AGENDA
OF THE
SPECIAL BUDGET MEETING
HELD IN THE BOARDROOM
DOOMADGEE ABORIGINAL SHIRE COUNCIL
275 Sharpe Street
Doomadgee Qld 4830
On Friday 29TH June 2018
Doomadgee Aboriginal Shire Council – Special Meeting Agenda 29th June 2018
Page 2 of 5
CONTENTS:
1. OPENING ........................................................................................................................ 3
2. ATTENDANCE ................................................................................................................ 3
4. APOLOGIES / LEAVE OF ABSENCE ............................................................................. 3
5. CEO REPORT ................................................................................................................. 3
8. CLOSURE OF MEETING ................................................................................................ 5
Doomadgee Aboriginal Shire Council – Special Meeting Agenda 29th June 2018
Page 3 of 5
1. OPENING
Meeting Opened at 1:44pm
2. ATTENDANCE
Elected Members
Acting Mayor Jason Ned
Cr Dean Jupiter
Cr Scharrayne Foster
Staff
Lothar Siebert – Chief Executive Officer
Juanita Holden –Director of Corporate Services
Trudy Mellor – Governance Officer
4. APOLOGIES / LEAVE OF ABSENCE Nil
5. CEO REPORT
Agenda Reference: 5.02
Title: 2017/2018 Operational Plan Report
Executive Summary –. Report on the 2017/2018 Operational Plan
Recommendation:
That Council adopt the 2017/2018 Operational Report as presented.
Resolution No SM15-06/18
Moved Cr Jason Ned
Seconded Cr Dean Jupiter
That Council receive the 2017/2018 Operational Plan as presented. Carried
Agenda Reference: 5.02
Title: 2017/2018
Executive Summary –. 2018/2019 Operational Plan
Recommendation:
That Council adopt the 2018/2019 Operational Report as presented.
Resolution No SM16-06/18
Moved Cr Jason Ned
Seconded Cr Dean Jupiter
That Council adopt the 2018/2019 Operational Plan as presented. Carried
Doomadgee Aboriginal Shire Council – Special Meeting Agenda 29th June 2018
Page 4 of 5
Agenda Reference: 5.03
Title: Code of Competitive Conduct
REPORT AUTHOR(S) Juanita Holden
REPORT APPROVED BY Lothar Siebert
DEPARTMENT Corporate Services
PURPOSE
To consider the application of the code of competitive conduct to Council’s identified business activities and to
adopt a competitive neutrality complaints process.
ISSUES
A review of Council’s operations has been conducted to ascertain its position in regard to the existence of prescribed or significant business activities and its obligations to apply the code of competitive conduct. The review has identified that;
There are no significant business activities.
There are no prescribed activities under Sect 47 (7) of the Local Government Act.
Council does not have a competitive neutrality complaints process. STRATEGIC IMPLICATIONS (Legislative, Financial, Risk, Environmental and Social)
Local Government Act S48 Competitive neutrality complaints (1) A local government must adopt a process for resolving competitive neutrality complaints. The following business activities were identified but are not deemed to be prescribed activities for the reasons provided.
Council’s roads operation is not a prescribed activity under the legislation as Council is only doing
sole invitee status work for DMR and its own work.
Council’s building certification activity is not prescribed under s38 of the Local Government Regulation 2012 and its current expenditure is below threshold.
Other business activities that are below the prescribed threshold. o Guest house
o Post Office
o Airport
o Water supply and sewerage o Waste management
Sect 47 (7) of the Local Government Act 2009 provides that “A local government must decide each financial year, by resolution, whether or not to apply the code of competitive conduct to a business activity prescribed under a regulation.” If Council chooses not to apply the code to a prescribed activity it must include the reason in the resolution. The risk of not maintaining compliance with the requirements of the Local Government Act is that Council may
face negative audit scrutiny.
REFERENCE TO CORPORATE PLAN
The provisions of Corporate Plan Goal 2 are consistent with addressing the issues identified with the code of
competitive conduct review.
Goal 2: Key Governance Goal – Administration and Corporate Services
Outcome: To provide timely, quality services to customers through effective and efficient administration of
Council affairs
Strategies
•Review Council’s Policies and Procedures and ensure they meet community expectations and legislative
requirements
•Effective policy implementation
•Effective legislative requirements
CONSULTATION
Consultation has occurred with all relevant Council Staff, in conjunction with the Mead Perry Group
Governance review.
