51 bridge road east welwyn garden city
TRANSCRIPT
51 BRIDGE ROAD EAST
WELWYN GARDEN CITY
ARBORICULTURAL
IMPACT
ASSESSMENT
&
METHOD
STATEMENT
Written by: M. Welby
Checked by: A Bigg
Date: 23/05/2017
Ref: TWNT20946aia-ams
Revision: D: 16.01.2018
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 2
Table of Contents
1.0 Executive Summary ................................................................................................... 3
2.0 Introduction ................................................................................................................ 4
3.0 Arboricultural Impact Assessment ............................................................................. 5
3.2. Tree Preservation Orders ...................................................................................... 53.3. Trees proposed for removal & surgery .................................................................. 53.4. Demolition, site clearance & archaeology ............................................................. 63.5. Construction within RPAs ...................................................................................... 63.6. Access and working room within RPAs ................................................................. 63.7. Protection fencing ................................................................................................. 73.8. Services ................................................................................................................. 7
4.0 Arboricultural Method Statement ............................................................................... 8
4.1. Phasing of operations & site supervision .............................................................. 84.2. Construction exclusions zone ............................................................................... 94.3. Tree protection barriers ....................................................................................... 104.4. Ground protection ............................................................................................... 134.5. Site storage, parking, welfare facilities, etc ......................................................... 164.6. Tree surgery and removal ................................................................................... 164.7. Soft landscaping .................................................................................................. 174.8. Installation of underground services ................................................................... 184.9. Installation of boundary fencing within protected areas ...................................... 204.10. Installation of ‘no-dig’ path surface .................................................................... 20
Appendix: Tree Protection Plan ........................................................................................ 24
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 3
1.0 Executive Summary
1.1. ACD was initially instructed, to carry out a tree survey, and present constraints details
in accordance with BS5837:2012 Trees in relation to design, demolition and
construction. This was to identify the quality and value of existing trees on the site,
allowing decisions to be made as to the retention or removal of trees during
development. Subsequently, the subject layout has been produced and is in line with
recommendations of the British Standard. Adequate protection can be provided to
ensure all retained trees are protected throughout development.
1.2. The proposal is described as: Demolition of office building (Class B1) and
redevelopment to provide 54 no. 1 and 2 bed residential apartments, associated
access and car parking, amenity space and landscaping.
1.3. Two trees are proposed for removal, both of low quality: 1No. hornbeam and 1No.
whitebeam (category C) from within the site are to be removed.
1.4. A section of no-dig path is proposed within the RPA of T19.
1.5. There are no tree preservation orders (TPOs) present on any trees on, or adjacent to
the site, nor is the site within a conservation area.
1.6. The relationship between the building and retained trees is sustainable and is not
likely to result in any unreasonable ‘pressure to prune’ requests from future
occupants.
1.7. The arboricultural method statement and tree protection plan include details of all tree
protection measures required.
1.8. The tree protection must be erected after tree removals and surgery but before any
demolition or construction contractor enter the site, and before any soil stripping takes
place.
1.9. There will be no changes in levels, service routeing, machine activity, storage of
materials or site hut positioning within areas to be protected, and the protective
fencing shall remain in position for the duration of the construction process.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 4
2.0 Introduction
2.1. Taylor Wimpey instructed ACD Environmental in May 2017 to prepare the following
impact assessment.
2.2. Following the recommendations of the British Standard1, this report includes the
necessary information to support a planning application. It demonstrates that the
impact, both direct and indirect, of the proposed development within the site, has
been assessed and where appropriate, mitigation and tree protection proposed.
2.3. The implementation of the protection methods recommended within this report is
critical for ensuring the retained trees are successfully protected through the
construction process and must be implemented prior to any work on the site.
2.4. This assessment is based on the supplied layout drawing, ref: 0480-1000-G and the
preceding ACD Tree Report ref: TWNT20946trA
2.5. The controlling authority is Welwyn Hatfield Borough Council, who can be contacted
at Welwyn Hatfield Borough Council Offices, The Campus, Welwyn Garden City,
Hertfordshire, AL8 6AE, Tel: 01707 357 000.
2.6. This assessment considers the impact of the development on the constraints posed
by the retained trees (both beneath ground: the root protection area (RPA), and above
ground: the canopy).
2.7. Direct impact from development comes in six main forms: 1) Surface installation
within RPAs, 2) Root loss from excavation for foundations, drainage and other utilities
within RPAs, 3) Soil stripping, removal and level changes within RPAs, 4) Excessive
access facilitation pruning to retained trees, 5) Soil compaction from storage and
vehicle movements within RPAs, 6) Soil contamination.
1 BS5837:2012 Trees in relation to design, demolition and construction- Recommendations, London: British
Standards Institute
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 5
2.8. Indirect impact can come from changes to the site hydrology, future pressure to prune
or fell, failure of trees exposed by removal of neighbouring trees, and other
environmental changes which can take several years to manifest.
2.9. The RPA for each tree represents a minimum area in m² that should be left
undisturbed around each retained tree. This is initially represented by a circle but is
often adjusted to account for constraints to root growth within the site (primarily
highways and buildings). It is, therefore, important to ensure the protection of trees
both above and below ground. Recommendations are provided in the British
Standard as to the protection of existing trees before, during and after development.
This is achieved by ensuring the tree protection plan and arboricultural method
statement are implemented before any commencement on site.
3.0 Arboricultural Impact Assessment
3.1. The proposal is described as: Demolition of office building (Class B1) and
redevelopment to provide 54 no. 1 and 2 bed residential apartments, associated
access and car parking, amenity space and landscaping. The layout of which can be
seen on the appended plan.
