETTER FROM BMRCL TO PRINCIPAL LMC COLLEGE FOR SOIL TEST
21/2/15 9/3/15 2 8 D
25 BMRCL/365/RTI/2015 DR.GEORGE-BANGALORELETTER FROM LMC PRINCIAL TO BMRCL FOR SOIL TEST
26 BMRCL/366/RTI/2015 DR.GEORGE-BANGALOREDETAILS PROPOSED ORDER FROM GOI TO BMRCL FOR METRO PROJECT INLMC COLELGE ETC.
27 BMRCL/367/RTI/2015Link to RTI/352/15
T.SHIVAMMA LAND ACQUIRED BY BMRCL IN SY.NO. 58/3 AND 58/1 Award passed.
24/2/15
28 BMRCL/368/RTI/2015Link to RTI/353/15
T.SHIVAMMALAND ACQUIRE BY BMRCL IN SY.NO. 58/3 AND 58/1 Family tree of K.Thimmaiah
24/2/15
29 BMRCL/MD-724/RTI/2015 SHRI MANJUNATH – BANGALORETHROUGH GOKN UDDDETAILS OF STAFF, DESIGANTION PAY AND TEL NOS.
25/2/15 25/2/15 1 4 D
30 BMRCL/369/RTI/2015 RAVINDRA – BANGALORE THRO GOI MUD MRTS CELL N.DELHII NEED PROJECT PROPOSAL DATES AND COMPLETIONS DATES WHY IT IS DELAYED.
25/2/15 25/2/15 1 3 D
31 BMRCL/370/RTI/2015 SYED NAYAZ AHMED BANGALOREBUILDING ASSESSMENT VALUATION ABSTRACT FOR NSN 136/1 (PAGE2) ETC;
25/2/15 17/3/15 1 8 D
32 BMRCL/371/RTI/2015 DR.GEORGE – BANGALOREAPPROVED ORDER FOR THE ADDITIONAL METRO TOWARDS MARTHALLI
27/2/15
33 BMRCL/372/RTI/2015 DR.GEORGE – BANGALOREDRASING OF PROPOSED MTRO ON LMC PROEPRTIES BN PURA
27/2/15
34 BMRCL/373/RTI/2015 DR.GEORGE – BANGALOREDETAILS OF DD/CHECQUE PAID TO LMC PRINCIPAL
27/2/15 2/3/15 1 4 D
35 BMRCL/374/RTI/2015 DR.GEORGE – BANGALORESUPREME COURT ORDER FORWARDED BY BMRCL 27/2/15 2/3/15 1 4 D
36 BMRCL/375/RTI/2015 DR.GEORGE – BANGALOREDD/CHECQUE DETEAILS ADVANCE AMT. PAID TO LMC PRINCIPAL DR.M.J.PRAKWANT
27/2/15 3/3/15 1 4 D
37 BMRCL/376/RTI/2015 DR.GEORGE – BANGALORECOPY OF LETTER FROM PRESIDENT OF INDIA DELHIT O BMRCL
27/2/15 3/3/15 2 6 D
38 BMRCL/377/RTI/2015 DR.GEORGE – BANGALOREDETAILS OF TENDER APPLCIATIONS 27/2/15
39 BMRCL/378/RTI/2015 DR.GEORGE – BANGALOREBMRCL REPLY TO RPESIDENT OF INDIA . N.DELHI 27/2/15 13/3/15 2 4 D
40 BMRCL/379/RTI/2015 DR.GEORGE – BANGALOREALIGNMENT FOR ADDITIONAL LINK TOWARDS MARATHJALLI OF LMC COLELGE
27/2/15
41 BMRCL/380/RTI/2015 C.GOPINATH-N.DELHIDETAILS OF PAY REMUENRATION TO DEPUTANIONIST ETC
27/2/15 28/2/15 1 6 D
42 BMRCL/381/RTI/2015 B.R.PRASANNALUMAR – BANGALOREMAP SKECTH OF MADAVARA VILLAGE BANGALORE NORTH
27/2/15
43 BMRCL/382/RTI/2015 DR.GEORGE – BANGALOREAPPROVED ORDER FOR CHAGNE OF ALIGNMENT 27/2/15
44 BMRCL/383/RTI/2015 DR.GEORGE – BANGALORECOPY OF ORIGINAL ALIGNMENT APPROVED BY GOVT.OF india N.DELHI
27/2/15
45 BMRCL/ 384 /RTI/2015 ASHOKA.T BANGALOREACQUISITION OF 6 ACRE AND 3 GUNTAS HANUMANTHAPURA VILLAGE JAKKARAYANAKERE VILALGE.
