5-. % t comcheck software version comcheckweb envelope

27
5-. % t COMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Information Energy Code: Project Title; Location: Climate Zone: Project Type: Verticai Glazing / Wall Area: 2017 Florida Building Code, Energy Conservation ERAU New Print Shop Building Daytona Beach, Florida 2a New Construction 8% Construction Site: Owner/Agent: Embry-Riddie Aeronautical University Designer/Contractor: Additional Efficiency Packagejs) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Building Area Floor Area 1-Office : Nonresidential 7117 Envelope Assemblies Assembly Gross Area Cavity Cent. Proposed Budget U- or R-Va!ue R-Value U-Factor Factor^) Perimeter Roof: Metal Building, Standing Seam, Single insulation Layer 7353 o.O 30.0 with Thermal Blocks (d), 3-Year-Aged Solar Reflectance Index = 0.65 (e), [BIdg. Use 1 - Office] Floor: Unheated Slab-On-Grade, [BIdg. Use 1 - Office] (c) 390 ~ NORTH Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 1359 o.O 21.0 (compressed at girt), [Bidg. Use 1 - Office] Window: Metal Frame: Fixed. Perf, Specs.: Product ID TBD, 47 _ SHGC 0.24, [Bidg. Use 1 - Office] (b) Door: , Perf. Specs.: Product ID See Arch Specs, SHGC 0.24, 22 _ _ [BIdg. Use 1 - Office] (b) EAST Ext. Wall: Metal Building Wail, Single Layer Mineral Fiber 1272 0.0 21.0 (compressed at girt), [Bidg. Use 1 - Office] Window: Metal Frame: Fixed, Perf. Specs.; Product ID See Arch 31 _ _ Specs, SHGC 0.24, [BIdg. Use 1 - Office] (b) Door: Insulated Metal, Swinging, [BIdg. Use 1 - Office] 38 Door: Insulated Metal, Non-Swinging, [BIdg. Use 1 - Office] 74 _ Door: , Perf. Specs.: Product ID See Arch Specs, SHGC 0.24, 2I _ _ [BIdg. Use 1 - Office] (b) SOUTH Ext. Wail: Metal Building Wall, Single Layer Mineral Fiber 1342 0.0 21.0 (compressed at girt), (BIdg. Use 1 - Office] Window: Metal Frame: Fixed, Perf. Specs.: Product ID See Arch 120 ~ ~ Specs, SHGC 0.24, [BIdg. Use 1 - Office] (b) WEST Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 1530 0.0 21.0 (compressed at girt), [BIdg. Use 1 - Office] 0.032 0.730 0.046 0.300 0.300 0.046 0.300 0.400 0.125 0.300 0.046 0.300 0.046 0.035 0.730 0.079 0.500 0.830 0.079 0.500 0.610 0.179 0.830 0.079 0.500 0.079 Project Title: ERAU New Print Shop Building Data filename: Report date: 07/15/19 Page 1 of 23

Upload: others

Post on 18-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5-. % t COMcheck Software Version COMcheckWeb Envelope

5-. % t

COMcheck Software Version COMcheckWeb

Envelope Compliance Certificate

Project Information

Energy Code:

Project Title;

Location:

Climate Zone:

Project Type:

Verticai Glazing / Wall Area:

2017 Florida Building Code, Energy Conservation

ERAU New Print Shop Building

Daytona Beach, Florida

2a

New Construction

8%

Construction Site: Owner/Agent:

Embry-Riddie AeronauticalUniversity

Designer/Contractor:

Additional Efficiency Packagejs)Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.

Building Area Floor Area

1-Office : Nonresidential 7117

Envelope Assemblies

Assembly Gross Area Cavity Cent. Proposed Budget U-or R-Va!ue R-Value U-Factor Factor^)

Perimeter

Roof: Metal Building, Standing Seam, Single insulation Layer 7353 o.O 30.0with Thermal Blocks (d), 3-Year-Aged Solar Reflectance Index= 0.65 (e), [BIdg. Use 1 - Office]

Floor: Unheated Slab-On-Grade, [BIdg. Use 1 - Office] (c) 390 — ~

NORTH

Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 1359 o.O 21.0(compressed at girt), [Bidg. Use 1 - Office]Window: Metal Frame: Fixed. Perf, Specs.: Product ID TBD, 47 _SHGC 0.24, [Bidg. Use 1 - Office] (b)Door: , Perf. Specs.: Product ID See Arch Specs, SHGC 0.24, 22 _ _[BIdg. Use 1 - Office] (b)

EAST

Ext. Wall: Metal Building Wail, Single Layer Mineral Fiber 1272 0.0 21.0(compressed at girt), [Bidg. Use 1 - Office]Window: Metal Frame: Fixed, Perf. Specs.; Product ID See Arch 31 _ _Specs, SHGC 0.24, [BIdg. Use 1 - Office] (b)Door: Insulated Metal, Swinging, [BIdg. Use 1 - Office] 38 — —

Door: Insulated Metal, Non-Swinging, [BIdg. Use 1 - Office] 74 _Door: , Perf. Specs.: Product ID See Arch Specs, SHGC 0.24, 2I _ _[BIdg. Use 1 - Office] (b)

SOUTH

Ext. Wail: Metal Building Wall, Single Layer Mineral Fiber 1342 0.0 21.0(compressed at girt), (BIdg. Use 1 - Office]Window: Metal Frame: Fixed, Perf. Specs.: Product ID See Arch 120 ~ ~Specs, SHGC 0.24, [BIdg. Use 1 - Office] (b)

WEST

Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 1530 0.0 21.0(compressed at girt), [BIdg. Use 1 - Office]

0.032

0.730

0.046

0.300

0.300

0.046

0.300

0.400

0.125

0.300

0.046

0.300

0.046

0.035

0.730

0.079

0.500

0.830

0.079

0.500

0.610

0.179

0.830

0.079

0.500

0.079

Project Title: ERAU New Print Shop Building

Data filename:

Report date: 07/15/19

Page 1 of 23

Page 2: 5-. % t COMcheck Software Version COMcheckWeb Envelope

1

\ \ •' Assembly Gross Area

or

Perimeter

CavityR-Value

Cont.

R-Value

ProposedU-Factor

Budget U-PactoHa)

Window: Metal Frame: Fixed. Perf. Specs.: Product ID See ArchSpecs, SHGC 0.24, [BIdg. Use 1 - Office] (b)

228 0.300 0.500

(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.(c) Slab-On-Grade proposed and budget U-factors shown in table are F-factors,(d) Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt, and the roof deck secured to the

purlins,(e) High albedo roof requirement options: 1) 3-year aged solar reflectance >= 0.55 thermal emittance >= 0.75, 2) 3-year

aged solar reflectance index >= 64.0, 3) Initial year aged solar reflectance >= 0.70 thermal emittance >= 0.75, 4) Initialyear aged solar reflectance index >= 82.0.

