- _ _ _ . _ - - _ - _ _ _ _ _ _ . _ - _ _ _ _ _ - 4 / %, UNITED STATES ' '' . ! NUCLEAR REGULATORY COMMISSION , $ WASHINGTON, D. C. 20HS * October 26, 1988 t Docket No. 50-601 and 50-605 ProjectNos. 669, 675, and 676 MEMORANDUM FOR: L. Shao, Director Divir. ion of Engineering and System Technology, NRR B. Grimes, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation NRR R. W. Houston, Director Division of Safety Issue Resolution, RES B. Sheron, Director , Division of Systems Research, RES FROM: Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate ' Division of Reactor Projects III, !Y, ' Y and Special Projects, NRR SUBJECT: STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS i Attached is the October status report con: erring the current rovirw milestones for each of the standard plant projects (EPRI, ABWR, RESAft SP/90, and CE ' System 80+). Note the "Due Date" column reflects dates established in the January 25, 1938 ' "Revised Prograin Plan for Standard Plant Reviews" or dates fer which modifica. tion was agreed to by PDSNP and the review branch. CONTACT: 1 T. Kenyon, NRR/PDSNP [ 492-1120 ranua%1 i i ' A

Upload: others

Post on 03-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNITED STATES NUCLEAR REGULATORY COMMISSION …

_ _ _ - _ _ _ . _ - - _ - _ _ _ _ _ _ . _ - _ _ _ _ _ -

4

/ %, UNITED STATES'''

.

! NUCLEAR REGULATORY COMMISSION,

$ WASHINGTON, D. C. 20HS*

October 26, 1988 t

Docket No. 50-601 and 50-605ProjectNos. 669, 675, and 676

MEMORANDUM FOR: L. Shao, DirectorDivir. ion of Engineering and

System Technology, NRR

B. Grimes, DirectorDivision of Reactor Inspection

and Safeguards, NRR

F. Congel, DirectorDivision of Radiation Protection

and Emergency Preparedness, NRR

J. Roe, DirectorDivision of Licensee Performance and

Quality Evaluation NRR

R. W. Houston, DirectorDivision of Safety Issue Resolution, RES

B. Sheron, Director ,

Division of Systems Research, RES

FROM: Charles L. Miller, DirectorStandardization and Non-Power

Reactor Project Directorate '

Division of Reactor Projects III, !Y,'

Y and Special Projects, NRR

SUBJECT: STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS i

Attached is the October status report con: erring the current rovirw milestonesfor each of the standard plant projects (EPRI, ABWR, RESAft SP/90, and CE'

System 80+).

Note the "Due Date" column reflects dates established in the January 25, 1938'

"Revised Prograin Plan for Standard Plant Reviews" or dates fer which modifica.tion was agreed to by PDSNP and the review branch.

CONTACT:1 T. Kenyon, NRR/PDSNP [492-1120

ranua%1 i i'

A

Page 2: UNITED STATES NUCLEAR REGULATORY COMMISSION …

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ .

: :-

..

-

. .

.g..

e

The column "Expected Input Date" reflects input from appropriate technicalbranch management. Category 1 items have been discussed with the appropriateAssistant Directors. I request any problems in meeting these input dates beidentified to me by the appropriate Assistant Director within a week of receiptof this memo.

...{ i, . N D.h -[1, 6 .s...

Charles L. Miller, DirectorStandardization and Non-Power

Reactor Project DirectorateDivision of Reactor Projects III, IV,

Y and Special Projects NRR

Enclosure:As stated

cc: T. Murley,

J. Sniezek'

F. Miraglia| D. Crutchfield

L. Rubenstein'

J. RichardsonC. Y. ChengL. B. MarshC. McCrackenA. ThadaniJ. JoyceJ. MaukF. RosaJ. CraigM. W. HodgesB. GrimesR. EricksonD. MatthewsR. BarrettL. CunninghamJ. ZwolinskiS. WeissW. Regan, Jr.J. MurphyG. BagchiS. Newberry

.

.

