901-kifa kifaru ground order no: fixingwicksteed.co.uk › wp-content › uploads › 2016 › 11...

38
Complied by Date ISSUE ECN DATE SIGN CUSTOMER: FIXING: ORDER No: AB 30/04/12 901-KIFA Kifaru Ground 0 1655 01/05/12 AB 1 1663 19/07/12 AB 2 Minor 30/10/13 DB

Upload: others

Post on 31-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    30/04/12

    901-KIFA Kifaru Ground

    01655

    01/05/12AB

    11663

    19/07/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    30/04/12

    901-KIFA Kifaru Ground

    1525 750

    350

    75

    044

    5

    1993

    600

    300

    All foundations 300 x 300unless otherwise stated

    All foundations 375 deepunless otherwise stated

    750750

    1440

    1586

    1050 x 950 DEEP

    500

    11663

    19/07/12AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    30/04/12

    901-KIFA Kifaru Ground

    1600

    3350

    2000

    2200 1100 550 3100

    450

    555

    0950

    1050 2850 3050

    2775

    2330

    695

    0

    6950

    Safety Surfacing38m² of 40mm wetpourwith 23m edging

    R2200

    R1500

    R23

    00

    R1800

    R2000

    R10

    00 R10001

    166319/07/12

    AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    30/04/12

    901-KIFA Kifaru Ground

    302

    5

    2350

    70007500

    Safety Surfacing44m² of 33mm tileswith 27m edging

    11663

    19/07/12AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    01/05/12

    901-KIFA Kifaru Ground

    55050

    500

    7500

    7500

    Safety Surfacing34 grassmats (1m x 1.5m)

    11663

    19/07/12AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    01/05/12

    901-KIFA Kifaru Loose-fill

    28

    252375

    180

    03850

    1400

    70

    50

    1400 2000 950 1600 1100

    1800 3450 1800

    180

    03

    200

    1100

    950

    7050

    Safety Surfacing42m² of loose-fill areawith 24.5m edging

    11663

    19/07/12AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

  • Complied by

    Date

    ISSUEECNDATESIGN

    CUSTOMER: FIXING:ORDER No:

    AB

    01/05/12

    901-KIFA Kifaru Ground

    90165Ramp c/w handrailsand panels

    90154Curved climbingwall

    90154Curved climbing wall

    90153Double tower

    90151Quadrant tower

    90122Metal barrier(Below deck)

    90110Double arch bridge

    90105Double widthslide

    11663

    19/07/12AB

    01655

    01/05/12AB

    2

    Minor30/10/13

    DB

    90156Monkey pole slider

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Tropica

    Double Width Slide90105

    Up to 8 years

    1200mm

    62 Kg Approx

    90 Kg Approx

    90105Page 1 of 5

    1980 x 1550 x 3122mm

    Chute made from 2mm stainless steel sheet.Guardrail made from 32mm nominal bore tube to BS 1387.Pedestals made from circular hollow section to BS 4848.Fixings are anti-vandal and plated for weather protection.Welds are copper free conforming to 2901 AIB for mild steel.Low lead polyester powder paint to BS EN 71.

    1. Read all instructions thoroughly before commencing installation of unit.

    2. Do not tighten fastenings until the unit is completely assembled.

    3. Excavate foundations as per the foundation plan.

    4. Place pedestals in the foundations and prop up in position.

    5. Ensuring pedestals are plumb, square and upright, and at the correct height and centre of thedimensions, backfill foundations with concrete.

    6. Allow 48 hours of drying time before fixing slide to pedestals.

    M8 bolts to be torqued to 18 Nm (13lbft). M10 bolts to be torqued to 34 Nm (25lbft).M12 bolts to be torqued to 55 Nm (40lbft). All protruding screw threads to be peened over to remove sharpedges. Lifting aid will be required when installing this peice of equipment.

    All installation aids to be removed before first use!

    In accordance with 6.1.3 EN1176-1:2008 we recommend that slides do notface south or near due south due to heat build up.

