PERI UP Rosett 72Working Scaffold with Deck UDS
Assembly Instructions for Standard Conguration
Edition 09/2008
D e
10/
2007
1m
a A
rt. N
r.: 7
9163
0
Cop
yrig
ht b
y P
ER
I Gm
bH
00_UP_Titel_und_U4_AuV.indd 2 15.09.2008 13:15:41 Uhr
-
Dokument 1 28.04.2005 12:48 Uhr Seite 1
-
Assembly Instructions PERI UP Rosett 72 Guidelines
Overview 1Product features, Remarks 3
Part AErecting and Dismantling Manual
A1 Erecting the baseA1.1 Load distributing base area 4A1.2 Adjustable base plates UJB, base plates UJP 4A1.3 Changes in height and sloping surfaces 4A1.4 Collar UVB 5A1.5 Ledger UH, Decking Transom UHD 5
A2 Erecting the first levelA2.1 Vertical Standards UVR 6A2.2 Decking Transom UHD and Steel Decks UDS 6A2.3 Diagonals 7A2.4 Erecting further scaffold bays 7
A3 Erecting a cornerA3.1 Outside corners 8
A4 Internal scaffold accessA4.1 Access deck with ladder UAL 9
A5 External scaffold accessA5.1 Access deck with ladder UAL 10A5.2 Staircase UAS 10
A6 Erecting further scaffold levelsA6.1 Transport according to German regulations 11A6.2 Erection sequence 12A6.3 Anchors 14A6.3.1 General 14A6.3.2 Single wall ties 14A6.3.3 Wall ties 15A6.3.4 Triangulated anchors 16A6.3.5 Pressure resistant ties 16
A7 Erecting and adapting sectionsof scaffold
A7.1 Modifying and refitting system decksin individual bays 17
A7.2 Subsequent closing of scaffold areas 18
A8 Combining PERI UP Rosett 72and PERI UP T72
A8.1 Combining side by side 20A8.2 Combining one above the other 21A8.2.1 Rosett 72 on T 72 21A8.2.2 T 72 on Rosett 72 21A8.3 Interlocking combinations 22A8.3.1 T 72 in Rosett 72 22A8.3.2 Rosett 72 in T 72 23
A9 Installing supplementary componentsA9.1 Extending with scaffold brackets 24A9.1.1 Console brackets UCB 32 and UCB 36 24A9.1.2 Console brackets UCB 72 and UCB 104;
Console bracket brace UCP72/104 25A9.2 Protection panel UPP 26A9.3 Overhead protection fans 27A9.4 Bridging 28A9.4.1 Assembling lattice girders ULS/ULA 28A9.4.2 Assembling lattice girders ULS/ULA
with a scaffold 29A9.4.3 Bracing and anchoring the lattice girders
ULS/ULA 30
A9.4.4 Bracing with scaffold tube 30A9.4.5 Bracing with wall tie UWT 30A9.4.6 Bridging with twin lattice girders ULS/ULA 31A9.5 Pavement gantry UVG 32A9.6 Sheeting 33A9.6.1 Covering with nets 33A9.6.2 Covering with tarpaulin 33
A10 Dismantling 34
Part BUsed as a working scaffold
B1 Load capacityB1.1 Decks 35B1.2 Lattice girder 36
B2 Anchor forcesB2.1 Triangulated anchors or single wall ties 37B2.2 Wall ties 38
B3 Reaction forces 39
B4 Anchor patternsB4.1 General 41B4.2 Key 42B4.3 Overview of equipment combinations 43B4.4 Legend 46B4.5.1 Unclad minimum anchor positions 47B4.5.2 Unclad basic arrangement 1 48B4.5.3 Unclad version 1 49B4.5.4 Unclad version 2 50B4.5.5 Unclad version 3 51B4.5.6 Unclad version 4 52B4.5.7 Unclad version 5 53B4.5.8 Unclad 4.00m bridging 54B4.5.9 Unclad 6.00m bridging 55B4.5.10 Unclad 8.00m bridging 56B4.5.11 Unclad pavement gantry 57B4.5.12 Unclad pavement gantry 58B4.5.13 Unclad top level not anchored 59B4.6.1 Net closed faade minimum
anchor positions 60B4.6.2 Net closed faade version 1 61B4.6.3 Net closed faade version 2 62B4.6.4 Net closed faade version 3 63B4.6.5 Net open faade basic arrangement 2 64B4.6.6 Net open faade version 1 65B4.6.7 Net open faade version 2 66B4.6.8 Net open faade version 3 67B4.7.1 Tarpaulin closed faade minimum
anchor positions 68B4.7.2 Tarpaulin closed faade version 1 69B4.7.3 Tarpaulin open faade minimum
anchor positions 70B4.7.4 Tarpaulin open faade version 1 71
B5 VariationsB5.1 Component combinations 72B5.2 Use of lattice girders 73
Part CComponent list PERI UP Rosett 72 74
Page
Contents
Page
Legend
Important safety Hints Visual Check Site Tipsinstructions
-
18
14
22
21
15
20
19
10b
1
3
4
6
16
12
17
7
10a
2
5
8 9
1124
1
Overview
1a Adjustable base plate UJB
1b Base plate UJP
1c Heavy duty ajustablebase plate TR 38-70/50
2 Collar UVB 24
3 Ledger UH
4 Decking Transom UHD
5 Standard UVR
6 Top Standard UVH
7 Decks
8 Guardrail post UVP 100
9 Guardrails UPG
10a Ledger bracing UBL
10b Node brace UBK
10c Coupler brace UBC(shown later)
10d Horizontal brace UBH(shown later)
11 Console bracket UCB
12 Console bracket brace UCP
13 Pavement gantry UVG(shown later)
14 Transom coupler UHC
15 Access decks UAL
16 Toe boards UPT
17 End guardrail frames UPX
18 Protection panel connection UPC
19 Protection panel UPP
20 Wall tie UWT
21 Lattice girder
22 Starter tube ULB
23 Decking gap filler UD(shown later)
24 Spigot ULT 32
25a Guardrail coupler UPR(shown later)
25b Guardrail holder UPW (shown later)
Stairs(shown later)
26 Staircase UAS
27 Stair guardrail UAG
28 Inside stair guardrail UAH
29 Landing link panel UAB 30
PERI UP T 72 components(shown later)
T2a Base frame UVF 72/124
T2b Base frame UVF 72/174
T4 T-frame UVT
T5 L-frame UVL
T6 Spigot tube UV 165
T10 Standard diagonalbracing UBF
Assembly Instructions PERI UP Rosett 72 Guidelines
-
Assembly Instructions PERI UP Rosett 72 Guidelines
system width: 72 cm
used as working scaffold in LoadClasses 1-3 according to DIN 4420-1orLoad Classes 1-3 according to EN 12811-1:
0.75 2.00 kN/m2
fulfills the requirements for protectionscaffolds (roof protection for fallingheights ) 2.0 m, protection fans)
bay lengths:72/104/150/200/250/300 cm,400 cm (as bridging)
Standard configuration accordingto EN 12810for a scaffold assembly: 24 m high plusmaximum spindle extension / internalbrackets at every level / external brackets/ protection fans / roof protection panels /pavement gantries / bridging / nets /tarpaulins
Product designation accordingto EN 12810:
PERI UP Rosett 72EN 128103DSW06/300-H1-B-LS
Key:3 = Service Load Class 3 (2.00 kN/m2)D = Platforms with drop test
(suitable as protection scaffold)SW06 = Width Class 06 (72 cm width)300 = Bay length ) 300 cmH1 = Headroom classB = with cladding facilitiesLS = vertical access by ladders and
by stairs
Faade ScaffoldPERI UP Rosett 72
Important safety information:The use of PERI UP Rosett 72 is intendedonly for industrial applications in theconstruction sector as facadescaffolding in accordance withEN 12810 - 1:2003 (intended use).
Only PERI UP original componentscomplete with the manufacturerslabel are to be used. The use of otherproducts and spare parts represents amisapplication with associated safetyrisks.
Any deviation from the standardconfiguration when assembling and/oruse present a potential safety risk andtherefore may only be undertaken aftera separate risk assessment has beencarried out by the scaffolding contractor.
Appropriate measures are to beimplemented regarding operational safetyand stability on the basis of the riskassessment (Extension of the assemblyinstructions as well as safety provisionsduring assembly, e.g. guardrails; proofof stability using draft and designspecifications in accordance withApproval Z-8.1-890 and taking intoaccount EN 12811-1).
Note:Appropriate proof of stability can beordered from PERI, if the risk assessmentand measures deriving from this areavailable. For loads from other load classes,and for wider scaffolding up to 150 cm,proofs of stability have already beenissued which can be ordered from PERI.
These assembly instructions applytogether with Approval Z-8.1-890.
They describe the standard designfor facade scaffold according to theprovisions set down in DIN 4420-1as well as the requirements assystem scaffolding according toEN 12810 and EN 12811.
Deviations from technically-functioninginstructions, especially assemblysequences, require separate static proof.
OverviewThese assembly instructions serve as abasis for the compilation of a building-related assembly instruction by thescaffolding contractor these do nothowever replace this.
The assembly instructions regulate the intended use provide the scaffolding contractor with
guidance for safe assembly,modifications and dismantling
give details regarding stability andworking safety requirements withinthe framework of the standardconfiguration
The assembly instructions are arrangedas follows: general information assembly of the base assembly of supplementary
components combination with PERI UP T 72
BasisApproval Z-8.22-863:PERI UP Rosett Modular System
Approval Z-8.1-865:PERI UP T 72 Scaffold System
Approval Z-8.1-890:PERI UP Rosett 72 Scaffold System
2
-
Dokument 1 28.04.2005 12:48 Uhr Seite 1
-
3Assembly Instructions PERI UP Rosett 72 Guidelines
Technical suitabilityPERI UP may only be assembled,modified and dismantled by technicallyskilled scaffolding contractors and sitepersonnel who also possess sufficientskill and experience (hereafter referredto as scaffolding contractor).
