a. brachmann and j. c. sheppard slac april 30, 2007

55
Slide 1 Global design effort 2007 DOE/NSF review Global design effort America s April 2007 DOE/NSF ART Review - ILC Polarized Electron Source and Positron Source FY06 Summary, FY07 Status and FY08-09 Proposal WBS 2.3, 3.3, 2.4, 3.4 A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Upload: dung

Post on 06-Jan-2016

15 views

Category:

Documents


0 download

DESCRIPTION

April 2007 DOE/NSF ART Review - ILC Polarized Electron Source and Positron Source FY06 Summary, FY07 Status and FY08-09 Proposal WBS 2.3, 3.3, 2.4, 3.4. A. Brachmann and J. C. Sheppard SLAC April 30, 2007. Nominal Source Parameters. DOE/NSF FY07 Review Polarized Electron Source – ART - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 1Global design effort2007 DOE/NSF review Global design effort

AmericasApril 2007 DOE/NSF ART Review -

ILC Polarized Electron Source and Positron Source FY06 Summary, FY07 Status and FY08-09 Proposal

WBS 2.3, 3.3, 2.4, 3.4

A. Brachmann and J. C. Sheppard

SLAC

April 30, 2007

Page 2: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 2Global design effort2007 DOE/NSF review Global design effort

Americas

Nominal Source Parameters

Parameter Symbol Value Units

Bunch Population Nb 2x1010 #

Bunches per pulse nb 2625 #

Bunch spacing tb 369 ns

Pulse repetition rate frep 5 Hz

Injection Energy (DR) E0 5 GeV

Beam Power (x1.5) Po 300 kW

Polarization e-(e+) P 80(30) %

Page 3: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 3Global design effort2007 DOE/NSF reviewApril 30-May 2, 2007 Global design effort

Americas

DOE/NSF FY07 ReviewPolarized Electron Source – ART

FY06/07 SummaryFY08/09 Planning

(A. Brachmann, SLAC)

Page 4: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 4Global design effort2007 DOE/NSF review Global design effort

AmericasPolarized Electron Source

WBS Overview

• WBS 2.3 Design• WBS 3.3 R&D• WBS 3.3.1.1. Source Laser R&D• WBS 3.3.1.2. Polarized Gun Development • WBS 3.3.1.3. Photocathode Development

Page 5: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 5Global design effort2007 DOE/NSF review Global design effort

AmericasPolarized Electron Source

FY06/07 Summary

• WBS 2.3 Source design (beam dynamics simulations) to support injector layout (RDR level)

Electron Gun Bunching System NC/SC accelerationeLTR with Spin precession/rotation RF energy compression

Page 6: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 6Global design effort2007 DOE/NSF review Global design effort

AmericasPolarized Electron Source

FY07 Summary

• WBS 3.3.1 Source laser system design

Completed facility 3 MHz pulse train generation using a

modelocked Ti:sapphire laser Start pulse train amplification work

Page 7: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 7Global design effort2007 DOE/NSF review Global design effort

AmericasPolarized Electron Source

FY07 Summary

• WBS 3.3.3 Photocathode R&D

Gridded Photocathodes (external bias for QE and polarization enhancement)

Development of Faraday rotation experiment to study depolarization mechanism

Alternative materials GaN, InGaP/GaAs Superlattice

Atomic hydrogen cleaning system development

Page 8: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 8Global design effort2007 DOE/NSF review Global design effort

AmericasPolarized Electron Source

FY08/09 proposal – WBS 2.3 - Design

• Polarized electron source design• Focus is EDR

– Subsystem design and engineering– Laser/Gun/Photo-cathodes strongly related to outcome of

R&D program– Trans-relativistic region

• Design is at stage of complete Parmela/MAD/Elegant simulations

• Engineering and system integration part of the EDR project phase

– 5 GeV booster linac assumes copy of linac technology no extra effort in FY08/09

– LTR design is shared between e- and e+ shared effort

Page 9: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 9Global design effort2007 DOE/NSF review Global design effort

