production schedule
TRANSCRIPT
Production schedule
Date and time
People involved
Equipment needed
location
Wednesday 18th of December 3:30 after school
Dan as his own narrator
Canon 600d or recording equipment.
A quiet room in school
Wednesday 6th of January after school
Dan as the main character, Rory as main gang member Craig, ben and ross as the other gang members.
Canon 600/1100d, tripod, dolly or steady cam and the props and costumes needed.
Alleyway in Ringwood and the Ringwood high street.
Thursday 7th of January after school
Dan as the main character, Rory as main gang member Craig, ben and ross as the other gang members.
Canon 600/1100d, tripod, dolly or steady cam and the props and costumes needed.
Alleyway in Ringwood and the Ringwood high street.
Friday 8th of January 11:15 during school start of editing
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Tuesday 12th of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Thursday 14th of January during
n/a Adobe premiere pro/ after effects
Ringwood school
Production schedule
school SD cardusb
Friday 15th or January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Tuesday 19th of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Thursday 12st of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Friday 22nd of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Tuesday 26th of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school
Thursday 28th of January during school
n/a Adobe premiere pro/ after effectsSD cardusb
Ringwood school