3.2. Tree Preservation Orders
3.2.1. There are no tree preservation orders (TPOs) present on any trees on, or
adjacent to the site, nor is the site within a conservation area.
3.3. Trees proposed for removal & surgery
3.3.1. The following trees are proposed for removal:
• Category C (low quality): T22 & T18
3.3.2. Following the preliminary recommendations made at the time of the survey
and works necessary to facilitate construction of the proposed development, tree
works are recommended and listed in the method statement. This work includes:
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 6
• Crown reduction of T21 to facilitate construction and improve light
levels into the building.
3.4. Demolition, site clearance & archaeology
3.4.1. To ensure damage does not occur to trees highlighted for retention, tree
protection fencing must be erected before ANY plant/vehicles entering site
whatsoever. This should be subject to a pre-commencement site meeting between
the developer and the project arboriculturist.
3.4.2. No special demolition procedures need be observed on this site, other than
respecting the tree protection fencing.
3.5. Construction within RPAs
3.5.1. The construction of all buildings is proposed outside the RPAs of retained
trees.
3.5.2. Where the circular RPA passes under the existing asphalt, it is the author’s
experience that there will be limited root development in these areas and therefore
no tree protection measures are required. Hence, the fencing is aligned along the
existing kerb line.
3.5.3. The footpath linking Block D with Tewin Road passes through T18 (hence its
removal) and is within the RPA of sycamore T19. Therefore, it will be installed above
existing grade using a no-dig surface.
3.6. Access and working room within RPAs
3.6.1. Space is required for scaffold erection and working room within the RPA of
T21. Following the recommendations of 6.2.3 of the British Standard, ground
protection could be employed to retain the underlying soil structure and avoid
detriment to roots. However, given the operational issues with implementing ground
protection, an alternative solution is proposed, in that the protection areas is
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 7
extended contiguous to the RPA2. We are comfortable with this approach and that it
will not be deleterious to the health of the tree. Nonetheless, should the council wish
to see the installation of ground protection, this can be enforced by a suitably worded
planning condition.
3.7. Protection fencing
3.7.1. Figure 2 of the British Standard recommends a standard fencing design for
tree protection. This is a weld mesh panel design, mounted upon a well-braced
scaffold framework. This is perfectly adequate for this site and all the retained trees
can be suitably protected by its erection before any works start on site whatsoever.
3.8. Services
3.8.1. Full details of the service and utility provisions for the site remain to be
finalised. However, there is adequate space for utility trenches to access the site
whilst avoiding RPAs and exclusion zones.
2 Section 5.3a). BS5837:2012 Trees in relation to design, demolition and construction- Recommendations,
London: British Standards Institute.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 8
4.0 Arboricultural Method Statement
TO BE READ IN CONJUNCTION WITH THE APPENDED TREE
PROTECTION PLAN REF: TWNT20946-03
4.1. Phasing of operations & site supervision
4.1.1. The tree protection and other arboricultural works must be carried out in the
following order:
Operation Present Notes
1 Tree removals
& surgery Tree contractor
See Tree Protection
Plan for trees to be
removed
2 Protection
barriers
erected
Fencing contractor
See Tree Protection
Plan for position and
type of barriers
3 Pre-start
meeting
ACD, site manager,
groundwork,
foreman, demolition
foreman
To ‘sign-off’ protection
prior to any plant
activity, demolition &
groundworks on site
4 Installation of
no-dig path
ACD, site manager
and groundwork staff
See method
statement
4
Removal of
protection
barriers and
landscape
work
ACD, landscape
contractor, site
manager
See method
statement
4.1.2. Supervision is required should any unplanned access and/or work be
required in the construction exclusion zone.
4.1.3. Supervision will require the arboriculturist to be present throughout the task,
to ensure all the arboricultural objectives are met. If the task is to take a long period
of time, provided the arboriculturist is satisfied, and after an initial ‘tool-box talk’, the
supervision may be reduced to telephone contact between the site
foreman/contractor and arboriculturist.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 9
4.2. Construction exclusions zone
4.2.1. Barriers and/or ground protection must be used to protect all retained trees
before any machinery or materials are brought onto the site, and before any
demolition, development or stripping of soil commences.
4.2.2. Where all activity can be excluded from the RPA, vertical barriers must be
erected to create the construction exclusion zone (CEZ). The default position of
which is shown on the appended Tree Protection Plan.
4.2.3. Where, due to site constraints, construction activity cannot be fully or
permanently excluded from all, or part of a tree’s RPA, appropriate ground protection
can be installed.
4.2.4. It is the responsibility of everyone engaged in the construction process to
respect the tree protection measures and observe the necessary precautions within
and adjacent to them.
4.2.5. Inside the exclusion zone, the following shall apply:
• No mechanical excavation whatsoever.
• No excavation by any other means without arboricultural site
supervision.
• No hand digging without a written method statement having first been
approved by the project arboriculturist.
• No lowering of levels for any purpose (except removal of grass sward
using hand tools).
• No storage of plant or materials.
• No storage or handling of any chemical including cement washings.
• No vehicular access.
• No fire lighting.
4.2.6. In addition to the above, further precautions are necessary adjacent to trees:
• No substances injurious to tree health, including fuels, oil, bitumen,
cement (including cement washings), builders sand, concrete mixing
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 10
and other chemicals shall be stored or used within or directly adjacent
to the protection area of retained trees.
• No fire shall be lit such that flames come within 5m of tree foliage.
4.3. Tree protection barriers
4.3.1. The construction exclusion zone will be protected as per the appended tree
protection plan that shows the default alignment of the tree protection barriers, to be
installed prior to any of the following taking place:
• Archaeology
• Demolition
• Plant and material delivery
• Soil stripping
• Utility installation
• Construction works
• Landscaping
4.3.2. Stages of installation of barriers:
1) Hand clearance of any vegetation to allow clear working access.
