REC Mechanism----

Execution Details

REC MechanismRenewable Energy Certificate (REC) mechanism is a market based instrument to promoterenewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimedat addressing the mismatch between availability of RE resources in state and the requirement ofthe obligated entities to meet the renewable purchase obligation (RPO).

Revenue for a RE generator under REC scheme includes revenue from the sale of electricitycomponent of RE generation and the revenue from the sale of environmental attributes in theform of RECs.

RevenueSale of Electricity

Sale of REC Certificate

Financials RECPer MW Optimistic Conservative Radically Pessimistic

Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores

Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units

Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit

Tariff Escallation 5% 3% 3%

Max possible tariff Rs 8 Rs 7 Rs 6

Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unitPrice of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unit

Price of REC after 5 years RS 6/unit Rs 4.0/unit Zero

Exim financing 50% of Cost No No

Interest rate (Exim) 10% NA NA

Interest rate (domestic) 12.50% 13% 14%

Tenor for Exim 15 years NA NA

Tenor for domestic 12 years 12 years 12 years

Accelerated depreciation Yes YES Yes

Equity IRR 90% 40% 16%

Accreditation

30 days

42 days

Execution PlanExecution Plan

Reg forproject

0 1 2 3 4 5 6

MOU

Accreditation

Registration

Open Access

Comissioning

42 days

Setting up of the project

42 days

Issuance

Documentation with Electricity Dept

Process of Accreditation

ELIGIBLEEntity

STATE AGENCY

SLDC - RVPN

1

2

3a

3b

Verification priorto accreditation

Intimation toaccreditation

Application toaccreditation

Confirmation toaccreditation

NLDC – Central agency

3a

3cIntimation toaccreditation

Confirmation toaccreditation

AccreditationAccreditation

0 7 14 21 28 35 42

Submission

Re Submit

Processiong

5 days

7 days

30 Days

Certificate

Check

Sec A Owner Details

Sec B Operator Details

Sec C RE Generating Station Details

Format 1.1

AccreditationAccreditationAccreditationAccreditation

Sec C RE Generating Station Details

Sec D Connectivity Details with Concerned Licensee (STU/Discom)