Stability requirementsThe scaffolding contractor has toguarantee on site that the bearingreactions of the scaffold indicated inthe Part B of the assembly instructionscan be reliably carried in the foundationand anchorage.
The load-bearing capacity of the fixingmaterial between the wall ties andanchorage must be verified for theanchoring forces. Proof must beprovided by official approval, staticcalculation or test loading accordingto a recognized method.
Load-distributing support, e.g. planks,is to be placed accordingly to matchthe ground conditions. If several layersare required, planks are to be arrangedcrosswise.
Condition of the materialThe material is to be regularly checkedfor any signs of damage particularlybefore any assembly takes place.Damaged components must beexchanged immediately on site andmay no longer be used.
Scaffold tubes and couplers formounting and bracingSteel tubes and couplers are to beused in the standard configuration asanchors and as bracing for the latticegirders. Steel tubes with a 48.3 mmexternal diameter and at least 3.2 mmwall thickness according to DIN 4427as well as couplers according toEN 74 with appropriate markings areto be used.
Bolted couplers must be tightenedwith a moment of 50 Nm (correspondsto a force of 20 kg with a 25 cm leverarm). Wedge couplers are to besecurely fitted using a 500 g hammer.
Personal protective equipmentagainst falls from a heightWhen using personal protectiveequipment against falls from a height,all valid standards and safetyregulations are to be taken intoconsideration by the scaffoldingcontractor.
Currently, the following are of particularimportance:
DIN EN 354:Personal protective equipmentagainst falls from a height; Lanyards
DIN EN 355: ... Energy absorbers DIN EN 360: ... Retractable type
fall arresters DIN EN 361: ... Full body harness DIN EN 362: ... Connectors DIN EN 363: ... Fall arrest systems
Availability of the assemblyinstructionsThese assembly instructions, togetherwith the assembly instructions fromthe scaffolding contractor, must bemade available for the entire period,from the beginning of the assemblywork through to the end of dismantlingand including the service life at thepoint of use (see EN 12811 - 1:2003(D) Clause 8)
Additional regulations:The scaffolding contractor mustobserve all valid laws and safetyregulations regarding assembly anduse.
Currently, the following is of particularimportance: Council Directive 89/655/EEC of
the European Parliament concerningthe minimum safety and healthrequirements for the use of workequipment by workers at work.
Signs
If certain parts of the scaffolding arenot ready for use - in particular duringassembly, alteration work anddismantling - a warning sign restrictedaccess must be clearly displayed, seeSign 1. In addition, it must be madeclear by appropriate physical meansthat the scaffold is not complete whichprevents unauthorized access to thedanger zone.
Sign 1
After handover, the scaffolding is to bemarked in such a way that the intendeduse is clearly visible e.g. installingSign 2 at the scaffold access points.
The signs do not replace theinspection record!
Sign 2
GeneralInformation
-
13
30
55
4 Assembly Instructions PERI UP Rosett 72 Guidelines
UJB 38-50/30(red handle)
UJB 38-80/55(yellow handle)
A1 Erectingthe base
Erecting the scaffold must follow thesequence described below!
A1.1 Load distributing base area
Always begin erecting at the highestpoint, preferable at an internal corner.
Lay the ledgers UH 3 down todetermine the length of the surface tobe scaffolded. This will fix the distancebetween the adjustable baseplatesUJB 1a (for loads see Part B).
The scaffold must only be erected withload distribution plates on ground orstructures capable of withstanding allimposed loads!
Settlement must be avoided!
A1.2 Adjustable base plates UJB,base plates UJP.
Position adjustable base platesUJB 1a or base plates UJP 1b atthe ends of the ledgers UH 3.
Adjustable base plates UJB 1a withyellow and red handles can beextended a maximum of 55 and30 cm respectively.
Adjustable base plates TR 38-70/50 1ccan be used instead of adjustable baseplates UJB 1a. They can be extendedto 47cm.
A1.3 Changes in height andsloping surfaces.
Steps, slopes and changes in heightcan be overcome using longer verticalstandards UVR.
-
72
1
3
4
5Assembly Instructions PERI UP Rosett 72 Guidelines
A1.4 Collar UVB
Place the collar UVB 24 2 over theadjustable base UJB 1.
This allows a scaffolder to work aloneup to a height of 6.50 m.Place collar UVB 24 2 and adjustablebase plates UJB 1 at the requireddistance from the wall (deck to buildingdistance must not exceed 30 cm)
Alternatively vertical standards UVR 5can be fitted directly on the adjustablebase plates UJB 1. This reduces thepermissible extension length in theanchor patterns (section B4) by 26 cm.
A1.5 Ledger UH,Decking Transom UHD
Form a base frame by connecting thecollar UVB 24 2 transversely with thedecking transom UHD 4 andlongitudinally with the ledger UH 3.
Fit the decking transom UHD 4 withthe red marker to the outside.
Ensure all ledgers UH 3 and deckingtransoms UHD 4 are level by adjustingthe adjustable base plates UJB 1.
Then securely fix all the wedges usinga 500 g hammer.
Place steel deck UDS 7 in a deckingtransom UHD 4 as an assembly aid tocheck squareness (see next page fordeck assembly).
The decks used at the base are an aidto erection only, they can be removedlater. This does not apply to bays whereaccess decks with ladders UAL arefitted, in these bays two steel decksshould be fitted to support the ladder.
A1 Erectingthe base
-
52
7
5
4
4
7
6 Assembly Instructions PERI UP Rosett 72 Guidelines
red mark
A2.1 Vertical Standards UVR
Insert vertical standards UVR 5 intothe collars UVB 24 2.
The joints in the inner and outer UVRstandard 5 must be staggered!
PERI recommends using UVR 200 onthe inside and UVR 300 on the outside and then continuing with the samelength (either UVR 200 or 400).
Depending on the supplementarycomponents fitted, additional deckingtransoms may need to be fixed to thefirst rosette on the standard UVR.Alternatively base frame UVF 124 maybe used. (see section B4)
A2.2 Decking Transom UHD andSteel Decks UDS
For the next level fit the deckingtransom UHD 4 in the rosette of thevertical standard UVR 5 with the redmarking to the outer standard. Securethe wedges.(maximum spacing betweenlevels = 2.00 m)
Fit steel decks UDS 7 by lining up thecentre lug with the cut-out in thedecking transom UHD 4. To preventdecks lifting off slide the steel deckUDS 7 towards the building as far asit will go (the same applies to all decks).
Decks have a structural function and,therefore, must be installed across thefull width of the scaffold!
Advantage:System deckingPosition slide ready!
Incorrectly fitted or unsecure deckswill rock on the longitudinal axis whenwalked on, and is an indication to thescaffolders that the deck is notfunctioning properly.
A2 Erecting thefirst level
-
10a
3
10a
3
7
A2.3 Diagonals
Diagonals are fixed to the outside faceof the scaffold at the base and act asbracing.
Either ledger braces UBL 10a ornode braces UBK 10b can be used.
If node braces UBK 10b are used, theupper UH ledger 3 is not needed.
See section B4 for the position andnumber of diagonals to be fitted.
A2.4 Erecting of furtherscaffold bays
The erection of all further baysis as previously described.
A2 Erecting thefirst level
Assembly Instructions PERI UP Rosett 72 Guidelines
-
45
8
A3 Erectinga corner
Assembly Instructions PERI UP Rosett 72 Guidelines
A3.1 Outside corners
Always erect corners to the full widthof the scaffold.
The corner is formed with four verticalstandards UVR 5 and decking transomsUHD 4 and continued all the way tothe top of the scaffold as a cornertower.
-
715
9
Before commencing work on the firstscaffold lift, a means of access mustbe installed.
A4.1 Access deck with ladder UAL
Select the most suitable bay in whichto install the ladder access.
In this bay steels decks UDS 7 shouldbe fitted at the lowest level to supportthe ladder.For the following levels access deckswith ladders UAL 15 are used insteadof steel decks UDS 7.
Alternate the direction of the laddersfor each level! When the ladder accessis not being used the access hatchmust remain closed.
Access decks with ladders UAL havingplywood surfaces must be inspectedfor any damage before use!
A4 Internalscaffold access
Assembly Instructions PERI UP Rosett 72 Guidelines
-
10b10a
7
15
3
34
27
26
28
10 Assembly Instructions PERI UP Rosett 72 Guidelines
A5.1 Access deck with ladder UAL
Scaffold access using access deckswith ladder UAL 15 can also be fittedto the outside of the scaffold. Theseare connected to the main scaffoldwith decking transoms UHD 4.
At the base level a ledger UH 3 andsteel decks UDS 7 (as footing for theladder) are fitted in the outer bay.
A5.2 Staircase UAS
Scaffold access positioned on theoutside can be fitted with the staircaseUAS 26.
The staircase is positioned in thedecking transom UHD 4 in the sameway as the steel deck UDS 7 is fittedand pushed sideways towards thebuilding.The stair guardrail UAG 27 is fixed onthe staircase stringer and pusheddownwards to lock behind a tread.The inside stair guardrail UAH 28serves as a safety feature on the innerface of the staircase UAS 26.
A5 Externalscaffold access
-
311Assembly Instructions PERI UP Rosett 72 Guidelines
Every possible step must be taken tominimise the possibility of men ormaterials falling during the erection ofthe scaffold.
