  • 8/3/2019 Abis Processing Steps 18 02 11

    1/9

    SRF Gwalior

    1. Processing Steps

    S.No

    Details ofTransaction

    Details Remarks

    1 Production dataProcess wise productiondata is required.

    1. Chips production qty (Activity code is P-LINE1)

    2. Suppose if u have chips sales then chips packing qty isrequired in production data. Consider chips sales qtyas production qty of chips packed.

    3. Denier wise Yarn production ( activity code isSPINDRAW-SDU)

    4. Suppose if u have YARN sales then YARN packing qty isrequired in production data. Consider YARN sales qtyas production qty of YARN packed otherwise enter theqty . . Kindly use denier wise item code

    5. Denier wise Cabling production qty (activity code isCABLING-TORAY)

    6. Style code wise weaving production qty (activity codeis WEAVING-DORNIER-WW)

    7. Fabric FG production qty (activity code is FAB-PACK)

    8. Suppose if your getting any new FG items then need tocreate the following masters

    a. Product masterb. Cost object masterc. Cost object BOM

    Kindly run BOM missing report in export option andensure all BOM are linked.

    2 Production driverData(Driver inputs toproduction)

    For Cost allocation purposewe need process wisemachine hours/ productionqty in some places

    1. Kindly prepare Driver data based on productionThe following data are requireda. Chips production (DRV011)b. Chips packing qty (DRV128)c. Denier wise spinning hours (DRV055)

    d. Denier wise yarn packing qty(DRV077)

  • 8/3/2019 Abis Processing Steps 18 02 11

    2/9

    e. Denier wise cabling hours (DRV103)f. Style wise Weaving hours (DRV117)g. Style wise packing qty(DR042)h. Chips packing qty, Yarn packing qty & style wise

    packing qty(DRV003)

    2. After preparing driver inputs to product data, kindlyuse VLOOKUP option between Driver inputs product

    and production data to confirm all the entries areavailable in both files

    Note : All production items should appear in driverinputs product data other wise cost will not beallocated to product hence that item will not appearin any of the reports

    All driver inputs to product items should existin production data otherwise cost will not beallocated to product

    3Cost objectproduction

    Need this information formatching with SKU cost

    1. All fabric, chips & yarn items code should linked withrelevant production route

    2. Consider only packing qty for yarn & chips not totalyarn & chips qty

    4Route wiseproduction

    Need this information formatching with COC

    3. All fabric, chips & yarn items code should linked withrelevant production route

    4. Consider total production qty for yarn & chips items

    5 Sales Data Customer & product wiseSales qty & sales value

    1. Chips sales

    2. Fabric Sales3. Yarn Sales (use denier wise code only i.e. YARN-840,

    YARN-1260 , etc)

    6 Cost object sales

    Run cost object sales(transactiondata preparation andselect cost object sales option.

    Note: Any changes in sales again need to run cost objectsales otherwise revised sales will not reflect the reports.

  • 8/3/2019 Abis Processing Steps 18 02 11

    3/9

    7 I/O ratio Process wise I/O ratio

    1. Ensure Route wise production, Sales, Cost objectsales(thru data preparation) , driver input to producthas been imported & data preparation

    2. Use export option (Toolsdatabase maintenance

    data exportsql List TransactionI/O working to

    export product wise I/O details based on currentmonth production

    3. Open exported file and first enter 1 in all norms (andthen enter actual I/O wherever required ) and import

    the same thru Processingtransaction data importI/O ratio

    8 Driver input toactivity

    Utility and Service costallocation

    Use quick updation option to transfer the data fromprevious month or export the data to excel and changePOWER, BOILER and utility units in that excel format andimport the revised data to current month. Further

    updating made in April 2011

    Driver Inputs to activity drivers are1. DRV094 MECHANICAL MAINTENANCE (Std

    Ratio)2. DRV096 ELECTRICAL MAINTENANCE (Power

    Norms)3. DRV042 Power Consumption Activitywise (Power

    Norms)4. DRV098 INSTRUNMENTAL MAINTENANCE (std

    Norms)

    5. DRV062 TIME SPENT ACTIVITYWISE - CIVILMAINTENANCE (Std Norms)

    6. DRV058 STEAM CONSUMPTION ACTIVITYWISE(Actual)

    7. DRV001 A/C CONSUMPTIONACTIVITYWISE(Actual)

    8. DRV006 AIR CONSUMPTIONACTIVITYWISE(Actual)

    9. DRV034 NITROGEN CONSUMPTIONACTIVITYWISE(Actual)

    10.DRV037 NO OF KWH GENERATED(Actual)

  • 8/3/2019 Abis Processing Steps 18 02 11

    4/9

    11.DRV019 DM WATER COSNUMPTIONACTIVITYWISE (Std Norms)

    12.DRV027 EFFLUENT TREATED ACTIVITYWISE13.DRV032 Allocated to weaving14.DRV118 SERVICE RELATED COST

    ALLOCATION(Stagewise Total Production)15.DRV069 TIME SPENT ACTIVITYWSIE IT(Std

    Norms)

    16.DRV036 NO OF EMPLOYEES ACTIVITYWISE(StdNorms)

  • 8/3/2019 Abis Processing Steps 18 02 11

    5/9

    9 Material Price

    The following RM & material prices are required1. Lactam2. Weft3. Packing material4. Process chemical5. Other materials