Doomadgee Aboriginal Shire Council – Special Meeting Agenda 29th June 2018
Page 5 of 5
ATTACHMENTS
1. Competitive Neutrality Complaints Process
Recommendation:
That pursuant to Section 47 of the Local Government Act 2009, Council will not apply the code of competitive
conduct to its identified business activities for the 2017/2018 financial year.
That Council adopt a completive neutrality complaint process as presented.
Resolution No SM17-06/18
Moved Cr Scharrayne Foster
Seconded Cr Dean Jupiter
That Council adopt a Competitive Neutrality Complaints Process as presented. Carried
Agenda Reference: 5.04
Title: Audit Committee – Independent Chair
Executive Summary – Council has previously adopted an Audit Committee Charter. It has been discussed
that an Independent Chair would be sourced for the Doomadgee Aboriginal Shire Council Audit Committee.
Recommendation:
That Scott Mead from the Mead Perry Group be engaged as the Independent Chair for the Doomadgee
Aboriginal Shire Council Audit Committee.
Resolution No SM18-06/18
Moved Cr Scharrayne Foster
Seconded Cr Dean Jupiter
That Council appoint Scott Mead from the Mead Perry Group as the Independent Chair for the
Doomadgee Aboriginal Shire Council Audit Committee. Carried
8. CLOSURE OF MEETING
The Meeting closed 2:08pm
_________________________ Jason Ned
Acting Mayor
Doomadgee Aboriginal Shire Council
Doomadgee Aboriginal Shire Council
2017/18Work Completed in Operational Plan
Progress Report Report DatePercent CompletedDepartment Quarter
Governance
Goal 1: Financial Management
1.1 - Effective and efficient management of all financial matters
Activity: Facilitate SustainableFinancial Management
Performance Measure: Internal Audit Completed – Risks Identified and Resolved
Council has incorporated strategies to reduce outstanding internal audit risks
Corporate Services 28/06/201890 %
1.2 - Effective grants management
Activity: Source additional funding opportunities
Performance Measure: Monthly report to Council on outcomes
Council has sourced addittional funding for specific programs. This will be ongoing as more detailed furture planning has been put in place.
Governance 28/06/201890 %
1.3 - Accurate and timely financial reporting
Activity: Facilitate Sustainable Financial Management
Performance Measure: Timeliness, Quality, Free from Error Reporting
Due to staffing issues, Council engaged KPMG to assist with the previous years financials. Due to loss of Corporte knowledge, the financials were late. Council has now entered into a shared services agreement with Burke Shire Council (3 year contract) to assist with the implementation of sustainable financial management. Ongoing Management of this project will be reported.
Corporate Services 28/05/201850 %
1.4 - Maximise revenues in accordance with Council’s Revenue Policy
Activity: Effective Policy and Revenue Raising Strategy
Performance Measure: Monthly report to Council on outcomes
Council continues to strive for continual improvement in this area. This will be an ongoing Strategy.
Corporate Services 28/06/201870 %
Monday, 25 June 2018 Page 1 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
1.6 - Effective and appropriate Council enterprises
Activity: Review all leasing arrangements to ensure they are in order
Performance Measure: Completed by September 2017
Leasing arrangements have been reviewed. This will an ongoing Strategy.Corporate Services 28/06/201880 %
Goal 2: Administration and Corporate Services
2.1 - Review Council’s Policies and Procedures and ensure they meet community expectations and legislative requirements
Activity: Review all Council’s Policies and Procedures
Performance Measure: Full Review to be Completed by November 2017
Council engaged The Mead Perry Group to undertake a full Governance Review.
Governance 30/06/2018100 % 4th Month
2.2 - Effective policy implementation
Activity: Implementation of Council’s Policies and Procedures
Performance Measure: Policy and Procedure Manuals to be distributed to all staff and Councillors by December 2017
As policies and procedures are reviewed, updated and adopted, policies are distributed to staff. Policies are updated on Council website and Intranet. This Strategy will remain as ongoing. This will be an ongoing Strategy.
Governance 28/06/201880 %
2.3 - Decisive Councillor Leadership
Activity: Fortnightly sessions to be held for Councillors
Performance Measure: Councillors to attend 70% of internal training sessions
Councillors are updated on all Governance requirements at Council Meeting or informal sessions. This will be an ongoing Strategy.
Governance 28/06/2018100 %
2.4 - Effective legislative requirements
Activity: Complete Internal Audit on Legislative Requirements
Performance Measure: Completed by October 2017 Monthly reports to Council
Council engaged The Mead Perry Group to undertake a full Governance review.
