Collaboration and Competition
Glenn BallardAOM 2010
Montreal, Canada
How maintain productive tension between collaboration and competition?
• Externally imposed demands• Self-imposed goals
“Lower the river to reveal the rocks.” (Taiichi Ohno, Chief Engineer, Toyota)
2005 CURRENT
Proposed Building Area: 1,298,500 BGSF 914,757 BGSF
Number of Stories (incl. below grade Parking and CUP):
21 18
Total No. of Beds: 620 555
Total No. of LDRs: 24 24
Total No. of ORs: 19 19
Total No. of ER Treatment Rms:
34 34
Loading Dock Location: Access off Post St. Access off Franklin St.
Ambulance Location: Access off Franklin St.
Access off Post St.
Total No. of Parking Spaces:
620 555
90% of the program in 70% of the space.Initial target cost for construction=$911 million, 14% below market
Innovation – Making Creativity and Learning Safe
The “Patient Boom” – Combined Patient Lift and Medical Boom