9NR UNITED STATESC NUCLEAR REGULATORY COMMISSION

ANNOUNCEMENT NO. 26DATE: March 19,1980

.

TO: Directors of Offices, Divisions and Regional Offices,Assistant Directors and Branch Chiefs

SUBJECT: RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION

The Office of Nuclear Reactor Regulation is being reorganized toreflect the nature of the expected workload during the next fewyears, to pennit the most effective implementation of recommendedchanges and improvements identified by the various TMI accidentinvestigations, and to provide for the most effective and efficientutilization of available resources. Some of the major features ofthe new organization are as follows.

(1) A new Division of Human Factors Safety is devoted totallyto supporting the operational and people-oriented aspectsof safety. .

(2) All project managers are consolidated into a Division ofProject Management, thus promoting the expansion andstrengthening of the authority and responsibility of theproject managers. Technical disciplines are largely cen-tralized into a Division of Engineering and Division ofSystems Integration, thus eliminating diffusion of technicalexpertise and assuring effective interchange and applicationof reystrements and experience between operating plant andlicensirig reviews.

(3) It maintains, reinforces and institutionalizes a separate-

organizational element, a Division of Safety Technology, forthe timely development of solutions to generic safety issues

L as well as other management and procedural improvements which| NRR has evolved since the TMI accident.

(4| The organization as a whole is designed to provide an inter-disciplinary systems approach to licensing reviews, operatingproblems and generic issues,

90 O gof0 3_ _ _ _ . . . . _ -

- - - -

.

. .

|

| -2-i

;

The organizational structure and supervisory / management assignments atthe branch chief level and above are shown on the accompanying charts.The following eight vacant SES positions will be posted and filledcompetitively.

8

(1) Director, Planning & Program Analysis Staff(2) Deputy Director, Division of Human Factors Safety

Chief, Licensing Projects Branch 3Chief, Systematic Evaluation Program BranchChief, Human Factors Engineering BranchChief, Emergency Preparedness BranchChief, Operating Experience Evaluation Branch

8) Chief, Reliability Assessment Branch

We intend to implement this new organization as soon as practicable.Functional descriptions of the components, as well as other details,are being developed and will be issued shortly as revised NRC ManualChapter 0123.

/4 *r M S b _Harold R. Denton, DirectorOffice of Nuclear Reactor Regulation

h: J.)-um Ms2ApproYe..y 'd:.

William J. Dircks, Acting, EDO

-- .- . -

_ _ _ _ _ _ - _ _ _ _ _ _ - _ __ _

.

.

Office of Nuclear Reactor Regulation '

Director *

Harold R. DentonDeputy DirectorEdson G. Case

Planning & ProgramTMI Program Office Analysis Staff

Pmg a$a t"Va acaDeputy

Program ManagerJohn T. Collins _ Resource & Scheduling Branch

Frank J. Miraglia, Chief_ Management Analysis Branch

Herbert N. Berkow, Chief_ Technical Support Branch

William T. Russell, Chief

1

'i

Division of Project Division of Division of Systems Division of Human Division of Safety(

Management Engineerin9 Integration Factors Safety i Technology

)-

!

!

i

h'

.

t

i

. _

,

..

4

.

.

Division of Project ManagementDirector '

Darrell G. EisenhutDeputy Director

Robert A. Purple

.___-,i

Assistant Director for Operating ! Assistant Director for Licensing Assistant Director for ProjectsReactor Management Management & TechnologyThomas Novak Richard P. Denise Brian K. GrimesI i

- Operating Projects Branch 1 - Licensing Projects Branch 1 Operating Projects Branch 5Steven A. Varga, Chief B. Joe Youngblood, Chief Dennis M, Crutchfield, Chief_0perating Projects Branch 2 _ Licensing Projects Branch 2 _ Systematic Evaluation Program BranchThomas A. Ippolito, Chief Albert Schwencer, Chief Vacant

O~ perating Projects Branch 3 Licensing Projects Branch 3 Operating Reactors Evaluation BranchRobert A. Clark, Chief - Vacant Gus C. Lainas, ChiefOperating Projects Branch 4 Special Projects Branch _ Emergency Preparedness BranchRobert W. Reid, Chief - James R. Miller, Chief Frank G. Pagano, Chief (Acting)

4

I

.

D

5

h

4

_ . . . _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ __

. - _ - - ._. ._ . _. _ ._ _ _ . -- .

,

. .. .

1

'

. , .Division of Engineering

'

DirectorRichard H. Vollmer '

'.

I |g

Assistint Director for Components Assistant Director for Materials & l Assistant Director for Environmental& Structures-Engineering Qualifications Engineering TechnologyJames P. Knight Vincent S. Noonan Daniel R. Muller

.

Mechanical Engineering Branch -Materials Engineering Branch Environmental Engineering Branch-

Robert J. Bosnak, Chief Stefan S. Pawlicki, Chief Ronald L. Ballard, Chief-

_ Civil Engineering Branch _ Chemical Engineering Branch _ Siting BranchFranz P. Schauer, Chief Victor Benarnya, Chief William H. Regan, ChiefGeosciences Branch Environmental Qualifications Branch Utility Finance Branch-

Robert E. Jackson, Chief - Zoltan R. Rosztoczy, Chief Jerome D. Saltzman, Chief-

Hydrologic Engineering Branch Quality Assurance BranchGeorge E. Lear, Chief Walter P. Haass, Chief !