Envelope PASSES: Design 25% better than code

Envelope Compliance Statement

Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed envelope systems have beendesigned to meet the 2017 Florida Building Code, Energy Conservation requirements in COMcheck Version COMcheckWeb and tocomply with any applicable mandatory requirements listed in the Inspection Checklist.

N^e -Title . \ \ ̂H I

^ •• 65

Signa^re15

Date

- ★

-0 •. ^ .••or-

STATE OF

Project Title: ERAU New Print Shop Building

Data filename:

Report date: 07/15/19

Page 2 of 23

Page 3: 5-. % t COMcheck Software Version COMcheckWeb Envelope

COMcheck Software Version COMcheckWeb

Interior Lighting Compliance Certificate

Project Information

Energy Code:

Project Title:

Project Type:

2017 Florida Building Code, Energy ConservationERAU New Print Shop Building

New Construction

Construction Site; Owner/Agent:

Embry-Rlddle AeronauticalUniversity

Designer/Contractor:

Additional Efficiency Package(s)Reduced interior iighting power. Requirements are implicitly enforced within interior lighting allowance calculations.

Allowed Interior Lighting Power

A B C D

Area Category Floor Area Allowed Allowed Watts

{ft2) Watts / ft2

1-Office 7117 0.74 5252

Total Allowed Watts = 5252

Proposed Interior Lighting PowerA B C D E

Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ #of Fixture (CXD)Fixture Fixture Watt.

1-Offire

LED: PH: HIGH BAY: LED Other Fixture Unit 95W: 1 23 97 2238

LED: R2; 2x4: LED Linear 33W: 1 13 32 417

LED: RW: DOWNLIGHT: LED PAR 13W: 1 6 13 80

LED: 5: STRIP LIGHT: LED Other Fixture Unit 46W: 1 2 44 89

LED: Rl: STRIP LIGHT: LED Linear 20W: 1 4 20 80

LED: SG: STRIP LIGHT: LED Linear 33W: 1 5 44 222

LED: LS: 4' SUSPENDED: LED Linear 33W: 1 17 29 495

LED: LS: 2' SUSPENDED: LED Linear 33W: 1 3 29 87

Total Proposed Watts = 3708

llnterior Lighting PASSES: Design 29% better than code

Interior Lighting ComplianceStatement

Compliance Statement: The proposed interior iighting design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application, The proposed interior iighting systems have beendesigned to meet the 2017 Florida Building Code, Energy Conservation requirements in COMcheck Version COMcheckWeb and tocomply with any applicable mandatory requirements listed in the Inspection Checklist.

NcTTTie - Title

z -k

Date

Project Title:

Data filename:

ERAU New Print Shop Report date: 07/15/19

Page 3 of 23

Page 4: 5-. % t COMcheck Software Version COMcheckWeb Envelope

COMcheck Software Version COMcheckWeb

Exterior Lighting Compliance Certificate

Project Information

Energy Code:

Project Title:

Project Type:

Exterior Lighting Zone

2017 Florida Building Code, Energy Conservation

ERAU New Print Shop Building

New Construction

2 (Light industrial area with limited nighttime use)

Construction Site; Owner/Agent:

Embry-Riddle AeronauticalUniversity

Allowed Exterior Lighting Power

Designer/Contractor:

A

Area/Surface CategoryB

QuantityC D

Allowed Tradable

Watts / Wattage

E

Allowed Watts

(BXC)

Entry canopy 184 ft2 0.25 Yes 46

Total Tradable Watts (a) =

Total Allowed Watts =

Total Allowed Supplemental Watts (b) =

46

46

600

(a) Wattage tradeoffs are only allowed between tradable areas/surfaces,(b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable

areas/surfaces.

Proposed Exterior Lighting PowerA

Fixture ID ; Description / Lamp / Wattage Per Lamp / Ballast

B C D E

Lamps/ # of Fixture (C X D)Fixture Fixture Watt.

Fntrv rannnv flR4 Tradable Wattaae

LED: Rl: DOWNLIGHT: LED PAR 20W: 1 4 20 80

Total Tradable Proposed Watts = 80

lExterior Lighting PASSES: Design 88% better than code

Exterior Lighting ComplianceStatement

Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have beendesigned to meet the 2017 Florida Building Code. Energy Conservation requirements In COMcheck Version COMcheckWeb and tocomply with any applicable mandatory requirements listed in the Inspection Checklist.

feme - Title Si TVrbH-H-rr77— Daten(i4'

'No. 656 lif -1★ -

- "O STATE OF •• 4^ -

Project Title: ERAU New Print Shop Building

Data filename:

Report date: 07/15/19

Page 4 of 23

Page 5: 5-. % t COMcheck Software Version COMcheckWeb Envelope

COMcheck Software Version COMcheckWeb

Mechanical Compliance Certificate

Project Information

Energy Code: 2017 Florida Building Code, Energy ConservationProject Title: ERAU New Print Shop BuildingLocation: Daytona Beach, Florida

Climate Zone: 2a

Project Type: New Construction

Construction Site: Owner/Agent: Designer/Contractor:Embry-Riddle AeronauticalUniversity

Additional Efficiency Package(s)Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.

Mechanical Systems List

Quantity System Type & Description

1 AH/HP-1 (Single Zone):

Split System Heat PumpHeating Mode: Capacity = 49 kBtu/h,

Proposed Efficiency = 3.75 COP, Required Efficiency = 3.30 COPCooling Mode: Capacity = 89 kBtu/h, , Air Economizer

Proposed Efficiency = 12.80 EER, Required Efficiency: 11.00 EER + 12.0 lEERFan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes

Fans:

FAN 1 Supply, Constant Volume, 3000 CFM, 3.0 motor nameplate hp, 0.0 fan efficiency grade

1 AH/HP-2 (Single Zone):Split System Heat PumpHeating Mode: Capacity = 42 kBtu/h,

Proposed Efficiency = 8.20 HSPF, Required Efficiency = 8.20 HSPFCooling Mode: Capacity = 45 kBtu/h,

Proposed Efficiency = 14.50 SEER, Required Efficiency: 14.00 SEERFan System: FAN SYSTEM 2 - Compliance (Motor nameplate HP method): Passes

Fans:

FAN 2 Supply, Constant Volume, 1600 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade

1 AH/HP-3 (Single Zone):Split System Heat PumpHeating Mode: Capacity = 42 kBtu/h,

Proposed Efficiency = 8.20 HSPF, Required Efficiency = 8.20 HSPFCooling Mode: Capacity = 45 kBtu/h,

Proposed Efficiency = 14.50 SEER, Required Efficiency: 14.00 SEERFan System: FAN SYSTEM 3 - Compliance (Motor nameplate HP method): Passes

Fans:

FAN 3 Supply, Constant Volume, 1600 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade

1 DOAS 1 (Single Zone):

Heating: 1 each - Central Furnace, Electric, Capacity = 34 kBtu/hNo minimum efficiency requirement applies

Cooling: 1 each - Split System, Capacity = 80 kBtu/h, Air-Cooled Condenser, Air EconomizerProposed Efficiency = 11.20 EER, Required Efficiency: 11.20 EER + 12.8 lEER

Fan System: FAN SYSTEM 4 ~ Compliance (Motor nameplate HP method) : Passes

Fans:

FAN 4 Supply, Constant Volume, 1000 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade

Project Title: ERAU New Print Shop Building Report date: 07/15/19

Data filename: Page 5 of 23

Page 6: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Quantity System Type & Description

1 Water Heater:

Electric Storage Water Heater, Capacity; 40 gallonsProposed Efficiency: 0.95 EF, Required Efficiency: 0.88 EF

Mechanical Compliance Statement

Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application. The proposed mechanical systems have beendesigned to meet the 2017 Florida Building Code, Energy Conservation requirements in COMc/iecAr Version COMcheckWeb and tocomply with any applicable mandatory requirements listed in the Inspection Checklist.

Name-Title Sigrfiatore Dafje '

★ -

-■tfjsiomvp'

Project Title: ERAU New Print Shop Building Report date: 07/15/19Data filename; Page 6 of 23

Page 7: 5-. % t COMcheck Software Version COMcheckWeb Envelope

COMcheck Software Version COMcheckWeb

Inspection ChecklistaI ̂ I Energy Code: 2017 Florida Building Code, Energy ConservationRequirements: 100.0% were addressed directly in the COMc/iec/r softwareText in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For eachrequirement, the user certifies that a code requirement will be met and how that is documented, or that an exceptionis being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.

Section

#

& Req.lDPlan Review Complies? Comments/Assumptions

C103.2

[PRljiPlans and/or specifications provide allinformation with which compliancecan be determined for the buildingenvelope and document whereexceptions to the standard areclaimed.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C103.2[PR2]i

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the mechanicalsystems and equipment anddocument where exceptions to thestandard are claimed. Loadcalculations per acceptableengineering standards andhandbooks.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C103.2[PR3]i

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the service waterheating systems and equipment anddocument where exceptions to thestandard are claimed. Hot watersystem sized per manufacturer'ssizing guide.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C405.6[PR17]i

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the electrical systemsand equipment and document whereexceptions are claimed. Provisions aremade for metering individual tenantunits. Feeder connectors (for feederand branch circuits) sized inaccordance with approved plans withmaximum drop of 5% voltage droptotal.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C103.2[PR4]i

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the interior lightingand electrical systems and equipmentand document where exceptions tothe standard are claimed. Informationprovided should include Interiorlighting power calculations, wattage ofbulbs and ballasts, transformers andcontrol devices.

□Complies□Ooes Not□Not Observable□Not Applicable

Requirement will be met.

High Impact (Tier 1) Medium Impact (Tier 2) Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 7 of 23

Page 8: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lPPlan Review Complies? Comments/Assumptions

C103.2 Plans, specifications, and/or[PR8]^ caicuiations provide all information

with which compliance can bedetermined for the exterior lightingand electrical systems and equipmentand document where exceptions tothe standard are claimed. Information

provided should include exteriorlighting power calculations, wattage ofbulbs and ballasts, transformers andcontrol devices.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C402.4.1tPRlO]!

The vertical fenestration area <= 30percent of the gross above-grade wallarea.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

0402.4.1[PRll]i

The skylight area <= 3 percent of thegross roof area.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.4.2 In enclosed spaces > 2,500 ft2[PR14]^ directly under a roof with ceiling

heights >15 ft. and used as an office,lobby, atrium, concourse, corridor,storage, gymnasium/exercise center,convention center, automotiveservice, manufacturing, non-refrigerated warehouse, retail store,distribution/sorting area,transportation, or workshop, thefollowing requirements apply: (a) thedaylight zone under skylights is >=half the floor area; (b) the skylightarea to daylight zone is >= 3 percentwith a skylight VT >= 0.40; or aminimum skylight effective aperture>= 1 percent.

□complies□Poes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C406[PR9]i

Plans, specifications, and/orcalculations provide all Informationwith which compliance can bedetermined for the additional energyefficiency package options.

□complies□Poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.5.9.1-4)[PR16]i

Ceilings with vented dropped ceilingcavities over conditioned spaces havea continuous air barrier between theconditioned space and the ventedunconditioned space and are sealed tothe air barrier of the walls. Unventeddropped ceiling cavities overconditioned spaces without air barrierbetween the conditioned andunconditioned space are sealed fromthe exterior environment and adjacentspaces by a continuous air barrier andis sealed to the air barrier of the walls.Unconditioned spaces above separatetenancies contain dividing partitionsbetween the tenancies to form acontinuous air barrier that is sealed atthe ceiling and roof. Building cavitiesdesigned to be air distribution systemcomponents are sealed according tothe criteria for air ducts, plenums, etc.in Section C403.2.7.

□complies□Poes Not□Not Observable□Not Applicable

Requirement will be met.

High Impact {Tier 1) Medium Impact {Tier 2) Low Impact {Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 8 of 23

Page 9: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Additional Comments/Assumptions:

1 High Impact (Tier 1) v2;; Medium Impact (Tier 2) Low Impact (Tier 3)

Project Title: ERAU New Print Shop Building

Data filename:

Report date: 07/15/19

Page 9 of 23

Page 10: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFooting / Foundation Inspection Complies? Comments/Assumptions

C303.2

[F04]2Slab edge insulation installed permanufacturer's instructions.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C303.2.1[F06]i

Exterior insulation protected againstdamage, sunlight, moisture, wind,landscaping and equipmentmaintenance activities.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C104[F03]2

Installed slab-on-grade insulation typeand R-value consistent with insulationspecifications reported in plans andCOMcheck reports.

□complies□ooes Not□Not Observable□Not Applicable

See the Envelope Assemblies table for values.

C402.2.6[F012P

Radiant heating systems panelsInsulated to >=R-3.5 on face oppositespace being heated.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

See the Envelope Assemblies table for values.