Americas

Polarized Electron Source

FY08/09 proposal – WBS 3.3.1.1 Laser Development

• FY 08 – Main R&D Program is the Development of the

AmplifierHigh power cw pump laser and regenerative cryo-cooled Ti:Sapphire amplifier stage

• FY09 – Complete Amplifier – Address technical challenges– Use laser system and (existing SLC) gun to

generate polarized e- bunch train

Page 10: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 10Global design effort2007 DOE/NSF review Global design effort

Americas

Polarized Electron Source

FY08/09 proposal WBS 3.3.1.2 – Gun Development

Project will receive first ILC funding in FY08

Use resources at Jlab to develop gun technology

• Min 140 kV operating voltage (200+ kV design)• Combine features of SLC and JLAB gun

(HV Design/Power Supply/Loadlock)• Testing can be done at JLAB and/or SLAC

Page 11: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 11Global design effort2007 DOE/NSF review Global design effort

Americas

Polarized Electron Source

FY08/09 proposal WBS 3.3.1.3 – Injector Development

– Trans-relativistic region (bunching and pre-acceleration)

• Variety of reference points (SLAC, NLCTA, TTF, …)• Many system are common with e+ source

– FY08/09 program (EDR)• Transform simulations for L-band bunching into hardware

design• Evaluate need for prototype of beta matched L-band TW

buncher modified 4.3 m L-band structure (used for e- and e+)

Page 12: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 12Global design effort2007 DOE/NSF review Global design effort

Americas

Polarized Electron Source

FY08/09 proposal WBS 3.3.1.4 – Photocathode R&D

– Strained-superlattice GaAs-GaAsP• Polarization = 85 – 90 %• Charge limit (problem for SLC/NLC) has been overcome by high gradient

doping, however, at expense of polarization• For ILC bunch charge is less, hence re-optimization of structure can lead to

higher polarization (~ 5%)

– Alternative materials:• AlInGaAs/GaAs (Ioffe (St. Petersburg, Russia) results: 92 % Polarization)• Large bandgap materials GaN, InGaN, AlGaN (robust and high QE)

– R&D (ongoing):• Investigate depolarization mechanisms (Faraday rotation)

– Additional Projects and Activities:• Cathode Test System (CTS) upgrade – Polarimeter, Cryogenic capabilities,• Use of Surface Science (XPS, SEM, etc.)

Page 13: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 13Global design effort2007 DOE/NSF review Global design effort

AmericasRegional distribution of ILC e-source design

and R&D

• Americas– SLAC, JLAB

• Asia– Polarized source R&D at Nagoya is in transition stage (most

likely it will disappear in the near future)– KEK may pick up polarized source R&D

• Europe– Various polarized source R&D programs and users

• Mainz, Bonn, St. Petersburg

– No direct involvement with ILC

Page 14: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 14Global design effort2007 DOE/NSF review Global design effort

AmericasBudget WBS x.3 Electron Sources

FY08: k$ 1,400 FY09: k$ 3,000

WBS FTE

FY 08 / 09

Total [k$] (Incl. M&S + Indir.)

FY08 / 09

2.3 Design 1.50 / 2.50 290 / 500

3.3.1.1 Laser Development 0.25 / 1.00 350 / 720

3.3.1.2 Gun Development 0.75 / 1.50 450 / 750

3.3.1.3 Injector Development 0.50 / 1.00 100 / 550

3.3.1.4 Photocathode 0.37 / 0.75 250 / 400

Budget is adequate for anticipated Program

Page 15: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 15Global design effort2007 DOE/NSF reviewApril 30-May 2, 2007 Global design effort

Americas

DOE/NSF FY07 ReviewILC Positron Source – ART

FY06/07 Summary and StatusFY08/09 Planning

(J. Gronberg, LLNL and J. C. Sheppard, SLAC)

Page 16: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 16Global design effort2007 DOE/NSF review Global design effort

AmericasPositron Source Layout

Page 17: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 17Global design effort2007 DOE/NSF review Global design effort