Transport according to Germanregulations.
For scaffolds with a top platform heightgreater than 8.00 m (deck height abovefixing level), scaffold hoists must beused. The use of a rope and wheel ispermitted for this purpose.
However, if the scaffold to be erectedis not longer than 10.00 m, it ispermitted to erect to a height of14.00 m without the use of a hoist.
In those bays where materials are tobe transported manually, both ledgersUH must be fitted as side protection.When transporting material manually,a scaffolder must be positioned oneach scaffolding level.
Guardrail fitted at base level!
If the material is stacked in each bay,the whole team can move from bayto bay supporting the erector withmaterial in advance.
A6 Erecting furtherscaffold levels
-
416
3
517
3
5
12 Assembly Instructions PERI UP Rosett 72 Guidelines
As end side protection, two ledgersUH 72 3 together with a toe boardUPT 16 can be fitted instead of theend guardrail frame UPX 17.
A complete scaffold level is nowready!
A6.2 Erection sequence
The erection sequence begins in thebay in which the material is beingraised.
The procedure is as follows:
1. Fit handrailWhen setting foot on the next scaffoldlevel, a ledger UH 3 must be fitted toserve as a handrail.
Before moving into the adjoining bayfit the ledger UH 3. Fit both ends ofthe ledger UH 3 into the rosette onthe outside standard UVR 5 andsecurely fix the wedges.
Ledgers UH 3, which are fitted asguardrails, have a structural functionand therefore must be installed for thefull elevation of the scaffold. There arecases where the ledger UH 3 isintermittent and still has a structuralfunction please see B4 anchor details.
2. Completion of the side protection
In every bay, fit the second ledgerUH 3 and the toe board UPT 16.
Place the pins on the toeboardUPT 16 into the holes in the top plateof the decking transom UHD 4.At the end of the scaffold fit the verticalstandard UVR 5 and the end guardrailUPX 17.
From the second scaffold levelupwards diagonal braces are notrequired due to the use of ledgersUH 3.
On the top level at the end of thescaffold guardrail posts UVP 8 may beused instead of top standards UVH 6.
The end guardrail UPX 17 is fitted tothe outer vertical standard UVR 5 usingthe attached coupler.
A6 Erecting furtherscaffold levels
-
57
5
4
13Assembly Instructions PERI UP Rosett 72 Guidelines
A6.2 Erection sequence
3. Fitting the vertical standards UVR
Fit the vertical standards UVR 5 overthe spigots of the lower verticalstandards UVR 5 ensuring that theholes in the spigot and the holes inthe bottom of the vertical standardUVR 5 line up.
If vertical standards UVR 200 5 areused a standard will always be availableon the next level for the side protectionto be fitted to.
4. decking transom UHD andsteel decks UDS
For the next scaffold level fit thedecking transom UHD 4 in the rosettesof the vertical standards UVR 5 withthe red marking to the outside standard(maximum height between levels is2.00 m)
Continue to fit steel decks UDS 7sliding them towards the building toengage the lock preventing lift off.Fit access deck UAL 15 on eachscaffold level.
Repeat steps 1 to 4 until all scaffoldlevels are complete.
A6 Erecting furtherscaffold levels
-
44
20
5
A
) 300 320 720
14 Assembly Instructions PERI UP Rosett 72 Guidelines
singlewall tie
A6.3 Anchors
A6.3.1 General
Anchoring is carried out progressivelyduring the erection of the scaffoldaccording to the relevant anchorpattern (see section B4). Ring boltsUFE are used for fastening to thefaade. Wall ties UWT 20 fitted directlyto the tube of the vertical standardUVR 5 immediately beneath thedecking transom UHD 4 with couplerscomplying with DIN EN 74 are usedto connect the scaffold to the ring boltsUFE. Individual wall ties UWT 20 maybe fitted up to 40 cm above or belowthe decking transom UHD 4.
Anchors do not carry vertical loads!
German regulations:Guidelines for Safety and HealthProtection in the Erection of ScaffoldingSystems (BGR 166)
A6.3.2 Single wall ties
The wall tie UWT 20 is fixed to thevertical standards UVR 5 using a rightangled coupler.Tensile and compressive forcesare carried at right angles to thefacade. (A)
A6 Erecting furtherscaffold levels
-
420
5
11
A
A II
) 300 320 720
15Assembly Instructions PERI UP Rosett 72 Guidelines
wall tie
A6.3.3 Wall ties
The wall tie UWT 20 is fixed to bothinner and outer vertical standardsUVR 5 with right angled couplers.Tensile and compressive forces arecarried at right angles and parallelto the facade (A and A II)
Wall ties UWT 20 should be fitted asclose as possible to the deckingtransom UHD 4 to give the greatestheadroom through the scaffold lift andso that console brackets UCB 11 canbe fitted without difficulty.
In exceptional cases, the wall tieUWT 20 can also be fitted above thedecking transom UHD 4.
A6 Erecting furtherscaffold levels
-
20
5
20
20
20
5
) 300 320 720
A
) 300 320 720
A III
ca.90
A I
16 Assembly Instructions PERI UP Rosett 72 Guidelines
Triangulatedanchors
pressure-resistant ties
ca.45
ca.45
A6.3.4 Triangulated anchors
Two wall ties UWT 20 are fixed at anangle of 45 to the ledger line withright angled couplers.
They can either: both be connected to the vertical
standard UVR 5 with right angledcouplersor
the first wall tie UWT 20 connectedto the vertical standard UVR 5 and thesecond wall tie UWT 20 connected tothe first wall tie UWT 20 at 90 bothconnections with right angled couplers.
Triangulated anchors carry tensileand compressive forces at rightangles and parallel to the facade(A I und A III).
A6.3.5 Pressure-resistant ties
The wall tie UWT 20 is fixed to thevertical standard UVR 5 with a rightangled coupler.The tube end, without a hook, ispositioned against the faade.
This arrangement can only carrycompressive forces at right anglesto the facade (A ).
A6 Erecting furtherscaffold levels
-
17
17
17Assembly Instructions PERI UP Rosett 72 Guidelines
A7.1 Modifying and refitting systemdecks in individual bays
The integrated protection against liftingallows individual decks to be removedand refitted anywhere on the scaffold.
This allows:
individual bays to be removed or
openings left during erection tobe closed
In bays which are left open, endguardrail frames UPX 17 should befitted either side of the plannedopening.
As end protection, two ledgersUH 72 3 and a toe board UPT canbe used instead of the end guardrailUPX 17.
Steel decks UDS 7 can be removedsafely when standing on the scaffoldlevel beneath.
The opening can be closed by refittingthe steel decks UDS 7 and the sideprotection.
A7 Erecting andadapting sectionsof scaffold
-
318 Assembly Instructions PERI UP Rosett 72 Guidelines
A7.2 Subsequent closing ofscaffold areas
If a U-shaped enclosure of anobstruction has to be allowed for duringerection, e.g for a formwork bracket,then the resulting opening in thescaffold can be closed afterwards withPERI UP.
The scaffold is erected, as describedin sections A1 A6, either side of theplanned opening as independentscaffolds and anchored to the building.
When the opening is to be closedproceed as described in section A6Erecting further scaffold levels.
Insert the UH ledger 3 for the next bayfrom a safe position. This means fittingthe guardrail before entering the newscaffold bay.
A7 Erecting andadapting sectionsof scaffold
-
4T425b
9
25a
5
2
3
1a
5
T4
T2a
T6
19Assembly Instructions PERI UP Rosett 72 Guidelines
Compatibility with PERI UP T 72
The PERI UP Rosett 72 modularscaffold system can easily becombined with PERI UP T 72 facadescaffolding due to the coordinatedsystem design and dimensions of thecomponents.
The integrated protection against liftingof the decks eliminates any risk oftripping at the interchange betweenthe modular and frame variants andno additional components are requiredto prevent lifting. Thus any combinationeither vertically or horizontally ispossible.
PERI UP T 72 and PERI UP Rosette 72must be erected according to theofficial assembly and use instructions.
Possible applications: Variations in height Adding loading platforms
to existing faade scaffolds Enclosing obstacles e.g. bay
windows
The areas of interface betweenPERI UP Rosett and PERI UP T 72 aredescribed in the following sections.
A8 CombiningPERI UP Rosett 72and PERI UP T 72
-
25b
3
9
553
9
25a
9
T4
47
20 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI
UP T 7
2
P
ERI U
P Rose
tt 72
A8.1 Combining side by side
PERI UP Rosett 72 modular scaffoldis connected to PERI UP T 72 facadescaffold with steel decks UDS 7 andguardrails UVG 9.
One end of the steel deck UDS 7 sitsin the T-frame UVT T4 and the otherin the decking transom UHD 4.
Guardrail couplers UPR 25a andguardrail holders UPW 25b are fixedto the vertical standard UVR 5 to allowguardrails UPG 9 to be fitted.
For this either a guardrail couplerUPR 25a can be inserted into therosette and the bolt fastened oralternatively a guardrail holderUPW 25b is inserted in the rosette ready.
A8 CombiningPERI UP Rosett 72and PERI UP T 72
-
T 72
R 72
T4
5
R 72
T 72
10c
T4
T10
21Assembly Instructions PERI UP Rosett 72 Guidelines
A8.2 Combining one abovethe other
The transition can take place at anyheight.
A8.2.1 Rosett 72 on T 72
Fit vertical standards UVR 5 e.g.UVR 200, over the inner and outerspigots of the T- frame UVT T4and continue erecting according to theassembly and use instructions forPERI UP Rosett 72.