_ _ _ _ _ _ _ _ . _ - _ _ _ _ - _

Page 3: UNITED STATES NUCLEAR REGULATORY COMMISSION …

. _ _ - _ _

October 26, 1988.

*. .

-2

i

The colur.n "Expected Input Date" reflects input from appropriate technicalbranch managerent. Category 1 items have been discussed with the appropriate|

Assistant Directors. I request any problems in meeting these input dates beidentified to me by the appropriate Assistant Director within a week of receiptof this meno.

/s/Charles L. Miller, DirectorStandardization and Non-Power

Reactor Projett DirectorateDivision of Reactor Projects III, IV,

V and Special Projects, NRR

Enclosure:As stated

cc: T. PurleyJ. SniezekF. MiragliaD. Crutchfieldt.. RubensteinJ. RichardsonC. Y. ChengL. B. MarshC. ftcCrackenA. ThadaniJ. JoyceJ. ItaukF. RosaJ. CraigM. W. HedgesB. GriresR. EricksonD. MatthewsR. BarrettL. CunninghamJ. ZowlinskiS. WeissW. Regan, Jr.J. MurphyG. BagchiS. Newberry

DISTRIEUTION:Docket File EHyltonNRC PDR DScaletti

h (/dP95hP Reading TrenyonCVissing hLeng yChiller LRubenstein \

FDSNP[L AD:PDShP

EHylpon:cw Chiller10/4/88 10/ /88

_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ -

Page 4: UNITED STATES NUCLEAR REGULATORY COMMISSION …

. _ _ - _. .

- *

. ..

~ ~

Date October 26 1988

-.

! REVIEW STATUS REPORT ON~,

WESTI EPOUSE RSAR SP/9_0PDA REVIDI

!

1 Expected

Division / Due InputBranch Reviewer Mocales Subject * Milestone Date Date Cat.** Comments

4

DEST /EMTB Johnson 1, 4, 5, 648, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Completei 10 to P.M. 5/5/88

| DEST /EMEB Rajan/ Brassier *** 1, 4, 5, 7 Mechanical Engineering Draft SER 10/31/88 10/31/88 2 DSER in typingto P.M.

DEST /ESGB ' Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Completeto P.M.

i

i Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Completeto P.M.

4

Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Completeto P.M.

See Septem6er 29,1987 meno for complete listing of review assignments*

Category definitions:**

1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

*** Brasener providing assistanceI

I

l

,

Page 5: UNITED STATES NUCLEAR REGULATORY COMMISSION …

!~

^

,.,.,

*| . .

| Date: October 26,1988 ,

'

.

REVIEW STATUS REPORT ONl. . .

PDA KI. VIEW

(Cont.)

ExpectedDivision / Duc InputBranch Reviewer Modules Subject * Milestone Date Date Cat.** Commients

|

DEST /ECEB Wing 1, 6&8, ID, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Couplete

Notley 13 Fire Protection Draft SER 7/15/88 9/01/88 4 Completeto P.M.

DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 CospleteControls to P.M.

,

DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4 Completeto P.M.

DEST /SPLB Shum(lead) 1, 10, 13 Containment Systems Draft SER 6/21/88 6/21/88 4 Completeto P.M.

Shum (lead) 688, 10, 12, 13 HVAC Systems, Waste Draft SLR 6/21/88 6/21/88 4 CompleteManagement, Steam & to P.M.Power Conversion

See Septem6er 29,1987 meno for complete listing of review assigemaats*

Category definitions:**1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

. . _ - - . . _ . - - _ - - - - _ - . . . . . . , . -. . - _. -- -. .- - _ - _ .

Page 6: UNITED STATES NUCLEAR REGULATORY COMMISSION …

_- ._ . _ __ . - -- - . ..-

*-. ..

Date: Octooer 26,1988 ," l

.

-

REVIEW STATUS REPORT Op.

PDA KtVIEW(cont.)

ExpectedDivisten/ Due Input

Branch Reviewer Modules Subject * Milestone Date Date Cat.** Comments

|

| DEST /SPLB Shum(lead) 4, 6&8, 7, 13 Plant Systems Draft SER 6/21/88 G/21/AR 4 Complete(cont.) to P.M.