  • 90105

    Page 2 of 5

    Foundation Detail(Care must be taken under abnormal conditions)

    15861443

    1050

    500

    TOWER

    TOWER

    875

    875

    Finished Surface Level

    Brick

    Underside of slide runout tofinished surface level shall be amaximum dimension of 200mm

    40

    0B

    AR

    K

    475

    47

    5

    300

    Foundation Detail:Ground Fixed 1050 x 500 x 875mm

    Foundation Detail:Bark Fixed 1050 x 500 x 475mm

  • 90105

    Page 3 of 5

    Surfacing & Free Space Detail

    R1000R1000

    R1500R1500

    FREE

    SPACE

    FREE

    SPACE

    3

    5

    11

    7

    4

    5

    11

    7

    Fixing pedestals to chute:1. To fit pedestals to chute use M12 x 25mm Lg PentButton Head Screws, placing a M12 fibre washer eitherside of the pedestal top plate.

    2. Ensure spragging iron is in place before.

  • 90105

    Page 4 of 5

    6

    1

    End Plug DetailInsert the two plastic end plugs into slide barrierspigots before securing to slide and tower.

    8

    12

    8

    1

    Fixing Detail to TowerAttach slide and barrier to tower using M10 x25mm Lg pent button head screws and M10Wicksteed washers.

    13

    10

  • REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90105

    Page 5 of 5

    MH

    13/11/01

    Parts ListDESCRIPTIONPART NUMBERQTYITEM

    DOUBLE WIDTH SLIDE BARRIER90105-0211

    CHUTE ASSEMBLY90105-0112

    PEDESTAL SUPPORT LEG - RUNOUT4013-03823

    PEDESTAL SUPPORT LEG - MIDDLE4013-03724

    SPRAGGING IRON3031-01145

    END PLUG (1¼ NB)2611-00526

    M12 Fibre Washer2571-013327

    Wicksteed Washer2215-51968

    M12 Plain Washer2215-50929

    M10 Safety Fastener2177-002210

    M12 x 25 Pent Button Head2176-1761611

    M10 x 50 Pent Button Head2176-129212

    M10 x 25 Pent Button Head2176-126413

    NEW

    1396

    MH

    13/11/01

    1

    Minor

    PG

    29/04/02

    All spare parts are available from Wicksteed Playscapes on request

    2

    Minor

    DB

    12/03/14

    3

    Minor

    DB

    15/07/15 18/08/15

    MC

    4

    Minor

  • SPECIFICATION Bridge: Made from 250 and 20 mm Nominal bore tube to BS 1387. Floor Panel: Made from Durbar 3 mm thick Chequer plate Logs: Made from recycled plastic. Fasteners: Non standard anti-vandal, plated for weather protection. Finish: Low lead polyester powder paint to BSEN 71 Part 3

    INSTALLATION INSTRUCTIONS 1 Read installation instructions through before commencing erection of unit. 2 Do NOT tighten fastenings until the unit is completely assembled

    DELIVERY LIST

    Part No. Description Qty

    90110-01 Double Arch Bridge Assembly 1

    - Fixings pack 1

    TROPICA DOUBLE ARCH BRIDGE

    PROD CODE: 90110

    SIZE: 1446 x 785 x 1100 mm

    AGE RANGE: UP TO 8 YEARS

    WEIGHT OF HEAVIEST PART 25 Kg

    OVERALL WEIGHT OF UNIT 93 Kg

    TROPICA - Double Arch Bridge 90110 page 1 of 3

    Fixing Detail to Tower: 1. Attach Double Arch Bridge To Tower

    using M10 x 50 lg Pent button head screws (B).

  • TROPICA - Oriental roof 90123 page 2 of 3

    TROPICA - Double Arch Bridge 90110 page 2 of 3

    MINIMUM SPACE

    FOUNDATION DETAIL:

    Fixing Detail 1. Logs are attached to chequer plate floor,

    using (E) M10 x 25 lg Pent button head screw, Neoprene Washer (F) and (D) M10 Safety fastener.