The longitudinal bracing using facebraces UBF T10 is fitted on the lowerPERI UP T 72 only.(See T 72 instructions for assemblyand use Part B anchor pattern).
At the interface with PERI UP Rosetta coupler brace UBC 10c is fitted abovethe last face brace UBF T10.
Due to the high rigidity and stiffnessof the PERI UP Rosette/Ledgerconnection no further diagonals arerequired.
A8.2.2 T 72 on Rosett 72
Fit T-frame UVT T4 over the spigotsof the vertical standards UVR 5 andcontinue erecting according to theassembly and use instructions forPERI UP T 72.
A8 CombiningPERI UP Rosett 72and PERI UP T 72
-
T10
22 Assembly Instructions PERI UP Rosett 72 Guidelines
A8.3 Interlocking combinations
PERI UP T 72 faade scaffolding canbe interwoven with Rosett 72 and viceversa.
There is no restriction to extent orlocation.
A8.3.1 T 72 in Rosett 72
Connections at the interface aredescribed in A8.1 and A8.2.
One face brace UBF T10 must be fittedin every five T 72 bays.
A8 CombiningPERI UP Rosett 72and PERI UP T 72
-
23Assembly Instructions PERI UP Rosett 72 Guidelines
A8.3.2 Rosett 72 in T 72
Connections at the interface aredescribed in A8.1 and A8.2.
No diagonals are required in bayserected in Rosett 72 as the ledgersUH 3 fitted as guardrails brace thescaffold.
A8 CombiningPERI UP Rosett 72and PERI UP T 72
-
11
8
24
5
11
11
8
24
Schutzwand UPP
Assembly Instructions PERI UP Rosett 72 Guidelines
Bolt M10
A9.1 Extending with scaffoldbrackets
Scaffold brackets allow externalwidening of the scaffold levels by 32,36, 72 or 104 cm.
Open the integrated coupler to fit theconsole bracket UCB 32 11a, UCB 7211c and UCB 11d. Angle the consolebracket UCB 11 slightly and place thehook around the vertical standard UVR5, and then push back the consolebracket as far as possible, close thecoupler gate and tighten the bolt.
When fitting console bracket decks atthe same level as the main deck theunderside of the console bracketUCB 11 transom sits on the rosetteof the vertical standard UVR 5.
The console bracket UCB 36 11b fitson a rosette in the same way as aledger UH 3 and the wedge securedwith a hammer blow.
A9.1.1 Console bracketsUCB 32 and UCB 36
A guardrail post UVP 100 8, with aspigot ULT 24 fitted prior to erectionis required on console bracketsUCB 32 11a and UCB 36 11b.
When attached with bolts the spigotULT 24 cannot fall through the endtube of the console bracket UCB 11and cause damage or injury to scaffoldpersonnel or become detached duringtransportation.
Vertical standards UVR 5 or topstandards UVH 6 can be used insteadof guardrail posts UVP 100 8.
A9 Installingsupplementarycomponents
-
12
11
5
12
25Assembly Instructions PERI UP Rosett 72 Guidelines
A9.1.2 Console brackets UCB 72 andUCB 104; Console bracket braceUCP 72/104
The console brackets UCB 72 11c andUCB 104 11d can, according to useand loads, be used with or without theconsole bracket brace UCP 72/104 12.(See Part B anchor patterns).
Fit console bracket UCB 11 aspreviously described.
To fit the console bracket braceUCP 72/104 12 first loosen the bolt tothe attached half swivel coupler. Insertthe spigot into the console brackettube and then turn the console bracketbrace UCP 72/104 12 until the luglocates under the hook. Then fix theconsole bracket brace UCP 72/104 12to the vertical standard UVR 5 usingthe attached half swivel coupler.
A vertical standard can be attached tothe UCB 72 11c and UCB 104 11dconsole brackets instead of theguardrail post UVP 8.
A9 Installingsupplementarycomponents
-
619
8
3
3
5
26
Schutzwand UPP
Assembly Instructions PERI UP Rosett 72 Guidelines
A9.2 Protection panel UPP
The protection panel UPP 19 issuspended from the ledger above thenext scaffold level.
Suspend the protection panel UPP 19from the ledger UH 3 above using bothhooks.The hooks either side of the protectionpanel UPP 19 must engage the verticalstandard UVR 5 to prevent theprotection panel UPP 19 from comingoff.
To extend the protection panelUPP 19 fit a vertical standard UVR 5or top standard UVH 6 link with a ledgerUH 3 and suspend the protection panelUPP 19 as before.
Alternatively vertical standardsUVR 200 5 can be fitted to take twolevels of protection panels UPP 19.
A9 Installingsupplementarycomponents
-
18
3
1111
7
5 7
23 7
11
518
3
27Assembly Instructions PERI UP Rosett 72 Guidelines
A9.3 Overhead protection fans
Integrated protection fans arenecessary to protect people walkingbelow from falling objects.The covering must be tight fitting tothe building with no gaps.
Fit a console bracket UCB 72 11c orUCB 104 11d to the external verticalstandard UVR 5, insert the steel decksUDS 7 and slide them towards thebuilding until it locks.
Loading requirements may prove thatconsole bracket braces UCP 72/10412 have to be fitted.
Insert the deck gap filler DU 23between the main decking and theconsole bracket decking to close allgaps.
Then place the protection panelconnector UPC over the spigot on theconsole bracket UCB 11. Fit steeldecks UDS 7, with the upper surfacefacing the building, into the gap in theprotection panel connector 18.
The fitting of a ledger UH 3 as sideprotection at this level will separatethe working area from the protectionarea.
For scaffolds without internal bracketsa protection fan can be erected withoutdeck gap fillers UD 23.
This is achieved by fitting the deckingtransom UHD 4 with the red marks tothe inside and pushing the steel decksUDS 7 to the outside edge (max.distance between deck and buildingno greater than 30 cm).
A9 Installingsupplementarycomponents
-
2122
5
3
7
4
5
5
4
22
14 21
2
28 Assembly Instructions PERI UP Rosett 72 Guidelines
A9.4 Bridging
To bridge openings or entrances tobuildings decks up to 4.00 m can beused. For greater spans scaffold bayscan be erected off steel ULS 21a oraluminium ULA 21b lattice girders(50 or 70 cm deep girders can be useddepending on the loads to be carried).Only couplers complying with DINEN 74 may be used.
A9.4.1 Assembling of lattice girdersULS/ULA
Fix right angled couplers to connectthe top chord of the lattice girdersULS/ULA 21 to the vertical standardsUVR 5 either side of the opening atthe required height. With ropes lift thelattice girder ULS/ULA 21 into thecouplers and secure, then connect thebottom chord of the lattice girderULS/ULA to the vertical standardUVR 5 with right angled couplers.
If the right angled couplers connectingthe lattice girder ULS/ULA 21 to thevertical standard UVR 5 are fitted2 cm beneath the decking transomUHD 4 the steel decks UDS 7 acrossthe girders ULS/ULA 21 will be at thesame level as those in the adjoiningbays.
Working from within the main scaffoldfit the starter tube ULB 22 over thelattice girder ULS/ULA 21 and placethe collar UVB 24 2 over the spigot ofthe starter tube ULB 22. Then connectinner and outer starter tubes ULB 22with a decking transom UHD 4 andinsert a vertical standard UVR 5 intothe outer collar UVB 24 2.
In this situation we recom-mend usinga 1.00 m long vertical standard UVR 5.
Fit a ledger UH 3 at the upper guardraillevel in the outer lattice girder standardand insert a steel deck UDS 7 in thedecking transom UHD 4 connectingthe starter tubes ULB 22.
Then from the same safe position slidethis assembly on the top chord of the
lattice girder ULS/ULA 21 using theledger UH 3 and steel deck UDS 7 intothe middle of the span. Then fit thissteel deck UDS 7 and ledger UH 3 intothe already erected bay.
Link the starter tubes ULB 22 with acoupler transom UHC 14 and thencomplete the decking and guardrailsto all bays.
A9 Installingsupplementarycomponents
-
529
21
Assembly Instructions PERI UP Rosett 72 Guidelines
A9.4.2 Assembling lattice girdersULS/ULA with a scaffold
For fast and safe assembly of latticegirders at low levels.
As an alternative to the previousmethod, lattice girders may also beinstalled from a scaffold.
Here, the vertical standards UVR 5 inthe opening are erected approxi-mately5 cm out of line.
After erecting the second scaffoldlevel, the lattice girders ULS/ULA 21,can be introduced across the openingfrom the first scaffold level platform.
Continue erecting as previouslydescribed and on completion dismantlethe temporary scaffold in the opening.
A9 Installingsupplementarycomponents
-
14
20
22
21
5
14
20
22
21
5
) 30
19
A
B
L
A
B
L
) 30
19
2
21
20
a 3a 2
a 1a 3
a 2a 1
21
20
a 3a 2
a 1a 3
a 2a 1
2
A B
30 Assembly Instructions PERI UP Rosett 72 Guidelines
Bracing withscaffold tubebraces
Bracing withUWT wall tie
A9.4.3 Bracing and anchoring thelattice girder ULS/ULA
The following illustrations show therequired bracing and anchorage for thelattice girders ULS/ULA 21 when usedin the standard configuration detailedin section B4.
A9.4.4 Bracing with scaffold tube
The top chord of the lattice girdersULS/ULA 21 are braced with scaffoldtube and swivel or right angledcouplers.
Anchors and diagonals on the mainscaffold are to be erected accordingto section B.
When console brackets UCB 11 arerequired they should be fixed to thestarter tube ULB 22.
A9.4.5 Bracing with wall tie UWT
As an alternative to bracing withscaffold tubes, the lattice girderULS/ULA 21 can be braced using wallties UWT 20 and right angled couplers.