AmericasFY06/07 Summaries

• Developed and promulgated ILC Positron System design for RDR

• “Optimized” overall layout with respect to function, risk, and cost

• Documented by writing ILC Positron System RDR chapter

• Formalized international ILC Positron Collaboration (RAL/06, IHEP/07, ANL/07 Meetings)

• EDR organizing and planning (ILC S5, see O. Napoly ILC MAC talk 04/07)

Page 18: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 18Global design effort2007 DOE/NSF review Global design effort

AmericasILC Positron Source

FY07 Status

• WBS 2.4. Source DesignSystems Design (production, capture, optics,

collimation, accelerators, remote handling, systems specifications, start-to-end simulations)

Monitoring and Planning of R&D Activities: domestic and international (targets, OMD, undulator, Collaboration and S5 coordination)

Page 19: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 19Global design effort2007 DOE/NSF review Global design effort

Americas

ILC Positron Source

FY07 Status

• WBS 3.4. Positron Source R&DLLNL target design for UK developments and

test programCornell undulator development activitiesANL pulsed flux concentrator (OMD) tests;

eddy current modeling for spinning targetSLAC NC SW RF Structure prototyping (C.

Adolphsen)

Page 20: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 20Global design effort2007 DOE/NSF review Global design effort

AmericasUS Institutions

• Institutions doing substantial work on ILC e+ development– SLAC

• overall coordination & leadership• define parameters• target hall, remote handling, activation• beamline optics and tracking• NC L-Band accelerator structures and RF systems• Experiments – E166, FLUKA validation experiment

– LLNL• target simulations (thermal hydraulics and stress, rotodynamics, materials)• target design (testing and prototyping)• pulsed OMD design

– ANL• optics• tracking• OMD studies• eddy current calculations

– Cornell• undulator design, alternative target concepts

Page 21: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 21Global design effort2007 DOE/NSF review Global design effort

AmericasEuropean Institutions

• Institutions doing substantial work on ILC e+ development– CCLRC-Daresbury

• undulator design and prototyping• beam degradation calculations

– CCLRC-RAL• remote handling• eddy current calculations• target hall activation

– Cockcroft and Liverpool University• target design and prototyping

– DESY-Berlin• target hall activation• spin preservation• photon collimation• E166

Page 22: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 22Global design effort2007 DOE/NSF review Global design effort

AmericasPositron Source

WBS Overview FY08/09• WBS 2.4 Design• WBS 2.4.1 EDR• WBS 2.4.2 Systems Engineering• WBS 2.4.3 Civil Facilities Systems Coordination• WBS 2.4.4 System Modeling• WBS 2.4.5 Remote Handling

• WBS 3.4 Research and Development• WBS 3.4.1. Undulator• WBS 3.4.2. Target • WBS 3.4.3. Optical Matching Device• WBS 3.4.4 Normal Conducting RF Structures

Page 23: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 23Global design effort2007 DOE/NSF review Global design effort

AmericasBudget WBS x.4 Positron Source

FY08: k$ 2543 FY09: k$ 5304

WBS FTE

FY 08 / 09

Total [k$] (Incl. M&S + Indir.)

FY08 / 09

2.4 Design 5/ 9 1360 / 2545

3.4.1.1 Undulator, UK 0.2 / 0.3 50 / 78

3.4.1.3 Undulator, Cornell 1/1 226/293

3.4.2 Target 1.3/ 1.5 622/ 821

3.4.3 OMD 0.5 / 1.0 285/1567

Page 24: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 24Global design effort2007 DOE/NSF review Global design effort

Americas

Select Positron References, 1

• ILC RDR Positron Chapter:

http://media.linearcollider.org/report-apr03-part1.pdf sec. 2.3, pg. 45 ff• ILC Positron Source Collaboration Meetings

1st meeting at RAL September, 2006: http://www.te.rl.ac.uk/ILC_Positron_Source_Meeting/ILCMeeting.html

