Enhancements From R6, R7.x to R9

Enterprise Product Data Management(EPDM)

David Kempdavid.kemp@cistech.net

Current Item Revision

• The current Item Revision replaces the Item Master as the source of the item related information for the XA essentials applications:

• EPDM• CSM• PM• MM• OBPM

Current Item Revision

• If multiple Item Revisions exist for a Site/Item combination, the current Item Revision is determined by the Effective From and Effective To dates. The Current Item Revision function utilizes the following criteria:

Current Item Revision Example

Current Item Revision

If no Item Revisions are effective for the system date but previous item revisions exist, EPDM selects the current based on:

Current Item Revision

If no Item Revisions are effective for the system date and no previous item revisions exist but future item revisions do exist, EPDM selects the current based on:

Item Revision Control Function

• Performs analysis whenever Item Revisions are updated

• Performs analysis whenever System Date changes, usually run at midnight (unattached job)

• Can be run anytime as a host job for a selected Site

Item Revision Control Function

Host Job in the Site Object

Item Revision Control Function

Item Revision Control Function

• Updates Item Site file with current revision• Logs change transaction for Item Site to

maintenance history• If Unit Cost Default is the cost basis, and the

UCD is different, EPDM generates a CU transaction

• If the Revision has been released and the Auto Sync attribute is Yes, updates the Item Master files

New Object: Item Site File

Item Site File

Item Revision Control

Item Revision Control

Item Revision Control

Controlled Attributes

• Some attributes of Item Revisions are controlled at the Enterprise or the Site level

• If control exists at the Enterprise level, all revisions of an item across all Sites will have the same value for the attribute

• If control exists at the Site level, all revisions for that Site will have the same value for the attribute

• Prevents accidental change of the attribute when a new Item Revision is created

Controlled Attribute

Controlled at the Enterprise Level

• Stocking Unit of Measure (UNMSR)

• Inventory Code (INVFG)

Controlled Attribute

Controlled at the Site Level

• Batch/Lot Control (BLCF)• Discrete Allocations (ALLOC)• Inspect on Receipt (INTYP)• Item Type (ITTYP)• QC (Shelf Life) (QCTYP)• Shelf Life Days (QCDAY)

Controlled Attribute

Second Level of Maintenance (Security)

Controlled Attribute – 2nd Level

Item Cost Roll-up Initiated in Client

Cost Roll-up in Client

Initiate costing run from the client

• Host job from Site or Item Revision• Include affected assemblies

Recosting this…

AffectedAssemblies

…automatically recosts these

Where used

Cost Roll-up – Can be Done From Site Object

Labor/Overhead Table by site

• Labor/Overhead tables by Site– Previously was in SYSCTL– Common to all sites

• If not common to all sites…– Be careful when copying across sites

• Can have more codes– Field changed to alphanumeric (36 characters)

Double-Click on Site to see Parameters

Labor Rates at Site Level

Manufacturing OH at Site Level

Purchase OH at Site Level

Data More Convenient in R9

Site Data

New Data Layout for Item Revision

Item Revision Engineering Data

Item Revision Engineering Data

Item Revision Engineering Data

Item Revision Engineering Data

Item Revision Engineering Data

Item Revision Engineering Data

Inventory Detail Inside Item Rev

Sales Data Inside Item Revision

Cost Information in Item RevisionGraphical Display Available

Costed Indented BOM Inquiry

• Costing added via Details– Standard or Current– Cost elements displayed for each item

• S-number filter– Can prompt for options (same as CSM)

• Summary costs– Options– Effective date– Extended quantity

Cost elements

Summary costs

Costs adjust for quantity.

Bill and costs adjust for S-number

Cost Simulation object

• Multiple runs• Unrestricted choice of parameters (vs. green

screen)• Results saved• Results visible via PowerLink (vs. printout)

Simulation results

Default:

• Sort by variance

• Variance not zero

Results at total item level…

…and by cost element…

…and by summary.

Two new objects

• Base Price• Foreign Language Description• Both allow entry & maintenance by item

revision (not just item)

Base Prices in EPDM

New pane on Sales card.

Blue shows price in effect now.

Kits

• Now maintained in EPDM• PDM+ not affected

The real benefits• A tool is as good as the use you make of it• R9 allows your company’s information infrastructure to be

nimble– React to business needs– New standard application function– Instant custom function

• Unite people with better integration– Departmental systems– External users– Off-site internal users

Questions ?