A9 Installingsupplementarycomponents
-
a 3
21
5
204
21
5
20
22
450
50
1619
) 30
50
50
1619
) 30
A
B
L
A
B
L
2
21
20
22
2
21
20
a 1a 2
a 3a 2
a 1
A B
a 3a 1
a 2a 3
a 2a 1
31Assembly Instructions PERI UP Rosett 72 Guidelines
Bracing withscaffold tubebraces
Bracingwith UWTwall tie
A9.4.6 Bridging with twin latticegirders ULS/ULA
All four top chords of the lattice girdersULS/ULA 21 must be braced withscaffold tube and swivel couplers.
Alternatively the top chord of the latticegirders ULS/ULA 21 can be bracedwith wall ties UWT 20 and right angledcouplers.
Bridging with twin lattice girdersULS/ULA 21 doubles the permissibleload as allowed on individual girders.
A9 Installingsupplementarycomponents
-
213
13
5
24
10a
1 3
13
7
9
23
23
32 Assembly Instructions PERI UP Rosett 72 Guidelines
Arrangement 1 Arrangement 2
A9.5 Pavement gantry UVG
Safe conditions for pedestrians arecreated using the pavement gantryUVG 13.
Insert spigots ULT 32 24 in thepavement gantry UVG 13 and securewith bolts. Place the pavement gantryUVG 13 over the adjustable base platesUJB 1.
Connect pavement gantries UVG 13with ledgers UH 3 fixed at the top andbottom of both inner and outer leg. Tofurther protect pedestrians guardrailsUPG 9 can be fitted to both inner andouter legs. Starting in the middle ofthe transom of the pavement gantryUVG 13 and working outwards fit steeldecks UDS 7 to cover the completepassageway.
Bracing with ledgers UH 3 anddiagonals 10 is described in the B4anchor patterns.
Face braces UBF T10 may be fitted tothe pavement gantries UVG 13 in placeof ledger braces UBL 10a.
Arrangement 1
From the pavement gantry UVG 13the scaffold is erected firstly withcollars UVB 24 2 fitted over the spigotsULT 32 24. The standards UVR 5 arethen inserted as described in section2.1 and braced with ledgers UH 3.
If plastic sheeting is to be laid directlyon the pavement gantry decks thisarrangement eliminates the risk ofdamage to the membrane by providingan independent walkway.
Arrangement 2
Alternatively erect the verticalstandards UVR 5 directly of the spigotsULT 32 24.
A9 Installingsupplementarycomponents
-
33Assembly Instructions PERI UP Rosett 72 Guidelines
A9.6 Sheeting
When using nets or tarpaulins ascovering careful attention must be paidto the scaffold anchorage. Thepermeability of the netting and theratio of openings in the faade willdetermine the number of anchorsrequired (see section B4 anchorpatterns).
The whole scaffold must be cladincluding ends.
A9.6.1 Covering with nets
The standard configuration shown insection B4 considers netting with thecoefficients (cf ) 0,6 and cf II ) 0,2). Thenets should have eyelets so that theycan be fitted to the vertical standardUVR 5 with ties at centres no greaterthan 50 cm.
A9.6.2 Covering with tarpaulin
The tarpaulin should have eyelets sothat they can be fitted to the verticalstandards UVR 5 with ties at centresno greater than 50 cm.
A9 Installingsupplementarycomponents
-
17
16
3
4
7
7
34 Assembly Instructions PERI UP Rosett 72 Guidelines
To dismantle the scaffold follow steps1 to 6 in reverse.
In order to ensure the safety of thescaffolders working on the upper levelsof the scaffold the following stepsshould be adhered to.
1.Remove the toeboard UPT 16, endguardrail frames UPX 17 and the lowerledger UH 3 (middle guardrail). Releaseand remove the top ledger UH 3 (topguardrail) successively working backto the access ladder bay. Remove thelast ledger UH 3 from the access ladderbay only when leaving that level.
2.Dismantle the steel decks 7 anddecking transom UHD 4 from below.
3.Then remove the verticalstandard UVR 5.
4.Repeat steps 1-3.
A10 Dismantling
-
35
6
6,00
xxxxx
xxx
xxxxx
x
Assembly Instructions PERI UP Rosett 72 Guidelines
B1.1 Belge
1
0,75
xxxxxxx
xx
xxxxxx
xxxxxx
xxxx
Weight[kg]
5,2 7,111,214,117,019,925,9
25,429,3
6,28,313,316,720,123,4
4,55,97,910,313,015,2
13,316,719,522,0
2
1,50
xxxxxxx
xx
xxxxxx
xxxxxx
xxxx
3
2,00
xxxxxxx
xx
xxxxxx
xxxxxx
xxxx
4
3,00
xxxxxx
xxxxx
xxxxxx
xxx
5
4,50
xxxxxx
xxxx
xxxxxx
xx
Scaffold deck
Steel decks UDS
Access deck withladder UAL
Timber decks UDT
Aluminium decks UDA
Length[m]
0,721,041,502,002,503,004,00
2,503,00
0,721,041,502,002,503,00
0,721,041,502,002,503,00
1,502,002,503,00
Width[m]
0,320,320,320,320,320,320,32
0,640,64
0,320,320,320,320,320,32
0,320,320,320,320,320,32
0,640,640,640,64
Load class according toEN 12811
Uniformly distributed load p [kN/m2]
x = permissible = not permissible
B1.1 Decks
The standard configurationconsidered in theseinstructions limit the use toload classes 1-3 due to the70 cm width of the scaffold.
B1 Load capacity
-
La1
a2
a3
a3
a2
a1
36 Assembly Instructions PERI UP Rosett 72 Guidelines
B1.2 Lattice girders
Span L = 600 cm
Span L = 800 cmTwo single loads at distance of 250 cm from the supports
Type
Depth /Length
[cm/cm]
50/42550/52570/52550/42550/52570/525
50/52550/62550/52550/62570/52570/62570/52570/625
50/62570/62570/82550/62570/62570/825
70/82570/825
70/82570/825
Endchord
connection
bottom/top
[]
NK/NKNK/NK
NK/NKNK/NK
NK/NKNK/NKNK/NKNK/NK
NK/NK
NK/NKNK/NK
NK/NK
NK/NKNK/NK
NK/NKNK/NK
Centrepointload
perm. F
[kN]
6,36,3
16,316,3
6,36,315,615,6
3,5
5,013,1
15,9
2,213,2
2x 2,52x 8,2
Endchord
connection
bottom/top
[]
NK/NKNK/NKNK/NKNK/NK
NK/UNKNK/UNK
NK/NKNK/NKNK/NK
UNK/NKNK/NKNK/NK
UNK/NKUNK/NK
NK/NKNK/NKNK/NKNK/NK
NK/UNKNK/UNK
NK/NKNK/NK
NK/NKUNK/NK
a2
[cm]
100100100
100100
100100
100100100
4x100
300
a3
[cm]
100100100
250
Span L = 400 cm
a1
[cm]
200200200100100100
250250150150250250150150
300300300100100100
400
250
Aluminiumlattice girder
ULA HD
Steel latticegirder ULS
NK: Right angled coupler class B, EN 74 (SWL 9 kN)UNK: Right angled coupler with a check coupler class BB (15kN)
Span L = 500 cm
Span L = 800 cm
Spacing ofgirder bracing
2x125 + 3x100 + 2x125
Centrepointload
perm. F
[kN]
15,115,120,730,730,731,1
15,115,127,227,420,720,729,129,1
8,812,112,123,226,826,6
5,422,5
2x 6,02x 14,6
B1 Load capacity
-
37Assembly Instructions PERI UP Rosett 72 Guidelines
Anchorpattern
8,0 m offset
4,0 moffset
2,0 m
Baylength
1,0
1,2
2,3
2,8
1,2
1,4
2,5
3,0
5,0
6,0
2,3
2,3
3,2
3,4
1,6
1,7
3,4
3,6
3,4
3,6
2,3
2,3
3,2
3,4
1,6
1,7
3,4
3,6
3,4
3,6
Standard configurationwith open facade*
Standard configurationwith closed facade*
Cladding
with nets
with nets
withtarpaulin
withtarpaulin
PERI UP Rosett 72
A[kN]
A'[kN]
A'II[kN]
A[kN]
A'[kN]
A'II[kN]
Anchor load for
Singlewall ties Triangulated anchors
2,3
2,3
2,6
2,8
3,4
3,6
3,1
3,6
3,5
4,2
5,0
6,0
2,3
2,3
2,6
2,8
3,4
3,6
B2.1 Triangulated anchorsor single wall ties
Singlewall ties Triangulated anchors
* open facade - closed facade dependson the ratio of net area of the facade An(with the openings deducted) and thegross area of the facade Ag:
= 1,0 : closed facade
= 0,4 : open facade
AnAgAnAg
AnAg
B2 Anchor forces
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
-
38 Assembly Instructions PERI UP Rosett 72 Guidelines
B2.2 Wall ties
Anchorpattern
8,0 moffset
4,0 moffset
2,0 m
1,5
1,5
1,7
1,9
2,2
2,4
1,0
1,2
2,3
2,8
1,2
1,4
2,5
3,0
5,0
6,0
1,5
1,5
2,1
2,3
1,1
1,1
2,2
2,4
2,2
2,4
Cladding
with nets
with nets
withtarpaulin
withtarpaulin
PERI UP Rosett 72
A[kN]
Baylength
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
2,5 m
3,0 m
3,1
3,6
3,5
4,2
5,0
6,0
Standard configurationwith open facade*
Standard configurationwith closed facade*
AII[kN]
A[kN]
AII[kN]
Anchor load for
Wall tie
* open facade - closed facade dependson the ratio of net area of the facade An(with the openings deducted) and thegross area of the facade Ag:
= 1,0 : closed facade
= 0,4 : open facade
AnAgAnAg
AnAg
B2 Anchor forces
-
0,72
Fi
0,72
Fa
39Assembly Instructions PERI UP Rosett 72 Guidelines
Internal leg load
External leg load
16 m24 m 8 m
Equipment
Without internalconsole bracket
With internal consolebracket UCB 32
Without externalconsole bracket
With external consolebracket UCB 32
With external consolebracket UCB 72
With external consolebracket UCB 104
Protection panel (additionalto console bracket or frame)
Protective fan on consolebracket UCB 72 (includesconsole bracket UCB 72)
Protective fan on consolebracket UCB 104 (includesconsole bracket UCB 104)
Baylength
[m]
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
2,5
3,0
Fi[kN]
7,0
8,0
12,8
14,9
Fa[kN]
10,7
12,1
Fi[kN]
5,5
6,3
10,2
11,8
Fa[kN]
7,9
9,0
Fi[kN]
3,9
4,6
7,5
8,8
Fa[kN]
5,2
6,0
Height of scaffold
Additional to Fa per level [kN]
1,9
2,3
4,0
4,7
6,3
7,4
0,6
0,7
1,4
1,6
1,6
1,8
PERI UP Rosett 72For use up to load class 3 (2,00 kN/m2)(One working platform)
B3 Reaction forces
-
1,76
0,72
Fa Fi
FDa FDi
40 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI UP T 72For use up to load class 3 (2,00 kN/m2)(One working platform)
Pavement Gantry
FDa[kN]
0,4 x Fa
FDi[kN]
Fi+0,6 x Fa
Bridgings
FUa[kN]
FUi[kN]
L
Fa Fi
FUa FUi
F F F F F
FU FUL L
Bay lengthL [m]
L = 8,0 m
2,10 x Fa
1,85 x Fa
2,10 x Fi
1,85 x Fi
2,50
3,00
Fa , FI to be choosen forrequired bay length L.