Governance 28/06/2018100 % 4th Month
2.5 - Enhance Council’s communication and decision making through appropriate public relations and community consultation process
Monday, 25 June 2018 Page 2 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Activity: Newsletters to inform Community of Councils processes and projects
Performance Measure: Quarterly Newsletter
No newletters were completed at a Governance Level. This Stategy will be implemented in 2018/2019
Community Services 28/06/20180 %
2.6 - Review and enforce Local Laws and Regulations to address local issues
Activity: Summarise Local Laws Implementation of Local Laws
Performance Measure: Local Laws Summarised and distributed throughout the Community – Completed by December 2017 Implementation of Local Laws through the Community - Ongoing
All Local Laws have been summarised ready for Community distribution.Governance 28/06/2018100 % 2nd Month
Goal 3: Human Resources
3.1 - Ensure workforce make-up best fits Council’s priorities, workloads and budget
Activity: Complete full review of Corporate Structure
Performance Measure: Completed by August 2017
Corpoarte Structure has been reviewed and updated.All Departments 28/06/2018100 % 1st Month
3.2 - Endorse and foster cross skilling in order to minimise need for specialists and to ensure full utilisation of staff
Activity: Performance Appraisals completed for all staff
Performance Measure: Completed by June 2018
Council engaged The Mead Perry Group to assist with the implementation of HR Activities. Performance Appraisals have been performed on a number of staff and a more robust structure has been implemented. This Strategy will be ongoing.
All Departments 28/06/201880 % 4th Month
3.4 - Maintain accurate and confidential staff records
Activity: Human Resources Officer engaged
Performance Measure: Human Resources Officer on site at Doomadgee Office by September 2017
Council has worked hard to recruit a number of high level staff. Due to the unavailability of staff housing, this has proved difficult. Council has been provided with assistance from the Mead Perry Group on a number of HR Issues. This Strategy will be ongoing.
Corporate Services 28/06/201850 %
Monday, 25 June 2018 Page 3 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
3.5 - Ensure all staff have access to appropriate training
Activity: Training Needs Analysis Completed
Performance Measure: Analysis Completed by December 2017 Training Needs Identified
Due to limited resources this Strategy has been postponed until 2018/2019.Human Resources 28/06/20180 %
3.6 - Maintain a safe and healthy workplace for all employees and other persons affected by Council operations
Activity: Engage Work Place Health and Safety Consultant
Performance Measure: Council Safe Plan commenced by December 2017
Council has engaged a Work Place Health and Safety Consultant. All policies and procedures have been review and ready for adoption. Consultant has started on site visits.
Governance 30/05/2018100 % 3rd Month
74.4Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 4 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Community
Goal 4: Arts and Culture
4.1 - Develop an Arts and Cultural Policy
Activity: Develop Council Arts and Cultural Policy
Performance Measure: Completed by June 2018
Due to limited resources this Strategy has been put on hold.Community Services 28/06/20180 %
4.2 - Facilitate the establishment and maintenance of an appropriate library service
Activity: Continual improvement of Library Service
Performance Measure: Ongoing
Due to limited resources this Strategy has been put on hold until 2018/2019Community Services 28/06/20180 %
4.3 - Support artistic and community involvement in the arts
Activity: Source Funding Opportunities
Performance Measure: Completed by June 2019
Council is sourcing addittional fnding opporunties as they come available. Ongoing
Community Services 28/06/201880 %
4.4 - Effective administration of the Regional Arts Development Fund (RADF)
Activity: Continual Improvement of RADF Administration
Performance Measure: Monthly reporting to Council
On GoingCommunity Services 28/06/201880 %
4.5 - Facilitate, in partnership with the community and key stakeholders, the preservation of the history of the Shire
Activity: Source funding opportunities to develop a program for preservation of Shire History
Performance Measure: Completed by June 2019
OngoingCommunity Services 28/06/201870 %
4.6 - Provide space, time and resources for the purpose of exhibition/sale of local art
Activity: Source funding opportunities for an Arts and Culture Centre
Performance Measure: Completed by June 2019
Council is actively seeking fundingCommunity Services 28/06/201850 %
4.7 - Support and promote appropriate events and festivals within the Shire
Monday, 25 June 2018 Page 5 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Activity: Continue to support events and festivals in line with Budget availability
Performance Measure: Ongoing Report to Council on requests
Council has supported the establishment of a Sports and Social Club for the Community
Community Services 28/06/2018100 % 3rd Month
4.8 - Encourage and support the development of programs for traditional language teaching and use
Activity: Source funding opportunities
Performance Measure: Ongoing Reporting to Council on availability of funding
OngoingCommunity Services 28/06/201850 %
4.9 - Facilitate programs/projects for recording of local languages and personal stories
Activity: Source funding opportunities
Performance Measure: Ongoing Reporting to Council on availability of funding
OngoingCommunity Services 28/06/201850 %
4.10 - Facilitate the development of support programs/projects for preservation of traditional culture
Activity: Source funding opportunities to develop a program for preservation of Shire History
Performance Measure: Completed by June 2019
OngoingCommunity Services 28/06/201850 %
53.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 6 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Disaster Management
Goal 5: Disaster Management
5.1 - Ensure that there is sufficient funding for emergency services
Activity: Develop Budget for Emergency Services in line with funding
Performance Measure: Budget Develop Ongoing Support
Budget developed for Emergencey Services for the 2017/2018 Financia Year. This Strategy will be ongoing.
