5s audit check list
DESCRIPTION
5s Audit Check ListTRANSCRIPT
5S AUDIT CHECK LIST - SHOP FLOOR
5S AUDIT CHECK LIST - SHOP FLOOR
Date:
S.No MARKS0123
IS (SEIRI)- SORT
1Shop Floor/Dept. layout clearly showing location of all Machines, Equipment, Items, etc. made & displayed
2All Machines, Equipment, Items are positioned as per layout
3Segregation of Necessary & Unnecessary Items done or not.
4Unwanted / Unused / Damaged / Scrap Material removed to separate place, away from work area
5Unwanted / Unused / Damaged items inside cupboards / table drawers
Sub Total
2S (SEITON)- STABILIZE
1Codification of Machine, Equipment, Tools, Gauges, Items done and Variable Address system is in place wherever applicable.
2Master List of all Machines, Equipment, Tools, Gauges, Items prepared & displayed
3Gangways Marking is clear and no material is in gangway.
4Filing System/Index System (alphabetical). Location is fixed for all items and there is mistake proofing in replacing the same after use (Z Mark)
5Required files are retrievable within one minute
6Shadow boards, wherever applicable ,are available &effectively used
7All Items inside the desk drawers are stored properly & easy to find, retrieval of any item -within one minute
8All tools (Plastic Moulds, Sheet Metal etc.) are retrievable within one minute
9Raw material retrievable is within one minute.
10Space saved after implementation of 1S,2S is measured & records are maintained
Sub Total
3S (SEISO)- SHINE
1Dirt Free Machines, Equipment, Tools, Gauges, Jigs, Fixtures, Measuring Equipment, etc.
2Dirt Free Storage Racks/Pallets/Bins
3No Oil / Water / Parts on the Floor
4Dirt Free Walls, Ceiling, Floors, Windows, Fans, Light Fittings, Switches, Control Panels, Cables, etc.
5All toilets are in good condition and no bad smell is coming
Sub Total
4S (SEIKETSU)- STANDARDIZE
1Cleaning schedule for each area is made and is effective
2Condition of Machines, Equipment, Tools, Gauges, Jigs & Fixtures
3Condition of Racks/Cupboards/Pallets/Bins
4Condition of Walls, Ceiling, Floors, Windows, Fans, Light Fittings, Switches, Control Panels, Cables, etc.
5Display of OGS, Inspection Standards, Safety Standard, PQCDSM, Organisation Structure, Activity Charts, Fixed Meeting Schedule, System Flow Chart, etc.
Sub Total
5S (SHITSUKE)- SUSTAIN
1Punctuality for Tea time / Meetings / Lunch
2Switching Off Fans/Lights/Office Equipment when not in use
3Internal 5S Audit conducted or Not / Last Audit NCRs Displayed and closed
4Trained Employees are operating machines / equipment. Fire Extinguishers are available at appropriate place
5Review of Dept. Activity/Display Boards as per set frequency
GRAND TOTAL
RATING : 0 - VERY POOR : 3 - EXCELLENT
Page 2 of 2