L = 6,0 m
1,70 x Fa
1,50 x Fa
1,70 x Fi
1,50 x Fi
2,50
3,00
L = 5,0 m
1,50 x Fa
1,35 x Fa
1,50 x Fi
1,35 x Fi
2,50
3,00
L = 4,0 m
1,30 x Fa
1,20 x Fa
1,30 x Fi
1,20 x Fi
2,50
3,00
F F
B3 Reaction forces
-
41Assembly Instructions PERI UP Rosett 72 Guidelines
B4.1 General
On the following pages variousanchor patterns, for use on PERI UPRosett 72, are shown for differentcombinations of components i.e.inside console brackets, fans etc. forboth unclad scaffolds and scaffoldswith nets or tarpaulins.
The diagrams indicate the anchortype, position and number togetherwith any additional ledgers/transomsand braces as well as maximum jackextension for different combinationsof supplementary components.
There are two basic arrangements:Basic arrangement 1 (page 48)For unclad scaffolds andNetted scaffolds in front of closedfacadesBasic arrangement 2 (page 64)For netted scaffolds in front of openfacades andTarpaulin clad scaffolds
Please note:
All anchors, diagonals and horizontalledgers in the basic arrangements(shown in grey) must be fitted.
When fitting supplementarycomponents additional anchors,diagonals and horizontal ledgers(shown in black) must also be fitted.
Where console brackets are shownexternally they may only be fitted onone level but that level may be atany height.
If the scaffold is erected withoutcollars UVB 24 the maximum jackextension, as shown in the diagrams,must be reduced by 26 cm.
Where the diagram shows 2 deckingtransoms UHD, one 50 cm abovethe other, a base frame UVF may besubstituted.
Application:The scaffold, for the appropriateload class, may be used inaccordance with the minimumrequirements of the EuropeanSafety and Health Directive for theuse of work equipment by workersat work (89/655/EEC).
The following applies to allanchor patterns:Scaffolding to the standardconfiguration with a maximumheight of 24.00 m and max. jackextension.3.00 m bay lengthsLoading up to scaffold group 3(2.00 kN/m2) with working load onone platform level only.Scaffold in front of open, where upto 60% of the face area containsopenings, or closed facades.
For unclad scaffolds in front ofclosed facades the followingvariations are allowed at theend bays.
Anchor loads and support reactionscan be taken from Table B2.
In the basic arrangement 1two single wall ties and onetriangulated anchor in place of threewall ties every 5th bay.
or
In the basic arrangement 2, twotriangulated anchors can beused in place of three wall ties every5th bay.This means that the plan bracecan be omitted.
or
8 m
4 m
8 m
8 m
n * 5 baysor
n * 5 bays
B4 Anchor patterns
-
104
Rosett72
GG3
h
32
32
72
104
104
72
72
72
4m
8m
72
6m
104
72
32
42 Assembly Instructions PERI UP Rosett 72 Guidelines
B4.2 Key
on console bracket UCB 104 withconsole bracket brace
PERI UP Rosett 72load class 3(2,0 kN/m2)
Maximum jack extensionHeight h (including plate and nut)
without console bracket
External console brackets UCB 32or UCB 36, UCB 72
Internal console bracketUCB 32 or UCB 36
Internal console bracket UCB 32 / UCB 36and external console bracket UCB 72
Protective fan
on console bracket UCB 72
Protection panel
on console bracket UCB 72 withconsole bracket brace
on frame
on console bracket UCB 32
on console bracket UCB 104 withconsole bracket brace
Bridging
4,0 m, with steel decks
6,0 m, with lattice girders
8,0 m, with lattice girders
Pavement gantry
Scaffolding with nets
for closed facade
for open facade(with 60% openings)
for open facades(with 60% openings)
Extension console brackets
Internal console bracket UCB 32 / UCB 36External console bracket UCB 32 / UCB 36
Scaffolding with tarpaulin
for closed facades
Internal console bracket UCB 32 / UCB 36and external console bracket UCB 104with console bracket brace
nets
tarp
sta
rps
nets
External console bracket UCB 104with console bracket brace
on console bracket UCB 72 withconsole bracket brace
B4 Anchorpatterns
-
32 104
104
104 104
104
72
32
32
4m
104
6m
8m
32
72
32
104
104
104
72
32
32
32
72
72
72
72
43Assembly Instructions PERI UP Rosett 72 Guidelines
or protectionpanel
B4.3 Overview of equipmentcombinations
PERI UP Rosett 72: For use up to scaffold group 3
Page
B4.5.1 Minimum anchorpositions 46
B4.5.2 Basicarrangement 1 478 m offsetanchor pattern
B4.5.3 Version 1 48
B4.5.4 Version 2 49
B4.5.5 Version 3 50
B4.5.6 Version 4 51
B4.5.7 Version 5 52
B4.5.8 4.00 m bridging 53
B4.5.9 6.00 m bridging 54
B4.5.10 8.00 m bridging 55
Unclad
or protectionfan
Extensionconsole brackets
BridgingPavement
gantrycladding
The grey fields are possible but arenot featured here.
Further combinations are listed in B5.
B4 Anchorpatterns
-
104
104
72
72
32
104104
72
104104
32
32
104
32
72
104
104
104
7272
44 Assembly Instructions PERI UP Rosett 72 Guidelines
B4.3 Overview of equipmentcombinations
PageBridgingPavementgantry
cladding
PERI UP Rosett 72: For use up to scaffold group 3
B4.5.11 Pavement gantry 56
B4.5.12 Pavement gantry 57
B4.5.13 Top level notanchored 58
B4.6.1 Closed facade,min. anchoringpositions 598.00 m offset anchor pattern
B4.6.2 Closed facadeVersion 1 60
B4.6.3 Closed facadeVersion 2 61
B4.6.4 Closed facadeVersion 3 62
B4.6.5 Open facadeBasicarrangement 2 634.00 m offset anchor pattern
B4.6.6 Open facadeVersion 1 64
B4.6.7 Open facadeVersion 2 65
B4.6.8 Open facadeVersion 3 66
Extensionconsole brackets Unclad
Nets
or protectionpanel
or protectionfan
The grey fields are possible but arenot featured here.
Further combinations are listed in B5.
B4 Anchorpatterns
nets
nets
nets
nets
nets
nets
nets
nets
-
104
104
104
104
104
104
104
104
104
104
45Assembly Instructions PERI UP Rosett 72 Guidelines
B4.3 Overview of equipmentcombinations
PageBridgingPavementgantry
cladding
PERI UP Rosett 72: For use up to scaffold group 3
B4.7.1 Closed facadeMin. anchorpositions 67
B4.7.2 Closed facadeVersion 1 68
B4.7.3 Open facadeMin. anchorpositions 69
B4.7.4 Open facadeVersion 1 70
Extensionconsole brackets Tarpaulin
or protectionpanel
or protectionfan
tarp
sta
rps
tarp
sta
rps
The grey fields are possible but arenot featured here.
Further combinations are listed in B5.