DEST /SPLB Tinkler IE PRA Review DSER 11/14/88 11/14/88 2re: PRA

| DEST /SRXB Liang 1, 4, 5, 658 Reactor Systems Draft SER 6/28/88 6/28/88 4 Complete9, 10, 11, 12 to P.M.

; DEST /SRXB Liang 16 PRA Review DSER 11/14/88 11/14/88 3 Reviewers| re: PRA providing| Assistance to

SPLB

DRIS/RSGB Mendelsohn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Completeto P.M.

DLPQ/LQAB Spraal 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete| to F.M.|

See September 29, 1987 seno for complete listing of review assignments*

Category definitions:"*

1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

. - , - - _ _ _ - - - _ - , - , , _ _- - _ _ __ . _ -_ . _ _ . .. ._ .. . . _ _ .

Page 7: UNITED STATES NUCLEAR REGULATORY COMMISSION …

. _ _ _ . .. _ ___ _

|- -

-. ...

t-

Date: October 26, IE8 [

,

*

|| REVIEW STATUS REPORT ON

~ *

| WESHRGNUU5E EL5AR SP/90PDA METIEW

| (Cont.)

Expected,

Division / Due Input|

Brcnch Reviewer Modules Subject * Milestone Date Date Cat.** Comments

! DLPQ/LHFB Lapinski 15 Control Room / Human Graft SER 3/31/88 5/05/88 4 Complete! Factors Engineering to P.M.

DREP/PRPB Spickler 1, 3, 4, S. Radiological Accident Draft SER 8/01/88 8/12/88 4 Complete6&8, 9, 10 Analysis to P.M.

Skopec 12 Process & Effluent Draft SER 7/15/88 7/13/88 4 Complete

|' Radiological to P.M.

Monitoring 1 SamplingSystems

DREP/PRAB Margulies 16 PRA Review DSER 11/14/88 11/14/88 3t

| re: PRA

| RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 7/15/88 7/15/88 4 Complete

| Study - back end SER toP.M.j

See Septester 29, 1987 meno for complete listf- '' review assignments*

Category definitions:**1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

r

,- . . - - _ .. -.--_,- -- _ . - -- - , , . _ . _ . . - . - - - . - - - -_ . - . - - . - . - . - - _ . _ . -. _ - . .

Page 8: UNITED STATES NUCLEAR REGULATORY COMMISSION …

__ - _ - _ - _ -- -

~,.,.,

~

Date: October 2ti.1988 |

.

REVIEW STATUS REPORT ONGE AFWR

*

FDA/DC Rt. VIEW-

ExpectedDivision / SRP Due InputBranch Reviewer Chapter Subject Milestone Date Date Ca t.* Cosmients

DEST /SPLB Chandrasekaran 9 Plant Systems RAIs to 9/30/85 4P.M.

j DEST /SPLb Chandrasekaran 11 Plant Systems RAIs to 9/30/88 2- P.M.

, DEST /SRXB Thomas 5, 6, 15 Reactor Systems RAIs to 10/01/88 10/01/88 4 a revisedP.M. schedule has'

been developedso as not to

i slip the SERissue date

J (3/30/89) DEST'

has agreed tothe proposedschedule

DEST /SELB Lazevnick 8, 9 Power Systems RAls to 9/30/88 ? 2P.M.

DEST /ECEB Witt 7,8,9,11,12,13 Chemical Engineering RAIs To 9/30/88 8/14/88 414, & 17 P.M.

DRIS/RSGB Mendelsohn 13 Safeguards RAIs to 9/30/88 4P.M.

3DLPQ;iOAB Sprual 17 QA RAIs to - -

P.N.

* Category definitions:1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

Page 9: UNITED STATES NUCLEAR REGULATORY COMMISSION …

._

"..-.

' "' Date: October 26, 1988 ,

-.

REVIEW STATUS REPORT ONGE ABI5t

FDA/DC n VIEW'"

(Cont.)

