NRRRF ERP Project Lessons

NRRRF Emergency Response Plan

NC / AWWA Annual Conference, RaleighNovember 17, 2015

Tim Woody, Resource Recovery Superintendent & Division DirectorWastewater and Reuse , CORPUD

Jack MoyerWater Security and Preparedness Practice Leader, AECOM

NRRRF ERP Project Lessons2

Presentation Overview

• Background on CORPUD and NRRRF

• Stuff Happens

• Project Background

• Project Methodology

• Lessons Learned

• Current Status and Next Steps

NRRRF ERP Project Lessons

Background on CORPUD

• City of Raleigh Public Utilities Department

• 530,000 and growing service population

• Serving Raleigh, six other towns, and surrounding areas• Garner

• Wake Forest / Rolesville

• Knightdale / Wendell / Zebulon

3

NRRRF ERP Project Lessons

Service Area Map

4

Wake Forest

Garner

NRRRF ERP Project Lessons

Background on NRRRF

• Neuse River Resource Recovery Facility (Name recently changed)

• Largest of three CORPUD RRF

• Build in mid-1970’s at 30 mgd, many expansions and enhancements, now 60 mgd, under expansion to 75

• One of the two largest wastewater treatment plants in North Carolina

• Average daily flow 45 MGD (2014) and peak of 83 MGD (2014)

5

NRRRF ERP Project Lessons6

NRRRF ERP Project Lessons

Current Treatment Process

• Fine screens

• Flow equalization

• BNR process

• Secondary and tertiary treatment

• UV disinfection

7

NRRRF ERP Project Lessons

Current Reuse System

8

• 8 customers in Zebulon and 14 in Raleigh with a total of 32 metered connections

• 284 million gallons per year

NRRRF ERP Project Lessons

Current Biosolids Process

• Belt thickened and centrifuged

• Aerobically digested

• Distributed as a liquid Class B or belt pressed and distributed as a composted product or a lime stabilized product

• Some applied on site

9

NRRRF ERP Project Lessons

Smith Creek

Wake Forest

Little Creek

Zebulon

Other Two Plants

10

NRRRF ERP Project Lessons

Stuff Happens - Tornados

11

NRRRF ERP Project Lessons

Hurricanes and Flooding

12

NRRRF ERP Project Lessons

Winter Storms

13

NRRRF ERP Project Lessons

Fuel Oil Spill to Sewer System

14

NRRRF ERP Project Lessons

Reuse Tank Main Break

15

NRRRF ERP Project Lessons

Plant Bypasses and Overflows

16

NRRRF ERP Project Lessons

Biosolids Truck Accidents

17

NRRRF ERP Project Lessons

Project Background

• CORPUD and NRRRF had many emergency plans, but no good hands-on plans for plant staff

• Needed to address emerging threats, such as wastewater influent contamination and active shooters

• Wanted to do a “grass-roots” project with strong plant staff involvement and minimal consultant assistance

18

NRRRF ERP Project Lessons

Project Methodology - 1

• Formed a team comprised of Emergency Management Team members

• Led by Division Director, Plant Superintendent, Several Program Managers

• Hired consultant, with emergency preparedness experience but with a specific scope that included guidance and support

19

NRRRF ERP Project Lessons

Project Methodology - 2

• 15 meetings, about 1/2 without the consultant

• Work products centered around a series of incident-specific response flow charts

• Small tabletop exercises were used to test the flow charts• Influent contamination

• Tornado

• Fire

• On-site chemical release

20

21

NRRRF ERP Project Lessons

Lessons Learned - Initial

• A major commitment is needed to set aside the time for a project like this

• The involvement of internal staff is critical to get a product that really works for the plant

• We didn’t realize how deficient we were until we really drilled into it

• Some up-front work is needed to develop the process and it took a while to hit our stride

22

NRRRF ERP Project Lessons

Lessons Learned – Flow Charts

• Flow chart plans are much more challenging than text plans and it took some iterations to get them right

• Flow charts provide much clearer direction and more valuable detail to the first in-house personnel responding to an incident

• It’s important not to get too far down in the weeds

23

NRRRF ERP Project Lessons

Lessons Learned – Other

• The little tabletop exercises were very helpful in testing the flow chart procedures

• The work developed provides an excellent framework

• Plan requires annual review and updating

• The plan is one tool in the response toolbox and needs to fit in with other CORPUD and City response plans

24

NRRRF ERP Project Lessons

Current Status and Next Steps

• Putting on the finishing touches

• Preparing to develop similar plans at the other PUD Facilities

• Striving for consistency

• Constantly changing

25

NRRRF ERP Project Lessons26

Tim Woody Jack Moyer

919-996-3712 919-461-1472

tim.woody@ jack.moyer@

raleighnc.gov aecom.com

Questions / Comments

top related