2) Setting out of node points
3) Barriers erected
4) Site meeting with project arboriculturist to ‘sign-off’ tree protection
fencing.
5) Site accessible to demolition/construction traffic
4.3.3. Once erected, all barriers will be regarded as sacrosanct, and will not be
removed or altered without prior recommendation by the project arboriculturist and
approval of the local planning authority.
4.3.4. The default barrier construction is suitable for areas of high-intensity
development and shall comprise of interlocking weld-mesh panels, well braced to
resist impacts by attachment to a scaffold framework that is set firmly into the ground.
A detailed specification can be found on the TPP.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 11
4.3.5. The images below are alternative barrier designs that have been successfully
used on site and that ACD are happy to support if a variation from the default style
is required. If such a variation is necessary, the approval of the project arboriculturist
will be obtained prior to any implementation on site.
4.3.6. Once barriers and/or ground protection have protected the exclusion zone,
construction work can commence.
4.3.7. All weather notices should be erected on the barriers (for example see figure
below).
Tree protection sign (download from http://www.acdenvironmental.co.uk)
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 12
Weld-mesh panels on scaffold uprights
Weld-mesh panels on wooden posts
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 13
Chain-link on angle-iron uprights
4.4. Ground protection
4.4.1. If required (or as shown on the appended tree protection plan), ground
protection is to be installed as follows. It must be capable of supporting the expected
loads and avoiding rutting, compaction and damage to the soil: as advised in section
6.2.3 of the British Standard.
4.4.2. Stages of ground protection installation:
1) No plant machinery to be used in the area of ground protection for
whatever reason
2) Dismantle primary TPF and re-erect in secondary location as shown
on TPP (if required) OR erect fencing to protect any newly exposed
CEZ not to be covered by ground protection.
3) Any shrubs, saplings or trees to be removed, are to be cut or ground
out to just below ground level rather than grubbed or winched out,
which can damage roots of retained trees.
4) Lay woven geotextile over existing ground surface by hand
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 14
5) Cover the area with compressible layer, woodchip, for example, using
hand tools only
6) Cover compressible layer with side butting scaffold boards or plywood
boards
7) Confirm surface is acceptable for use with project arboriculturist
8) Area ready for construction access
4.4.3. Any scaffolding required within the area will be erected with the uprights
placed on spreader boards.
4.4.4. The boarding will be left in place until the construction works are finished.
4.4.5. A single thickness of boarding laid on the soil surface will provide sufficient
protection for pedestrian loads. However, for wheeled or tracked construction traffic
movements within the RPA, ground protection will involve the use of temporary
cellular confinement systems, reinforced concrete slabs or track-board systems
details of which are to be specified by the project engineer and approved for use by
the project arboriculturist and local authority before construction commences.
4.4.6. Track-boards can be sourced from Trakmats Europe Ltd, 0845 6435388,
www. trakmatseurope.com, or groundguards.com
4.4.7. There is to be no excavation within ground protection area whatsoever. This
includes installation of services and associated utilities.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 15
Scaffold board pedestrian ground protection
Vehicular ground protection trackway
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 16
4.5. Site storage, parking, welfare facilities, etc.
4.5.1. The site will require provision for; site storage, contractor parking, welfare
facilities, temporary services/drainage, material drop off points, etc.
4.5.2. It is acceptable to place site cabins and walkways within the CEZ provided
they are installed sensitively:
• Cabins must be placed on sleepers (or similar) to spread the load,
avoiding point loading and associated soil compaction.
• The delivery of cabins should ensure that any unloading via ‘hi-ab’
crane can be carried out without impact on the crowns of retained
trees.
• Walkways, if required, should be installed as per the ground
protection specification.
• Any utilities for site compounds must be run above ground. For
example, WC foul pipes/drainage and temporary electrical
connections.
4.5.3. It is imperative that if cabins and walkways are installed, that fencing is
erected to limit access to the protected areas. If amendments are made, the project
arboriculturist should sign off the proposals prior to their implementation.
4.5.4. Contractor parking and storage areas should be sited outside the CEZ.
4.6. Tree surgery and removal
4.6.1. The following surgery works are to be carried out:
• T21- reduce lateral branches to east to retain a spread of 3.5m, and
in height to 7m.
4.6.2. All trees to be removed are indicated on the TPP.
4.6.3. If any further surgery work is proposed, details will be submitted to, and
approved by, the council, before being carried out.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 17
4.6.4. All work will be carried out in accordance with BS39983 industry best practice
and in line with any works already agreed with the council.
4.6.5. The tree surgeon shall ideally be chosen from The Arboricultural
Association's Approved Contractor list. All work shall be undertaken at the
appropriate time and with the consent and approval of the site agent.
4.6.6. The statutory protection4 5 will be adhered to. If further advice is required,
particularly if bats are discovered during tree work, it will be obtained from Natural
England or other competent persons and recommendations adhered to.
4.6.7. The stumps of any trees removed from within the Construction Exclusion
Zone or the RPAs of retained trees will be either cut flush to ground level and left in
situ or ground out using a stump grinder. They will not be winched out.
4.6.8. All operations shall be carefully carried out to avoid damage to the trees being
treated or neighbouring trees. No trees to be retained shall be used for anchorage
or winching purposes.
4.7. Soft landscaping
4.7.1. All landscaping and associated ground preparation within exclusion zones
will be carried out sensitively to ensure root damage is minimised as much as is
practicable.