-

'

|i

:

|

|

|

i~

i

_ _ _ - - _ _|

. '

. .

.

Division of Systems IntegrationDirector

Denwood F. Ross

|I

IIAssistant Director for Assistant Director for Assistant Director for!Plant Systems i Radiation Protection Reactor Safety

Paul S. Check | William E. Kreger i Robert Tedesco!

,

,- Instrumentation & Control f Accident Evaluation Branch - Reactor Systems Branch| Systems Branch Robert W. Houston, Chief Themis P. Speis, Chief-

| R:dney M. Satterfield, Chief

Power Systems Branch h Radiological Assessment Branch- Core Performance Branch

-

Faust Rosa, Chief ; Thomas D. Murphy, Chief Lester S. Rubenstein, Chief '

|

'b Containment Systems Branch Effluent Treatment Systems Branch - Systems Interaction Branch

-

Walter R. Butler, Chief William P. Gammill, Chief John F. Stolz, Chief|

' Auxiliary Systems BranchOlan D. Parr, Chief

|

0

l1

I

|

.

=- .

, ,

. - . .-.

.,

4

.

.

. -

Division of Human Factors Safety.

Director '

Stephen S. Hanauer

'Deputy DirectorVoss A. Moore (Acting)

- Human Factors Engineering Branch: Vacant ''

- Operator Licensing Branchj Paul F. Collins, Chief

'

Licensee Qualifications Branch-

Domenic B. Vassallo, Chief.

- Procedures & Test Review BranchDennis L. Ziemann, Chief

C,

4

4

.

e

4

0

4

-

-

-. ~. .

.

.

Division of Safety Technolcgy-

I Director 4

Roger J. Mattson

I

Assistant Director for Generic. Projects Assistant Director for TechnologyI Review

{ Frank Schroeder[ Malcolm L. Ernst

! Generic Issues Branch.' Karl Kniel, Chief _ Safety Program Evaluation Branch

.

Robert L. Baer, Chief:i: Licensing Guidance Branch| Donald J. Skovholt, Chief _ Operating Experience Evaluation Branch

Carl H. Berlinger, Chief (Acting)'

Research & Standards Coordination Branch Reliability Assessment Branch"George W. Knighton, Chief m

Vacant

i

.

4

i

e

h

- _ - - - ----- --- -- - -

~

EZZ_ -- _ - - - - - - - - - - - -.

**.,

-

, ,

4j -. -- -- - , ,

ACTION CONTROL DATES CONTROL NO'

i FHOM: COMPL DEAOLINE j f f t/ml EII. d+ I NIM / ' DATE OF DOCUMENT

|Fwnasselur Polytechnic Institute ACKNOWLEDG MENT

INTERIM REPLY g f ] q f _. 3PREPARE FOR BIGNATURE

| ,

} TO: CHAIRMAN' **

O EXECUTIVE DIRECTORhJf.04|$$|Q4Cr d}ggrfgg FILE LOCATipN * ,r / 4' OTHER: thnt?M;

f SPECI AL INSTRUCTIONS CR REMARKSD ESCRIPTION O LETTER O MEMO O REPORT O OTHERre efforts to set up a aceting to discusstua nce.1 for fucreased trainiW) Of utilitywicatives i operational perswool. And tin

ssrole tu: ulursities en play in the pruci

CLASSIFIED DATA'CLASSIFIC ATION|DOCUMENT / COPY NO. ggggQCATEGORYNUMBER OF PAGES

O NSI O RO O FRO| POST AL REGIST RY NO. LEGAL REVIEW O FINAL 0 Copy

f ASSIGNED TO: DATE INFORMATION ROUTING NO LEG AL OBJECTIONSASSIGNED TO: DATE

[ dentOn 3 / _"6 /.10 $jfCK$ NOTIFY:a EDO ADMIN &CORReSen

Cornellf EXT.',

?.Si'J4 COMMENTS. NOTIFY:EXT.

;

0 YES O NO.lCAE NOTIFICATION RECOMMENDED:

*

{ DO NOT REMOVE THIS COPYEXECUTIVE DIRECTOR FOR OPERATIONSI NRC FOAM 232

PRINCIPAL CORRESPONDENCE CONTROL""*.

O

Y

. . . - .

. -.

,

. .

*'

M* ]hN). Logging Dat) 3/24/80-

NRC SECRETARIAT

TO* O Commissioner DateD Exec. Dir./Oper. O con. Counsei

Cong. Liaison O soiicitorO Public Affairs O secretary

inspector & Auditor

O posiev Ev.iu.t4on

inco,n;ng: Dr. R. T. Lahey, Jr, Chairman

From: Rensselaer Polytechnic Institute

To: Ahearne care 3/13/80suweet: rea meetino with NRC staff on the oost-TMI

'

increased trainino needs of utility executives & ODertrainina

Xb Prepare reply for signature of:

M Chairman Data 1: Cer: April 2

O Commi ioner

E DO. GC, CL, SQ L, P A, S ECY, I A. PE

Signature block omitted

Return onginal of incoming with response-

O ror direct repiv-

O ror appropriate action

For information.

Rec'd 0ff. EI)9 |

m.. . .pg:.h, . .%o.t.. . . . ! 1. . .

.. u .eema.,

|

For the Commission: |6

'

' Send three (3) copies of reply to Sacy Correspondence and Records Branch j

Nnc42 ACTION SLIP