DESCRIPTION

CEZ WIND FARMS IN ROMANIA FANTANELE, COGEALAC ADRIAN BOROTEA CORPORATE AFFAIRS DIRECTOR CEZ ROMANIA. COMMUNICATION FROM THE eu COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011 RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS. - PowerPoint PPT Presentation

TRANSCRIPT

CEZ WIND FARMS IN ROMANIAFANTANELE, COGEALAC

ADRIAN BOROTEACORPORATE AFFAIRS DIRECTOR

CEZ ROMANIA

COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS

2

COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (2) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS

3

RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETSSUPPORTING SCHEMES

4

MEMBER STATES PROGRESS IN REACHING RENEWABLE TARGETS

5

CEZ GROUP IS AN INTERNATIONAL UTILITY WITH A STABLE POSITION IN DOMESTIC MARKET AND A GROWING PORTFOLIO IN CEE

6

CZECH REPUBLIC: RENEWABLES SUPPORT

ROMANIA: SUPPORTING SCHEME

9

CEZ WINDFARM PROJECT IN ROMANIA WILL BE THE LARGEST ON-SHORE IN EUROPE

10

CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW

11

CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW

12

WIND TURBINE PARTS WERE DELIVERED FROM DIFFERENT PARTS OF THE WORLD VIA MIDIA HARBOR

13

120 TURBINES EACH OF 2.5 MW WERE INSTALLED AT FANTANELE BY THE END OF 2010

14

THE MAIN TRANSFORMER STATION AT TARIVERDE WAS THE FASTEST TO BE BUILT IN ROMANIA

15

THE FIRST TURBINE WAS ENERGIZED IN JUNE 2010

16

CEZ GROUP INVESTMENT BRINGS MANY BENEFITS ALSO TO LOCAL COMMUNITIES WHERE THE WIND FARM WILL OPERATE

17

CEZ GROUP USED LOCAL EXPERIENCE DURING SUCCESSFULL IMPLEMENTATION OF THE WIND FARM PROJECT

THANK YOU VERY MUCH FOR YOUR KIND ATTENTION!