4.7.2. At no time is any heavy plant to be used within any protected area.
4.7.3. Removal of existing vegetation (including turf) will be carried out with hand
tools only.
4.7.4. Should the soil be compacted or have a poor structure that may hinder the
development of any new planting, soil decompaction techniques may be used upon
consultation with the project arboriculturist.
3 BS3998:2010- Recommendations for Tree Work. London: British Standards Institute
4 Wildlife and Countryside Act. (1981) London: HMSO.
5 Countryside and Rights of Way Act. (2000) London: HMSO.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 18
4.7.5. Tree protection barriers may be removed to allow access and then replaced
as required/per approved documents (in liaison with the arboricultural clerk of works)
4.7.6. Levels (high spots) will not be reduced or excavated in any way. Use good
quality topsoil to level any low-lying areas and hollows, and provide a fine tilth to lay
turf on. This imported soil must not result in a level increase of more than 100mm in
any area.
4.7.7. Import materials by hand in wheelbarrow or using a digger sited outside the
sensitive area.
4.7.8. Any excavation for planting pits must be dug using hand tools only.
4.7.9. No works will be carried out within any protected areas if the soil moisture is
at a level likely to allow compaction to occur.
4.8. Installation of underground services
4.8.1. Mechanical trenching for the installation of underground apparatus and
drainage severs any roots present and can change the local soil hydrology in a way
that adversely affects the health of the tree. For this reason, particular care should
be taken in the routeing and methods of installation of all underground apparatus.
Wherever possible, apparatus should be routed outside RPAs. Where this is not
possible, it is preferable to keep apparatus together in common ducts. Inspection
chambers should be sited outside the RPA.
4.8.2. Where underground apparatus is to pass within the RPA, detailed plans
showing the proposed routeing should be drawn up in conjunction with the project
arboriculturist. In such cases, trenchless insertion methods should be used:
Microtunnelling, Surface-launched directional drilling, Pipe ramming or Impact
moling (see BS5837:2012 Table 3), with entry and retrieval pits being sited outside
the RPA. Provided that roots can be retained and protected, excavation using hand-
held tools might be acceptable for shallow service runs. If this is case, the following
methodology must be followed:
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 19
4.8.3. Stages for installing services by hand within tree protection areas:
No plant machinery to be used in the area for whatever reason
1) Contact project arboriculturist to hold pre-start site meeting and
‘toolbox’ talk before starting work.
2) Remove just enough tree protection fencing to allow access to area
and facilitate trenching.
3) Remove any surface vegetation or existing hard surfaces using hand
tools.
4) Using and air-pick excavate the trench, keeping to minimum
dimensions required.
5) Roots occurring in clumps of 25 mm diameter and over are
encountered they will be retained and kept damp by covering with
hessian (re-wetted as required). If required, these should be severed
only following consultation with an arboriculturist; as such roots might
be essential to the tree’s health and stability.
6) Feed in services.
7) Backfill trench with 200-300mm depth of excavated soil, or a mixture
of excavated and imported topsoil to BS3882 (BSI, 2007), firming
down with heels.
8) Repeat step 7 until trench is filled.
9) Re-erect tree protection fencing as per approved plan.
4.8.4. The method of excavation above, for trenching within RPAs, is using air
excavation. This tool utilises compressed air to remove soil from around tree roots
causing minimal damage and can be run off a typical site compressor. ACD can
provide details of contractors supplying air excavation services if required.
4.8.5. Alternatively, trenchless technology, such as thrust boring can be used in
some instances and is particularly effective as it can pass directly under the tree, at
a depth which is likely to avoid almost all impact on roots of the subject tree. As no
access/thrust pits will be located within the RPAs of the subject trees, the need for
arboricultural supervision is limited.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 20
4.9. Installation of boundary fencing within protected areas
4.9.1. Stages for installing wooden fence posts:
No plant machinery to be used in the area for whatever reason
1) Contact project arboriculturist to hold pre-start site meeting and
‘toolbox’ talk before starting work.
2) Remove TPF to allow access to area.
3) Dig postholes using hand tools, avoiding damage to the protective
bark covering larger roots. Roots smaller than 25mm diameter may
be pruned back using either secateurs or a hand saw, leaving a clean
cut.
4) Damage or severance of roots above 25mm diameter must be
avoided. If roots of this size are discovered, the hole should be
relocated. If there are a large number of such roots it may be
necessary to relocate the hole by half a fence panels length and
adjust the fence panels accordingly.
5) Line hole with non-porous lining, for example, durable polyethene
bag.
6) Insert post and fill post-hole with concrete to just below ground level.
7) Trim polyethene to ground level and fill with clean topsoil.
4.10. Installation of ‘no-dig’ path surface
4.10.1. To ensure that tree roots, within the ground under this proposed surface,
continue to survive during and after construction a cellular confinement system
(CCS) such a ProtectaWeb6 of 75-200mm depth is to be used.
4.10.2. The following example CCS spec is courtesy of Wreckin Products and shows
an asphalt finish. Other surfaces can be used, and similar CCS are available from
other suppliers.
6 Wrekin Products, www.wrekinproducts.com, 01543 440440.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 21
1 Root-tex 30 geotextile
2 70-200mm deep ProtectaWeb tree root protection system infilled with
4/20 clean angular stone to BS EN 13242 / EN 12620
3 Treated timber edging (or other edging detail acceptable)
4 Asphalt surface to engineer’s details
5 Soil graded to edging (if required)
6 Existing tree
4.10.3. Stages for Installation of the cellular confinement surface:
8) Contact project arboriculturist to hold pre-start site meeting and
‘toolbox’ talk before starting work
9) Dismantle TPF and re-erect in secondary location as shown on TPP
10) Remove existing vegetation by using a specific herbicide (as advised
by a specialist) or manual removal with hand tools only. Agreed
removal of shrubs, saplings or trees, within the protected areas of
retained trees are to be cut or ground out to just below ground level
rather than grubbed or winched out, which can damage roots of
retained trees.