B4 Anchorpatterns
-
46 Assembly Instructions PERI UP Rosett 72 Guidelines
B4.4 Legend
protectionpanel
single wall tie
wall tie
triangulated anchor
pressure-resistant ties
anchor type:
ledger UHledger brace UBL
tie
clos
ed f
acad
e
internalconsolebracket
open
fac
ade
access ladder bay
externalconsolebracket
2 x ledger UH
horizontal brace UBH
ledger brace UBL
consolebracketbrace
protectivefan
deckingtransom
protective fan
2. deckingtransoms UHD
Ledger UH asguardrail
deck level
ledger UH in thelevel of deck
AB A B
Cladding(nets, tarpaulin)
Ledger UH asintermediateguardrail
cladding(nets, tarpaulin)
B4 Anchorpatterns
-
32
) 0,30m0,72m
8m
) 0,3m
) 0,3m
4m8m
0,72m0,72m
"A" "B" "A" "B"
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
50
32
UHUHUHUH
47Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
H )
24m
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
UH UBL 2x UHDUHUH
or
Rosett72
GG3
UBL
B4.5.1 Unclad,minimumanchor positions
-
) 0,3m
) 0,62m0,72m
8m
4m8m
0,72m0,72m
"A" "B" "A" "B"
30
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
) 0,3m
48 Assembly Instructions PERI UP Rosett 72 Guidelines
wall tie
single wall tie
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only
Standard configuration for open and closed facades
H )
24m
UH UBL
8 m offset anchor pattern
UH2x UHD
Rosett72
GG3
UH
2x UH
UBL
B4.5.2 UncladBasic arrangement 18.00 m offset pattern
-
) 0,62m0,72m
8m
4m8m
) 0,3m
0,72m0,72m
"A" "B""A" "B"
) 0,3m
35
32
32
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
49Assembly Instructions PERI UP Rosett 72 Guidelines
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
H )
24m
UH 2x UH
or
UH
2x UHD
Rosett72
GG3
UBL
UBL UH
UH
B4.5.3 UncladBasic arrangement 1Version 1
-
) 0,62m0,72m
8m
4m8m
) 0,3m
0,72m0,72m
"A" "B" "A" "B"
) 0,3m
35
32
32
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
72
72
72
50 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
UH UBL
or
UH
2x UHD
Rosett72
GG3
UH
2x UHUH
UBLUH
B4.5.4 UncladBasic arrangement 1Version 2
-
) 0,62m0,72m
0,72m
8m
4m8m
0,72m
"A" "B" "A" "B"
0,72m 0,72m
72
72
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
) 0,3m
) 0,3m
30
51Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
H )
24m
UH UBLUH
or
UH
2x UHD
Rosett72
GG3
UH
UH
UH UBL
2x UH
B4.5.5 UncladBasic arrangement 1Version 3
-
) 0,62m0,72m
0,72m
8m
4m8m
0,72m
"A" "B" "A" "B"
1,04m 1,04m
20
104
104
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
) 0,3m
) 0,3m
52 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-690Fax: 0 73 09 / 951-690info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
UH UBL
or
UH
2x UHD
Rosett72
GG3
UH
UH
UBL2x UH
UBL
B4.5.6 UncladBasic arrangement 1Version 4
-
104
0,72m
8m
4m8m
0,72m
"A" "B" "A" "B"
) 0,3m
) 0,3m
0,72m
104 104
1,04m
104
104
) 0,62m0,72m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
20
53Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
H )
24m
UH UBL
or
2x UHD
UH
Rosett72
GG3
UH
UH
2x UH
UBL
B4.5.7 UncladBasic arrangement 1Version 5
Rosett72
GG3
-
) 3,0m
) 0,3m
) 0,62m0,72m
2,5m 4,0m 2,5m ) 3,0m 2,0m 4,0m 2,0m ) 3,0m
"A" "B""A" "B"
8m
4m8m
) 0,3m
0,72m0,72m
35
4m
54 Assembly Instructions PERI UP Rosett 72 Guidelines
wall tie
single wall tie
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only
Standard configuration for open and closed facades
H )
24m
UH
UH
2x UHD
Rosett72
GG3
UH
2x UH UH UBL
UH UBL
with adjoining bays2,5 m
with adjoining bays) 2,0 m
B4.5.8 UncladBasic arrangement 14.00 m bridging
-
104
) 0,62m0,72m
0,72m
"A" "B""A" "B"
8m
4m8m
) 0,3m
0,72m
1,04m
6,0m
6m
104
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
1,04m
) 0,3m
104
104
72
20
55Assembly Instructions PERI UP Rosett 72 Guidelines
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
H )
24m
UH
UH
2x UHD
2x UH
or
Rosett72
GG3
2x UH UBL
UBL
UH
UH
UH
B4.5.9 UncladBasic arrangement 16.00 m bridging
-
32
32
) 0,62m0,72m
) 0,3m
"A" "B""A" "B"
4m8m
) 0,3m
0,72m0,72m3,0m 2,5m 3,0m 2,5m 3,0m
(3,0m) (2,0m) (3,0m)
20
8m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
8m
104
0,32m 0,32m
104
72
56 Assembly Instructions PERI UP Rosett 72 Guidelines
wall tie
single wall tie
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only
Standard configuration for open and closed facades
H )
24m
UH 2x UH
UH
or
2x UHD
Rosett72
GG3
UH
UBL
UBL
B4.5.10 UncladBasic arrangement 18.00 m bridging
-
) 0,3m
) 0,30m
1,76m
"A" "B""A" "B"
4m8m
2m8m
32
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
) 0,3m
1,76m
0,72m
1,76m
0,72m
32
25
72
57Assembly Instructions PERI UP Rosett 70 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 70
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
H )
24m
UH 2x UBL transverse diagonals
UBL
or
Rosett70
GG3
UH
2x UH
UH
B4.5.11 UncladPavement gantrymin. anchor positions
-
104
) 0,62m1,76m
"A" "B""A"
) 0,3m
) 0,3m
4m8m
2m8m
0,72m
"B"
1,04m
20
72
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
104
1,76m
0,72m
1,76m
0,72m
58 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
UH 2x UBL transverse diagonals
UBL
or
Rosett72
GG3
UH
2x UH
UH
B4.5.12 UncladBasic arrangement 1Pavement gantry
-
"A" "B" "A" "B"
) 0,3m
) 0,3m
59Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facades
Modular Scaffolding PERI UP Rosett 72
wall tie
UVR 200
locking pin
UVR 200
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Note: The side protection is not complete shown for static purposes only
locking pin
UCB 32(UCB 36)
UH
UHD 72UWT 110
UPT
Rosett72
GG3
UH
B4.5.13 UncladBasic arrangement 1Top level not anchored
-
) 0,3m0,72m
"A" "B""A" "B"
4m8m
) 0,3m
0,72m0,72m
8m
) 0,3m
50
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
60 Assembly Instructions PERI UP Rosett 72 Guidelines
wall tie
single wall tie
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only
Standard configuration for open and closed facades
H )
24m
UH UBL
nets
nets
UBL2x UHD
Rosett72
GG3
UH
UH nets
UH
B4.6.1 Net closedfaade, minimumanchor positions
nets
-
32
) 0,62m0,72m
"A" "B""A" "B"
4m8m
) 0,3m
0,72m0,72m
) 0,3m
8m
35 32
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
61Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
UH
H )
24m
nets
nets
UH
2x UHD
or
Rosett72
GG3
UH
2x UH
UBL
UHUBL
UH nets
B4.6.2 Net closed faadeVersion 1
nets
-
72
) 0,62m0,72m
0,72m
"A" "B""A" "B"
8m
4m8m
) 0,3m
0,72m
) 0,3m
0,72m 0,72m
30 72
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
62 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
UH 2x UH
nets
nets
UH
2x UHD
or
Rosett72
GG3
UH
UH
UBL
UH
UH
UBL nets
B4.6.3 Net closed faadeVersion 2
nets
-
104
) 0,62m0,72m
"A" "B""A" "B"
4m8m
) 0,3m
0,72m0,72m
) 0,3m
1,04m1,04m
20 104
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
8m
104
104104
63Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
UH
H )
24m
UBL
nets
nets
2x UH
UH
or
2x UHD
2x UH
Rosett72
GG3
UH
UH
UH
UBL UH nets
B4.6.4 Net closed faadeVersion 3
nets
-
2m4m
4m
4m4m
) 0,30m0,72m
0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
50
64 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
H )
24m
nets
nets
2x UHD
Rosett72
GG3
nets
UH
4 m offset anchor pattern
B4.6.5 Net - open faadeBasic arrangement 24.00 m offset anchor pattern
nets
-
104
) 0,30m0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
1,04m1,04m
0,72m
4m2m
4m
4m4m
4m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
20 104
65Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
H )
24m
nets
nets
UH
or
2x UHD
Rosett72
GG3
UH
netsUH
B4.6.6 Net - openfaade, Basic arrange-ment 2, Version 1
nets
-
) 0,62m0,72m
0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
2m4m
4m
4m4m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
50
66 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
UBH
nets
nets
UH 2x UHD
Rosett72
GG3
UH
nets
UH UBL
UBL UH
B4.6.7 Net - openfaade Basic arrange-ment 2, Version 2
nets
-
104
) 0,62m0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
1,04m1,04m
0,72m
4m2m
4m
4m4m
4m
20 104
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
104
104104
67Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
wall tie
single wall tie
Note: The side protection is not complete shown for static purposes only
H )
24m
nets
nets