Governance 28/06/2018100 % 1st Month
5.2 - Facilitate effective counter disaster planning in conjunction with the community, emergency service organisations and other stakeholders
Activity: Annual Review of DMP Local Disaster Management Committee formed and established
Performance Measure: DMP Reviewed by September 2017 LDC established by September 2017
Annual Review of the DMP has started. All Stakeholders have received a copy of the DMP. Follow up with continue in the 18/19 Financial Year
Governance 28/06/201850 %
5.3 - Counter disaster and other emergency contingency plans promoted to the community and visitors to the Shire
Activity: Community Clean Up of hard Materials prior to Cyclone Season
Performance Measure: Completed by December 2017
Council has been proactive in cleaning up the community prior to Storm Season. This is an ongoing Strategy.
Governance 28/06/2018100 % 4th Month
5.4 - Ensure airport security in compliance with Aviation Transport requirements
Activity: Airport Upgrade
Performance Measure: Completed by December 2017
OngoingEngineering 28/06/201870 %
80.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 7 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Economic Development
Goal 6: Economic Development
6.1 - Encourage private enterprise development to maximise employment opportunities and development in the Shire
Activity: Establishment of a Sport and Recreation Club
Performance Measure: Community Survey completed by August 2017 Consultation with Departmental Stakeholders completed by December 2017
Establishment of the Doomadgee Sports and Rec Club has been completed. Local Committee has been setup.
Community Services 28/06/2018100 % 3rd Month
6.3 - Facilitate the preparation of a scoping study for a Shire Tourism Development and Promotion Plan
Activity: Source Funding Opportunities
Performance Measure: Completed by June 2019
This Strategy has been put on hold due to limited resources. Will be implemented in the 2018/2019 Plan
Community Services 28/06/20180 %
6.4 - Facilitate liaison/consultation with educational institutions and other stakeholders to support initiatives that will enhance the employability of local people, including the provision of appropriate training, education and employment networking initiatives that support existing and future industries
Activity: Facilitate ongoing relationship with My Pathway to enhance the employability of local people
Performance Measure: Ongoing Quarterly Meetings with My Pathways Quarterly reports to Council
DASC and My Pathway have continued to grow the relationship between the 2 organisation. Many clients are performing their activities at Council. Monthly meetings have been facilitated for the JV. This Strategy will be ongoing.
Governance 28/06/2018100 % 4th Month
66.7Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 8 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Environment
Goal 7: Environmental Protection
7.1 - Facilitate the development of a Shire Environmental Development Plan
Activity: Develop Environmental Development Plan
Performance Measure: Completed by June 2018
This Strategy on hold due to limited resources until 18/18Community Services 28/06/20180 %
7.2 - Facilitate the formation of an Environmental Action Group
Activity: Formation of an Environmental Action Group
Performance Measure: Completed by June 2018
Due to limited resources this Straegy has been put on hold until 18/19.Community Services 28/06/20180 %
7.3 - Develop and promote policies to preserve and promote the natural environment while increasing local community involvement in its management
Activity: Develop policies and appropriate local laws to ensure the coverage of noxious and environmental weed are contained in the Shire
Performance Measure: Ongoing Commencing the Post State Review of the Plan
Local Law No3 and Local Law No 7 have been adopted by Council. Officers are working on consultation with the community.
