EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course
Figure 1 – Existing Overall Plan
LegendLien Holder(498,584 SF or 12 Acres)UICN(7,000,103 SF or 161 acres)WWTP(103,446 SF)
North
EXISTING PRIMARY EFFLUENT POND
EXISTING UICN PLANT 3
EXISTING OVERFLOW PONDS
EXISTING WILLOW CREAK GOLF COURSE PUMP
STATIONEXISTING LAKEVIEWGOLF COURSE PUMP
STATION
EXISTING TWIN PONDS
EXISTING TWIN PONDS PUMP STATION
EXISTING POND
EXISTING POND
EMERGENCY OVERFLOW
POND
EMERGENCY OVERFLOW PONDS
EXISTING ENLARGED SITE PLAN | UICN Plant 3 and Willow Creek Golf Course
Figure 2 – Existing Enlarged Site Plan
UICNPLANT 3 WWTP
OVERFLOW RESERVOIR #2 (OR #2)
MAX POOL EL=2614STORAGE CAPACITY=2.51 AC FT
TOB EL=2615INV OUT EL=2609
OVERFLOW RESERVOIR #1 (OR #1)
MAX POOL EL=2614STORAGE CAPACITY=1.37 AC FT
TOB EL=2615INV IN EL=2606
INV OUT EL=2608
PRIMARY EFFLUENT RESERVOIR (PER)
MAX POOL EL=2614STORAGE CAPACITY=2.65 AC FT
TOB EL=2615INV OUT EL=2610
WILLOW CREEK GOLF COURSE PUMP STATION
EL=2619
LAKEVIEW GOLF COURSE PUMP STATION
EL=2619
Existing 24-inchPVC Outfall
Existing 16-inchPVC Overflow Line
Existing 16-inchPVC Overflow Line
PER
OR#1
OR#2
• Total existing storage capacity estimated to be 2,127,820 gallons (per Kevin Tucker Design Group, Drawing C-4 of Phase Three Interim Solution Plans dated August 29, 2012).
North
LegendLien Holder
UICN
WWTP
EXISTING OVERVIEW – Option #1 | UICN Plant 3 and Willow Creek Golf Course
Figure 1 – Existing Overall Plan
LegendLien Holder(498,584 SF or 12 Acres)UICN(7,000,103 SF or 161 acres)WWTP(103,446 SF)
North
EXISTING PRIMARY EFFLUENT POND
EXISTING UICN PLANT 3
EXISTING OVERFLOW PONDS
EXISTING WILLOW CREAK GOLF COURSE PUMP
STATIONEXISTING LAKEVIEWGOLF COURSE PUMP
STATION
EXISTING TWIN PONDS
EXISTING TWIN PONDS PUMP STATION
EXISTING POND
EXISTING POND
EMERGENCY OVERFLOW
POND
EMERGENCY OVERFLOW PONDS
ENLARGED SITE PLAN – Option #1 | UICN Plant 3 and Willow Creek Golf Course
Figure 3 – Enlarged Site Plan Option #1
UICNPLANT 3 WWTP
PRIMARY EFFLUENT RESERVOIR (PER)
MAX POOL EL=2614STORAGE CAPACITY=3.0 AC FT
TOB EL=2615INV OUT EL=2610
WILLOW CREEK GOLF COURSE PUMP STATION
EL=2619
LAKEVIEW GOLF COURSE PUMP STATION
EL=2619
Existing 24-inchPVC Outfall
PER
Option #1 – New Storage Pond,Remediate PER, Abandon OR#1 and OR#2
• Construct new PER-1 of approximately 4.0 AC FT or 1.3 MG
• Improve booster stations and install new connection to existing wetwells from
PER-1; install new overflow line from PER-1 to PER
• Remediate PER• Add valves to isolate either PER from
plant outfall and pump stations• Total storage volume would match existing volume ~ 2.1 MG
PER-14.0 AC FT
North
Legend Valve
Lien Holder
UICN
WWTP
EXISTING OVERVIEW – Option #2 | UICN Plant 3 and Willow Creek Golf Course
Figure 1 – Existing Overall Plan
LegendLien Holder(498,584 SF or 12 Acres)UICN(7,000,103 SF or 161 acres)WWTP(103,446 SF)
North
EXISTING PRIMARY EFFLUENT POND
EXISTING UICN PLANT 3
EXISTING OVERFLOW PONDS
EXISTING WILLOW CREAK GOLF COURSE PUMP
STATIONEXISTING LAKEVIEWGOLF COURSE PUMP
STATION
EXISTING TWIN PONDS
EXISTING TWIN PONDS PUMP STATION