11) Retain all original ground levels after vegetation removal. No
excavation whatsoever.
12) Remove any existing hard surfaces (paving, tarmac etc.) Hand tools
should be used if possible. If machinery is required for this operation,
it must be used only on existing surfaces or outside the protection
areas and tree canopies (approval from project arboriculturist must be
sought before using machinery). The sub base of existing surfaces or
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 22
foundations should be left in situ where possible to avoid
unnecessary root disturbance and provide a base for the new
surface.
13) Install a non-woven geotextile (such as Root-tex 30) directly over soil
grade level (levelled where necessary, by non-compacted washed
sand) and fix in place.
14) Lay the cellular system over the geotextile, which is secured open
under tension during the infill process with steel staples or wooden
pegs.
15) Install kerbs and edgings directly on top of existing soil grade level.
For light structures, a treated peg and board may be acceptable. For
more substantial structures, railway sleepers, haunched concrete with
road pins, drilled kerbstones, gabions or cast in situ kerbs will be
appropriate.
16) Fill the cellular system ensuring any machinery works only on already
filled areas. Typical infill consists of no fines angular granular material
20-40mm, which will remain uncompacted.
17) Cover with a non-woven geotextile (Root-tex 30 or similar).
18) Install porous wearing surface.
4.10.4. Any variation to the above specification must meet the following design
criteria for low-invasive surfaces to provide the conditions for continued tree survival
and growth:
• Maintain oxygen diffusion through new surface to rooting area (5-12%
by volume7)
• Maintain sufficient passage of water to the rooting area (12-40% by
volume8)
• Avoid compaction by maintaining a soil structure sufficient to sustain
root growth (soil bulk density below 1.4g/cc9).
7 Smith, R. J. (2006). Tree Roots in the Built Environment. HSO
8 Coder, D. K. (2000). Tree Root Growth Requirements. University of Georgia
9 Harris, C. M. (2004). Arboriculture, Tree Management of Shade Trees and Vines.
51 Bridge Road East, Welwyn Garden City
Arboricultural Impact Assessment and Method Statement
______________________________________________________________________________________________
ACD Environmental Ltd Page 23
4.10.5. Site analysis of the soil type and its structural characteristics will be required
prior to determining the specific depth of products to be adopted for example,
footpaths normally require a depth of 75mm and, 100mm to 200mm depths are used
for residential driveways, while greater depths may be required for the passage of
heavier traffic such as for construction access and delivery vehicles.
4.10.6. If ground levels are to be raised more than 150mm this should be achieved
by the use of a granular material, which does not inhibit vertical gaseous diffusion.
For example no-fines gravel, washed aggregate, structural soil (min. 20% sand
content) or cobbles.
Mark Welby RCArborA, FArborA, Dip Arb (RFS), Tech Cert (ArborA)
Director & Principal Arboriculturist
23 May 2017
LIMITATIONS OF USE AND COPYRIGHT
All rights in this report are reserved. No part of it may be reproduced or transmitted, in any form or by any means,
electronic, mechanical, photocopying, recording or otherwise, or stored in any retrieval system of any nature, without our
written permission. Its content and format are for the exclusive use of the addressee in dealing with Insert site address.
Until all invoices rendered by ACD Environmental to the Client have been paid in full, the copyright of any documents,
forms, statements, maps, plans and other such material will remain vested in ACD Environmental and no unauthorised
use of such material may be made by the Client or any person purporting to be acting on his/her behalf. It may not be
sold, lent, hired out or divulged to any third party not directly involved in this site without the written consent of ACD
Environmental ©
SV
GV
GV
GV
GV
GV
GV
LP
LP
LP
LP
LP
LP
LP
MH
MH
MH
MH
MH
MH
MH
IC
IC
IC IC
ICIC
IC
IC
IC
IC
IC
IC
IC
IC
IC
P
RS
RS
RS
RS
RS
RS
RS
RS
RS
GY
GY
GY
GY
GY
GY
GY
GY
GY
GY
GY
WM
WM
WM
WM
WM
WM
BN
BN
BN
BN
BN
BN
BN