Community Services 28/06/2018100 % 1st Month
7.4 - Continually update, with partners, a Pest Identification and Management Plan, and action recommendations of that plan
Activity: Develop a Pest Identification and Management Plan
Performance Measure: Implementation following State Review
The current Pest Management Plan is currenlty under review. Due to limited resources this Strategy has been postponed until 18/19
Community Services 28/06/201850 %
7.8 - Develop policy to ensure that development is designed to meet user needs and cause minimal impact upon others and the environment
Activity: Ensure Planning Scheme takes into account impact upon others and the environment
Performance Measure: Ongoing
Council has worked with DATSIP on the current Planning Scheme. Council has adopted the various changes. Waiting for DATSIP for final design
Community Services Engineering
28/06/201880 %
46.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 9 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Infrastructure
Goal 9: Development, Maintenance and Replacement
9.1 - Develop and implement programs for the design, construction and maintenance of roads, streets, footpaths, Council buildings, public conveniences, bridges and related drainage systems
Activity: Works Plan Developed
Performance Measure: Completed by June 2019
OngoingGovernance 28/06/201850 %
9.2 - Maintain clean, safe, secure and adequate water supply ensuring that all legislative requirements are met
Activity: Develop and Implement Drinking Water Quality Management Plan
Performance Measure: Completed by June 2018
Drinking Water Quality Management Plan has been developed. OngoingEngineering 28/06/201880 %
9.4 - Manage the operation of associated activities such as work depots, workshops and plant fleets to facilitate efficient and effective provision and maintenance of Shire infrastructure
Activity: Works Plan Developed
Performance Measure: Completed by June 2018
OngoingEngineering 28/06/201850 %
9.5 - Facilitate the development of flood mitigation plans and the provision and maintenance of necessary flood mitigation works
Activity: Flood Mitigation Study
Performance Measure: Commence by June 2018
Due to limited resouces this Strategy has been postponed until 19/20Engineering 0 %
9.8 - Ensure workplace health and safety obligations are monitored and met
Activity: Policies and Procedures are in place
Performance Measure: Ongoing
WPHS Consultatnt has been engaged. Policies and Procedures have been reviewed and ready for adoption. Consultant will visit on site 4 times a year.
All Departments 28/06/2018100 % 3rd Month
56.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 10 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Community and Human Services
Goal 10: Community and Human Services
10.1 - Ensure Council is always an effective advocate for the community
Activity: Storage Shed for Community Services Equipment
Performance Measure: Completed by June 2018
Due to limited resources this project has been postponed until 18/19Community Services 28/06/20180 %
10.2 - Facilitate public access to a swimming pool
Activity: Development of Plan
Performance Measure: Completed by December 2017
The Swimming Pool is run by Education Qld. They have made public notices of when the pool is accessible.
Community Services 28/06/2018100 % 4th Month
10.3 - Facilitate the provision of television, telephone and radio communication services in response to community needs
Activity: Development of Plan
Performance Measure: Completed by June 2018
Council has sourced funding to fix the telecommunication issues that the community is facing. This project will be finished in 2019.
Community Services 28/06/201880 %
60.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 11 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Public Health
Goal 11: Public Health
11.1 - Develop a Health Portfolio link with Qld Health CEO
Activity: Engage with Qld Health
Performance Measure: 4 meetings a year
Council and Qld Health have established a very good working relationship. This Strategy will be ongoing.
Elected Members 28/06/2018100 % 4th Month
11.2 - Work with partners to ensure that adequate health programs, inspections and education are focused on lifting overall community health standards
Activity: Involvement in stakeholder discussions by Council Officers and Elected Members
Performance Measure: Ongoing
Council is invloved with the Technical Working Group Meetings. This Strategy will be ongoing.
All Departments Elected Members
28/06/2018100 % 4th Month
11.3 - Facilitate the development of a Disabilities Action Plan
Activity: Work with partner agencies
Performance Measure: Ongoing Support
Council has had a number of Meetings with NDIS providers that service the community. This strategy will be ongoing.