C403.2.4.5,C403.2.4.6[F09P

Snow/ice melting system sensors forfuture connection to controls. Freezeprotection systems have automaticcontrols Installed.

□complies□poes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 10 of 23

Page 11: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFraming / Rough-in Inspection Complies? Comments/Assumptions

C303.1.3

[FR12PFenestration products rated inaccordance with NFRC.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C303.1.3[FR13P

Fenestration products are certified asto performance iabels or certificatesprovided.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.4.3[FRlOp

Vertical fenestration SHGC value. □compiles□poes Not□Not Observable□Not Applicable

See the Envelope Assemblies table for values.

C402.4.3,0402.4.3.4[FR8]i

Vertical fenestration U-Factor, □Complies□poes Not□Not Observable□Not Applicable

See the Envelope Assemblies table for values.

C402.4.4[FR14P

U-factor of opaque doors associatedwith the buiiding thermai enveiopemeets requirements.

□Complies□poes Not□Not Observable□Not Applicable

See the Envelope Assemblies table for values.

C402.5.1tFR16]i

The building envelope contains acontinuous air barrier that is sealed inan approved manner and eitherconstructed or tested in an approvedmanner. Air barrier penetrations aresealed in an approved manner.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.5.2,C402.5.4[FR18]3

Factory-buiit fenestration and doorsare labeled as meeting air leakagerequirements.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

Additional Comments/Assumptions:

1 High impact (Tier 1) 2 Medium impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuiidingData filename:

Report date: 07/15/19Page 11 of 23

Page 12: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDPlumbing Rough-In inspection Complies? Comments/Assumptions

0404.5,C404.5.1,C404.5.2

[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C404.5,C404.5.1,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C404.5,C404.5.1,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

□complies□□oes Not□Not Observable□Not Applicable

Requirement will be met.

C404.5.C404.5.1,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

□Compiles□□oes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.5,C404.5,l,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<=5 minutes after end of heatingcycle.

□Compiles□□oes Not□Not Observable□Not Applicable

Requirement will be met.

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

□complies^Does Not□Not Observable□Not Applicable

Requirement will be met.

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

□Complies^Does Not□Not Observable□Not Applicable

Requirement will be met.

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

□compilesIHooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

□complies□□oes Not□Not Observable□Not Applicable

Requirement will be met.

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 12 of 23

Page 13: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDPlumbing Rough-In Inspection Complies? Comments/Assumptions

C404.7

[PL8]3Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104''F.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104''F.

□Complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104'F.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104°F.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the coid-water piping to104'F.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 13 of 23

Page 14: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDMechanical Rough-In Inspection Complies? Comments/Assumptions

C402.2.6

[ME41PThermally ineffective panel surfaces ofsensible heating panels haveinsulation >= R-3.5.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C402.5.5,C403.2.4.3[ME3P

Stair and elevator shaft vents havemotorized dampers that automaticallyclose.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C403.2.9.1.1[ME60P

HVAC ducts and plenums insulatedand sealed according to FloridaSection C403.2.9, Table C403.2.9.1.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.9.2[ME79P

All ducts, air handlers, filter boxes,building cavities, mechanical closetsand enclosed support platforms thatform the primary air containmentpassageways for air distributionsystems are constructed and erectedin accordance with Table C403.2.9.2and with Chapter 6 of the FloridaBuilding Code, Mechanical. Ducts arebe constructed, braced, reinforcedand installed to provide structuralstrength and durability. All transversejoints, longitudinal seams and fittingconnections are securely fastened inaccordance with the applicablestandards of this section.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.9.1.2[ME80P

Duct insulation is protected fromdamage but not limited to thefollowing: 1. Insulation exposed toweather is suitable for outdoorservice. Cellular foam insulation isprotected or painted with a coatingthat is water retardant and providesshielding from solar radiation. 2.Insulation covering cooling ductslocated outside the conditioned spaceis vapor retardant located outside theinsulation, all penetrations and jointsof which shall be sealed.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.9.1.3[ME81P

Additional insulation with vaporbarrier is provided where theminimum duct insulation requirementsof Section C403.2.9.1.1 aredetermined to be insufficient toprevent condensation.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.13[ME71]2

Unenclosed spaces that are heateduse only radiant heat.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C403.2.3[ME55P

HVAC equipment efficiency verified. □complies□ooes Not□Not Observable□Not Applicable

See the Mechanical Systems list for values.

1 High impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 14 of 23

Page 15: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDMechanical Rough-in Inspection Complies? Comments/Assumptions

C403.2.9.

3

[MEIOP

Ducts, air handlers, filter boxes,building cavities, mechanical closetsand enclosed support platforms thatform the primary air containmentpassageways for air distributionsystems are sealed in accordance withthe applicable criteria of this sectionand Table C403.2.9.2.

□complies□Does Not□Not Observabie□Not Appiicabie

Requirement will be met.

C403.2.9.4[ME78]2

Cavities in framed spaces are notused to deliver air from or return air tothe conditioning system unless theycontain an air duct insert which isinsulated in accordance with SectionC403.2.9.1 and constructed andsealed in accordance with therequirements of Section C403.2.9.2appropriate for the duct materialsused.

□Compiies□Does Not□Not Observable□Not Applicable

Exception; Requirement does not appiy.

C403.2.9.5[ME76P

Air distribution systems are sized anddesigned in accordance withrecognized engineering standards.Refer to section details.

□Complies□Does Not□Not Observable□Not Applicable

Requirement wiii be met.

C403.2.9.6[ME77]2

Air-handling units not installed inattics of commercial buildings.

□complies□ooes Not□Not Observable□Not Applicable

Requirement wiii be met.

C403.2.4.7[ME113P

Fault detection and diagnosticsinstalled with air-cooled unitary DXunits having economizers.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C403.2.4.7[ME113]2

Fault detection and diagnosticsinstalled with air-cooled unitary DXunits having economizers.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.2.1[ME53P

Air system balancing accomplished ina manner to first minimize throttlinglosses, then for fans with fan systempower greater than 1 hp, fan speedsshall be adjusted to meet design flowconditions. Balancing procedures shallbe in accordance with NEBBProcedural Standards, the AABC,National Standards, or equivalentprocedures.

□complies□ooes Not□Not Observable□Not Applicable

Requirement wiii be met.

C403.2.6.1[ME59]i

Demand control ventilation providedfor spaces >500 ft2 and >25people/1000 ft2 occupant density andserved by systems with air sideeconomizer, auto modulating outsideair damper control, or design airflow>3,000 cfm.

□complies□ooes Not□Not Observabie□Not Applicable

Exception: Requirement does not apply.