28/2/15 12/3/15 2 5D
1 BMRCL/ 385/RTI/2015 RANGARAJA URS BANGALORENOC FOR PROEPRTY NO.3 IN SY.NO.34 OF KENGERI VILALGE
3/3/15 3/3/15 1 2 D
2 BMRCL/ 386/RTI/2015 B.V.CHOBHE- PUNEWHEN IS METRO START FUNCTIONING WHAT ARE THE MAJOR DELAYS
3/3/15 3/3/15 1 3 D
3 BMRCL/ MD-744/RTI/2015 BHEEMAPPA GUNDAPPA GADADA SOCIAL WORKER, BELGAVI£ÁåAiÀÄ®AiÀÄ ¸À«ÄwUÀ¼À £ÉêÀÄPÀ ªÀiÁrzÀ ¥ÀæPÀgÀtU¼ÀÀ PÀÄjvÀÄ
3/3/15 4/3/15 1 9 D
4 BMRCL/ 387/RTI/2015 KRISHNAMURTHY – BANGALOREBBMP WARD NAGAPURA H.S.SOMASHEKAR PROEPRTY DETAILS AND NOTIFICATIONS
7/3/15 9/3/15 1 2 D
5 BMRCL/388/RTI/2015 VENAKTARATHNAM BANGALOREPROVIDE DETAILS OF ALL PERMANENT EMPLOYEES WITH DESIGN, DATE OF JOINING ETC. Shops & Estts. Details /
7/3/15 14/3/15 1 2 D
6 BMRCL/ MD-750/RTI/2015 DURGA PRASAD –BIHARDETAILS OF FACILITIES AT PUBLIC PALCE FOR PHYSICALLY HANDICAPPED EPRSONS ETC.
7/3/15 12/3/15 1 4 D
7 BMRCL/ MD-752/RTI/2015 SMT.SOMA CHAKRABORTY N.DELHIAPPLN.NOT RECED.
7/3/15 9/3/15 1 7 D
8 BMRCL/ MD-760/RTI/2015 ²æà GªÉÄñï.J¸ï. PÀÄ®PÀtÂð - ¨ÉAUÀ¼ÀÆgÀĸÀPÁðgÀzÀ ««zsÀ, E¯ÁSÉUÀ¼À°è ¸ÀPÁðgÉÃvÀgÀ C£ÀÄzÁ¤vÀ ¸ÀA¸ÉÜUÀ¼À°è CAUÀ«PÀ®gÀ «ÄøÀ¯Áw CrAiÀÄ°è £ÉêÀÄPÁw ºÉÆA¢zÀ ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ¸ÀA¥ÀÆt𠫪ÀgÀUÀ¼À ªÀiÁ»w PÉÆÃjgÀÄvÁÛgÉ.
10/3/15 17/3/15 1 13 D
9 BMRCL/ 389/RTI/2015 SAMUEL JOSEPH BANGALOREDETAILS OF E-PUNCH ATTENDANCE OF EAs OF BMRCL ETC
10/3/15 30/3/15 1 5 D
MARCH- 2015RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
10 BMRCL/ 390/RTI/2015 SAMUEL JOSEPH BANGALOREDETAILS OF COPY OF ORDER OF PS TO MD ETC;
10/3/1527/3/15 1 11 D
11 BMRCL/ 391/RTI/2015 DHANANJAIAH H.R. BANGALOREAPPLIED FOR MAINTAINER ap-No.C2-805300 WHY REJECTED
11/3/159/3/15 1 2 D
12 BMRCL/ 392/RTI/2015 V.N.RAMASWAMI BANGALORECERTIFIED COPY OF FINAL REPORT BY IDECK
12/2/1519/3/15 1 13 D
13 BMRCL/ 393/RTI/2015 C.GOPINATH, EX-DIR. FIN. BMRCL FAA PETITION
12/2/15
14 BMRCL/ 394/RTI/2015GOI MUD N.DELHILinked to File No.RTI/369/15
RAVIDNRA – BANGALOREPROJECT PROPOSAL AND COMPLETIOND ATES
13/3/15 25/2/15 1 3 D
15 BMRCL/ 395/RTI/2015GOI MUD N.DELHILinked to File No.RTI/359/15
PRADEEP HYDERABADREG- SEVERAL QUESTIONS/QUERRY VIZ; VONCRETE MISX ETC
13/3/15 2/3/15 1 4 D
16 BMRCL/ 396/RTI/2015Linked to File No.RTI/360/15
ABHIJEET VAIDYA BANGALOREBRAND NAME OF PUBLIC ANNOUNCEMENT SYSTEM IN BMRCL STATIONS.
