14 so what now - tmca

Post on 16-Apr-2017

732 Views

Category:

Technology

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

World-Class Servitisation: Methods, Cases and PartnershipsCompleting the PSS toolbox with the maritime industryPROTEUS Conference 12th December 2013

CLICK TO EDITCLICK TO EDIT

So what now..?

PROTEUS ConferenceBY TIM C. McALOONE

PROFESSOR, PhD, PROJECT LEADERTMCA@DTU.DK

1. Maritime branch analysis

DK has a leading branch, with respect

to quality and efficiency

2. What do other industries do?

It’s difficult to servitise, but the

benefits are considerable

4. How to design a PSS?

Comprehensive development of own tools, plus

design methodology

6. What can PSS partnerships give?

Many cost and energy savings, new

business, greater global presence

7. How to make business out of this?

Creation of business model concepts and trialling of these in

the branch

3. If/when to servitise?

Each company we studied is different

and therefore needs careful guidance

5. How to organise company for PSS?

Understanding of the change situation of the company, for the adoption of PSS

PROTEUS Workbook series

PSS ConfiguratorPlease try it out! You cannot break it

Academic contributions• 25 academic publications now published

• and some 10 more in pipeline• 3 PhD projects underway (January 2014, March 2015, May 2015)• 6 bachelor projects completed (and one underway)• 10 master projects completed• 2 open industry conferences (March and December 2013)• PSS Configurator launched – hopefully a source of both industrial inspiration

and research data collection• One externally financed project during PROTEUS (Danish Maritime Foundation)• Catalogue of 11 tools and a systematic PSS development framework• Pairing of academic publication with indsutry-ready publication (workbook

series)• PSS idea cards: great for research projects and for teaching• Modern and interesting website, full of results, guidelines and tools.• Follow-on projects of a sizeable magnitude

• TORM PhD’s (as a result of a Masters project)• Current application regarding eco-innovation• Other applications to Innovation consortia

Reflections about the project• PSS concepts vs. setting boundary conditions

• 11 companies = over 18.000 hours• Companies’ changes over the course of the project say something

about the speed of change in the branch

• Learning effect of the project

• Partnerships arising are very promising

• Significant impact on teaching

• Introduced new companies to the world of research

• Now we’re ready for the next innovation consortium!

Click to edit Master title style

11-12-2013 Presentation title 7

Presentation title

11-12-2013 7

Introduction to the workshop

11-12-2013 711-12-2013 7

Future projects and outputs planned

• Three PhD projects• Publications from project’s last year• TORM PhD projects• PSS Configurator project proposal• New research collaboration with you..?

Click to edit Master title style

11-12-2013 Presentation title 8

Presentation title

11-12-2013 8

Introduction to the workshop

11-12-2013 811-12-2013 8

Distribution of workbooks

• There’s no such thing as a free lunch workbook…• Timesheets from all - this is what makes the day workbooks “free”

Click to edit Master title style

Presentation title Introduction to the workshop

11-12-2013 911-12-2013 9

The extended PROTEUS workforce

Core staff Steering group Project students 2010-2013

Former staff

Rassvet.dk

Click to edit Master title style

Presentation title Introduction to the workshop

11-12-2013 1011-12-2013 10

Want to see more?www.proteus.dtu.dk

Click to edit Master title style

Presentation title Introduction to the workshop

11-12-2013 1111-12-2013 11

Want to see more?PSS Configurator

top related