8/8/2019 Air Weapons Complex
1/23
AIR WEAPONS COMPLEXCivil Engineering Department
Extension of Electric Supply Sub Station,
H-Block, Air Weapons Complex,
Wah Cantt.
BUILDING EMERGENCY
POWER SUPPLY SYSTEM
Zainab Ali, Syed
Zeeshan Hassan, Mohammed Umer
-
8/8/2019 Air Weapons Complex
2/23
PROCEEDINGS The company
Documents Form of Tender Conditions of Contract
Performance bond
Bill of Quantity
Activities
Planning Process
Risks
-
8/8/2019 Air Weapons Complex
3/23
COMPANY Electromech Services made the bid for a project.
A proposal is a precisely structured document, which
should meet the requirements contained in the
officialRequest forProposal (RFP).
Electromech had the required competence in the
organization to meet the needs of Air Weapons
Complex.
-
8/8/2019 Air Weapons Complex
4/23
COMPANY The company is ISO certified:
No compromises on safety.
Uses only high quality materials, prohibiting use of
substandard materials.
Is customer driven organization.
-
8/8/2019 Air Weapons Complex
5/23
DOCUMENTS
Form of Tender
Conditions of Contract
Bill of Quantity/Specifications
-
8/8/2019 Air Weapons Complex
6/23
FORMOF TENDER Includes:
TenderPricex Rs .995 million
Acknowledging the satisfaction against theprovided resources
Undertake to cater any change during the projectbut against a prevailing price at that moment.
-
8/8/2019 Air Weapons Complex
7/23
FORMOF TENDER
Verification of no hidden charges, extra fees or any
other information.
All rates are fixed and inclusive of duties or othertaxes.
-
8/8/2019 Air Weapons Complex
8/23
FORMOF TENDER Confirming time of completion:
Within 4 months from the issuance date of work
order.
Agreement to pay all costs incurred during thepreparation of the contract.
If failed to complete the project in time, forfeitureof the earnest money would commence on thecompany.
-
8/8/2019 Air Weapons Complex
9/23
FORMOF TENDER EarnestMoney:
An earnest payment (sometimes called earnest
money or simply earnest, or alternatively a good-
faith deposit) is a deposit towards the purchase
of real estate or publicly tendered government
contract.
-
8/8/2019 Air Weapons Complex
10/23
FORMOF TENDER
Certifying no involvement in discretionary or
fraudulent acts.
Signed by the MD of Electromech and twowitnesses.
-
8/8/2019 Air Weapons Complex
11/23
CONDITIONS OF CONTRACT
1. Amount of earnest money/performance security.
1% on amount less than 25lacs and 2% above 25lacs
2. Proposed time for completion of work.
4 months
3. Percentage of retention money.
5% of the value of gross monthly payments
4. Income tax.
5% or as per Government orders
-
8/8/2019 Air Weapons Complex
12/23
CONDITIONS OF CONTRACT
5. Time of Payments.
Within 15 days6. Defect liability period.
12 months
7. Amount of liquidated damages for delay.
Rs. 5000/ calendar day
8. Secured advance.
75% advance
9. Escalation
-
8/8/2019 Air Weapons Complex
13/23
CONDITIONS OF CONTRACT
10. Deduction of water charges. @ .4% of the work done
11. Valuation of variation items. AWC to approve the rates of extra items
-
8/8/2019 Air Weapons Complex
14/23
AGREEMENT OF CONTRACT
Both AWC head and MD of Electromech signs theagreement after clearing all their issues.
-
8/8/2019 Air Weapons Complex
15/23
PERFORMANCE BOND
The contractor shall duly perform and observe allthe terms, provisions, conditions and stipulationsof the contract.
-
8/8/2019 Air Weapons Complex
16/23
BILLOF QUANTITY
A bill of quantities (BOQ) is a document used intendering in the construction industry in which
materials, parts, and labor (and their costs) are
itemized.
-
8/8/2019 Air Weapons Complex
17/23
BILLOF QUANTITY
Summary of Tender Cost:
Civil Works= Rs. 354,230
Electrical Works= Rs. 10.13 million
GeneratorRoom= Rs. 272,835
Grand Total= Rs. 10.76 million
-
8/8/2019 Air Weapons Complex
18/23
ACTIVITIES Building a GeneratorRoom
With 24 preceding activities with its given
description
Power Supply System forPlant Room in H-Block
40 preceding activities
-
8/8/2019 Air Weapons Complex
19/23
SPECIFICATIONS
All general and descriptive information related
with the items to be used in this project are
defined.
-
8/8/2019 Air Weapons Complex
20/23
PLANNING PROCESS Diagrammatic approach was used.
Prepared by a taking off process in which the costof a structure (power plant) is estimated from
measurements in the architect's drawings.
Helps in planning the processes in a better way.
-
8/8/2019 Air Weapons Complex
21/23
RISKS ContractRisks:
Failure of acquiring the tender. Termination of the contract due to any faulty work.
Cost Risks: Rampant Inflation.
PoliticalRisk: Political unrest and uncertainty.
-
8/8/2019 Air Weapons Complex
22/23
END NOTE
The contractor is responsible for completion of the
project in time and also ensuring that the integrity
of the project is preserved.
-
8/8/2019 Air Weapons Complex
23/23
THANK YOU