  • Location : Wasit SS # 200 (Pit for equipment foundations for Line - A)

    Disconnected cable Permanent cable Temporary cable

    4-Way Exothermic weld joint Straight - Exothermic weld joint

    Necessary modifications in existing ground mat for excavation & equipment foundation placement

    Project : REPLACE POWER SUPPLY AT ABU ALI PLANTS

    Phase - 1

    Phase - 2

    Phase - 3