13/3/15 28/2/15 1 7 D
17 BMRCL/ 397/RTI/2015 KANTHI LAL R.PATEL BANGALOREREG DRAWING OF METRO IN WHITEFIELDSITE No.LI, LII 106/107Khata No.106/107
16/3/1524/3/15 1 3 D
18 BMRCL/ 398/RTI/2015 RAGHUVANSHI TIMBERS – BANGALOREMETRO ROUTE MAP PASSING THRO SITE NO.399, KHATA NO.228 SY.NO.8/1 (II)
16/3/1524/3/15 1 3 D
19 BMRCL/ 399/RTI/2015 NARASIMHAMURTHY BANGALOREJMC SKETCH, VALUATION REPROT PACKAGE COPY OF GAZETTE NOTIFICATION ETC.
16/3/15
20 BMRCL/ 400/RTI/2015 AMIT JAGDISH NAGPAL – BANGALOREREG LAND ACQUISTION DETAIL IN HEBBAGODI DEPOT, CSB BOMMASANDRA ETC.
16/3/1528/3/15 3 3 D
21 BMRCL/401/RTI/2015Linked to RTI/354/2015
SHASHIKANTH DONGRE, REG – DOPIES OF HIS PF STATEMENT ETC;
16/3/15
22 BMRCL/402/RTI/2015 V.N.RAMASWAMI BANGALOREREG SWASTIK METRO STATION AND OFFICE BUILDINGS ETC.
17/3/1518/3/15 1 4 D
23 BMRCL/404/RTI/2015 DR.GEORGE, BANGALORECOPY OF NTOFICATION ISSUED BY BMRCL TO LMC
17/3/1427/3/15 1 10 D
24 BMRCL/ 405/RTI/2015 DR.GEORGE, BANGALOREBUILDING EXCAVATION ETC.
17/3/14
25 BMRCL/ 406/RTI/2015 DR.GEORGE BANGALOREREGE ENVIRONMENTAL ASSSMENT IMPACT STUDY ETC.
17/3/14
26 BMRCL/ 407/RTI/2015 DR.GEORGE BANGALOREFINAL NOTIFICATION FOR THE LAND ACQUISITION OF LMC ETC.
17/3/14
27 BMRCL/ 408/RTI/2015 DR.GEORGE BANGALOREREG COPY OF SURVEY SKETCH MAP ETD.
17/3/14
28 BMRCL/ 409/RTI/2015 DR.GEROGE, BANGALORELETTER ISSUED BY LMC PRINCIPAL GRANTING PERMISSION ETC.
17/3/1427/3/15 1 4 D
29 BMRCL/ 410/RTI/2015 DR.GEORGE BANGALOREREG WEBPAGE DETAILS ETC.
17/3/14
30 BMRCL/ 411/RTI/2015 NARASIMHAMRUTHY – BANGALOREREG JMC SKETCH VALAUTION ETC. OF SY.NO.42/2, PEENYA
17/3/14 24/3/15 2 18 D
31 BMRCL/ 413/RTI/2015 B.V.CHOBHE PUNEREG- EMPLOYEES VIZ; DRIVING, TRAINING ETC;
19/3/1525/3/15 2 4 D
32 BMRCL/ 414/RTI/2015 D.R.SUBHASH MANIPAL UDUPIREG-DETAILS OF TOTAL AMT FUNDS ALLOTTED METRO ETC.
23/3/15
33 BMRCL/ 415/RTI/2015 GOPINATH.T. – BANGALOREREG-BHAGAT SINGH NAME TO BE GIVEN FOR CENTRAL COLLEGE METRO STATION.
24/3/15 1 9 D
34 BMRCL/ 416/RTI/2015 V.N.RAMASWAMI – BANGALOREREG SKETCH/DRAWING OF SWASTIK METRO STATIONETC.
25/3/1530/3/15 2 5 D
35 BMRCL/ 417/RTI/2015 ASHOK KUMAR, ADVCOATE BANGALOREREG ACQUISITION OF PPTY IN BYTARAYANAPURA SY.NO. 77/1, 78/1, 78/2
26/3/15
36 BMRCL/ 419/RTI/2015 C.GOPINATH N.DELHIBMRCL BOARD RESOLUTION BMRCL TERMS AND CONDITIONS OF DEPTUATION ETC
27/3/15 17/4/15 2 3 D