EXISTING POND
EXISTING POND
EMERGENCY OVERFLOW
POND
EMERGENCY OVERFLOW PONDS
ENLARGED SITE PLAN – Option #2 | UICN Plant 3 and Willow Creek Golf Course
Figure 4 – Enlarged Site Plan – Option #2
UICNPLANT 3 WWTP
WILLOW CREEK GOLF COURSE PUMP STATION
EL=2619
LAKEVIEW GOLF COURSE PUMP STATION
EL=2619
Existing 24-inchPVC Outfall
Option #2 – New Storage Tank,Abandon PER, OR#1 and OR#2
• Construct 2.1 MG storage tank (120 ft dia) or pair of 1 MG storage tanks (60 ft dia each)
• Improve booster stations and install new connection to existing wetwells from
storage tanks
North
Legend Valve
Lien Holder
UICN
WWTP
EXISTING OVERVIEW – Option #3 | UICN Plant 3 and Willow Creek Golf Course
Figure 1 – Existing Overall Plan
LegendLien Holder(498,584 SF or 12 Acres)UICN(7,000,103 SF or 161 acres)WWTP(103,446 SF)
North
EXISTING PRIMARY EFFLUENT POND
EXISTING UICN PLANT 3
EXISTING OVERFLOW PONDS
EXISTING WILLOW CREAK GOLF COURSE PUMP
STATIONEXISTING LAKEVIEWGOLF COURSE PUMP
STATION
EXISTING TWIN PONDS
EXISTING TWIN PONDS PUMP STATION
EXISTING POND
EXISTING POND
EMERGENCY OVERFLOW
POND
EMERGENCY OVERFLOW PONDS
ENLARGED SITE PLAN – OPTION #3 | UICN Plant 3 and Willow Creek Golf Course
Figure 3 – Enlarged Site Plan Option #3
UICNPLANT 3 WWTP
OVERFLOW RESERVOIR #2 (OR #2)MAX POOL EL=2614
STORAGE CAPACITY=2.51 AC FTTOB EL=2615
INV OUT EL=2609
OVERFLOW RESERVOIR #1 (OR #1)MAX POOL EL=2614
STORAGE CAPACITY=1.37 AC FTTOB EL=2615
INV IN EL=2608INV OUT EL=2606
PRIMARY EFFLUENT RESERVOIR (PER)MAX POOL EL=2614
STORAGE CAPACITY=3.30 AC FTTOB EL=2615
INV OUT EL=2610
PROPOSED OUTFALL OF DIVERSION LINE
INV 2615.14
24”x12” GATE VALVE
WILLOW CREEK GOLF COURSE PUMP STATION EL=2619
LAKEVIEW GOLF COURSE PUMP STATION EL=2619
SEDIMENT BASIN FORE BAY WITH SPILLWAY
Option #3 – Remediate Ponds in Place
• Install temporary line to OR#2 (A)• Install temporary suction to booster
pump stations (B) to withdraw from OR#1 and OR#2
• Remediate PER and improve booster pump stations
• Abandon line (B) and use rehabilitated PER
• Install diversion line to OR#2 (C)• Plug overflow line from PER to OR#1• Remediate OR#1• Plug overflow line from OR#1 to OR#2• Remediate OR#2• Abandon in place line (A) and (C)
Existing 24-inchPVC Outfall
Existing 16-inchPVC Overflow Line
Existing 16-inchPVC Overflow Line
PER
OR#1
OR#2
A
B
C
North
Legend Valve
Lien Holder
UICN
WWTP
ANALYSIS OF OPTIONS | UICN Plant 3 and Willow Creek Golf Course
Table 3 – Analysis of Options
Option Advantages Disadvantages
Preliminary Opinion of
Construction Costs
Operating Costs
1. New Storage Pond, Remediate PER, Abandon OR#1 and OR#2
• Least complex construction
• Opens space for other use through abandonment of OR#1 and OR#2
• Aesthetically pleasing
In progress In progress
2. New Storage Tank, Abandon PER, OR#1 and OR#2
• Reduced maintenance (eliminates pond maintenance)
• Highest construction cost
• Least aesthetic alternative
In progress In progress
3. Remediate Ponds in Place
• Complicated construction
• Least optimal use of space
UICN Land Remediation
NA NA In progress In progress