C403.2.6.2[ME115P

Enclosed parking garage ventilationhas automatic contaminant detectionand capacity to stage or modulatefans to 50% or less of design capacity.

□complies□Does Not□Not Observabie□Not Appiicabie

Exception: Requirement does not apply.

C403.2.7[ME57]i

Exhaust air energy recovery onsystems meeting Table C403.2.7{1)and C403.2.7(2).

□complies□Does Not□Not Observabie□Not Appiicabie

Exception: Requirement does not apply.

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 15 of 23

Page 16: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDMechanical Rough-In Inspection Complies? Comments/Assumptions

C403.2.8

[ME116PKitchen exhaust systems comply withreplacement air and conditionedsupply air limitations, and satisfy hoodrating requirements and maximumexhaust rate criteria.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C403.3[ME62]^

Air economizers provided whererequired, meet the requirements fordesign capacity, control signal,ventilation controls, high-limit shut-off,integrated economizer control, andprovide a means to relieve excessoutside air during operation.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.3[ME62P

Air economizers provided whererequired, meet the requirements fordesign capacity, control signal,ventilation controls, high-limit shut-off,integrated economizer control, andprovide a means to relieve excessoutside air during operation.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.4.4.6[MEllOp

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for values.

C403.4.4.6[MEllOp

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for values.

C4G3.4.4.6[MEllOp

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for values.

C403.4.4.6[MEllOp

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for vaiues.

C408.2.2.1[ME53]3

Air outlets and zone terminal deviceshave means for air balancing.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.5,C403.5.1,C403.5.2[ME123P

Refrigerated display cases, walk-incoolers or walk-in freezers served byremote compressors and remotecondensers not located in acondensing unit, have fan-poweredcondensers that comply with SectionsC403.5.1 and refrigeration compressorsystems that comply with C403.5.2..

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C403.5.3[ME124P

Condensing coils installed in cool airstream of another air-conditioningunit. The condensing coil of one air-conditioning unit shall not be installedin the cool air stream of another air-conditioning unit.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

Additional Comments/Assumptions:

1 High impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 16 of 23

Page 17: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDRough-In Electrical Inspection Complies? Comments/Assumptions

C405.2.1

[ELlSjiLighting controls installed to uniformlyreduce the lighting load by at least50%.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C405.2.1[EL18]i

Occupancy sensors Installed inrequired spaces.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C4C5.2.1.0405.2.2.3[EL23P

Independent lighting controls installedper approved lighting plans and allmanual controls readily accessible andvisible to occupants.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C405.2.2.1[EL22P

Automatic controls to shut off allbuilding lighting installed in allbuildings.

□Complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C405.2.3[EL16P

Daylight zones provided withindividual controls that control thelights independent of general arealighting.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C405.2.3.C405.2.3.1,C405.2.3.2[EL20]i

Primary sidelighted areas areequipped with required lightingcontrols.

□complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C405.2.3,C405.2.3.1.C405.2.3.3[EL21]i

Enclosed spaces with daylight areaunder skylights and rooftop monitorsare equipped with required lightingcontrols.

□Complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C405.2.4[EL4]i

Separate lighting control devices forspecific uses installed per approvedlighting plans.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C405.2.4[EL8]i

Additional Interior lighting powerallowed for special functions per theapproved lighting plans and isautomatically controlled andseparated from general lighting.

□complies□Does Not□Not Observabie□Not Applicable

Requirement will be met.

C405.2.5[EL25]"""

Automatic lighting controls for exteriorlighting installed. Controls will bedaylight controlled, set based onbusiness operation time-of-day, orreduce connected lighting > 30%.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C405.3[EL6]i

Exit signs do not exceed 5 watts perface.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

Additional Comments/Assumptions:

High Impact (Tier 1) Medium Impact (Tier 2) Low impact (Tier 3)

Project Title: ERAU New Print Shop BuiidingData filename:

Report date: 07/15/19Page 17 of 23

Page 18: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDInsulation inspection Complies? Comments/Assumptions

C303.1

[IN3]iRoof insulation installed permanufacturer's instructions. Blown or

poured loose-fill insulation is installedonly where the roof slope is <=3 in12.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C303.1[INlOp

Building envelope insulation is labeledwith R-value or insulation certificateproviding R-value and other relevantdata.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C303.2[IN7]i

Above-grade wall insulation installedper manufacturer's instructions.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C303.2.1[IN14P

Exterior insulation is protected fromdamage with a protective material.Verification for exposed foundationinsulation may need to occur duringFoundation Inspection.

□Complies□ooes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C402.1.3[IN19P

Non-swinging opaque doors have R-4.75 insulation.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C402.2.1[IN17P

Insulation intended to meet the roofinsulation requirements cannot beInstalled on top of a suspendedceiling. Mark this requirementcompliant if insulation is installedaccordingly.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C104[IN6P

Installed above-grade wall insulationtype and R-value consistent withinsulation specifications reported inplans and COMcheck reports.

□complies□poes Not□Not Observable□Not Applicable

See t/ie Envelope Assemblies table for values.

C104[IN8P

Installed floor insulation type and R-value consistent with insulationspecifications reported in plans andCOMcheck reports.

□complies□Poes Not□Not Observable□Not Applicable

See the Envelope Assemblies table for values.

C402.2.6[IN18P

Radiant panels and associatedcomponents, designed for heattransfer from the panel surfaces to theoccupants or indoor space areinsulated with a minimum of R-3.5.

□Complies□Poes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C402.3[IN5P

High-albedo roofs satisfy one of thefollowing: 3-year-aged solarreflectance >= 0.55 and thermalemittance >= 0.75 or 3-year-agedsolar reflectance index >= 64.0.

□Complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.5.1.1[INlp

All sources of air leakage In thebuilding thermal envelope are sealed,caulked, gasketed, weather strippedor wrapped with moisture vapor-permeable wrapping material tominimize air leakage.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 18 of 23

Page 19: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFinal Inspection Complies? Comments/Assumptions

C303.3.C408.2.5.

2

[FI17P

Furnished O&M instructions for

systems and equipment to thebuilding owner or designatedrepresentative.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C303.3,C408.2.5.3tFI8P

Furnished O&M manuals for HVACsystems within 90 days of systemacceptance.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.4[FI56P

Minimum one humidity control deviceper installedhumidification/dehumidificationsystem. Controls preventsimultaneous operation ofhumidification and dehumidificationequipment.

□complies□poes Not□Not Observable□Not Applicable

Requirement wiii be met.

C403.2.4.2.4[FI56P

Minimum one humidity control deviceper installedhumidification/dehumidificationsystem. Controls preventsimultaneous operation ofhumidification and dehumidificationequipment.