2nd meeting at IHEP, Beijing January, 2007 : http://hirune.kek.jp/mk/ilc/positron/IHEP/• ILC Notes

1. ILC Target Prototype Simulation by Means of FEM Antipov, S; Liu, W; Gai, W [ILC-NOTE-2007-011] http://ilcdoc.linearcollider.org/record/6949

2. On the Effect of Eddy Current Induced Field , Liu, W ; Antipov, S; Gai, W [ILC-NOTE-2007-010] http://ilcdoc.linearcollider.org/record/6948

3. The Undulator Based ILC Positron Source: Production and Capturing Simulation Study – Update,

Liu, W ; Gai, W [ILC-NOTE-2007-009] http://ilcdoc.linearcollider.org/record/6947• Other Notes

1. F.Zhou,Y.Batygin,Y.Nosochkov,J.C.Sheppard,and M.D.Woodley,"Start-to-end beam optics development and multi-particle tracking for the ILC undulator-based positron source", slac-pub-12239, Jan 2007. http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-12239.pdf

2. F.Zhou,Y.Batygin,A.Brachmann,J.Clendenin,R.H.Miller,J.C.Sheppard,and M.D.Woodley,"Start-to-end transport design and multi-particle tracking for the ILC electron source", slac-pub-12240, Jan 2007. http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-12240.pdf

3. A.Mikhailichenko, " Liquid metal target for ILC*."*. Jun 2006. 3pp.Prepared for European Particle Accelerator Conference (EPAC 06), Edinburgh, Scotland, 26-30 Jun 2006.Published in *Edinburgh 2006, EPAC* 816-818

Page 25: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 25Global design effort2007 DOE/NSF review Global design effort

Americas

Select Positron References, 2

• Other Notes, cont’d4. A.A. Mikhailichenko

<http://www-spires.slac.stanford.edu/spires/find/wwwhepau/wwwscan?rawcmd=fin+%22Mikhailichenko%2C%20A%2EA%2E%22>, "Test of SC undulator for ILC.",Jun 2006. 3pp. Prepared for European Particle Accelerator Conference (EPAC 06), Edinburgh, Scotland, 26-30 Jun 2006.

Published in *Edinburgh 2006, EPAC* 813-815.

5. A.Mikhailichenko, "Issues for the rotating target", CBN-07-02, 2007, http://www.lns.cornell.edu/public/CBN/2007/CBN07-2/CBN07-2.pdf

6. A.Mikhailichenko, "Positron Souse for ILC:A perspective", CBN-06-06, 2006, http://www.lns.cornell.edu/public/CBN/2006/CBN06-1/CBN06-1.pdf

Page 26: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 26Global design effort2007 DOE/NSF review Global design effort

AmericasElectron and Positron

Sources

End of Formal Presentation

Additional info as needed

Page 27: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 27Global design effort2007 DOE/NSF review Global design effort

AmericasPositron Plans

Backup and Breakout

Discussion Slides

Page 28: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 28Global design effort2007 DOE/NSF review Global design effort

AmericasFY 06 WBS 3.3.2 Photocathode R&D

- Biased Photocathodes (SBIR with Saxet Inc.)

Biased photocathodes(thin unstrained GaAs)

– Bias across Photocathode using metal grid

– forward bias QE ↑

– negative bias QE, Polarization ↓

Page 29: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 29Global design effort2007 DOE/NSF review Global design effort

AmericasMajor Issues

• Target design, prototyping needed– integrity

• target spinning mechanical effects• pulsed OMD• thermal stress cooling design• activation and radiation damage

– vacuum, water couplings– eddy current heating effects– target hall remote handling

• OMD– baseline is pulsed because we do not completely understand

effects of DC magnetic field on target• Beam loss in beamlines

– collimation schemes• Undulator prototyping needed to ensure specs are met

Page 30: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 30Global design effort2007 DOE/NSF review Global design effort

AmericasMeetings

• Regular meetings– 10.30AM (PST) Wednesdays - positrons

• ANL, LLNL, SLAC,Cornell• Alternate between hardware issues and optics• Maybe expand the invitation list