    FIXING DETAIL FOR LOGS

  • REF QTY DESCRIPTION PART No

    A 1 Double Arch Bridge Assembly 90110-01

    B 8 M10 x 50 lg Pent button head screw 2176-129

    C 7 Plastic log 90110-02

    D 21 M10 Safety Fastener 2177-002

    E 21 M10 x 25 lg Pent button head screw 2176-126

    F 21 Neoprene Washer 2900-041

    COMPILED: APPROVED : REV NEW 1 2 3

    MH ECN 1396 1455 minor minor

    DATE: DATE: SIG. MH SB PK SB

    31/010/01 DATE. 31/10/01 23/09/03 18/03/04 18/05/05

    Note:-All spare parts are available from Wicksteed Leisure on request.

    For maintenance instructions see separate sheet.

    TROPICA - Double Arch Bridge 90110 page 3 of 3

    Note:-Ensure all installation aids are removed before first use.

  • SPECIFICATION Barrier: Made from 20 mm Nominal Bore Tube, medium gauge to BS 1387, infills are 16Ø mm mild steel bar. Fasteners: Non standard anti-vandal, plated for weather protection. Finish: Low Lead Polyester powder paint to BS EN71 Pt. 3. Welds: Copper free wire diameter 1 mm conforming to 2091 AIB for Mild Steel.

    INSTALLATION INSTRUCTIONS 1 Read installation instructions through before commencing erection of unit. 2 Do NOT tighten fastenings until the unit is completely assembled

    DELIVERY LIST

    Part No. Description Qty

    90122-01 Metal Barrier Assembly 1

    - Fixings Pack 1

    TROPICA METAL BARRIER

    PROD CODE: 90122

    SIZE: 788 x 28 x 910 mm

    AGE RANGE: UP TO 8 YEARS

    WEIGHT OF HEAVIEST PART 15 Kg

    OVERALL WEIGHT OF UNIT 15 Kg

    TROPICA-Metal barrier 90122 page 1 of 2

    Fixing detail to tower: 1. Attach (A) Metal barrier to tower using (B)

    M10 x 25 lg Pent button head screws and (C) M10 Wicksteed washers.

  • REF QTY DESCRIPTION PART No

    A 1 Metal Barrier assembly 90122-01

    B 4 M10 x 25 lg Pent button head screws 2176-126

    C 4 Wicksteed Washer 2215-519

    COMPILED: APPROVED : REV NEW

    MH ECN 1396

    DATE: DATE: SIG. MH

    2/11/01 DATE. 2/11/01

    For maintenance instructions see separate sheet.

    Note:-All spare parts are available from Wicksteed Leisure on request.

    TROPICA-Metal barrier 90122 page 2 of 2

    Note:-Ensure all installation aids are removed before first use.

    Note: M8 bolts to be torqued to 18 Nm (13lbft.). M10 bolts to be torqued to 34 Nm (25lbft) M12 bolts to be torqued to 55 Nm (40lbft). All protruding screw threads to be peened over to remove sharp edges.

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Planet Jungle

    Single Towers90150/90151/90152

    0.8 x 0.8 x 3.25

    990mm

    Approx 70 - 78 kg ea

    90150/1/2Page 1 of 3

    90150SquareTower

    90151QuadrantTower

    90152OpenTower

    Solid steel to BS 970 part 1Steel RHS to BS 4848 part 23mm Durbar chequer plateWelds are from copper-free wire to BS EN 440Low lead polyester powder paint to BS 71 part 3

    1 Read instructions thoroughly before commencing installation of unit

    2 Excavate foundations as shown in the foundation plan

    3 Position tower in the excavated foundations on a brick, ensuring it is plumb,square and at the correct height, orientation and distance

    4 When unit is fully assembled and all fixings secure, back fill the foundationswith concrete (4 parts gravel/2 parts sand/1 part cement) 0.095m² for towerswith 3 legs, 0.125m² for towers with 4 legs