Elected Members 28/06/2018100 % 4th Month
100.0Average Percentage Work Completed for this Section %
Monday, 25 June 2018 Page 12 of 13
Progress Report Report DatePercent CompletedDepartment Quarter
Planning and Development
Goal 12: Planning and Development
12.1 - Facilitate, in conjunction with partners, the continued development of the Doomadgee Town Plan
Activity: Finalise Town Planning Scheme in partnership with State
Performance Measure: Community Consultation State Review Completed by June 2018
OngoingEngineering 28/06/201880 %
12.3 - Promote orderly development of the Shire to support employment and economic prosperity in keeping with infrastructure capacity and environmental considerations
Activity: Develop an Open Spaces Strategy
Performance Measure: Completed by June 2019
Due to limited resources this Strategy has been postponed until 2019.Engineering 28/06/20180 %
12.4 - Implement, through the Shire Planning Schemes, appropriate controls over development to foster land uses and attitudes that enhance the quality of the natural and built environment
Activity: Finalise Town Planning Scheme in Partnership with State
Performance Measure: Community Consultation State Review Completed by June 2018
OngoingEngineering 28/06/201880 %
53.3Average Percentage Work Completed for this Section %
65.2Average Percentage Work Completed for Operational Plan %
Monday, 25 June 2018 Page 13 of 13
Doomadgee Aboriginal Shire Council
2018/19Operational Plan
DepartmentActivityStrategies Link BudgetPerformance Target
Governance
Goal 1: Financial Management
Indictor: To achieve maximum community benefit from available financial resources
Corporate ServicesAudit Committee to be established1.1 - Effective and efficient management of all financial matters Reporting onlyAudit Committee to be established
Corporate ServicesFacilitate SustainableFinancial Management
1.1 - Effective and efficient management of all financial matters Reporting onlyInternal Audit Completed – Risks to be Identified and Resolved
GovernanceSource additional funding opportunities
1.2 - Effective grants management Reporting onlyMonthly report to Council on outcomes
Corporate ServicesFacilitate Sustainable Financial Management
1.3 - Accurate and timely financial reporting Reporting onlyTimeliness, Quality, Free from Error Reporting
Corporate ServicesEffective Policy and Revenue Raising Strategy
1.4 - Maximise revenues in accordance with Council’s Revenue Policy
Reporting OnlyMonthly report to Council on outcomes
Corporate ServicesReview all services and charges to ensure correct cost recovery
1.5 - Effective management of the replacement and expansion of Council service
Reporting OnlyCompleted by August 2018
Corporate ServicesReview all leasing arrangements to ensure they are in order
1.6 - Effective and appropriate Council enterprises Reporting OnlyCompleted by September 2017
Goal 2: Administration and Corporate Services
Indictor: To provide timely, quality services to customers through effective and efficient administration of Council affairs
GovernanceReview all Council’s Policies and Procedures as required
2.1 - Review Council’s Policies and Procedures and ensure they meet community expectations and legislative requirements
Reporting OnlyOngoing review to be completed. Report to Council each Quarter
GovernanceImplementation of Council’s Policies and Procedures
2.2 - Effective policy implementation Reporting OnlyPolicy and Procedure Manuals to be distributed to all staff and Councillors by September 2018
GovernanceMonthly sessions to be held for Councillors
2.3 - Decisive Councillor Leadership Reporting OnlyCouncillors to attend 70% of internal training sessions
GovernanceComplete Internal Audit on Legislative Requirements
2.4 - Effective legislative requirements Reporting OnlyCompleted by October 2017 Monthly reports to Council
Monday, 25 June 2018 Page 1 of 6
DepartmentActivityStrategies Link BudgetPerformance Target
Community ServicesNewsletters to inform Community of Councils processes and projects
2.5 - Enhance Council’s communication and decision making through appropriate public relations and community consultation process
Reporting OnlyQuarterly Newsletter
GovernanceSummarise Local Laws Implementation of Local Laws
2.6 - Review and enforce Local Laws and Regulations to address local issues
Budget ItemLocal Laws Summarised and distributed throughout the Community – Completed by December 2017 Implementation of Local Laws through the Community - Ongoing
Goal 3: Human Resources
Indictor: To maximise Council’s human resource potential
All DepartmentsComplete full review of Corporate Structure
3.1 - Ensure workforce make-up best fits Council’s priorities, workloads and budget
Reporting OnlyCompleted by August 2017
All DepartmentsPerformance Appraisals completed for all staff
3.2 - Endorse and foster cross skilling in order to minimise need for specialists and to ensure full utilisation of staff
Reporting OnlyCompleted by June 2018
Corporate ServicesHuman Resources Officer engaged3.4 - Maintain accurate and confidential staff records Budget ItemHuman Resources Officer on site at Doomadgee Office by September 2017
Human ResourcesTraining Needs Analysis Completed3.5 - Ensure all staff have access to appropriate training Reporting OnlyAnalysis Completed by December 2017 Training Needs Identified
GovernanceEngage Work Place Health and Safety Consultant
3.6 - Maintain a safe and healthy workplace for all employees and other persons affected by Council operations