Sec E Metering Details

Sec F Statutory Clearance Details

Sec H Details of Fee & Charges

Sec G General Details

Section I : Declaration

Format 1.2 CERTIFICATE OF ACCREDIATION

Sec A

Sec B

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec F

Sec H

Sec G

Sec B

Sec A

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec F

Sec H

Sec G

Sec C

Sec A

Sec B

Sec D

AccreditationAccreditationAccreditationAccreditation

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec F

Sec H

Sec G

Sec D

Sec A

Sec B

Sec C

AccreditationAccreditationAccreditationAccreditation

Sec D

Section I : Declaration

Format 1.2

Sec E

Sec F

Sec H

Sec G

Sec A

Sec B

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Sec E

Section I : Declaration

Format 1.2

Sec D

Sec F

Sec H

Sec G

Sec A

Sec B

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Sec F

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec H

Sec G

Sec A

Sec B

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Sec G

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec F

Sec H

Sec A

Sec B

Sec C

Sec D

AccreditationAccreditationAccreditationAccreditation

Sec H

Section I : Declaration

Format 1.2

Sec D

Sec E

Sec F

Sec G

Process of Registration

ELIGIBLEEntity

STATE AGENCYSLDC - RVPN

1

2

3a3c

3b

Verification forregistration

Intimation ofRegistration

Intimation ofRegistration

Application forRegistration

Confirmation toRegistration

POWEREXCHANGE

3d

Intimation ofRegistration

NLDC –Central agency

RegistrationRegistration

0 7 14 21 28 35 42

Check

Submission

2

incomplete

Processing

Fees Submit

Certificate

Check 2

7 work day

15 days

15 days

RegistrationRegistration

Sec A Owner Details

Sec B RE Generating Station Details

Sec C Copy of Certificate of Accreditation from State Agency

Format 2.1 Application for Registration of RE Generating as Eligible Entity

RegistrationRegistration

Sec C Copy of Certificate of Accreditation from State Agency

Sec D Commissioning Schedule

Sec E Details of Fee & Charges

Sec F Declaration

Section I : Declaration

Format 2.2 CERTIFICATE OF REGISTRATION

RegistrationRegistration

Sec A

Format 2.1

Sec B

Sec C

RegistrationRegistration

Section I : Declaration

Format 2.2

Sec C

Sec D

Sec E

Sec F

Sec B

Format 2.1

Sec A

Sec C

RegistrationRegistration

Section I : Declaration

Format 2.2

Sec C

Sec D

Sec E

Sec F

Sec C

Format 2.1

Sec A

Sec B

RegistrationRegistration

Sec C

Section I : Declaration

Format 2.2

Sec D

Sec E

Sec F

Format 2.1

Sec A

Sec B

Sec C

RegistrationRegistration

Sec D

Section I : Declaration

Format 2.2

Sec C

Sec E

Sec F

Format 2.1

Sec A

Sec B

Sec C

RegistrationRegistration

Sec E

Section I : Declaration

Format 2.2

Sec C

Sec D

Sec F

Format 2.1

Sec A

Sec B

Sec C

RegistrationRegistration

Sec F

Section I : Declaration

Format 2.2

Sec C

Sec D

Sec E

Sec A

Sec B

Sec C

Format 2.1

RegistrationRegistration

Sec C

Sec D

Sec E

Sec F

Section I : Declaration

Format 2.2

Process of Open Access

Power Ex

NLDC

Urja Bhawan

RREC

Open AccessOpen Access

0 10 20 30 40 50 60

Submission

MOU

incomplete

Processing

System stren

System Study

Submission

10 day

30 days

30 days

???

Form I APPLICATION FOR SCHEDULING

Form II CONCURENCE FROM SLDC

Form III REQUEST/CONCURRENCE FROM RLDC

Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING)

Open AccessOpen Access

Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING)

Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION

Form VI ACCEPTANCE FOR SCHEDULING

Form VIII REGISTRATION FORM

Form VII DETAILS OF PAYMENT

Commissioning

Process of Issuance

2

3

Verification priorto Issuance

Intimation toIssuance

Issuance ofREC

Intimation of Meter Reading

5b

Regular Injection

Report

STATE AGENCY

NLDC – Central agencySLDC - RVPN

ELIGIBLE Entity

14b

5a

Issuance ofREC

Application forIssuance

Intimation of Meter Reading

DistributionLicensee

4a

4c

SLDC - RVPN

IssuanceIssuance

0 7 14 21 28 35 42

2Check

Submit

Incomplete

Processiong

2

5 days

15 days

Certificate

Check

IssuanceIssuance

Sec A Energy Injection Report

Sec B Registration Certificate (To ascertain validity)

Format 3.1

Sec B Registration Certificate (To ascertain validity)

Sec C Details of Fee & Charges

Sec D Compliance Auditor Report (if applicable)

Format 3.2 CERTIFICATE OF ISSUANCE

IssuanceIssuance

Sec A

Format 3.1

Sec B

Sec C

Format 3.2

Sec C

Sec D

IssuanceIssuance

Sec B

Format 3.1

Sec A

Sec C

Format 3.2

Sec C

Sec D

IssuanceIssuance

Sec C

Format 3.1

Sec A

Sec B

Sec C

Format 3.2

Sec D

IssuanceIssuance

Format 3.1

Sec A

Sec B

Sec C

Sec D

Format 3.2

Sec C

IssuanceIssuance

Sec A

Sec B

Sec C

Format 3.1

Sec C

Sec D

Format 3.2

Application

Execution time

Forms

Application

Execution time

FormsI Company Details

II Proposed Power Project

III Details of Proposed Power Project

IV Electrical DetailsIV Electrical Details

V Financial Details

VI Any Other relevant information

VIII Documents enclosed – As applicable

VII Declaration

Application

Execution time

FormsI Company Details

II Proposed Power Project

III Details of Proposed Power Project

IV Electrical DetailsIV Electrical Details

V Financial Details

VI Any Other relevant information

VIII Documents enclosed – As applicable

VII Declaration

Services Offered

Conceptualization Execution Project MonitoringConceptualization

Monitoring

Execution Project Monitoring

Land Identification

Funding

Feasibility Study

Rebates and Incentives

Quality

Design

Procure

Install

Testing and Certification

Maintenance

Providing Engineering Excellence in every Step

Scope of Work

Business ModelIncorporating Renewable Incentives and Policy changes to get maximum outof the Business Model

Technical

Proposals

Finance

Tie ups

Investor

Incorporating Renewable Incentives and Policy changes to get maximum outof the Business Model

Forming JV for FI’s and facilitating tie ups with Indian Companies.Overcoming legal hurdles to ease Investments in India

Consulting about best technology for Solar projects, based on the locationand the cost.

Pre Bid and Post Bid Consultancy for lucrative but competitive for Solartenders in India

Arranging Funds and Optimizing it to get maximum returns on Equity

Making strategic tie-ups for Foreign companies looking for Solar BusinessOpportunity in India

Contact us:-410, Alankar PlazaJaipur, RajasthanPh no :- +91 141 2231469Fax :- +91 141 3916464Mob no :- +91 – 9829031658Email :- agm@greenergytechnologies.in

Thank You

Contact us:-410, Alankar PlazaJaipur, RajasthanPh no :- +91 141 2231469Fax :- +91 141 3916464Mob no :- +91 – 9829031658Email :- agm@greenergytechnologies.in

Our Business Associations

Power Ex

NLDC

Urja Bhawan

RREC

S.No Type Charges

1 Registration for the project Rs 10,000 / MW

Registration Charges Rs 50,000/ MW

Processing Charges Rs 10,000 / MW

2 Accreditation Charges

3 Registration for certificate

4 Issuance for Certificates

Compliance Auditor