    AIR WEAPONS COMPLEXCivil Engineering Department

    Extension of Electric Supply Sub Station,

    H-Block, Air Weapons Complex,

    Wah Cantt.

    BUILDING EMERGENCY

    POWER SUPPLY SYSTEM

    Zainab Ali, Syed

    Zeeshan Hassan, Mohammed Umer

  • 8/8/2019 Air Weapons Complex

    2/23

    PROCEEDINGS The company

    Documents Form of Tender Conditions of Contract

    Performance bond

    Bill of Quantity

    Activities

    Planning Process

    Risks

  • 8/8/2019 Air Weapons Complex

    3/23

    COMPANY Electromech Services made the bid for a project.

    A proposal is a precisely structured document, which

    should meet the requirements contained in the

    officialRequest forProposal (RFP).

    Electromech had the required competence in the

    organization to meet the needs of Air Weapons

    Complex.

  • 8/8/2019 Air Weapons Complex

    4/23

    COMPANY The company is ISO certified:

    No compromises on safety.

    Uses only high quality materials, prohibiting use of

    substandard materials.

    Is customer driven organization.

  • 8/8/2019 Air Weapons Complex

    5/23

    DOCUMENTS

    Form of Tender

    Conditions of Contract

    Bill of Quantity/Specifications

  • 8/8/2019 Air Weapons Complex

    6/23

    FORMOF TENDER Includes:

    TenderPricex Rs .995 million

    Acknowledging the satisfaction against theprovided resources

    Undertake to cater any change during the projectbut against a prevailing price at that moment.

  • 8/8/2019 Air Weapons Complex

    7/23

    FORMOF TENDER

    Verification of no hidden charges, extra fees or any

    other information.

    All rates are fixed and inclusive of duties or othertaxes.

  • 8/8/2019 Air Weapons Complex

    8/23

    FORMOF TENDER Confirming time of completion:

    Within 4 months from the issuance date of work

    order.

    Agreement to pay all costs incurred during thepreparation of the contract.

    If failed to complete the project in time, forfeitureof the earnest money would commence on thecompany.

  • 8/8/2019 Air Weapons Complex

    9/23

    FORMOF TENDER EarnestMoney:

    An earnest payment (sometimes called earnest

    money or simply earnest, or alternatively a good-

    faith deposit) is a deposit towards the purchase

    of real estate or publicly tendered government

    contract.

  • 8/8/2019 Air Weapons Complex

    10/23

    FORMOF TENDER

    Certifying no involvement in discretionary or

    fraudulent acts.

    Signed by the MD of Electromech and twowitnesses.

  • 8/8/2019 Air Weapons Complex

    11/23

    CONDITIONS OF CONTRACT

    1. Amount of earnest money/performance security.

    1% on amount less than 25lacs and 2% above 25lacs

    2. Proposed time for completion of work.

    4 months

    3. Percentage of retention money.

    5% of the value of gross monthly payments

    4. Income tax.

    5% or as per Government orders

  • 8/8/2019 Air Weapons Complex

    12/23

    CONDITIONS OF CONTRACT

    5. Time of Payments.

    Within 15 days6. Defect liability period.

    12 months

    7. Amount of liquidated damages for delay.

    Rs. 5000/ calendar day

    8. Secured advance.

    75% advance

    9. Escalation

  • 8/8/2019 Air Weapons Complex

    13/23

    CONDITIONS OF CONTRACT

    10. Deduction of water charges. @ .4% of the work done

    11. Valuation of variation items. AWC to approve the rates of extra items

  • 8/8/2019 Air Weapons Complex

    14/23

    AGREEMENT OF CONTRACT

    Both AWC head and MD of Electromech signs theagreement after clearing all their issues.

  • 8/8/2019 Air Weapons Complex

    15/23

    PERFORMANCE BOND

    The contractor shall duly perform and observe allthe terms, provisions, conditions and stipulationsof the contract.

  • 8/8/2019 Air Weapons Complex

    16/23

    BILLOF QUANTITY

    A bill of quantities (BOQ) is a document used intendering in the construction industry in which

    materials, parts, and labor (and their costs) are

    itemized.

  • 8/8/2019 Air Weapons Complex

    17/23

    BILLOF QUANTITY

    Summary of Tender Cost:

    Civil Works= Rs. 354,230

    Electrical Works= Rs. 10.13 million

    GeneratorRoom= Rs. 272,835

    Grand Total= Rs. 10.76 million

  • 8/8/2019 Air Weapons Complex

    18/23

    ACTIVITIES Building a GeneratorRoom

    With 24 preceding activities with its given

    description

    Power Supply System forPlant Room in H-Block

    40 preceding activities

  • 8/8/2019 Air Weapons Complex

    19/23

    SPECIFICATIONS

    All general and descriptive information related

    with the items to be used in this project are

    defined.

  • 8/8/2019 Air Weapons Complex

    20/23

    PLANNING PROCESS Diagrammatic approach was used.

    Prepared by a taking off process in which the costof a structure (power plant) is estimated from

    measurements in the architect's drawings.

    Helps in planning the processes in a better way.

  • 8/8/2019 Air Weapons Complex

    21/23

    RISKS ContractRisks:

    Failure of acquiring the tender. Termination of the contract due to any faulty work.

    Cost Risks: Rampant Inflation.

    PoliticalRisk: Political unrest and uncertainty.

  • 8/8/2019 Air Weapons Complex

    22/23

    END NOTE

    The contractor is responsible for completion of the

    project in time and also ensuring that the integrity

    of the project is preserved.