01.03.2010 lar slhc detector engineering meeting max-planck-institut fÜr physik münchen s.vogt...

Post on 20-Jan-2016

228 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

01.03.2010LAr sLHC detector engineering meeting

MAX-PLANCK-INSTITUT FÜR PHYSIK München

S.Vogt vog@mppmu.mpg.de

Page 1

1

Cost estimatefor

Cleanroom Radioprotection Shield HEC I+II

Workingplatforms

01.03.2010LAr sLHC detector engineering meeting

MAX-PLANCK-INSTITUT FÜR PHYSIK München

S.Vogt vog@mppmu.mpg.de

Page 2

2

Cost estimate Cleanroom

Low cost estimate ( tent ) 150 k CHFOnly suitable for Overpressure

Like B180 300 k CHF

12m x 4m x 4.5m (L x W x H)Class 8 clean room according to ISO 14644

01.03.2010LAr sLHC detector engineering meeting

MAX-PLANCK-INSTITUT FÜR PHYSIK München

S.Vogt vog@mppmu.mpg.de

Page 3

3

Radioprotection Shield HEC I+II

 

Shield ( HEC 1 ) 9 to - 10 to    13 to Shield ( HEC 2 ) 2 to - 3 to     13 to x 15 k EUR/to = 230 k EUR 300 k CHF

01.03.2010LAr sLHC detector engineering meeting

MAX-PLANCK-INSTITUT FÜR PHYSIK München

S.Vogt vog@mppmu.mpg.de

Page 4

4

Cost estimateFor Workingplatforms

( PCB exchange at HEC I+II )

two pieces together 4 to  4 to Al x 30 k EUR/to = 120 k EUR 180 k CHF 

01.03.2010LAr sLHC detector engineering meeting

MAX-PLANCK-INSTITUT FÜR PHYSIK München

S.Vogt vog@mppmu.mpg.de

Page 5

5

Cost estimateSummary

top related