37 BMRCL/ 420/RTI/2015 C.GOPINATH N.DELHITERMS AND CONDITIONS OF DEPUTATION WITH BMRCL ETC
27/3/1517/4/15 2 3 D
38 BMRCL/ 421/RTI/2015 C.GOPINATH N.DELHIREG ARREARS OF PAY & ALLOWANCES TO DEPUTATIONISTS ETC
27/3/15 17/4/15 2 3 D
39 BMRCL/ 422/RTI/2015 C.GOPINATH N.DELHIPAY & ALLWOANCES PAYABEL TO HIM DURING HIS DEPTUATION ETC.
27/3/15
40 BMRCL/ 427/RTI/2015 DR. GEORGE – BANGALOREREG SOCIAL IMPACK ASSESMENT REPROT
01/04/157/4/15 1 3 D
41 BMRCL/ 428/RTI/2015 DR.GEORGE – BANGALOREREG-SOCIAL IMAPCT OF MANAGEMENT PLAN OF LMC
01/04/157/4/15 1 3 D
43 BMRCL/ 429/RTI/2015 DR.GEORGE – BANGALORREG- ENVIRONMENT IMPACT ASSESMENT STUDY REPROT OFCHRISTIAN MI ORITY INSTITUTION.
01/04/157/4/15 1 3 D
44 BMRCL/MD-800/2015 L.S.MALLIKARJUNAReg-imposing penalty. 25/3/15 27/3/15 3 12 d
ABSTRACT - Mar 2015
Receipts 44Replied/Disposed 44Balance Nil
============================================================================
APRIL 2015 TO MARCH 2016APRIL- 2015
RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
SLNO
FILE NO.DIGITAL LIBRARY NO. NAME OF THE APPLICANT/BRIEF SUBJECT
RECDON
DT.OF OPENIN
GFILE
REPLY SENT ONDATE OF CLOSING/Disposal
FILE
NO. OF NOTE SHEET
S
NO. OFCORRESPONDENT
PAGES
CLASSIFICATION OF FILES
A/B/C/D
REMARKS
01 BMRCL/ 001/RTI/2015 H.PRAMOD – BANGALOREREG- (A) POSITIONS AND DRAWINGS, STATIONS (B) PIERS, PATH OF THE VIADUCT(C) NOTABLE LANDMARKS- ETC.
6/4/15 8.4.15 3 10 D
02 BMRCL/ 002/RTI/2015 RANGAPPA BANGALOREREG-AWARD COPY OF METRO RATE FOR LAND SY.NO.8/1A, 81B, 8/3 13 ETC OF DASARAHALLI ETC
6/4/15 27.5.15 6 14 D
03 BMRCL/ 003/RTI/2015 H.PRAMPOD – BANGALOREREG- PROEPRTIES/LANDS SY.NOS. ETCAPPROVED PROCEEDUR4ES FOR LAND ACQUISITION ETC
6/4/15 2.5.215 4 13 D
4 BMRCL/ 004/RTI/2015 CIVIL AID TECH.PVT.LTD BANGALOREREG-STATUS OF PAYMENT OF Rs.1,09,950/- INVOICE DATED 29.12.2012
10/4/15 17/4/15 2 7 D
5 BMRCL/ 005/RTI/2015Linked to RTI/387/15
H.S.SOMASHEKAR – BANGALORE REG NO OBJECTION TO GIVE DOCUMENTS OF HIS PROPERTY IN SY.NO.418/59, RR NGR. BNAGALORE
10/4/15 9.3.15 1 2 D
6 BMRCL/ 006/RTI/2015 KUMAR VVRP VARTHURLAND AQUISTION DETAILS FOR NEW METRO STATIONS IN PUTTENAHALLI,K ANJANAPURA KKRISHN LEEL APARK ETC.,
11/4/1526.5.15 1 23 D
7 BMRCL/RTI/MD-820/2015Linked to;
RTI/299/300/343/344/2015
SUDHA KATWA –BANGALOREREG – NOT ALLOWING TO USE THE METRO TOILET FOR USE.
