Location : Wasit SS # 200 (Pit for equipment foundations for Line - A) Disconnected cable Permanent cable Temporary cable 4-Way Exothermic weld joint Straight - Exothermic weld joint Necessary modifications in existing ground mat for excavation & equipment foundation placement Project : REPLACE POWER SUPPLY AT ABU ALI PLANTS Phase - 1 Phase - 2 Phase - 3

Upload: r-bharat-kumar

Post on 12-Sep-2015

215 views

Category:

Documents


2 download

DESCRIPTION

hand sketch, re instate of work, grounding, foundation

TRANSCRIPT

  • Location : Wasit SS # 200 (Pit for equipment foundations for Line - A)

    Disconnected cable Permanent cable Temporary cable

    4-Way Exothermic weld joint Straight - Exothermic weld joint

    Necessary modifications in existing ground mat for excavation & equipment foundation placement

    Project : REPLACE POWER SUPPLY AT ABU ALI PLANTS

    Phase - 1

    Phase - 2

    Phase - 3