life cycle approach for plant maintenance
Post on 04-Jun-2018
221 Views
Preview:
TRANSCRIPT
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 1/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 1
SOGAT 2012
The Shah Gas Development Project
A Lifecycle Approach to the HSEIA Process
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 2/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 2
HSE Impact Assessment
What is an HSEIA & Its Importance
• An HSEIA is systematic approach to evaluating the potential effect of a project
on health, safety and the environment
• A living document that considers the full lifecycle of the project (FEED, EPC,
Operations, Decommissioning & Abandonment)
• ADNOC Requires HSEIAs to be undertaken for all project phases
• Key function is to identify, assess, mitigate to ALARP and monitor on a
continuous basis all material risk that can adversely impact health, safety, and
environment
• Residual impacts and hazards managed by the operator’s HSE ManagementSystem (HSEMS)
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 3/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 3
A Lifecycle Approach to the HSEIA Process
Introduction to the Approach
• A streamlined, risk-based and quality-focused methodology based on current
industry best practice for HSE Case development• A systematic and gated verification and review process that provides for the
management of major accident hazards through the lifecycle of the Shah Gas
Development (SGD) Programme
• Greater emphasis is placed on HSE Critical Equipment and Systems (HSECES)
integrity that provides significant safety and efficiency benefits to the end user• Developed in close cooperation with the ADNOC EHS Division
• Demonstrates the safe systems of work and organisation required to effectively
identify, manage and maintain risks to a tolerable and As Low As Reasonably
Practicable (ALARP) level
• Based on the detailed assessment of the proposed SGD activities and the outputsfrom HSEIA studies, management plans and procedures
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 4/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 4
A Lifecycle Approach to the HSEIA Process
How it is Different from Traditional HSEIA Approaches
The Al Hosn Gas HSEIA approach is a departure from traditional HSEIAs process in
the following ways:• Process based method compared to the traditional prescriptive methodology of
HSEIA report development
• Is overarching and not limited to providing a ‘snap-shot’ in time of HSE risk i.e.
lifecycle philosophy
• Systematic and gated verification and review process provide tangible barriersfrom allowing the development to proceed to the next stage until a strategy to
manage HSE risks to ALARP can be put in place
• Reduces unnecessary duplication of HSE studies/reviews; and
• Reduces the turnaround time for obtaining approvals from ADNOC EHS Division.
• Inter-linkages between quality management and procurement thus effectively
integrating supply chain logistics in the lifecycle and improving operational
efficiency
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 5/16Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 5
A Lifecycle Approach to the HSEIA Process
How it is Different from Traditional HSEIA Approaches
The following slides contain diagrams and process flows for the following:
1. ADNOC HSEIA report process (slide 6)
2. Overview of the Al Hosn Gas lifecycle HSEIA approach developed for the
Phase II SGD Programme – well operations and well testing (slide 7)
3. The 8 step elements of the Al Hosn Gas lifecycle HSEIA approach developed forthe Phase II SGD Programme – well operations and well testing (slides 8 – 15)
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 6/16Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 6
• Identify and assess material Risk
• Mitigate risk to ALARP
• Provide control measures and monitoring
A Lifecycle Approach to the HSEIA Process
Traditional ADNOC HSEIA Report Components
ADNOC HSE Impact
Assessment Report
Environmental
Impact StatementCOMAH Report OHRA Report
Hazard & Effects Register
For Risk categories:
People, Environment, Assets &
Reputation
Manage medium/low risk through Operator’s HSE Management System
ADNOC and
SPC asregulator
require HSEIA
for O&G
Projects
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 7/16Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 7
Drilling
Operations
Procurement,
Inspection &
Testing
Well Testing &
Handover
HSE Critical
Positions & Tasks
Quality
Management
Detailed Well &
Well Test Design
& Engineering
Project
Initiation &
Control
MAH & HSECES
Identification
1
2
3
4 5
6
7
8
Al Hosn Gas Lifecycle HSEIA Approach
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Evergreen Process
Gates
Review
Gates
Review
Gates
Review
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 8/16Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 8
Change Control
in Design
Robust Change Control procedures in place for review,
approval & documentation of design changes.
Change Management supported by an integrated
(Company/Contractor) multi-discipline technical
authority community (approved terms of reference)
Baseline
Documentation
Design Codes, Standards and Guidelines established by
Drilling Development Division for the Drilling
Contractors.