    5 Allow concrete to set for 48 hours before first use

    ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE

  • 90150/1/2

    Page 2 of 3

    1295

    deck

    heig

    ht

    220

    8

    3248

    324

    8

    2898324

    8

    2898

    90150SquareTower

    90151QuadrantTower

    90152OpenTower

    800800

    800

    800

  • REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90150/1/2

    Page 3 of 3

    AB

    23/04/12

    3 LEG TOWER - FOR BARK FIX ADD

    DESCRIPTIONPART NUMBERQTYITEM

    BELOW GROUND ASSY5071-00331

    SPRAGGING IRON3031-01032

    M12 x 25 LG HEX HD SCREW2175-13463

    4 LEG TOWER - FOR BARK FIX ADD

    DESCRIPTIONPART NUMBERQTYITEM

    BELOW GROUND ASSY5071-00341

    SPRAGGING IRON3031-01042

    M12 x 25 LG HEX HD SCREW2175-13483

    FoundationsCare must be taken in abnormal conditions

    750

    750

    750

    750

    300 square

    300 square

    380

    Brick

    400

    305

    38

    0

    Round offconcrete

    Bark

    Brick

    123

    Typical foundation detailsfor all single towers

    01655AB

    23/04/12

    990

    de

    ckheig

    ht

    1

    Minor

    DB

    30/10/13

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Planet Jungle

    Double Tower90153

    0.8 x 1.6 x 3.25

    990mm

    Approx 66.5 kg

    Approx 129 kg

    90153Page 1 of 4

    Solid steel to BS 970 part 1Steel RHS to BS 4848 part 23mm Durbar chequer plateWelds are from copper-free wire to BS EN 440Low lead polyester powder paint to BS 71 part 3

    1 Read instructions thoroughly before commencing installation of unit

    2 Excavate foundations as shown in the foundation plan

    3 Position tower in the excavated foundations on a brick, ensuring it is plumb,square and at the correct height, orientation and distance

    4 Fix the towers together as shown

    5 When unit is fully assembled and all fixings secure, back fill the foundationswith 0.155m² concrete (4 parts gravel/2 parts sand/1 part cement)

    6 Allow concrete to set for 48 hours before first use

    ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE

  • 90153

    Page 2 of 4

    FoundationsCare must be taken in abnormal conditions

    750

    750750

    300 square995

    deck

    heig

    ht

    38

    0

    Brick

    40

    0

    305

    380

    Round offconcrete

    Bark

    8910

  • A ( 1 : 5 )

    B ( 1 : 5 )Note - quarter deck not shown

    C ( 1 : 5 )

    90153

    Page 3 of 4

    A

    B

    C

    354

    4 7 3

    6

  • REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90153

    Page 4 of 4

    AB

    23/04/12

    PARTS LIST

    DESCRIPTIONPART NUMBERQTYITEM

    DOUBLE TOWER B90153-0211

    DOUBLE TOWER A90153-0112

    Black Poepplemann Cup2611-031_Cup33

    Black Poepplemann Cap2611-031_Cap34

    M10 x 70 HEX HEAD BOLT2185-04215

    M10 x 65 Hex Head Bolt2185-04126

    M10 x 50 Hex Head Bolt2185-03827

    FOR BARK FIX ADD

    DESCRIPTIONPART NUMBERQTYITEM

    BELOW GROUND ASSY5071-00358

    SPRAGGING IRON3031-01059

    M12 x 25 LG HEX HD SCREW2175-1341010

    01655AB

    23/04/12

    1

    Minor

    DB

    30/10/13

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Planet JungleCurved Climbing Wall

    90154

    1.09 x 0.24 x 1.89

    6 to Adult

    1.01m

    Approx 22.5 kg

    Approx 23.5 kg

    90154Page 1 of 2

    15mm thick HDPE 100% recyclableStandard fixings are made to either BS 3692 or BS 4190Non-standard fixings are anti-vandal and corrosion resistant

    1 Read instructions thoroughly before commencing installation of unit

    The climbing wall is overbent

    2 To fit the panel position it against the tower and gently push in the centre,easing the panel over the struts and uprights as necessary

    3 Fit the fixings down the middle of the panel

    4 Fit the fixings down both sides

    ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE

  • A ( 1 : 5 )

    REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90154

    Page 2 of 2

    AB

    24/04/12

    PARTS LIST

    DESCRIPTIONPART NUMBERQTYITEM

    CURVED CLIMBING PANEL90154-0111

    FIXING WASHER2900-041162

    Black Poepplemann Cup2611-031_Cup323

    Black Poepplemann Cap2611-031_Cap324

    FIXING SPACER (15 panel)2472-009165

    Wicksteed Washer2215-519166

    M10 Binx Nut2191-010167

    M10 x 50 Hex Head Bolt2185-038168

    A

    6 3 7 4

    5

    24 8 3

    1

    These fixings to goagainst inside oftower strut

    01655AB

    24/04/12

    11672AB

    03/12/12

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Planet Jungle

    Monkey Pole Slider90156

    0.8 x 0.45 x 2.37

    Up to 8 years old

    990mm

    Aprox 25.25 kg

    Approx 25.5 kg

    90156Page 1 of 3

    Solid steel to BS 970 part 1Steel nominal bore tube (medium) to BS 1387Welds are from copper-free wire to BS EN 440Low lead polyester powder paint to BS 71 part 3

    Standard fixings are made toBS 3692 or BS 4190Non-standard fixings are anti-vandaland corrosion resistant

    1 Read instructions thoroughly before commencing installation of unit

    2 Excavate foundations as shown in the plan

    3 Position pole slider on a brick in the excavated hole, ensuring it is plumb, squareand at the correct height

    4 Fix the pole slider to the tower as shown

    5 When the unit is fully assembled and all fixings secure, backfill the foundationwith 0.03m³ of concrete (4 parts gravel/2 parts sand/1 part cement)

    6 Allow concrete to set for 48 hours before first use

    ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE

  • 90156

    Page 2 of 3

    FoundationsCare must be taken in abnormal conditions

    375

    375

    445

    300 square

    375

    Brick

    40

    0

    300

    380

    Round offconcrete

    Bark

    Brick

    456

  • REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90156

    Page 3 of 3

    AB

    24/04/12

    PARTS LIST

    DESCRIPTIONPART NUMBERQTYITEM

    WELDED MONKEY POLE SLIDER90156-0211

    Wicksteed Washer2215-51942

    M10 x 25 Pent Button Head2176-12643

    Sliding Pole Assy4202-48115

    M10 x 40 Pent Button Head2176-13316

    M10 Safety Fastener2177-00217

    FOR BARK FIX ADD

    DESCRIPTIONPART NUMBERQTYITEM

    BELOW GROUND ASSY5071-00314

    SPRAGGING IRON3031-01015

    M12 x 25 LG HEX HD SCREW2175-13426

    2

    3

    1

    Fixingsintotower

    01655AB

    24/04/12

    11707AB

    25/11/14

    2

    Minor

    DB

    21/08/15

  • SPECIFICATION

    INSTALLATION INSTRUCTIONS

    Note

    Note

    PROD. CODE

    SIZE

    AGE RANGE

    F/ FALL HEIGHT

    HEAVIEST PART

    TOTAL WEIGHT

    Planet JungleRamp c/w handrails & panels

    90165

    0.8 x 3 x 1.05

    Up to 8 years old

    990mm

    Approx 57 kg

    Approx 155 kg

    90165Page 1 of 5

    Solid steel components to BS 970 part 1Nominal bore tube (medium) to BS 1387RHS to BS 4848 part 23mm Durbar chequer plate15mm HD polyethylene 100% recyclableand non-toxic

    Logs made from dia 72mm half round recycledplasticStandard fixings are to BS 3692 or BS 4190Non-standard fixings are anti-vandal andcorrosion resistantWelds are from copper-free wire to BS EN 440Low lead polyester powder paint to BS 71

    1 Read instructions thoroughly before commencing installation of unit

    2 Excavate foundations as shown

    3 Position ramp on bricks in foundations and fix to tower as shown

    4 Fix handrails to ramp and tower as shown

    5 Fit panels to handrails as shown

    6 When unit is fully assembled and all fixings secure, backfill foundations with0.13m³ of concrete (4 parts gravel/2 parts sand/1 part cement)

    7 Allow concrete to set for 48 hours before first use

    ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE

  • 90165

    Page 2 of 5

    FoundationsCare must be taken in abnormal conditions

    1993

    600

    300

    375

    Bricks

    400

    300

    38

    0

    BarkRound offconcrete

    18

    19

    20Brick

  • 90165

    Page 3 of 5

    16

    10

    15

    10

    15

    10

    14

    11

    10

    13

    1

    2

    4

    3

    5

    5

    Panels to handrails and handrailsto ramp fixing detail

    7

  • 90165

    Page 4 of 5

    9

    17

    9

    17

    8

    6

    12

    17

    Log fixingdetail

    Ramp and handrailfixing to tower

  • REV

    ECN

    SIG.