– 08.00 AM (PST) Thursdays - target• SLAC, Daresbury, RAL, DESY-Z, ANL, LLNL• Alternate between target design & hall activation

– 08.00 AM (PST) Wednesdays – E166

Page 31: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 31Global design effort2007 DOE/NSF review Global design effort

AmericasPositron RDR Update

• Positron RDR , in good shape– Numbers need to be checked and finalized– Figures are fine, one or two could be even

better– April 1 deadline for complete RDR draft– June or so for non-draft RDR & paper version

• EDR plans being hatched..• E166 getting closer to publishing!!!

Page 32: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 32Global design effort2007 DOE/NSF review Global design effort

AmericasPositron Collaboration Meeting

• ILC Positron Source Collaboration Meeting– Collaboration to meet three times a year

• 1st meeting at RAL last November• Main web page: http://www.te.rl.ac.uk/ILC_Positron_Source_Meeting/ILCMeeting.html

– 2nd meeting in Beijing before GDE meeting• Main web page : http://hirune.kek.jp/mk/ilc/positron/IHEP/• Summaries: http://hirune.kek.jp/mk/ilc/positron/IHEP/summary.html

– 19 attendees , 6-9-4 USA-Europe-Asia , 2 from SLAC : John & Feng)

Page 33: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 33Global design effort2007 DOE/NSF review Global design effort

Americas

A. Target Systems (I. Bailey/ T. Piggott)

• Source alternative magnet solutions for first proposed UK target prototype - Ian B to coordinate.

• LLNL to evaluate DL target prototype design for vibrational modes and compatibility with water-cooling design (flow rates, etc) - Tom P to coordinate.

• Rationalise proposed UK prototyping wrt available funding - Ian B to coordinate.

• Continue evaluation of alternative target materials - Chris D to coordinate.• Seek further clarification from BINP on their 1ms OMD work - Vinod B to

coordinate.• Adopt common geometry for eddy current simulations (based on UK

prototype?) - Jeff G to coordinate.• Beam window issue remains unresolved? Wei + Alexander to discuss.

Topic Action Items:

Target Summary

Page 34: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 34Global design effort2007 DOE/NSF review Global design effort

AmericasTarget Wheel

Page 35: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 35Global design effort2007 DOE/NSF review Global design effort

Americas

Topic Action Items:D. Target Hall (I. Bailey on behalf of V.B.)

• Evaluate dose rates for short times after shutdown (1 hour, 1 day) - Andriy (DESY)

•Complete detailed target station geometry for FLUKA - Luis (DL)

•Include material absorption effects in FLUKA simulations - Andriy (DESY)

•Carry out benchmarking of FLUKA using Ti alloy at SLAC - John (SLAC)

•Get feedback on impact of 53 hour changeover on availability - Vinod (SLAC)

•Evaluate need to include photon collimator in remote-handling module - Lei (Liverpool)

•Evaluate activation of water in water-cooled systems - Andriy (DESY)

•Evaluate shielding requirements compatible with 53 hour remote-handling schedule - Andriy (DESY)

•Evaluate achievable vacuum. Assess need to evolve pillow seal design. - Ian (Liverpool)

•Does ILC plan to have a central hot cell facility? - Vinod (SLAC)

•Develop detailed remote-handling scenarios - Mike W (RAL)

•Assess need for remote-handling for KAS - Vinod (SLAC)

Target Hall Summary

Page 36: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 36Global design effort2007 DOE/NSF review Global design effort

AmericasTarget Remote Handling

Estimated 53 hour replacement time

Page 37: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 37Global design effort2007 DOE/NSF review Global design effort

AmericasOptical Matching Device (OMD)

• Optical Matching Device – factor of 2 in positron yield (3 if immersed target)

– DC solenoid before target or pulsed flux concentrator after target

– Pulsed device is the baseline design

• Target spins in the magnetic field of the OMD– Eddy currents in the target – need to calculate power

– Magnetic field is modified by the eddy currents – effect on yield??

