BIM Camp, Zürich_27.10.2017

A BIM STORY

Philipp SeerHead of BIM / Burckhardt+Partner AG

José AlvesBIM Coordinator / Burckhardt+Partner AG

Lauren EllerAssociate – Project Manager / Burckhardt+Partner AG

Andreas WeckerBIM Management / Losinger Marazzi

Thibaut LecoutereBIM Site Coordinator / Losinger Marazzi

BIM Camp, Zürich_27.10.2017

1st February 2017Start of BIM coordination with the execution team

ten 3D models

33 laboratories

33 offices

375 m2 technical equipment

355 windows

8,722 m of pipe

820 m2 per floor

1,322 electrical outlets

186 rooms

and more …

6th November 2016End of design phase with closure folder

Summer 2018Delivery of the building

7th November 2017Crane dismantling

February 2015LM & B+P won the tender and is awarded the work

3.7 m clear room height

1st March 2017First coordination meeting with Solibri

6th April 2017First 3D model on Site with Dalux

25th October 2015First signature of BIM Execution Plan

9th January 2017Mobilization of the work team

Beginning of 2014client CHUV launched a call for tender in total enterprise

October 2015Contract signature

December 2015First architectural coordination model

… based on the project CNP CERY

BIM Camp, Zürich_27.10.2017

Software and data formats used in the project

IFC format BCF format

Revit native format

and SMC format

Software and data formats used in the project

Consultants General contractor Providers

Structure

Mechanical

Plumbing

Electrical

Furniture

Precast Facade

CoordinationProject database

BIM2Field

Lite DMS

API

API

Architecture

Case study laboratory building

BIM Camp, Zürich_27.10.2017

Model usage and information flow during the different project phases

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

Building Information Model

BIM Camp, Zürich_27.10.2017

Requests of the client

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

From the database into the 3D model

The client’s specifications for rooms

PBIM Camp, Zürich_27.10.2017

Digital room book

From the database into the 3D model

P

Room

Core

information

Room data

sheet

Items per

room

Item library

BIM Camp, Zürich_27.10.2017

P

From the database into the 3D model

Centralization of the client’s specifications – database

BIM Camp, Zürich_27.10.2017

BIM Camp, Zürich_27.10.2017

Import of client’s data from dRofus into the 3D model

P

From the database into the 3D model

BIM Camp, Zürich_27.10.2017

Import of client data from dRofus into the 3D model

P

From the database into the 3D model

BIM Camp, Zürich_27.10.2017

Visualization of the clients requests on architectural changes

P

From the database into the 3D model

BIM Camp, Zürich_27.10.2017

The planning of the project evolves …

P… and needs the client’s approval

From the database into the 3D model

BIM Camp, Zürich_27.10.2017

Approved information gets synchronized back from the 3D model to the dRofus database

P

From the database into the 3D model

Building Information Model

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

BIM Camp, Zürich_27.10.2017

S

BIM Process – Expectations & Goals

ARCHITECT CIVIL ENG. MEP ENG. OTHER

GENERAL

CONTRACTOR

CLIENT

BIM Camp, Zürich_27.10.2017

Project Manager

BIM Manager

Project Manager

BIM

Referent

BIM

Referent

BIM

Referent

BIM

Referent

BIM Manager

BIM Coordinator

on site

S

BIM Process - Project Organisation & Roles

BIM Camp, Zürich_27.10.2017

S

BIM Goals

Building services equipment

BIM Camp, Zürich_27.10.2017

S

Guidelines

Contract Client Architect Engineer Contractor Subcontractor (…)

Shared Vision BIM Execution Plan – Shared objectives -

Details

Coordination

ScheduleModelised Item

Item

Configuration

3D Model

Organisation

Responsibility /

Management

3D Models

transfer

2D/3D

CoordinationModelling rulesBIM Glossary

Output

documents

Collaborative

Database

Detailed

validation

process

Quality Control

Rules

Request for

information

BIM Camp, Zürich_27.10.2017

We model like we construct…

Walls

Floors

Partitions

New floors

Screeds and finishings

Rooms

S

Modeling rules

LODLOD

LOI

Building Information Model

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

D

Project development

Site / topography Site / topography

Existing buildingsNew building

D

Project development

D

Project development

D

Project development

D

Communication

Building Information Model

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

L

Permit documentation

Building Information Model

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

T

Tendering

T

Tendering

T

Tendering

T

Tendering - Coordination

2 - Assignments

Who? What?

3 - Report

Coordination Meeting

4 - Clash processing

5 - Upload of new models

formats:IFC + NATIVE

1 - 3D models

Clash Detection

Coordination

Cycle

different 3D models

3D Coordination

Quantitytake-off

3D Coordination allows high-quality design

T

Coordination

Issue Management

old method:

- assignment in Revit

- using native models

T

Coordination

T

Coordination

current method:

- assignment in Solibri

- using IFC models

Issue Management

T

Coordination

T

Coordination

Clash resolving

T

Coordination

Clash resolving

T

Coordination

… with updated IFC and NATIVE models - a new coordination cycle can begin

End of the coordination cycle

T

Coordination

Coordination increases accuracy of quantity extractions

Building Information Model

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

C

Construction

C

Construction

C

Construction

C

Construction

C

Construction

Conclusion

BIM Camp, Zürich_27.10.2017

P

S

D

L

T

C

FProgram

Strategy

Development

Legal

Tendering

Construction

Future…

Input FM

Feedback

Use cases

TODAY

A BIM project from the beginning in all trades

Easy, quick & early handling of complex topics

New processes & software

Team spirit : Sharing skills & knowledge

Planning team & Construction crew make use of BIM

F

Facility management

COO

REV

DATA BASE REVISED MODELS

Items Products

Technical Data Sheets

USERS

… INPUT …

A STORY TO BE CONTINUED …