11/4/1512/2/15 4 37 D
8 BMRCL/ 007/RTI/2015 NALINI PRAKASH – BANGALORESTREET LEVEL PLANS IN PUTTENAHALLI, ANJAPURA ROAD, KRISHNA LEELA PARK AND VARJAHALLI ETC.
15/4/1528.5.15 1 15 D
9 BMRCL/ 008/RTI/2015 C.RAMACHADNRAIAH – BANGALOREREG- DETAILS OF CONSTRUCTION OF COMMERCIAL SHOPS IN IN PPTY NOL 622/142 IN YALANKA WARD
15/54/1516.5.15 2 4 D
10 BMRCL/ 009/RTI/2015 REG-NO.OF APPLICANTS FOR SO/TO APPLIED SELECTED ETC.
16/4/157.5.15 2 11 D
11 BMRCL/MD-827/2015
Through GOK, UDD
S.C.DANAPPA KAMPLI BELLARYBHARATHIYA DALLITHA PANTHERFUNDS FOR THE YEAR 2015-15 SC/ST IN BMRCL ETC.
16/4/15 25.5.15 2 10 D
12 BMRCL/MD-828/2015
Through GOK, UDD
ANJENAYA – BANGALOREBHARATHIYA DALLITHA PANTHERFUNDS FOR THE YEAR 2014-15 SC/ST IN BMRCL ETC.
16/4/15 27.4.15 2 8 D
13 BMRCL/ 010/RTI/2015 NARASIMHAMURTHY- BANGALOREAWARD COPY OF SY.NO.42/2 PEENYA 17/4/15
14 BMRCL/ 011/RTI/2015 MRS.MADHULEKHA ADV. BNAGALOREREG ANYACQUISITION IN SY.NOS. 50/2 AQND 50/3 OF ALLALASANDRA VILLAGE PRESENT STATUS AND ETC.
27/4/15 29/4/152 5
D
15 BMRCL/ 012RTI/2015 MRS.MADHULEKHA ADV. BNAGALOREREG ACQUITION IN SY.NO. 41/1, 41/1B ETC IN SHIVANAHALLI BNAGLAORE NORTH TALUK
27/4/115
16 BMRCL/ 013/RTI/2015Lin to RTI/001/2015
H.Pramod – BangaloreEXACT POSITION OF PIERS AND VIDADUCTDRAWINGS OF STATIONS AND CONCOURSEAuto cad soft copy etc.
27/4/15 8.4.15 3 1- D
17 BMRCL/ 014/RTI/2015 JOTHI ANBIAH, - Ref: (Dr.George)REG LAND ACQUISTION DETAILS OF LMC COLLEGEETC. (Application not clear)
27/5/15
18 BMRCL/ 015/RTI/2015 ANKIT GUPTA ADVCOATE NEW DELHI REG DETAILS OF NO.OF PASSENGERS TRAVELLING IN 8 COPARTMENTS , WEIGHT, RISK INVOVLED ETC
27/4/15 15.5.15 1 4 D
19 BMRCL/ 016/RTI/2015 VENKATARATHNAM – BANGALOREDETAILS OF EMPLOYEES IN BMRCL - SHOPS AND ESTT. DETAILS.
MAY- 2015RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
SLNO
FILE NO.DIGITAL LIBRARY NO. NAME OF THE APPLICANT/BRIEF SUBJECT
RECDON
DT.OF OPENIN
GFILE
REPLY SENT ONDATE OF CLOSING/Disposal
FILE
NO. OF NOTE SHEET
S
NO. OFCORRESPONDENT
PAGES
CLASSIFICATION OF FILES
A/B/C/D
REMARKS
1 BMRCL/ 017/RTI/2015Link to 002/RTI/2015 of April 2015
RANGAPPA – BANGALOREREVISED APPLICATION RECEIVED
2 BMRCL/ 018/RTI/2015 TEJUS 7 RAVI KIRAN CHARTERED ACCOUNTANTDETAILS OF PROEPRTY TO BE ACQUIRED NEAR JAYADEVA HOSPITAL ETC;
3 BMRCL/ MD-851/RTI/2015THOUGH GOK UDD letter
dt. 28.4.15
K.N.KRISHNAIAH SHETTY, BANGALOREREG HOW TO APPLY FOR A JOB IN BMRCL ADDRESS, TEL ETC.