□complies□Poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.4[FI56P

Minimum one humidity control deviceper installedhumidification/dehumidificationsystem. Controls preventsimultaneous operation ofhumidification and dehumidificationequipment.

□complies□Poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.4[FI56P

Minimum one humidity control deviceper installedhumidification/dehumidificationsystem. Controls preventsimultaneous operation ofhumidification and dehumidificationequipment.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.5.3[FI51P

Where open combustion air ductsprovide combustion air to opencombustion fuel burning appliances,the appliances and combustion airopening are located outside thebuilding thermal envelope or enclosedin a room, isolated from inside thethermal envelope. Such rooms aresealed and insulated.

□Complies□poes Not□Not Observable□Not Applicable

Exception: Requirement is not applicable.

C402.5.6IFI37P

Weatherseals installed on all loadingdock cargo doors.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C402.5.8[FI26]3

Recessed luminaires in thermalenvelope to limit infiltration and be ICrated and labeled. Seal betweeninterior finish and luminaire housing.

□complies□poes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuiidingData filename:

Report date: 07/15/19Page 19 of 23

Page 20: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFinal inspection Complies? Comments/Assumptions

C403.2.1

[FI50PHVAC systems and equipment designloads calculated in accordance with

ANSI/ASHRAE/ACCA Standard 183 orACCA Manual N or by an approvedequivalent computational procedure.Design loads shall be attached to thecode compliance form submitted tothe building department when thebuilding is permitted or, in the eventthe mechanical permit is obtained at alater time, the sizing calculation shallbe submitted with the application forthe mechanical permit.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.2[FI27]3

HVAC systems and equipmentcapacity does not exceed calculatedloads.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1[FI47P

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1[FI47]3

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1[FI47]3

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1[FI47P

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1.1[FI42P

Heat pump controls preventsupplemental electric resistance heatfrom coming on when not needed.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1.1[FI42P

Heat pump controls preventsupplemental electric resistance heatfrom coming on when not needed.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1.1[FI42P

Heat pump controls preventsupplemental electric resistance heatfrom coming on when not needed.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.1.2[FI38P

Thermostatic controls have a 5 "Fdeadband.

□Complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 20 of 23

Page 21: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFinal inspection Complies? Comments/Assumptions

C403.2.4.

1.3

[Fi20]3

Temperature controls have setpointoverlap restrictions.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2[FI39]3

Each zone equipped with setbackcontrols using automatic time clock orprogrammable control system.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C404.12.2[FI53P

Public lavatory facilities equipped withoutiet devices which limit the flow ofhot water to a maximum of 0.5 gpm orare equipped with self-closing valvesthat limit deiivery to a per cyclemaximum of 0.25 gallons of hot waterfor recirculating systems and to amaximum of 0.50 gallons for non-recirculating systems.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C404.12.2[FI57P

Public lavatory water temperature<=110''F.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C404.12.1tFI52]3

Showers used for non-safety reasonsequipped with flow control devices tolimit the water discharge to amaximum of 2.5 gpm per showerhead. Flow restricting inserts used asa component part of a showerheadare mechanically retained at the pointof manufacture

□complies□poes Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C408.2.2[FI54P

Construction documents require that awritten balance report be provided tothe building owner or rep for HVACsystems serving zones with totalcondition area > 5,000 sqft. Airdistribution systems shall be tested,adjusted, and balanced by a licensedengineer or certified company.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.1,C4G3.2.4.2.2[FI40P

Automatic Controls: Setback to 55''F(heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hourbackup

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.3[FI41]3

Systems include optimum startcontrols.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.3[FI41P

Systems include optimum startcontrols.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

C403.2.4.2.3[FI41P

Systems include optimum startcontrols.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

1 High impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData fiiename:

Report date: 07/15/19Page 21 of 23

Page 22: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFinal Inspection Complies? Comments/Assumptions

C403.2.4.

2.3

[FI41]3

Systems include optimum startcontrols.

□Complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C404.3[Flllp

Heat traps installed on supply anddischarge piping of non-circulatingsystems.

□complies□Does Not□Not Observable□Not Applicable

Exception: Requirement does not apply.

C404.4[FI25P

All piping insulated in accordance withsection details and Table C403.2.10.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C405.4.1[FI18P

Interior installed lamp and fixturelighting power is consistent with whatis shown on the approved lightingplans, demonstrating proposed wattsare less than or equal to allowedwatts.

□complies□Does Not□Not Observable□Not Applicable

See the Interior Lighting fixture schedule for values.

C405.5.1[Fll9]i

Exterior lighting power is consistentwith what is shown on the approvedlighting plans, demonstratingproposed watts are less than or equalto allowed watts.

□complies□Does Not□Not Observable□Not Applicable

See the Exterior Lighting fixture schedule for values.

C408.2.1[FI28]i

Commissioning plan developed byregistered design professional orapproved agency.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

Location on plans/spec: Total mechanical equipmentcapacity 480,000 Btu/h

C408.2.3.1[FI31]i

HVAC equipment has been tested toensure proper operation.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.3.2[FllOji

HVAC control systems have beentested to ensure proper operation,calibration and adjustment of controls.

□Complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.3.3[FI32]i

Economizers have been tested toensure proper operation.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.4[FI29]i

Preliminary commissioning reportcompleted and certified by registereddesign professional or approvedagency.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

Location on plans/spec: Total mechanical equipmentcapacity 480,000 Btu/h

C408.2.5.1[FI7P

Furnished HVAC as-built drawingssubmitted within 90 days of systemacceptance.

□complies□Does Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.5.1[FI16P

Furnished as-built drawings forelectric power systems within 90 daysof system acceptance.

□complies : Requirement will be met.□Does Not□Not Observable:□Not Applicable ;

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 22 of 23

Page 23: 5-. % t COMcheck Software Version COMcheckWeb Envelope

Section

#

& Req.lDFinal Inspection Compiles? Comments/Assumptions

C408.2.5.

3

[FI43]i

An air and/or hydronic systembalancing report is provided for HVACsystems.

□complies□ooes Not□Not Observable□Not Applicable

Requirement will be met.

C408.2.5.4[FI30]i

Final commissioning report due tobuilding owner within 90 days ofreceipt of certificate of occupancy.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

Location on plans/spec: Total mechanical equipmentcapacity 480,000 Btu/h

C408.3[FI33P

Lighting systems have been tested toensure proper calibration, adjustment,programming, and operation.

□complies□poes Not□Not Observable□Not Applicable

Requirement will be met.