    10 Actual BOM

    The following Actual BOM are required1. Lactam(Enter Lactam norms for fabric in ISBG-LATAM BOMEnter Lactam norms for Chips in ISBG-LATAM-C BOMEnter Lactam norms for Yarn in ISBG-LATAM-Y BOM)2. Weft3. Packing material4. Process chemical

    Other materials

    11 Trial BalanceCost centre, Account wiseExpenses

    1. Remove 0 Cost centre from TB2. Note down the DG cost centre cost from TB and

    remove the same data from TB3. If system identified new account code then do the

    following stepsa. Create new account code in account code masterb. The same account code should grouped under one

    cost element thru account code grouping master

    12 Cost Model

    Department to activity

    allocation

    1. Confirm TB has been imported2. Run data preparation3. Export previous month cost model data from ABIS4. Change to current process month and import.

    5. Run Data preparation6. Go to cost model transaction and select cost centre code

    & enter the ratio wherever the total is 0.

    13Inclusion of normsactivity

    For Remove & Addcategory items inAccount code grouping

    1. Packing overheads(41413)2. Power(41421)3. Fuel(41424)4. Freight(41882)5. Depreciation(42313)

  • 8/3/2019 Abis Processing Steps 18 02 11

    6/9

    14Inclusion of normsProduct

    1. Process chemical cost chips & yarn denier wise(41122)2. Product wise freight cost for only MODI products(41471)

    15Inclusion of normscustomer

    1. Export Incentive(31393)2. Freight on sales (41472)

    16 Processing

    3. Kindly confirm all the above transaction data has beenimported

    4. Run Data preparation

    5. (After data preparation pls run Data preparation reportand ensure all overheads are added) suppose if urchanging or adding in TB or Inclusion on norms then plsrun data preparation again

    6. Run processing with Prerequisite option and ensure no

    error

    7. if there is no error then continue the processing otherwise correct the error and run data preparation andprocessing again

    17 Validation reports

    After complete the processing Pls check the followingreports and ensure all TB & Inclusion on norms cost areallocated

    1. Trial balance reconciliation report

    2. reportsCheck listIntegrity Report

  • 8/3/2019 Abis Processing Steps 18 02 11

    7/9

    2. Reports

    Denier wise Fabric

    cost/Yarn based on

    production

    ReportsCost

    StatementSegment wise

    cost

    Select Report View : DefaultSelect PeriodSelect HierarchySelect Fabric or Yarn from product option

    Select Denier from grouped bySelect Rs or Rs/Unit option and preview

    Period wise cost

    comparison based on

    production

    ReportsCost

    StatementSegment wisecost

    Select Report View : Period wiseSelect Period (For exp : From period Apr-2011 & To Period : May-2011Select HierarchySelect Rs or Rs/Unit option and preview

    Denier wise Fabric

    cost/Yarn based on

    Sales(Pft & los)

    ReportsProfit

    StatementSegment wise

    Profitability

    Select Report View : DefaultSelect Period

    Report Type : ProductSelect HierarchySelect Fabric or Yarn from product optionSelect Denier from grouped bySelect Rs or Rs/Unit option and preview

    Note : %Sales Option reportSelect Report view : % Sales and all other parameters willbe same

    Period wise cost

    comparison based onSales(Pft & los)

    ReportsProfit

    StatementSegment wiseProfitability

    Select Report View : Period wiseSelect Period (For exp : From period Apr-2011 & To Period : May-

    2011Select HierarchySelect Rs or Rs/Unit option and preview

    Customer wise report

    (Pft & los)

    ReportsProfit

    StatementSegment wise

    Profitability

    Select Report View : DefaultSelect PeriodReport Type : CustomerSelect HierarchySelect Customer from grouped bySelect Rs or Rs/Unit option and preview

    Note : %Sales Option reports

    Select Report view : % Sales and all other parameters

  • 8/3/2019 Abis Processing Steps 18 02 11

    8/9

    will be same

  • 8/3/2019 Abis Processing Steps 18 02 11

    9/9

    Customer & product

    wise report (Pft & Los)

    ReportsProfit

    StatementCustomer and

    Cost object wise Profit

    Select PeriodSelect Costobject from report orderSelect Report column : Cost ObectSelect Amount Type : Rs or Rs/unit and preview

    Trial balance

    Reconciliation

    ReportsOther

    ReportsTrial BalanceReconciliation

    Select PeriodReport Type : Resource or Activity wise and Preview

    Total Cost/Qty

    consumption

    individual Material

    wise based on sales or

    production

    ReportsOther

    ReportsCost object material

    cost

    Select PeriodSelect Production or Sales and Material cost from ReportsonSelect Summarized and Material from Report type then pressPreview.

    Final SKU wise

    Material cost( materials defined in

    BOM)

    ReportsOther

    ReportsCost object Product

    BOM

    Select Period

    Select Production or Sales from reports onSelect HierarchySelect Detail from Report Type and press preview button

    Stage wise Cost SKU

    wise (like COC format)

    ReportsFlash ReportsCost

    Summary

    Select PeriodSelect HierarchySelect ProductionSelect cumulative from report typeSelect Process from report columnSelect specific from Activity optionSuppose if u want to see the fabric items then select Fab-Pack

    from the Activity List. Select Yarn pack for yarn items.Press Preview button