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element Project Initiation &
Control1
1.1
1.2
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 9/16Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 9
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element MAH & HSECES
Identification2
HEMP Studies
HAZID/ENVID/OHRA etc., to identify Major Accident
Hazards (MAHs) & Initial identification of HSECES.ISO17776 Standard for Hazard Reference Codes with
additional hazards identified for Al Hosn Gas
Risk RegistersStandard Hazards, Effects & Aspects Register format used
by Company and Contractors
Bowtie Analysis
Developed via multi-discipline technical authority
community workshops using BowTieXP.
Company Bowtie Analysis Standard establishes unique
hazard and barrier referencing system that will carry
through from design to operations bowties
HSECES
Identification
HSECES are identified and confirmed by discipline
technical authorities during bowtie analysis workshops.
Controlled HSECES Register
2.1
2.2
2.3
2.4
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 10/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 10
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element HSE Critical
Positions & Tasks3
• HSE Critical Positions & Tasks identified
for all HSECES for the Drilling & Well
Testing Phase.
• Unique barrier referencing systemfacilitates efficient assurance activities
i.e., barrier verification audits.
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 11/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 11
Well & Well Test
Design Execution plans and assignment of competent resources
Design Inputs &
OutputsQuality plans, codes/specs/standards and HSE criteria
Design programs and calculation sheets
Well Design &
Development
Review
Integrated multi-discipline design reviews conducted
HSE Embedded
into ProcessSpecific safety studies and reviews in line with the HSE
plans
Design &
Development
Validation
Independent Verification Process for HSECES
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element Detailed Well & Well Test
Design & Engineering4
4.1
4.2
4.3
4.4
4.5
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 12/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 12
PurchaseInformation
HSECES Design Performance Standards Operating
Envelope Criteria
Verification of
Purchased ProductsHSECES inspection and test plans
Independent Verification Process for HSECES
Inspection and testing plans prior to operationInspection &
Testing
Verification of inspection reportsThird Party Inspection monitoring
Change Control procedures
Inspection &
Disposition Reports
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element Procurement,
Inspection & Testing5
5.1
5.2
5.3
5.4
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 13/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 13
Testing Well IntegrityDrilling logs.
Cement quality and casing integrity testing.
Validation Processes Pre-mobilization audits of HSECES.Technical audits to check critical equipment.
Quality plans
Identification procedures
Non-conformance procedures
Identification &
Traceability
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element Drilling Operations 6
6.1
6.2
6.3
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 14/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 14
Measurement Inspection, testing and examination against design
performance standards
Non-conformance Non-conformance control procedure
Non-conformance reports & follow up
Monthly quality reports
Independent Verification Body (IVB) compliancereports
Analysis
SGD Phase II – Drilling, Well Testing & Cleanup Phase
ElementQuality
Management7
7.1
7.2
7.3
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 15/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 15
Stimulation &Cleanout & Testing
Air Quality
Flaring ManagementDispersion Modeling
Real time data monitoring – model verification
Operation
Validation
Nitrogen purging of service linesPermit to work compliance
Well start up procedure
Endorsed well handover document
Handover
8.1
8.2
8.3
8.4
Defined Test Objectives – optimised well test programmeWell integrity assurance – standards verification
Wellsite HSE management plan (BAT & ALARP principles)
Management of change
Validation of testing contractors QA/QC via
ADNOC standards & audit
Competence assurance
Well Testing &
Handover8
SGD Phase II – Drilling, Well Testing & Cleanup Phase
Element
A Lif l A h t th HSEIA P
8/13/2019 Life Cycle Approach for Plant Maintenance
http://slidepdf.com/reader/full/life-cycle-approach-for-plant-maintenance 16/16
Page ‹#› Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 16
A Lifecycle Approach to the HSEIA Process
The Benefits
• The HSEIA approach provides tangible performance enhancement benefits in the
following ways:
• A greater focus on MAHs and HSECES integrity thus significantly reducing the
overall risk picture;
• Greater flexibility for managing HSEIA process associated with multi-
package/multi-rig operations thus providing optimum efficiency
• Minimizing overall lifecycle costs through procurement of HSECES againstapproved performance standards i.e., QA/QC of HSECES from day one
• Reduction of turnaround in ADNOC/SPC approval process i.e., SGD Program
HSEIA Phase II approvals have been achieved approximately 14 days from
submittal
• The approach is fully integrated with ADNOC & COMPANY HSEMS
• The iterative and evergreen nature of the approach provides the opportunity for
continuous improvement