production schedule

Post on 08-Jan-2017

63 Views

Category:

Art & Photos

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Production schedule

Date and time

People involved

Equipment needed

location

Wednesday 18th of December 3:30 after school

Dan as his own narrator

Canon 600d or recording equipment.

A quiet room in school

Wednesday 6th of January after school

Dan as the main character, Rory as main gang member Craig, ben and ross as the other gang members.

Canon 600/1100d, tripod, dolly or steady cam and the props and costumes needed.

Alleyway in Ringwood and the Ringwood high street.

Thursday 7th of January after school

Dan as the main character, Rory as main gang member Craig, ben and ross as the other gang members.

Canon 600/1100d, tripod, dolly or steady cam and the props and costumes needed.

Alleyway in Ringwood and the Ringwood high street.

Friday 8th of January 11:15 during school start of editing

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Tuesday 12th of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Thursday 14th of January during

n/a Adobe premiere pro/ after effects

Ringwood school

Production schedule

school SD cardusb

Friday 15th or January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Tuesday 19th of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Thursday 12st of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Friday 22nd of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Tuesday 26th of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

Thursday 28th of January during school

n/a Adobe premiere pro/ after effectsSD cardusb

Ringwood school

top related