M2
M1M3
M5
M6
F5
F4
IC
RS
BOXIC
RS
BOX
RS
IC
RS
RS
BOX
RIDGE
RIDGE
EAVE
EAVE
82.550
81.43283.519
82.394
79.822
79.994
79.937
88.57
91.53
82.6682.74
83.01
82.90
82.83
82.93
82.9983.06
83.19
83.19
83.1583.27
83.31
83.38
83.30
83.2183.30
83.34
83.4483.4483
.38
83.4
183
.51
83.5
783
.62
83.4
2
83.4
3
83.27
83.11
82.93
82.74
82.48
82.5982.66
82.5582.43
82.47
82.49
82.64
82.7
1
82.7
0
82.68
82.6
082
.61
82.6
6
82.6
1
82.7
7
82.5882.58
82.7182.7282.81
82.8782.89
82.92
82.73
82.81
82.86
82.95
82.8882.85
82.77
82.93
83.03
83.08
83.14
82.98
83.3483.30
83.2683.14
83.40
83.19
82.98
82.18
82.15
81.97
81.30
81.26
81.91
81.8182.04
81.85
81.76
81.27
81.26
81.63
81.73
81.60
81.56
81.27
94.59
98.08
83.51
83.52
83.3783.32
83.38
83.46
83.51
83.36
83.65
83.50
83.42
83.58
83.46
83.49
83.5
383
.51
83.5
483.5
7
83.4
8
83.38
83.3
783
.50
83.4
2
83.3
6
83.4
3
83.3
2
83.2
283
.35
83.2
8
83.2
0
83.2
9
83.1
7
83.1483.21 83.11
83.1
9
83.2
383
.13
83.2
3
83.3
4
83.4
183.4
583
.43
83.5
3
83.5
5
83.4
383
.30
83.3
483.4
7
83.62
83.35
83.43
83.54
83.74
83.5483.59
83.87
83.71
83.82
83.8983.80
83.95
83.4
3
83.3
8
83.2
9
83.2
0
83.5
983.6
8
83.5
7
83.7583.65
84.06
83.95
84.0
083
.89
83.8
8
83.9
9
83.90
84.04
83.7883.83
83.94
83.91
83.82
83.72
83.85
83.75
83.66
83.65
83.82
83.6083.70
83.51
83.54
83.7383.74
83.59
83.50
83.47
83.49
83.54
83.75
83.57
83.67
83.6
183
.52 83.56
83.49
83.6
4
83.5
2
83.35
83.47
83.4783.41
83.51
83.44
83.46
83.35
83.6583.73
83.7683.69
83.7483.67
83.67
83.75
83.7
5
83.76
83.7
7
83.73
83.85
83.56
83.5
7
83.57
83.6
0
83.65
83.49
83.4
4
83.3
8
83.3
2
83.2
6
83.2
183.1
483.2
2
83.1
1
83.11
83.0
583
.16
83.0
7
83.1
4
83.22
83.17
83.0
6
83.0
583.1
0
82.9
7
82.97
83.09
83.02
83.0682.9
1
83.0
3
83.1
182
.96
83.08
83.1
5
83.32
83.18
83.18
83.0
383
.05
83.01
83.1
3
83.0
4
83.0
1
82.93
82.59
82.21
82.28
82.16
82.11
81.98
81.89
81.97
82.07
81.18
81.23
81.30
79.97
79.92
79.94
80.05
80.07
79.94
79.88
79.91
80.01
79.88
79.86
79.81
79.89
79.99
80.05
81.74
81.75
81.77
81.66
81.36
81.70
81.21
81.06
80.03
82.18
82.22
83.16 83.06
83.4483.48
83.69
83.86
83.73
83.72
83.92
83.49
83.40
83.32
83.33
83.18
83.09
83.18
82.63
82.54
83.18
83.57
83.52
83.27
83.49
83.0
83.0 83.0
83.0
83.0
83.0
83.0
82.082
.0
80.0
80.080.0
80.0
81.0
81.0
81.0
83.0
80.0
1
2
3
4
5
82.14
82.39
82.49
82.7
83.23
83.1
7
83.2
7
83.3
4
83.3
9
83.4
7
83.6
2
83.73
83.58
83.28
83.11
82.9
83.0
583.33
83.23
83.0
4
2
83.1583.01
83.2383.28
83.2883.15
82.9
82.89
82.1882.26
82.36
82.48
82.7
82.83
82.91
82.9
2
82.9
8
83.0
3
82.72
82.6
2 82.5
82.19
82.4
8
82.4
1
82.3
1
82.2
2
82.2
GY82.2
82.2
2
82.26
82.24
82.21
BT
BT
82.46
82.55
82.57
82.69
82.82
82.83
82.76
82.73
82.03
82.1
82.73
82.76 GP
GP82.54
82.56 82.6
82.19
81.91
81.77
81.72
81.56
81.72
81.8
81.9
82.51
82.55
82.4
5
82.4
3
82.4
2
82.56
MH FWCL 82.44
82.6
7
82.5
982
.66
82.5
5
82.72
82.88
83.03
83.11
82.23
82.21
GY82.22
82.4
1
82.2
2
82.2
6
82.29
82.3
82.25
82.31
82.76
82.69
82.57
82.47
82.26
82.59
82.55
82.47
82.43
82.07
82.09
82.14
82.1
6
82.07
82.05
81.97
GY 81.85
GY 82
GY 81.85
MH SWCL 81.85
GY 81.99
RS
82.1
8
82.11
82.06
81.99
81.98
82.06
82.1
82.1
5
81.86
81.7182
.06
81.94
82
81.99
83.33
83.31
83.31
83.33
82.02
82.79
83.14
canopy
81.81
81.85
81.92
81.99
81.98
81.96
81.96
LP
LPEP
LP
81.96
81.98
81.89
81.85
LP
79.97
80
79.97
80
8080.13
80.12
80.1
80.1
80.09
ER79.83
79.879.83
P
81.99
79.82
79.7979.84
79.84
79.95
GY79.76
ER
81.99
80.2
79.82
79.87
79.99
80.05
79.89
79.88
79.9
BD
BD
79.92
79.84
PER
79.77
79.8779
.86GY79
.84
81.61
79.95
79.97
80.01
MH SW
CL 79.8
8
79.9879.95
79.95
79.97
80.75
81.58
82.15
82.35
82.14
81.7
80.66
79.92
82.18
81.8
80.78
80.03
80.0680.06
80.06
80.1
80.89
81.73
82.26
82.37
82.23
81.78
80.76
79.92
79.94
79.98
79.92
79.91
80.81
81.67
81.9581.98
82.09
79.97
79.98
80.01
79.99
79.97
79.96
79.87GP
GP
79.87
79.82
79.92
81.83
79.84
ER
GY 79.83
79.8779.99
GY 79.83
ER
GY 79.81
79.8979.93
79.9
80.0280.02
79.89
79.8279.83
ER
79.81
79.84
79.85
79.84
79.84
79.82
79.81
GY79
.79
GY
MH SW
CL 79.79
79.81
79.83
79.84
80.22
80.18
80.08
80.08
79.94
79.95
79.95
79.9
79.9280
.04
80.06
80.08
80.07
80.08
BT
80.07
82.26
82.19
80.1
80.12
82.17
82.3
4
82.38
82.3
8
82.21
82.01
81.98LP
LP
82.2
82.24
82.17
82.1
82
82.03
81.8782.13
bkwl h
t 0.2m
prf ht
1.0m
prf ht
1.0m
floor
level
of main
entra
nce
IL 79.48
IL 80.62
pipe f
ixed t
o und
erside
of bri
dge.