Budget ItemCouncil Safe Plan commenced by December 2017
Community
Goal 4: Arts and Culture
Indictor: To create opportunities through Arts and Culture to enhance individuals skills, bolster community pride and quality of life
Community ServicesDevelop Council Arts and Cultural Policy
4.1 - Develop an Arts and Cultural Policy Reporting OnlyCompleted by June 2018
Community ServicesContinual improvement of Library Service
4.2 - Facilitate the establishment and maintenance of an appropriate library service
Reporting OnlyOngoing
Community ServicesSource Funding Opportunities4.3 - Support artistic and community involvement in the arts BudgetCompleted by June 2019
Community ServicesContinual Improvement of RADF Administration
4.4 - Effective administration of the Regional Arts Development Fund (RADF)
BudgetMonthly reporting to Council
Community ServicesSource funding opportunities to develop a program for preservation of Shire History
4.5 - Facilitate, in partnership with the community and key stakeholders, the preservation of the history of the Shire
BudgetCompleted by June 2019
Community ServicesSource funding opportunities for an Arts and Culture Centre
4.6 - Provide space, time and resources for the purpose of exhibition/sale of local art
BudgetCompleted by June 2019
Monday, 25 June 2018 Page 2 of 6
DepartmentActivityStrategies Link BudgetPerformance Target
Community ServicesContinue to support events and festivals in line with Budget availability
4.7 - Support and promote appropriate events and festivals within the Shire
BudgetOngoing Report to Council on requests
Community ServicesSource funding opportunities4.8 - Encourage and support the development of programs for traditional language teaching and use
BudgetOngoing Reporting to Council on availability of funding
Community ServicesSource funding opportunities4.9 - Facilitate programs/projects for recording of local languages and personal stories
BudgetOngoing Reporting to Council on availability of funding
Community ServicesSource funding opportunities to develop a program for preservation of Shire History
4.10 - Facilitate the development of support programs/projects for preservation of traditional culture
BudgetCompleted by June 2019
Disaster Management
Goal 5: Disaster Management
Indictor: To limit the impact of natural and man- made disasters
GovernanceDevelop Budget for Emergency Services in line with funding
5.1 - Ensure that there is sufficient funding for emergency services BudgetBudget Develop Ongoing Support
GovernanceAnnual Review of DMP Local Disaster Management Committee formed and established
5.2 - Facilitate effective counter disaster planning in conjunction with the community, emergency service organisations and other stakeholders
ReportingDMP Reviewed by September 2017 LDC established by September 2017
GovernanceCommunity Clean Up of hard Materials prior to Cyclone Season
5.3 - Counter disaster and other emergency contingency plans promoted to the community and visitors to the Shire
ReportingCompleted by December 2017
EngineeringAirport Upgrade5.4 - Ensure airport security in compliance with Aviation Transport requirements
BudgetCompleted by December 2017
Economic Development
Goal 6: Economic Development
Indictor: To increase the overall strength and diversity of the Shire’s economic base, create jobs and actively promote the Shire’s tourism potential
Community ServicesEstablishment of a Sport and Recreation Club
6.1 - Encourage private enterprise development to maximise employment opportunities and development in the Shire
Reporting OnlyCommunity Survey completed by August 2017 Consultation with Departmental Stakeholders completed by December 2017
Corporate Services / ITTemporary Website Closed New Website developed
6.2 - Facilitate the development of a Council website BudgetCompleted by December 2017
Community ServicesSource Funding Opportunities6.3 - Facilitate the preparation of a scoping study for a Shire Tourism Development and Promotion Plan
BudgetCompleted by June 2019
GovernanceFacilitate ongoing relationship with My Pathway to enhance the employability of local people
6.4 - Facilitate liaison/consultation with educational institutions and other stakeholders to support initiatives that will enhance the employability of local people, including the provision of appropriate training, education and employment networking initiatives that support existing and future industries
Reporting OnlyOngoing Quarterly Meetings with My Pathways Quarterly reports to Council
Monday, 25 June 2018 Page 3 of 6
DepartmentActivityStrategies Link BudgetPerformance Target
Environment
Goal 7: Environmental Protection
Indictor: To conserve and the natural and built environments to achieve ecologically sustainable development
Community ServicesDevelop Environmental Development Plan
7.1 - Facilitate the development of a Shire Environmental Development Plan
Reporting OnlyCompleted by June 2018
Community ServicesFormation of an Environmental Action Group
7.2 - Facilitate the formation of an Environmental Action Group Reporting OnlyCompleted by June 2018
Community ServicesDevelop policies and appropriate local laws to ensure the coverage of noxious and environmental weed are contained in the Shire
7.3 - Develop and promote policies to preserve and promote the natural environment while increasing local community involvement in its management
Reporting OnlyOngoing Commencing the Post State Review of the Plan