    DATE:

    COMPILED

    DATE:

    90165

    Page 5 of 5

    AB

    25/04/12

    FOR BARK FIX ADD

    DESCRIPTIONPART NUMBERQTYITEM

    BELOW GROUND ASSY5071-003218

    SPRAGGING IRON3031-010219

    M12 x 25 LG HEX HD SCREW2175-134420

    PARTS LIST

    DESCRIPTIONPART NUMBERQTYITEM

    BOTTOM LH INFILL PANEL90165-0411

    TOP LH INFILL PANEL90165-0312

    BOTTOM RH INFILL PANEL90165-0213

    TOP RH INFILL PANEL90165-0114

    HAND RAIL ASSY90139-0225

    PLASTIC LOG90110-02106

    LOG RAMP WELDED ASSY90103-0217

    FIXING WASHER2900-041308

    Wicksteed Washer2215-51949

    M10 Washer2215-5083010

    M8 Washer2215-5072411

    M10 Safety Fastener2177-0023012

    M8 Safety Fastener2177-0012413

    M8 x 16 Pent Button Head2176-1512414

    M10 x 30 Pent Button Head2176-132415

    M10 x 50 Pent Button Head2176-129216

    M10 x 25 Pent Button Head2176-1263417

    01655AB

    25/04/1207/10/14MC

    Minor

    1

  • Product: Date of Issue: 27/04/12

    Issue:

    Item Unit Qty Part No. Checked

    1 1 90105-02

    2 1 90105-01

    3 2 4013-038

    4 17 90110-02

    5 1 90110-01

    6 1 90122-01

    7 1 90151-01

    8 1 90153-02

    9 1 90153-01

    10 2 90154-01

    11 1 90156-02

    12 1 4202-481

    13 1 90165-04

    14 1 Top LH infill panel 90165-03

    15 1 Bottom RH infill panel 90165-02

    16 1 Top RH infill panel 90165-01

    17 2 Hand rail assy 90139-02

    18 1 Log ramp welded assy 90103-02

    19 2 Pedestal support leg - middle 4013-037

    1 Fixing pack

    Picked By: Checked By:

    COMPILED REV 0 1 2 3 4BY: AB ECN No. 1655 1663 1672 1707 Minor

    DATE 27/04/2012 12/09/2012 03/12/2012 12/12/2014 24/08/2015

    DATE: 27/04/12 SIGN AB AB AB AB DB

    Sheet 1 of 1

    Curved climbing panel *

    Welded quadrant tower assy

    DESPATCH LIST

    Plastic log *

    Metal barrier

    Wide slide chute

    Description

    901-KIFA Kifaru

    Double tower A

    Total No. of Items

    Sliding Pole Assy

    Bottom LH infill panel

    Welded monkey pole slider

    Order No:

    Double width slide barrier

    Pedestal support leg - runout

    Double tower B

    Items marked * to be fitted prior to despatch

    Double arch bridge welded assy

  • Product: Date of Issue: 27/04/12

    Issue:

    Item Unit Qty Part No. Checked

    1 4 3031-010

    2 2 2611-005

    3 6 2215-519

    4 32 2571-013

    5 2 2176-129

    6 16 2176-176

    7 2 2177-002

    8 4 2176-126

    9 2 2215-509

    10 21 Fixing washer * 2900-041

    11 21 M10 safety fastener * 2177-002

    12 8 M10 x 50 pent button head screw 2176-129

    13 21 M10 x 25 pent button head screw * 2176-126

    14 4 2215-519

    15 4 2176-126

    16 3 2611-031

    17 3 2611-031

    18 1 2185-042

    Picked By: Checked By:

    COMPILED REV 0 1 2 3 4 5BY: AB ECN No. 1655 1663 1672 Minor Minor Minor

    DATE 27/04/2012 12/09/2012 03/12/2012 23/09/2013 30/10/2013 13/03/2014DATE: 27/04/12 SIGN AB AB AB MC DB DB

    REV 6 7

    ECN No. Minor Minor

    DATE 07/10/2014 24/08/2015

    SIGN MC DB

    Order No:

    Wicksteed washer

    90105 Wide Slide

    M10 x 50 Pent Button Head

    M12 x 25 pent button head screw

    End plug (1¼NB)

    Description

    90122 Metal barrier

    Spragging iron

    Sheet 1 of 3

    M10 Safety Fastener

    FIXINGS LIST

    M12 fibre washer

    M10 x 25 pent button head screw

    M12 Plain Washer

    Wicksteed washer

    M10 x 25 pent button head screw

    901-KIFA Kifaru

    90110 Double Arch Bridge

    Total No. of Items

    Black Poepplemann cup

    Black Poepplemann cap

    M10 x 70 hex head bolt

    Items marked * to be fitted before despatch

    90153 Double Tower

  • Product: Date of Issue: 27/04/12

    Issue:

    Item Unit Qty Part No. Checked

    19 2 2185-041

    20 2 2185-038

    21 32 2900-041

    22 64 2611-031

    23 64 2611-031

    24 32 2472-009

    25 32 2215-519

    26 32 2191-010

    27 32 2185-038

    28 4 2215-519

    29 4 2176-126

    30 1 2176-133

    31 1 2177-002

    32 30 2900-041

    33 4 Wicksteed washer 2215-519

    34 30 M10 washer * 2215-508

    35 24 M8 washer 2215-507

    Picked By: Checked By:

    COMPILED REV 0 1 2 3 4 5BY: AB ECN No. 1655 1663 1672 Minor Minor Minor

    DATE 27/04/2012 12/09/2012 03/12/2012 23/09/2013 30/10/2013 13/03/2014DATE: 27/04/12 SIGN AB AB AB MC DB DB

    REV 6 7

    ECN No. Minor Minor

    DATE 07/10/2014 24/08/2015

    SIGN MC DB

    Items marked * to be fitted before despatch

    Total No. of Items

    90165 Ramp c/w Handrails & Panels

    Fixing washer *

    90156 Monkey Pole Slider

    Wicksteed washer

    M10 x 25 pent button head screw

    M10 x 40mm Pent Button Head

    M10 Safety Fastener

    Black Poepplemann cup *

    Black Poepplemann cap *

    Fixing spacer (15 panel) *

    Wicksteed washer *

    M10 binx nut *

    M10 x 50 hex head bolt *

    90153 Double Tower (cont)

    M10 x 65 hex head bolt

    M10 x 50 hex head bolt

    90154 Curved Climbing Wall

    Fixing washer *

    FIXINGS LIST Sheet 2 of 3

    901-KIFA Kifaru

    Order No:

    Description

  • Product: Date of Issue: 27/04/12

    Issue:

    Item Unit Qty Part No. Checked

    36 30 2177-002

    37 24 2177-001

    38 24 M8 x 16 pent button head screw 2176-151

    39 4 2176-132

    40 2 M10 x 50 pent button head screw 2176-129

    41 34 M10 x 25 pent button head screw (30 off *) 2176-126

    42 20 Insert plug M10 2611-016

    43 2 M8 pent key 2372-003

    44 2 M10/M12 pent key 2372-007

    Picked By: Checked By:

    COMPILED REV 0 1 2 3 4 5BY: AB ECN No. 1655 1663 1672 Minor Minor Minor

    DATE 27/04/2012 12/09/2012 03/12/2012 23/09/2013 30/10/2013 13/03/2014DATE: 27/04/12 SIGN AB AB AB MC DB DB

    REV 6 7

    ECN No. Minor Minor

    DATE 07/10/2014 24/08/2015

    SIGN MC DB

    Items marked * to be fitted before despatch

    Total No. of Items

    FIXINGS LIST Sheet 3 of 3

    901-KIFA Kifaru

    Order No:

    Description

    90165 Ramp c/w Handrails & Panels (cont)

    M8 safety fastener

    M10 x 30 pent button head screw

    M10 safety fastener *