(Indic
ative
)
IL 78
.67
WL 79.49
SL 78.99
blocked
79.77
c h a
i n l
i n k
f e n
c e
h t
2 . 0
0 m
c h a i n l i n k f e n c e h t 2 . 0 0 m
c h a i n l i n k f e n c e h t 2 . 0 0 m
c h
a i n
l i
n k
f e
n c
e
h t
2 .
0 0
m
c h a i n l i n k f e n c e h t 2 . 0 0 m
c h a i n l i n k f e n c e h t 2 . 0 0 m
iron railings ht 2.00m
iron railings ht 2.00m
t a r m a c
t a r m a c
t a r m
a c
t a r m a c
t a r m a c
t a r m a c
drainage channel
paviors
pavio
rs
draina
ge ch
anne
l
c o n
c r e
t e
d r
a i n
a g
e
c h a
n n
e l
t a r
m a
c
cps
conc
rete p
aving
slab
s
cps
ret. b
kwl h
t 0.50
m
ret. b
kwl h
t 2.00
m
post
and r
ail fe
nce h
t 1.00
m
prf ht
1.0m
prf ht 1.0m
prf ht 1.0m
prf ht
2.00
m
bridge over
pavio
rs
iron drainage channel
concrete
t a r
m a
c
cps
shrubbery
f o l i a g e
g r a
s s
g r a s s
g r a s s
g r a s s
g r a
s s
f o l i a g e
bin co
mpoun
d
benc
h
concrete
ht 85.44
conc.
post and rail fence ht 0.5m
GY
acuacu
Tree protection limitedto extent of existingsoft landscape
Crown reduce T21:retain spread of 3.5mand height of 7m
T1 - B1Common Oak
T2 - B1Common Oak
T3 - C1Wild Cherry
T4 - C1Norway Maple
T5 - C1Oriental Plane
T6 - C1Whitebeam
T7 - B1Swedish Whitebeam
T8 - B1Swedish Whitebeam
T9 - C1Wild Cherry
T10 - B1Sycamore
T11 - C1Wild Cherry
T12 - B1Lime
T13 - B1Lime
T14 - B1Lime
T15 - C1Lime
T16 - B1Wild Cherry
G17 - UCrack Willow, Silver Birch
T18 - C1Whitebeam
T19 - B1Sycamore
T20 - B1Norway Maple
T21 - B1Norway Maple
T22 - C1Hornbeam
Poor quality self-seededboundary vegetation. Noprotection required
1100L
2x 36
0L
Mini-ban
k
Bike st
ore
x11
2x 360LM
ini-bank
1100L
1100L
1100
L
1100
L
BS
1
D
D
D
D
D
D
DD
D
D
CSD
D
D
D
D
2x 360LMini-bank1100L
1100L
Bikestore x9
CS
CS
BS
CS
BS
1100L
1100L
1100L
1100L
D
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2728
2930
31
3233
3435
3637
38
39
40
46
47
48
45
44
43
42
41
4950
5152
5354
55
5756
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
PedestrianAccess
NEIGHBOURING NORTON BUILDINGBORDERING THE NORTH EAST BOUNDARY
EXISTING SITE
ENTRANCE
61 BRIDGE ROAD EAST(ISABEL HOSPICE)
18m
SS
Communal green amenityspaces - 662m²
BRIDGE ROAD EAST
TEW
IN R
OAD
BLOCK A(3-storeys)
Green amenityspace - 108m²
BLOCK C(4-storeys)
BLOCK D(3-storeys)
BLOCK B(4-storeys)
VEHICLE REPAIRCENTRE
PedestrianAccess
Green amenityspace - 218m²(not incl banking)
Green buffer /defensible space
EntryGate
Communal greenamenity spaces -85m²
PedestrianAccess
1.8m closeboarded fencing
1.8m closeboarded fencing
1.8m closeboarded fencing
Bikestore x9
1100
L
Date Details Drawn
drawn: checked:dwg no:
scale:
drawing:date:
scheme:
May 2017
AJB
51 Bridge Road East,Welwyn Garden City
Tree Protection Plan
1:200@A1
MW
Rev
client: Taylor Wimpey
ACD
Copyright of ACD. All rights described in Chapter IV of the Copyright, Designs andPatents Act 1988 have been generally asserted: 2015. Copyright of this plan remains
with ACD until all fees have been paid in full.
The original of this drawing wasproduced in colour- a monochrome
copy should not be relied upon.
TWNT20946-03A
0 1 2 3 4 5 10m
TREE TO BE REMOVED
ROOT PROTECTION AREA (RPA) FOR RETAINED TREES
A CATEGORY TREEB CATEGORY TREEC CATEGORY TREEU CATEGORY TREE
INDICATIVE SERVICE ROUTE AVOIDING PROTECTION AREAS
EXISTING SITE FEATURES
Foot traffic Scaffolding
Protectivefencing
Ground undisturbed and protected by geotextilefabric , woodchip and side-butting scaffold boards
Protectedarea
Platform levelat first lift ofbrickwork
Protectedarea
Protectivefencing
For pedestrian movements only, a single thickness of scaffold boards should be placed eitheron top of a driven scaffold frame, so as to form a suspended walkway, or on top of acompression-resistant layer (e.g. 100 mm depth of woodchip), laid onto a geotextile.