UHUBH
or
2x UHD
Rosett72
GG3
UH
UH UBL
UBL UH nets
B4.6.8 Net - openfaade, Basic arrange-ment 2, Version 3
nets
-
) 0,30m0,72m
0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
2m4m
4m
4m4m
50
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
104
1,04m
104
68 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only
wall tie
H )
24m
tarp
aulin
tarp
aulin
pressure-resistant ties
or
2x UHD
Rosett72
GG3
UH
tarpaulin
UH
UH
B4.7.1 Tarpaulin -closed faade,min. anchor positions
tarp
s
-
104
) 0,62m0,72m
0,72m
"A" "B""A" "B"
) 0,3m
0,72m
2m4m
4m
4m4m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
20 104 104
) 0,3m
1,04m
104104
69Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only
wall tie
pressure-resistant ties
H )
24m
tarp
aulin
tarp
aulin
UBH
or
2x UHD
Rosett72
GG3
UH
UH
UH
UBL
UBL
UH
UH tarpaulin
B4.7.2 Tarpaulin -closed faadeVersion 1
tarp
s
-
104
4m
) 0,30m0,72m
0,72m
"A" "B""A" "B"
) 0,3m
0,72m
2m4m
4m
4m4m
50
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
104
1,04m
) 0,3m
70 Assembly Instructions PERI UP Rosett 72 Guidelines
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Standard configuration for open and closed facades
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
tarp
aulin
tarp
aulin
or
Rosett72
GG3
UH
UH
UH tarpaulin
B4.7.3 Tarpaulin -open faade,min. anchor positions
tarp
s
-
104
104
) 0,62m0,72m
"A" "B""A" "B"
) 0,3m
0,72m
) 0,3m
1,04m1,04m
0,72m
4m2m
4m
) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m ) 3,0m
104
4m4m
4m
20
104104
71Assembly Instructions PERI UP Rosett 72 Guidelines
Standard configuration for open and closed facadesPERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 950-6900Fax: 0 73 09 / 951-6900info@peri-up.comwww.peri-up.com
Modular Scaffolding PERI UP Rosett 72
Note: The side protection is not complete shown for static purposes only wall tie
single wall tie
H )
24m
tarp
aulin
tarp
aulin
UHUBH
or
Rosett72
GG3
UH
UH
UH tarpaulin
UBLUH
UBL
B4.7.4 Tarpaulin -open faadeVersion 1
tarp
s
-
72
- x x x x x x x x x - x x - x x x - - x x - x - x
x - x x x x x - x x x x - x x x - x - x x x x x
- - - - x x 51 - x - - x - - x x - x - x x x x x
- - - - - x x - x - - x - - - x - x - x x x x x
x 50 x x x x x - x x x x x x x x 50 x x x x x x x
50 50 50 x 50 50 x 50 x x - - 50 50 50 x 50 50 50 x 50 x 50 x
53 53 53 53 53 53 x 53 x x - - 53 53 53 x 53 53 53 x 53 x 53 x
x
x
x
x x
Assembly Instructions PERI UP Rosett 72 Guidelines
key to page
cladding without
open
nets
closed open closed openfacades
internal console bracketUCB 32/36
external consolebracket
max. one levelon any level +top level pro-tection panel
tarpaulin
x Permitted in accordance with this instruction booklet
- Not permitted according to this instruction booklet
49 Additional ties and components as detailed on page 49
protection panel onexternal standard
fan protection
bridging
pavement gantry
UCB32
UCB72
UCB104
UCB72
UCB104
4 m
6 m
8 m
B5.1 Componentcombinations
47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71
-
50 / 525 50 / 625 70 / 525 70 / 625 50 / 525 50 / 625 50 / 525 50 / 625 50 / 625 70 / 625 70 / 825 50/ 625 70/ 825 70/ 825
250 100 250 100 250 100 250 100 100 100 250 250 300 100 300 100 300 100 300 100 300 100 100
x x x x x x x x x x x x x x - x - x - - - x x x
x x x x x x x x x x - - x x - x - x - x1) - x x2) x
x x x x x x x x x x - - x2) x - x - x - - - x1) - x
- x - x x x x x - - - - - x - x - x - - - - - -
x x x x x x x x x x x x x2) x x x x x - - - - x2) x
- x - x x x x x - - x x x x - x - x - - - - x -
- x - x x x x x - - - - x x - x - x - - - - - -
73Assembly Instructions PERI UP Rosett 72 Guidelines
Spacing ofadditionalbracing [cm]
size
internal consolebracket UCB 32/36
externalconsolebracket
max. onelevel on anylevel + toplevelprotectionpanel
UCB32
UCB72
UCB104
span
5 m 6 m 8 m
lattice girderst
eel U
LS
alu
min
ium
ULA
twin
alu
min
ium
ULA
twin
alu
. ULA
stee
l ULS
alu
min
ium
ULA
stee
l ULS
twin
alu
. ULA
Protection panel onexternal standard
fan pro-tection
UCB72
UCB104
x Permitted for the standard configuration
- Not permitted on the standard configuration
1) Protection panel on external console bracket not permitted
2) Protection panel on external console bracket not permitted with protection fan
B5.2 Use oflattice girders
-
74 Assembly Instructions PERI UP Rosett 72 Guidelines
Item no. Description Weight [kg]
Adjustable base plates
100411 Adjustable base plate UJB 38-50/30 3,3
100242 Adjustable base plate UJB 38-80/55 4,5
100159 Swivel base spindle UJS 38-80/55 4,8
100863 Handle lock UJS 1,0
019780 Heavy duty adjustable base plate TR 38-70/50 5,2
100244 Base plate UJP 1,2
Frames T 72
100200 Base frame UVF 72/124 12,4 100170 Base frame UVF 72/174 20,6 100212 T-frame UVT 72/200 14,7 100217 L-frame UVL 72/100 8,1
Tubes T 72
100220 Spigot tube UV 165 7,5
100222 Guardrail post UVP 100 4,5
Bracing UBF
100247 Standard diagonal bracing UBF 150/200 5,4
100253 Standard diagonal bracing UBF 200/200 6,0
100257 Standard diagonal bracing UBF 250/200 6,8
100261 Standard diagonal bracing UBF 300/200 7,5
Components listPERI UP
-
75Assembly Instructions PERI UP Rosett 72 Guidelines
Item no. Description Weight [kg]
Steel decks UDS
100488 Steel deck UDS 32 x 72 5,2
100486 Steel deck UDS 32 x 104 7,1
100355 Steel deck UDS 32x150 11,2
100373 Steel deck UDS 32x200 14,1
100375 Steel deck UDS 32x250 17,0
100377 Steel deck UDS 32x300 19,9
100820 Steel deck UDS 32x400 25,9
102605 Deck link plate UED 0,4
Timber decks UDT
on request Wood deck UDT 32 x 72 6,2
on request Wood deck UDT 32 x 104 8,3
on request Wood deck UDT 32x150 13,3
on request Wood deck UDT 32x200 16,7
on request Wood deck UDT 32x250 20,1
on request Wood deck UDT 32x300 23,4
Aluminium decks UDA
on request Aluminium deck UDA 32 x 72 4,5
on request Aluminium deck UDA 32x104 5,9
on request Aluminium deck UDA 32x150 7,9
on request Aluminium deck UDA 32x200 10,3
on request Aluminium deck UDA 32x250 13,0
on request Aluminium deck UDA 32x300 15,2
on request Aluminium deck UDA 64x150 13,2
on request Aluminium deck UDA 64x200 16,4
on request Aluminium deck UDA 64x250 19,5
on request Aluminium deck UDA 64x300 22,6
Access decks UAL
100524 Access deck with ladder 64 x 250/3 25,5
100523 Access deck with ladder 64 x 300/3 29,4
Decking gap fillers UD
101360 Decking gap filler UD 7/150 2,4
101372 Decking gap filler UD 7/200 3,2
101373 Decking gap filler UD 7/250 3,9
101375 Decking gap filler UD 7/300 4,7
on request Decking gap filler UD 7/400 6,2
Components listPERI UP
-
76 Assembly Instructions PERI UP Rosett 72 Guidelines
Item no. Description Weight [kg]
Guardrails UPG
100265 Guardrail UPG 150 2,4
100266 Guardrail UPG 200 3,2
100267 Guardrail UPG 250 4,0
100268 Guardrail UPG 300 4,8
100810 Guardrail UPG 400 9,1
Toe boards UPT
100381 Toe board UPT 150 4,5
100390 Toe board UPT 200 5,5
100393 Toe board UPT 250 6,5
100396 Toe board UPT 300 7,5
100816 Toe board UPT 400 9,5
108068 Toe board wood UPT-2 150 4,1
108114 Toe board wood UPT-2 200 4,9
108117 Toe board wood UPT-2 250 6,3
108120 Toe board wood UPT-2 300 7,3
108204 Toe board wood UPT-2 400 9,5
End guardrail frames UPX
101579 End guardrail frames UPX 32 4,0
100444 End guardrail frames UPX 72 7,3
100349 End guardrail frames UPX 104 9,3
Components listPERI UP
-
77Assembly Instructions PERI UP Rosett 72 Guidelines
Item no. Description Weight [kg]
Vertical and horizontal elements
100014 Collar UVB 24 2,5
102859 Standard UVR 50 3,1
101306 Standard UVR 100 5,5
102860 Standard UVR 150 7,8
100009 Standard UVR 200 10,1
100012 Standard UVR 300 14,8
100013 Standard UVR 400 19,4
101309 Top standard UVH 50 2,3
100000 Top standard UVH 100 4,7
100003 Top standard UVH 150 7,0
100005 Top standard UVH 200 9,3
100007 Top standard UVH 250 11,7
100440 Ledger UH 72 2,4
100192 Ledger UH 104 3,3
100021 Ledger UH 150 4,7
100023 Ledger UH 200 6,0
100025 Ledger UH 250 7,3
100027 Ledger UH 300 8,7
100029 Ledger UH 400 11,4
100017 Ledger UH 75 2,5
101159 Ledger UH 100 3,2
100031 Decking transom UHD 72 4,3
100039 Decking transom UHD 104 5,2
100076 Decking transom UHD 150 8,1
100079 Decking transom UHD 200 10,0
100082 Decking transom UHD 250 12,1
100085 Decking transom UHD 300 14,2