4 BMRCL/ 19/RTI/2015 C.GOPINATH N.DELHIREGARDING INFORMATION SENT. ONCE AGAIN A COPY SENT TO HIM.
13/5/15 13/5/15
5 BMRCL/ 20/RTI/2015 SHRI B.SHAKOOR – BANGALORESTATUS OF LAND NOTIFICATION REG SY.NO.34 KENGERI VILLAGE
6 BMRCL/ 21/RTI/2015 NIRANJAN J.KIRVADI – WHITEFIELD MAIND ROADDETAILED PROJECT REPORT (DPR) FROM Byappanahalli to Whtiefield phase-II
14/5/1
7 BMRCL/ 22/RTI/2015 ISSUE LETTER FROM BMRCL PUTTENAHALLI METRO NO.25 LOCATED AT YELECHANAHLLI
18/5/15
8 BMRCL/ MD-875/RTI/2015 ªÉ¨ï¸ÉÊmï°è ªÀiÁ»w ºÀPÀÄÌ D¢ü¤AiÀĪÀÄ 2005 gÀ ¥ÀæPÀgÀt 491) ªÀÄvÀÄÛ 491)©) UÀ¼Àr ªÀiÁ»wAiÀÄ£ÀÄß ¥ÀæPÀn¹gÀĪÀ §UÉÎ.
18/5/15
9 BMRCL/ MD-872/RTI/2015 KIRAN S.J. – BANGALORE Number of new cars bought by the Government of Karnataka from May 203 to May 2014.
18/5/15
10 BMRCL/ 23/RTI/2015 S.T.VIJAYA BANGALOREDPR AND ALIGNMENT PLAN COPY PHASE –II (Reach-6) from nagavara to Gottigere.
19/5/15
11 BMRCL/ 24/RTI/2015 P.NARAYAN BANGALOREREG-GAZETTE NOTIFICATION PHASE-II RECH -6 NAGAWA TO GOTTIGERE
19/5/15
12 BMRCL/ 25/RTI/2015 A.VENKATESH BANGALOREREG PHAS-II REACH-6 VENKATESHWARA STATION A.G.CHURCH IR MARKED FOR ACQUISITION DETAILS WANTGED
19/5/15
13 BMRCL/ 30/RTI/2015 GURUDATH KINI BANGALOREREG LAND ACQUISITION IN SY.NO. 25/2b, DASANAPURA HOBLI PRELIMINARY NOTIFN.
21/5/15 GM LA E21/5/15
14 BMRCL/ 31/RTI/2015 KRISHNA DUTT SHARMA – NEW DELHIREG LAND ACQUIRED IN KERNGERI, LETTER TO BMRCL ETC.
22/5/15 GM LA E22/5/15
15 BMRCL/ MD-879/RTI/2015THROUGH GOK UDD
MOHAN BEERAPPA MALIGERA, ADVCOATEHUBLI- SINCE 1994 DETAILS OF NO. BOARDS & CORPORATIONS, CHAIRMAN, FUNDS RELEASED SPENT ETC;
23/5/15
16 BMRCL/ 32/RTI/2015Link- RTI/006/2015
Kumar VVRP REQUEST INFORMATION FOR UNANSWERED QUESTIONS - CLARIFICATION
25/5/1520/5/15 2 25 D
17 BMRCL/ MD-897/RTI/2015GOK UDD
ANNUAL REPORT OF RTI CELL FOR THEYEAR 2014-15
27/5/15
JUNE - 2015RTI Applications Receipts/Disposal under 4(1) a of RTI Act 2005
SLNO
FILE NO.DIGITAL LIBRARY NO. NAME OF THE APPLICANT/BRIEF SUBJECT
RECDON
DT.OF OPENIN
GFILE
REPLY SENT ONDATE OF CLOSING/Disposal
FILE
NO. OF NOTE SHEET
S
NO. OFCORRESPONDENT PAGES
CLASSIFICATION
OF FILESA/B/C/D
REMARKS
1D.Lib.No.BMRCL/0156/RTI/2015
top related