ExpectedDivision / SRP Due InputBranch Reviewe - Chapter Subject Milestone Date Date Cat.* Comments

DREP/PRPB Brown 15 Radiation Protection Draft 7/31/88 9/30/88 2 8/19/88 mensSER committing to

to 9/30/88 SERinput

DREP/PRP8 Pederse.1 12 Radiation Pr7tection RAI to 9/30/88 10/29/83 4P.M.

DEST /EMEB Rajan 4, 5, 6, 15 Mechanical Eng|neering Draft 7/31/88 9/29/88 4(Code Cases) SER

-

DEST /EMEB Rajan 1, 2, 3 Mechanical Engineering RAls to 6/30/88 9/13/88 :1 P.M.

* Category definitions:1. AD or above sttention requested2. Branch Chief attention requested3. On schedule4. Complete

. __ . - - _ _ - - _ _ . _ - - _ _ . _-_ - .- . . - _ . - - - _ - - - . . , - . _ - . . . - _ . - _ . . . .

Page 10: UNITED STATES NUCLEAR REGULATORY COMMISSION …

- . - --_

' ,=.*,

~

Date: October 26,1988

REVIEW STATUS REPORT ON .

CE 5Y5ILM 80+Ct551.E-DC REVIEW

, ,

ExpectedDivision / Due InputBranch Reviewer Chapter Subject Milestone Date Date Cat.* Cossents |

DEST /EMTB M. Hum 4 Rev 8 R? actor PAI 07/10/88 10/13/88 4

DEST /EMTB M. Hum 5 Rev B Reactor Coolant System RAI 07/10/88 10/13/88 4,

DEST /EMEB J. Rajan 5 Rev C Reactor Cooling System RAI 09/30/68 09/30/88 No Comments

DEST /SRIB L.Kopp 5 Rev C Reactor Cooling System RAI 09/30/88 09/30/88 2|

| DEST /EMTB M. Hum 5 Rev C Reactor Coolant System RAI 09/30/88 10/13/88 4

DEST /SPLB J. Raval 5 Rev C Reactor Coolant System RAI 09/30/88 09/30/88 4

DEST /ECEB ' F. Witt 5 Rev C Reactor Coolant System RAI 09/30/88 10/26/68 3

| DEST /SPLB J. Raval 6 Rev C Engineered Safety Features PAI 09/30/88 09/30/88 4

|

| DEST /ECEB F. Witt 6 Rev C Engineered Safety Features RAI 09/30/88 10/26/88 3

DEST /EMTB M.11um 6 Rev 'J Engineered Safety Features RAI 09/30/88 10/13/88 4

DEST /SPLB J. Raval 10 Rev C Steam & Power Conversion RAI 09/30/88 09/30/88 4System

DEST /ECEB F. Witt 10 Rev C Steam & Power Conversion RAI 09/30/88 10/26/88 3System

* Category definition:1. AD or above attention requested2. Bran ( Chief attention requested3. On schedule4. Complete

.._ _ . _

Page 11: UNITED STATES NUCLEAR REGULATORY COMMISSION …

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

. - .,.

,

Date: October 26, 1988 ,

REVIEW STATUS REPORT ON -

CE SYSTEM 60+CESSAR-DC RtWIEW

''

(Cont'd)

ExpectedDivision / Due Input

Brrcch Reviewer Chapter Subject Milestone Date Date Cat.* Comments

DEST /EMTB M. Hum 10 Rev C Steam & Power Conversion RAI 09/30/88 10/13/88 4System

RES/DRAA/ E. Che111ah Base Line Sase Line PRA Comments 10/30/88 10/30/88 3

PRAB PRA|

DEST /ESGB N. Ror.ney 2 REY D Site Characteristics RAI 12/30/88 12/30/88 3 j

DREP/PREB R. Van Niel 2 PEV D Site Characteristics RAI 12/30/88 12/30/88 3

DEST /ESGB N. Romney 2 REV D Structures Components RAI 12/30/88 12/30/08 3

DEST /EMEB J. Rajan 3 REV D Structures, Components RAI 12/30/88 12/30/88 3

DEST /EMTB H. Hum 3 PEV D Structures, Components RAI 12/30/88 10/17/88 4

DEST /SPLB J. Raval 3 REV D Structures, Components RAI 12/30/88 12/30/88 3

DEST /SRDB L. Kopp 4 REV D Reactor RAI 12/30/88 12/30/88 3

DEST /EMTB M. Hum 4 REV D Reactor RAI 12/30/88 10/17/88 4

DEST /EMEB J. Rajan 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 3

o Category definition:1. AD or above attention requested2. Branch Chief attention requested3. On schedule4. Complete