For pedestrian operated plant up to a gross weight of 2 t, proprietary, inter-linked groundprotection boards should be placed on top of a compression-resistant layer (e.g. 150 mm depthof woodchip), laid onto a geotextile.
For wheeled or tracked construction traffic exceeding 2 t gross weight, an alternative system(e.g. pre-cast reinforced concrete slabs) should be employed to an engineering specificationdesigned in conjunction with arboricultural advice to accommodate the likely loading to which itwill be subjected.
CONSTRUCTION EXCLUSION ZONE
Root protection areas (RPA) of retained trees within which all construction activity is restricted.
All trees that are being retained on site must be protected by barriers and/or ground protectionbefore any materials or machinery are brought onto the site, and before any demolition,development or stripping of soil commences. Where all activity can be excluded from the RPA,vertical barriers must be erected to create a construction exclusion zone. Where, due to siteconstraints, construction activity cannot be fully or permanently excluded in this manner from allor part of a tree’s RPA, appropriate ground protection can be installed.
DEFAULT POSITION FOR THE TREE PROTECTION BARRIERS.
BS5837:2012 Figure 2- barrier specification
GROUND PROTECTIONWhere the set-back of the tree protection barrier would expose unmade ground to constructiondamage, new temporary ground protection should be installed as part of the implementation ofphysical tree protection measures prior to work starting on site.
Examples of alternative barrier designs can be found in the method statement. Should analternative design be more viable and appropriate, it must be agreed with the projectarboriculturist before its implementation.
1 Standard scaffold poles2 Heavy gauge 2m tall galvanized tube and weld mesh infill panels3 Panels secured to uprights and cross-members with wire ties4 Ground level5 Uprights driven into the ground until secure (minimum depth 0.6m)6 Standard scaffold clamps
5
4
6
3
1
2 m
3 m
4
4
4
6
6
6
RESTRICTIONS WITHIN TREE PROTECTION AREASInside the exclusion area of the fencing, the following shall apply:
· No mechanical excavation whatsoever· No excavation by any other means without
arboricultural site supervision· No hand digging without a written method statement
having first been approved by the projectarboriculturist.
· No lowering of levels for any purpose (exceptremoval of grass sward using hand tools)
· No storage of plant or materials· No storage or handling of any chemical including
cement washings· No vehicular access· No fire lighting
In addition to the above, further precautions are necessaryadjacent to trees:
· No substances injurious to tree health, includingfuels, oil, bitumen, cement (including cementwashings), builders sand, concrete mixing and otherchemicals shall be stored or used within or directlyadjacent to the protection areas of retained trees
· No fire shall be lit such that flames come within 5mof tree foliage.
WHY TREE PROTECTION IS NEEDED1) Soil compaction kills roots- caused by plantmovement and storage of materials withinprotected areas.2) Trenching severs roots- many small rootsgrow within the top 600mm of soil. Even theremoval of the top 200mm can cause damage.3) Soil pollution kills roots- Dripping fuel storageor cement washings can contaminate the soilresulting in root death.4) Raising & lowering levels kills roots- the soilused to increase levels can compact theunderlying soil (see point 1). Lowering levels willremove roots causing damage to the tree.5) Bark and branch damage- bark removal andbranch damage can allow disease and fungi intothe tree.The impact of any of the above can take yearsto show- trees can have huge reserves of foodand water.
WimpeyTaylor
16.01.2018 Revised layout MWA
NO-DIG SURFACECellular confinement system (CCS) to be used to create this area of hardsurface, above the existing ground level. Topsoil to be retained. Depth ofCCS to be 50-75mm for pedestrian surfaces and 100-200 for vehicularsurfaces. Surface to be porous to approved details and specifications. Tobe installed under arboricultural supervision. All specifications subjectto engineering design.
Original groundlevel level
Peg and board edging
Top soil toBS3882:2007
Depressionsand soft spots information to befilled with sharpsand to levelsrequired
Porous surface to finish
TreeTex T300 non-woven geotextile orsimilar approved laid over formation
CCS/Cellularconfinement system(Geosynthetics CellWebor similar approved)
Cells to be filled with 20-40mm clean graded angularstone to manufacturers details and specifications
TreeTex T300 geotextile or similar laid over CellWeb
Head Office
Rodbourne Rail Business Centre
Grange Lane
Malmesbury
SN16 0ES
Tel: 01666 825646
Surrey Office Courtyard House
Mill Lane
Godalming
GU7 1EY
Tel: 01483 425714
Hampshire Office Suite 6
Crescent House
Yonge Close
Eastleigh
SO50 9SX
Tel: 02382 026 300
Cambridgeshire Office
9 Brownlow Road
Cambridge
CB4 3NG
Tel: 07825 868654
Email: [email protected]
Website: www.acdenvironmental.co.uk
ECOLOGICAL SURVEYS * PROTECTED SPECIES LICENSING * MITIGATION * IMPACT ASSESSMENT ARBORICULTURAL SITE MONITORING AND SUPERVISION * ARCHAEOLOGY
LANDSCAPE & VISUAL IMPACT ASSESSMENT * LANDSCAPE AUDIT * PROJECT MANAGEMENT EXPERT WITNESS* LANDSCAPE DESIGN & PLANNING LANDSCAPE MANAGEMENT