CONSTRUCTION OF 38,048

MODULAR PRE FABRICATED KITCHEN

SHEDS IN THE STATE OF MAHARASHTRA.

Head office:

Wing “A”, Raheja Point I, Pt. Jawaharlal

Nehru Road, Vakola, Santacruz(E).

Mumbai 400 055.

CLIENT - Directorate of primary Education Maharashtra state, PUNE

Regional office:

Block No. 11, 19 & 20, B-1,

Guru Ganeh Commercial Complex, Guru

Ganeshnagar,

Kothrud, PUNE- 411 038

Project Management Consultant :

Wadia Techno Engineering Services Ltd.,

Project Brief

• Government of India has launched “Sarva Shiksha Abhiyan” . Implementation is commenced in the year 2004 for the benefits of students taking primary education.

• Mid day Meal is one of the important aspect of the “Sarva Shiksha Abhiyan”

• Food for Mid Day Meal scheme was mostly cooked outside the school premises due to which quality assurance was consistent issue.

• To overcome with this Government of India has decided to provide Kitchen sheds to all eligible primary schools.

• Central Govt. has approved for 38048 kitchen sheds at

RS.60,000/- per number

• Government of Maharashtra has received Rs.

228,28,80,000/- funds for construction of Kitchen Sheds

in the year 2008-2009 Under Mid Day Meal Scheme.

• Government of Maharashtra decided to construct Pre-

fabricated Moduker Kitchen Sheds of 120 sqft area to

eligible primary schools.

• The Government of Maharashtra has entrusted work of

providing Kitchen Sheds all over Maharashtra State to

Directorate of Primary Education (DPEMS).

• The work is being implemented through Project

Management Consultant.

Salient Features of Project • Size of Kitchen shed 3.30 mtr. X 3.30 mtr.

• Plinth Construction in BB / CC Block / UCR Masonry.

• Pedestal blocks in M20 grade concrete for foundation of

post.

• Posts & roof trusses fabricated from rolled steel section.

• Flooring with M15 Plain Cement Concrete.

• 35 mm thick Sandwich panel - walls with aluminum sheet

on either side & insulated with Poly Eurethene Foam.

• Profiled color coated Roof sheets.

• MS Door frame and Sandwich PUF panel door shutter.

• Provision of Ventilation from all four sides.

• Provision of One light point & one plug point.

• The actual construction of a pre-fabricated kitchen shed

on site requires maximum 5 days for complete the

kitchen shed.

• As time require for a kitchen shed is less comparing to

time required for regular RCC or any conventional

method, and costing is less as compared to any other

structure.

• This modular pre-fabricated kitchen shed having wall

panels & door shutter is fire proof material & remaining is

of structural members.

• The kitchen shed structure having durability of 25 years

& is a decent structure.

APPROVED DRAWINGS

APPROVED DRAWINGS

Methodology for work execution

• Actual survey carrying out by PMC for availability of

sufficient space & finalizing of location.

• The copies of survey done by PMC are handing over to

Contractor for execution.

• Contractor start the work with lay out as per location

finalizing in survey.

• The work is completed by contractor under supervision of

PMC.

• Final inspection is done by PMC & inspection report is

prepared.

• Finally completed kitchen shed is handed over to concern

Head Master along with copy of inspection report.

Excavation In Progress

Plinth Construction In Progress

Plinth Construction In Progress

Plinth Construction In Progress

Completed Plinth

Erection Work In Progress

Erection Work In Progress

Completed Kitchen Shed

Completed Kitchen Shed

Inauguration of Completed Kitchen Shed

Handing Over of Completed Kitchen Shed

Kitchen Shed In use

Kitchen Shed In use