Page 12: UNITED STATES NUCLEAR REGULATORY COMMISSION …

. . - -.. - - - - - - - - - - - - - - - - -

.

,

~

Date: October 26,1988'

REVIEW STATUS REPORT ON-

CE 3Y31tn 50+CE353NICRTfDi

'

(cont'd)

Espected

Division / Due InputBranch Reviewer Chapter Subject Milestone Date Date Cat.* Comments

DEST /SRX8 L. Kopp 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3

DEST /EMT8 M. Hun 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 4

DEST / SPL8 J. Raval 5 REV D Reactor Crolant System RAI 12/30/88 12/30/88 3

DEST /SPL8 F. Witt 5 REY D Reactor Coolant System RAI 12/30/8" J/30/88 3

DREP/RGS8 8. Mendelsohn 5 REY D Reactor Coolant System RAI 12/30/88 12/30/88 3

DEST /SPL8 J. Raval 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3Features'

DEST /SRIB L. Kopp 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3Features

DEST /ECE8 F. Witt 6 REY D Engineered Safety RAI 12/30/88 12/30/88 3

Features|

|

* Category definition:1. AD or above attention regsested2. Branch Chief attention requested3. On schedule4. Complete

Page 13: UNITED STATES NUCLEAR REGULATORY COMMISSION …

-. ___ _ _ _ _ _

' *-

. ,..

.

' '

Date: October 26,1988 ,

REVIEW STATUS REPORT ON'

-

CE SY5ILM 80+CEI5XIF-UC'ETTEW

*

(Cont'd)

ExpectedDivision / Due input

Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments

DEST /ENTB M. Hum 6 REY D Engineered Safety RAI 12/30/88 12/30/88 4

Features

DEST /SICB J. Stewart 7 REV D Instrumentation & R4I 12/30/88 12/30/88 3Controls

DLPQ/LHFB G. Lapinski 7 REV D Instrumentation & RAI 12/30/88 12/30/88 3Controls

DLPQ/LHFB G. Lapinski 18 REV D Human Factors Engineering RAI 12/30/88 12/30/88 3

* Category defiettion:1. AD or above attention rysted2. Branch Chief attention raluested3. On schedule4. Complete

- , _ - _ _ _ . _ _ _ _ _ _ __ _.__ _ _ _ . _ _ _ .__ _ _

Page 14: UNITED STATES NUCLEAR REGULATORY COMMISSION …

. - _ _ _ _ _ - - -- ,

~

.''* .

Date: October 26, 1988 ,

*

REVIEW STATUS REPORT ON .

SYSItn 80 ct55AF-F~

,KtTIEW

ExpectedDivision / Due Input

Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments

DEST /SRIB C. 1.iang TAC 66400, ASPSS ISSUE Final SER open open 3 Wating res-to P.M. ponse from

CE on RAI

DEST /EMEB J. Rajan TAC 66401 Steam Gen. Tube Vibration RAIs to oper. open 3 Waiting res-P.M. posse frem

CE on RAI

DEST /EM'8 W. Wickman TAC 66401, Steam Gen. Tube Vibration RAls to open open 3 Waiting res-P.M. ponse from

CE on RAI

DREP/PRPB 1. Spickler tan. 66400 ASPSS ISSUE (SFT Rupture) Final SER open open 3 Waiting res-to SRIB/PM ponse from

CE on RAI

|

| Category definition:*

| 1. AD or above attention requested| 2. Branch Chief attention requested

| 3. On schedule4. Coglete'

** Close out issue

1

!