• Eddy current mitigation– Reduce amount of spinning metal

– Do experiment to validate eddy current calculations

– Look for low electrical / high thermal conductivity Ti-alloys

– Other materials such as ceramics

– No OMD• Use focusing solenoidal lens (1/4 wave) – lower fields• OMD is upgrade to polarization!!!!!

Page 38: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 38Global design effort2007 DOE/NSF review Global design effort

AmericasEddy Current Experiment

Eddy current calculation mesh -

S. Antipov, W. Liu, W. Gai - ANL

Proposed experimentLayout at CockcroftInstitute/Daresbury(this summer)

Page 39: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 39Global design effort2007 DOE/NSF review Global design effort

AmericasCalculated Eddy Current Power

0

500

1000

1500

2000

2500

0 500 1000 1500 2000 2500 3000 3500

RPMs

Power, kWatts σ=2.5e6

σ=2.0e6

σ=1.5e6

σ=1.0e6

coppersigma=60e6

Nominal RPMs

Page 40: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 40Global design effort2007 DOE/NSF review Global design effort

AmericasTarget Progress

• Baseline target/capture

– RAL, ANL and Cornell have done Eddy current simulation which produce consistent results with multiple codes. Estimates for power dissipation in the target are >100kW for a constant field and are considered excessive.

– Evaluation of ceramic target material is on-going. No conclusions.– Radiation damage of the superconducting coil is still TBD but may not

be worthwhile unless a solution can be found for the eddy currents.– ANL simulation of beam heating in windows shows that an upstream

window is feasible but a downstream window is not.

• Alternative target/capture

– Capture efficiency for the lithium lens focusing and ¼ wave solenoid is still TBD

– Thermal heating and stress for the lithium lens is still on-going.– Thermal stress calculation for the liquid metal target is still on-going

Page 41: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 41Global design effort2007 DOE/NSF review Global design effort

AmericasOMD

• Plans and Actions (baseline target/capture):– ANL will simulate eddy currents in the pulsed magnet configuration.

– UK will evaluate suitability of non-conducting materials for the target

– Daresbury/Cockroft/RAL will spin a one meter target wheel in a constant magnetic field and will measure the forces.

• Eddy simulations will be calculated and benchmarked against this configuration

• Plans and Actions (alternative targets/capture):– ANL will determine the capture efficiency for ¼ wave focusing optics

and lithium lens.

– LLNL will evaluate the survivability of lithium lens to beam stress

– Cornell will specify an initial design of a liquid metal target. LLNL will calculate the Stress-strain behavior of the outgoing beam window.

Page 42: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 42Global design effort2007 DOE/NSF review Global design effort

AmericasOptics

• Source optics laid out. Need to look at details– Beam loss and collimation

– Component interferences (target halls, DR injection)

– Refine and document optics and beam physics

Page 43: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 43Global design effort2007 DOE/NSF review Global design effort

AmericasFLUKA Validation Experiment

Page 44: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 44Global design effort2007 DOE/NSF review Global design effort

AmericasFLUKA Validation Experiment

• SLAC/CERN Collaboration (RP groups) – Validation of FLUKA activation calculations

• 100 W

• 30 GeV electron beam in ESA at SLAC

• Cylindrical copper dump

• Samples around the dump (including a Ti-4V-6Al)

• Look mr/hour and gamma spectrum from irradiated samples

– Run at the beginning of April …

Page 45: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 45Global design effort2007 DOE/NSF review Global design effort

AmericasExperiment Setup

Page 46: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 46Global design effort2007 DOE/NSF review Global design effort

AmericasPreliminary Data: Ti and Ti-alloy

Page 47: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 47Global design effort2007 DOE/NSF review Global design effort