Community ServicesDevelop a Pest Identification and Management Plan
7.4 - Continually update, with partners, a Pest Identification and Management Plan, and action recommendations of that plan
Reporting OnlyImplementation following State Review
Community Services Engineering
Ensure Planning Scheme takes into account impact upon others and the environment
7.8 - Develop policy to ensure that development is designed to meet user needs and cause minimal impact upon others and the environment
Reporting OnlyOngoing
Goal 8: Waste Management
Indictor: To prove and sustain an effective and disposal service
GovernanceDevelopment of Town Beautification Program
8.1 - Maintain high standards to ensure public facilities, houses and streets are clean and healthy
BudgetFunding secured through DATSIP Timelines achieved
EngineeringPurchase of Vacuum (Sullage) Truck8.1 - Maintain high standards to ensure public facilities, houses and streets are clean and healthy
BudgetOngoing
EngineeringEnsure the Shire Dump complies with regulatory standards
8.2 - Ensure waste is disposed of in approved dump BudgetOngoing
EngineeringEnsure the Shire Dump complies with regulatory standards
8.3 - Ensure the Shire dump complies with regulatory standards BudgetOngoing
EngineeringCommence agreements for site for future relocation of tip
8.4 - Initiate a recycling regime BudgetOngoing
Infrastructure
Goal 9: Development, Maintenance and Replacement
Indictor: To Maintain and upgrade essential infrastructure to maximise the utility of existing assets and provide for their long term improvement and / or replacement
GovernanceWorks Plan Developed9.1 - Develop and implement programs for the design, construction and maintenance of roads, streets, footpaths, Council buildings, public conveniences, bridges and related drainage systems
BudgetCompleted by June 2019
Monday, 25 June 2018 Page 4 of 6
DepartmentActivityStrategies Link BudgetPerformance Target
EngineeringDevelop and Implement Drinking Water Quality Management Plan
9.2 - Maintain clean, safe, secure and adequate water supply ensuring that all legislative requirements are met
BudgetCompleted by June 2018
EngineeringWorks Plan Developed9.4 - Manage the operation of associated activities such as work depots, workshops and plant fleets to facilitate efficient and effective provision and maintenance of Shire infrastructure
BudgetCompleted by June 2018
EngineeringFlood Mitigation Study9.5 - Facilitate the development of flood mitigation plans and the provision and maintenance of necessary flood mitigation works
BudgetCommence by June 2018
All DepartmentsPolicies and Procedures are in place9.8 - Ensure workplace health and safety obligations are monitored and met
ReportingOngoing
Community and Human Services
Goal 10: Community and Human Services
Indictor: To encourage and participate in the continuing development of community to service and foster a safe, harmonious community with a strong community spirit
Community ServicesStorage Shed for Community Services Equipment
10.1 - Ensure Council is always an effective advocate for the community
BudgetCompleted by June 2018
Community Services#Deleted10.2 - Facilitate public access to a swimming pool ReportingCompleted by December 2017
Community ServicesDevelopment of Plan10.3 - Facilitate the provision of television, telephone and radio communication services in response to community needs
ReportingCompleted by June 2018
Public Health
Goal 11: Public Health
Indictor: To create and foster a dynamic ongoing relationship with all relevant health policy departments and health service providers to ensure that operational programs are coordinated, focused and effective, in contributing to and enhancing, the health and well being of the whole community
Elected MembersEngage with Qld Health11.1 - Develop a Health Portfolio link with Qld Health CEO Reporting4 meetings a year
All Departments Elected Members
Involvement in stakeholder discussions by Council Officers and Elected Members
11.2 - Work with partners to ensure that adequate health programs, inspections and education are focused on lifting overall community health standards
ReportingOngoing
Elected MembersWork with partner agencies11.3 - Facilitate the development of a Disabilities Action Plan ReportingOngoing Support
Planning and Development
Goal 12: Planning and Development
Indictor: To develop and implement planning controls that ensure and encourage balanced and sustainable development and to promote the Shire as a desirable place to live, work, invest and visit
EngineeringFinalise Town Planning Scheme in partnership with State
12.1 - Facilitate, in conjunction with partners, the continued development of the Doomadgee Town Plan
BudgetCommunity Consultation State Review Completed by June 2018
EngineeringDevelop an Open Spaces Strategy12.3 - Promote orderly development of the Shire to support employment and economic prosperity in keeping with infrastructure capacity and environmental considerations
BudgetCompleted by June 2019
Monday, 25 June 2018 Page 5 of 6
DepartmentActivityStrategies Link BudgetPerformance Target
EngineeringFinalise Town Planning Scheme in Partnership with State
12.4 - Implement, through the Shire Planning Schemes, appropriate controls over development to foster land uses and attitudes that enhance the quality of the natural and built environment
BudgetCommunity Consultation State Review Completed by June 2018
Monday, 25 June 2018 Page 6 of 6