. __ _.__ _ ___ _ __ _ ... _... _ .____ _ __ _ _ _ - _ . _ _ ,_ __ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ __ ._,_ _ _ __

Page 15: UNITED STATES NUCLEAR REGULATORY COMMISSION …

_ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

',.*-.

Date: October 26,1988 ,

.

REVIEW STATUS REPORT ONCE 5T5ItR 80+

CE N'

AEFTUFICTAFERS

ExpectedDivision / Due InputBranch Reviewer Chapter Subject Milestone Date Date Ca t.* Comments

RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 09/16/88 4 CommentsNo. I provided

CE at meeting6/21/88

RES/SAIB C. Ferrell, et al Topic Paper Set 6 ARSAP Issues RAI 06/30/88 08/30/PA 1

No. 2

RES/SAIR C. Ferrell, et al Topic Paper Set 3 ARSAP Issues RAI 10/30/88 10/30/88 3No. 3

RES/SAIB C. Ferrell, et al Topic Paper Set 1 ARSAP !ssue RAI 11/9/88 11/9/88 3No. 4

|

|

* Category definition:1. AD or above attention requested2. Branch Chief si.*ention requested3. On schedule4. Complete

__ ._ . . . _ . _ _ _ . _ _ .__ _ .-_ _ _ _. . _ ___ _ _ _ - _ _ _ _ - - _ _ _. __ . _ _ _ _._

Page 16: UNITED STATES NUCLEAR REGULATORY COMMISSION …

- .__. ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _

' ,*'* .

Date: October 26,1988

REVIEW STATUS REPORT ONEPRI'5 ALuit utguisuutun D0a91ENT

, |,

l

Ezpected |

Division / Due InsutBranch Revleuer Chapter Subject * Milestone Date Date Ca t.* Comments

DEST /EMER Rajan 5 Eng. Safety Systems DSER to 10/28/88 " 2

|P.M.

|

| DEST /ENTS Tsao 5 Eng. Safety Systems DSER to N/A 4 Reviewer willP.M. have no 1spet

DEST /51CB Stewart 5 Eng. Safety Systems DSER to 10/28/88** 2P.M.

DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to 10/28/98 3P.M.

-

DEST /SPLB Shun 5 Eng. Safety Systems DSER to 10/28/88** 2P.M.

| DEST /SRX8 Schwenk 5 Eng. Safety Systems DSER to 10/28/fl8** 3 7/8/88 DSERP.M. Input necd

revision

Category Definition:*

1. AD or above attention requested2. BC attention requested3. On schedule4. CompleteDue date revised to reflect receipt**

of additional information dated 08/16/88and ACRS schedule

-_ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ . . - _ _ - _ _ . . _ _ . - _ . _ . . _ . _ _ . . _ . _ - _ _ _ _ _ _-- -

Page 17: UNITED STATES NUCLEAR REGULATORY COMMISSION …

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ . _ _ _ _ . . _ _ _

~*

. .,,.

t. .

Date: October 26, 1988r

-

.

REYIEW STATUS REPORT ON~ ' EPRI'5 ALUR RtqulNU4t.N15 DOGNOIT -

(Cont.)

ExpectedDivision / Due InputBranch Reviewer Chapter Sub,)ect* Milestone Date Date Cat.* Ceauents

|

| DREP/RPB Martin 5 Eng. Safety Systems DSER to N/A 4

| P.M.

DEST /ECEB Parczewsti 5 Eng. Safety Sysi. ems DSER to 10/28/88** 4P.M.

DREP/RAB Kelly 5 Eng. Safety Systems DSER to N/A 4P.M.

DRIS/RSGB ' Mendelsohn 5 Eng. Safety Systems DSER to N/A 4P.M.

DEST /ESGB Rinaldi 5 Eng. Safety Systems DSER to N/A 4P.M.

Dt.PQ/LHF8 Correia 5 Eng. Safety Systems DSER to N/A 4P.M.

Note: Aapter 6 '8vilding Arangements" review begins 11/17/88.

Category Definition:*

1. AD or above attention requested2. BC attention requested3. On schedule4. CompleteDue date revised to reflect receipt**

of additional information dated 08/16/.*3and ACRS schedule