Americas STATUS OF CORNELL UNDULATOR

PROTOTYPING

Alexander Mikhailichenko, Maury Tigner

Cornell University, LEPP, Ithaca, NY 14853

A superconducting, helical undulator based source has been selected as the baseline design for the ILC. This report outlines progress towards design, modeling and testing elements of the needed undulator. A magnetic length of approximately 150 m is needed to produce the desired positron beam. This could be composed of about 50 modules of 4 m overall length each.This project is dedicated to the design and eventual fabrication of one full scale, 4 m long undulator module. The concept builds on a copper vacuum chamber of 8 mm internal bore

Page 48: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 48Global design effort2007 DOE/NSF review Global design effort

Americas

Fig.1;Extensible prototype concept for ILC positron undulator . Diameter of cryostat =102mm

Page 49: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 49Global design effort2007 DOE/NSF review Global design effort

AmericasUndulator cold mass design

Fig.2:Details of design. 1–Iron yoke, 2–Copper collar, 3, 4–trimming Iron nuts. Inner diameter of Copper vacuum chamber is 8mm clear.

Page 50: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 50Global design effort2007 DOE/NSF review Global design effort

Americas

Several 40 cm long undulator models with 10 and 12 mm period, Ø 8 mm clear bore have been made and measured. See Table

OFC vacuum chamber, RF smoothness

For aperture diameter 5.75 mm we expect: for period 8mm – K~0.4 ; for period 10mm -K~0.9

SC wire 54 filaments 56 filaments 56 filaments

# layers 5* 6* 9** (12***) +sectioning

λ=10 mm K=0.36 tested K=0.42 tested K≈0.5 (calculated)

λ=12 mm K=0.72 tested K=0.83 tested K≈1 (calculated)

*) Wire – Ø0.6 mm bare; **) Wire – Ø0.4 mm bare; ***) Wire – Ø0.3 mm bare

Fig.3: Field profile – conical ends. 6 layer, 12 mm period – orthogonal hall probes. 1Tesla full scale

Page 51: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 51Global design effort2007 DOE/NSF review Global design effort

Americas

•Progress to Date

•An overall concept design for the module as shown in Fig. 1 has been developed. The design is very compact, having an outside cryostat diameter of 100 mm. Standard size plumbing components are used throughout. Figure 1 shows the cross section design for tapered end coils.

•We have made optimization studies for undulators having 10 and 12 mm period with 8 mm clear bore and wound with various commercially available wires.

•Technology for fabrication of the undulator has been reduced to practice including winding of the wire and the helical iron yoke as well as procedures and apparatus for measuring the field distribution at the operating temperature. •Several 40 cm long undulator models with 10 and 12 mm period, 8 mm clear bore have been made and measured.

Page 52: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 52Global design effort2007 DOE/NSF review Global design effort

AmericasSummary Page for the Capture RF

Topic Action Items:

C. Capture RF

1. ProgressFive-cell L-Band SW Test Structure • Microwave QC for all accelerator cells and assemblies has been completed. • As a last assembly, the coupler assembly has been delayed. Now the final

machining for cell profile is nearly finished. • We plan to have a stack measurement starting from next week.• The final structure assembly will be done in February of 2007. Then, the

microwave tuning, characterization as well as high power test will proceed.L-Band RF Windows• Two windows have been completed and are under high power test.• All of other three sets of window parts are ready to assembly.

2. In the process of cost estimation and drafting for RDR, the RF system configuration and detailed parts count have been carefully studied.

Juwen Wang

Page 53: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 53Global design effort2007 DOE/NSF review Global design effort

AmericasPrototype Positron Capture Section

Page 54: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 54Global design effort2007 DOE/NSF review Global design effort

AmericasPreliminary Microwave Checking

1300.175 MHz at 20°C, N2

1300.125 MHz at 20°C, N2

Field Plots for Bead Pulling Two Different Frequencies Showing the Correct Cell Frequency and Tuning Property.

Measurement Setup for the Stacked Structure before Brazing without Tuning

Page 55: A. Brachmann and J. C. Sheppard SLAC April 30, 2007

Slide 55Global design effort2007 DOE/NSF review Global design effort

Americas

Brazed Coupler and Body Subassemblies Ready for Final Brazing