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title: ERAU New Print Shop BuildingData filename:

Report date: 07/15/19Page 23 of 23

Page 24: 5-. % t COMcheck Software Version COMcheckWeb Envelope

ERAU - Print Shop Building

Location

Building ownerProgram userCompanyComments

Daytona Beach, FL

Embry-Riddie Aeronautical University

ByDataset name

Salas O'Brien

K:\19\005\Design\Mech\Caiculations - HVAC\19005 TRACECALCS.TRC

Calculation time

TRACE® 700 version

Location

Latitude

LongitudeTime Zone

Elevation

Barometric pressure

Air densityAir specific heatDensity-specific heat productLatent heat factor

Enthalpy factor

Summer design dry bulbSummer design wet bulbWinter design dry bulbSummer clearness number

Winter clearness number

Summer ground reflectanceWinter ground reflectanceCarbon Dioxide Level

Design simulation periodCooling load methodologyHeating load methodology

09:52 AM on 06/21/2019

6.3.4

Jacksonville, Florida

degdeg

ft

in.Hg

30.0

81.0

5

24

29.9

0.0760

0.2444

1.1144

4,905.3

4.5588

97.3

76.5

32.0

0.95

0.95

0.20

0.20

400 ppm

January - DecemberTETD-TA1

UATD

Ib/cu ft

Btu/lbT

Btu/h-cfm-°F

Btu-min/h-cu ft

Ib-min/hr-cu ft

°F

°F

°F

rmMF TRACEtoo

Page 25: 5-. % t COMcheck Software Version COMcheckWeb Envelope

System ChecksumsBy Salas O'Brien

AH-COMMON CORE

COOLING COIL PEAK

Peaked at Time:

Outside Air:

Mo/Hr: 6/18

OADB/WB/HR: 93/75/104

CLG SPACE PEAK

Mo/Hr: Sum of

GADB: Peaks

Space Plenum Net Percent Space PercentSens. + Lat. Sens. + Lat Total Of Total Sensible Gf Total

Btu/h Btu/h Btu/h (%) Btu/h (%)Envelope Loads Envelope LoadsSkylite Solar 0 0 0 0 0 0 Skylite SolarSkylite Cond 0 0 0 0 0 0 Skylite CondRoof Cond 0 9,145 9,145 12 0 0 Roof Cond

Glass Solar 20,670 0 20,670 27 20,876 34 Glass Solar

Glass/Door Cond 3,980 0 3,980 5 3,830 6 Glass/Door Cond

Wall Cond 6,210 2,645 8,855 11 6,220 10 Wall Cond

Partition/Door 0 0 0 0 0 Partition/Door

Floor 0 0 0 0.00 0 Floor

Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent FloorInfiltration 0 0 0 0 0 Infiltration

Sub Total ==> 30,859 11,789 42,649 55 30,926 50 Sub Total ==>

Internal Loads

Lights 6,118 1,530 7,648 10 6,118 10 LightsPeople 12,000 0 12,000 15 6,000 10 PeopleMisc 15,222 0 15,222 20 15,222 25 Misc

Sub Total ==> 33,340 1,530 34,870 45 27,340 45 Sub Total ==>

Ceiling Load 3,112 -3,112 0 0 3,085 5 Ceiling LoadVentilation Load 0 0 0 0 0 0 Ventilation Load

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans HeatDehumid. Ov Sizing 0 0 Gv/Undr SizingOv/Undr Sizing 0 0 0 0 0 Exhaust Heat

Exhaust Heat 0 0 0 OA Preheat Diff.

Sup. Fan Heat 0 0 RA Preheat Diff.

Ret. Fan Heat 0 0 0 Additional Reheat

Duct Heat Pkup 0 0 0

Underfir Sup Ht Pkup 0 0 Underfir Sup Ht PkupSupply Air Leakage 0 0 0 Supply Air Leakage

Grand Total ==> 67,312 10,207 77,519 100.00 61,351 100.00 Grand Total ==>

HEATING COIL PEAK

Mo/Hr: Heating DesignGADB: 32

Internal Loads

Space PeakSpace Sens

Btu/h

0

0

0

0

-9.777-3,546

0

0

0.00

0

-13,323

0

0

0

0

-1,3310

0

0

Coil Peak Percent

Tot Sens Gf Total

Btu/h

0

0

-3,9980

-9,777-5,097

0

0

0.00

0

-18,872

(%)

0.00

0.00

21.18

0.00

51.81

27.01

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-14,654 -18,872 100.00

Single Zone

TEMPERATURES

SADB

Ra Plenum

Return

Ret/OA

Fn MtrTD

Fn BIdTD

Fn Frict

Cooling55.0

78.2

78.1

78.1

0.0

0.0

0.0

Heating74.8

68.6

68.6

68.6

0.0

0.0

0.0

Diffuser

Terminal

Main Fan

Sec Fan

Nom Vent

AMU Vent

Infil

MinStop/RhReturn

Exhaust

Rm Exh

AuxiliaryLeakage OwnLeakage tips

AIRFLOWS

Cooling2,755

2,7552,755

0

0

0

0

0

2,7550

0

0

0

0

Heating2,755

2,7552,755

0

0

0

0

0

2,7550

0

0

0

0

ENGINEERING CKS

Cooling Heating%0A 0.0 0.0

cfm/ft^ 0.90 0.90

cfm/ton 426.48

ftVton 473.38

Btu/hr-ff® 25.35 -6.17

No. People 24

COOLING COIL SELECTIONTotal Capacity Sens Cap. Coil Airflow Enter DB/WB/HRton MBh MBh cfm °F "F gr/lb

Main CIg 6.5 77.5 71.5 2,755 78.1 61.0 52.8

Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0

Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0

Leave DB/WB/HR

•F T gr/ib

55.0 51.0

0.0 0.0

0.0 0.0

49.3

0.0

0.0

Total 6.5 77.5

AREASGross Total Glass

ft^ (%)

3,0580

Floor

Part

Int Door 0

ExFIr 0

Roof 3,058Wall 2,586

Ext Door 0

0

516

0

0

20

0

HEATING COIL SELECTIONCapacityCoil Airflow Ent Lvg

cfm °F "F

2,755 68.6 74.80 0.0 0.0

0 0.0 0.0

0 0.0 0.0

0 0.0 0.0

MBh

Main Htg -18.9

Aux Htg 0.0

Preheat 0.0

Humidif 0.0

Opt Vent 0.0

Total -18.9

Project Name:

Dataset Name:

ERAU - Print Shop Buiiding

19005 TRACE CALCS.TRC

TRACE® 700 V6.3.4 calcuiated at 09:52 AM on 06/21/2019

Alternative -1 System Checksums Report Page 1 of 3

Page 26: 5-. % t COMcheck Software Version COMcheckWeb Envelope

System ChecksumsBy Salas O'Brien

AH-ENGRAVING

COOLING COIL SELECTIONTotal Capacity Sens Cap. Coil Airflow Enter DB/WB/HRton MBh MBh cfm "F 'F gr/lb

Main CIg 2.4 28.4 26.9 965 80.1 62.1 54.6

Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0

Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0

Leave DB/WB/HR

"F "P gr/ib

55.0 51.8

0.0 0.0

0.0 0.0

52.3

0.0

0.0

Total 2.4 28.4

AREASGross Total Glass

ft^ (%)

Floor 1,971Part 0

Int Door 0

ExFIr 0

Roof 1,971 0 0

Wall 1,801 0 0

Ext Door 0 0 0

Single Zone

COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK

Peaked at Time: Mo/Hr: 6/17 Mo/Hr: Sum of Mo/Hr: Heating DesignOutside Air: OADB/WB/HR: 96/76/ 104 GADB: Peaks OADB: 32

Space Plenum Net Percent Space Percent Space Peak Coil Peak PercentSens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total

Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%)Envelope Loads Envelope LoadsSkylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00

Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00

Roof Cond 0 6,414 6,414 23 0 0 Roof Cond 0 -2,525 36.35

Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00

Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00

Wall Cond 3,924 1,158 5,082 18 4,250 20 Wall Cond -3,363 -4,422 63.65

Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00

Floor 0 0 0 0.00 0 Floor 0 0 0.00

Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00Infiltration 0 0 0 0 0 Infiltration 0 0 0.00

Sub Total ==> 3,924 7,573 11,496 40 4,250 20 Sub Total ==> -3,363 -6,947 100.00

Internal Loads Internal Loads

Lights 4,305 1,076 5,382 19 4,305 20 Lights 0 0 0.00People 3,000 0 3,000 11 1,500 7 People 0 0 0.00Misc 8,533 0 8,533 30 8,533 40 Misc 0 0 0.00

Sub Total ==> 15,838 1,076 16,914 60 14,338 67 Sub Total ==> 0 0 0.00

Ceiling Load 3,162 -3,162 0 0 2,912 14 Ceiling Load -1,317 0 0.00

Ventilation Load 0 0 0 0 0 0 Ventilation Load 0 0 0.00

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0

Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00

Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00

Exhaust Heat 0 0 0 OA Preheat Diff. 0 0.00Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00

Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00Duct Heat Pkup 0 0 0

Underfir Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00

Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00

Grand Total ==> 22,923 5,487 28,410 100.00 21,500 100.00 Grand Total ==> -4,680 -6,947 100.00

TEMPERATURES

Cooling HeatingSADB 55.0 74.4

Ra Plenum 80.1 67.9

Return 80.1 67.9

Ret/OA 80.1 67.9

Fn MtrTD 0.0 0.0

Fn BIdTD 0.0 0.0

Fn Frict 0.0 0.0

AIRFLOWS

Cooling HeatingDiffuser 965 965

Terminal 965 965Main Fan 965 965

Sec Fan 0 0

Nom Vent 0 0

AHU Vent 0 0

Infil 0 0

MInStop/Rh 0 0

Return 965 965

Exhaust 0 0

Rm Exh 0 0

Auxiliary 0 0

Leakage Dwn 0 0

Leakage Ups 0 0

ENGINEERING CKS

%0A

cfm/ft^

cfm/ton

ftVton

Btu/hrft^

No. People

Cooling0.0

0.49

407.48

832.51

14.41

6

Heating0.0

0.49

-3.52

HEATING COIL SELECTIONCapacityCoil Airflow Ent

MBh cfm "F

Main HtgAux Htg

Preheat

Humidif

Opt Vent

Total

-7.0

0.0

0.0

0.0

0.0

-7.0

965 67.9

0 0.0

0 0.0

0 0.0

0 0.0

Lvg"F

74.4

0.0

0.0

0.0

0.0

Project Name:

Dataset Name:

ERAU - Print Shop Building

19005 TRACE CALCS.TRC

TRACE® 700 V6.3.4 calculated at 09:52 AM on 06/21/2019

Alternative -1 System Checksums Report Page 2 of 3

Page 27: 5-. % t COMcheck Software Version COMcheckWeb Envelope

System ChecksumsBy Salas O'Brien

AH-PRINT SHOP Single Zone

COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK

Peaked at Time: Mo/Hr: 8/15 Mo/Hr: Sum of Mo/Hr; Heating DesignOutside Air: OADB/WB/HR: 94/77/115 GADB: Peaks GADB: 32

Space Plenum Net Percent Space Percent Space Peak Coil Peak PercentSens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total

Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h {%)Envelope Loads Envelope LoadsSkyiite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00Roof Cond 0 6,332 6,332 22 0 0 Roof Cond 0 -2,684 45.49Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00Giass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00Wall Cond 3,155 948 4,103 14 3,548 16 Wall Cond -2,444 -3,217 54.51Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00Floor 0 0 0 0.00 0 Floor 0 0 0.00Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00Infiltration 0 0 0 0 0 Infiltration 0 0 0.00

Sub Total ==> 3,155 7,280 10,435 36 3,548 16 Sub Total ==> -2,444 -5,901 100.00

Internal Loads Internal Loads

Lights 4,561 1,140 5,701 20 4,561 21 Lights 0 0 0.00People 4,000 0 4,000 14 2,000 9 People 0 0 0.00Misc 8,533 0 8,533 30 8,533 39 Misc 0 0 0.00

Sub Total ==> 17,093 1,140 18,234 64 15,093 70 Sub Total ==> 0 0 0.00

Ceiling Load 3,194 -3,194 0 0 3,015 14 Ceiling Load -1,311 0 0.00Ventilation Load 0 0 0 0 0 0 Ventilation Load 0 0 0.00

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0

Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00

Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00

Exhaust Heat 0 0 0 OA Preheat DIff. 0 0.00

Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00

Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00

Duct Heat Pkup 0 0 0

Underfir Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00

Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00

Grand Total ==> 23.442 5.227 28,669 100.00 21,657 100.00 Grand Total ==> -3,755 -5,901 100.00

COOLING COIL SELECTIONTotal Capacity Sens Cap. Coil Airflow Enter DB/WB/HRton MBh MBh cfm T °F gr/lb op «p

Main CIg 2.4 28.7 26.7 972 79.8 62.5 56.9 55.0 52.3Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0

Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0

od

od

Leave DB/WB/HR

gr/lb

54.2

0.0

0.0

Total 2.4 28.7

AREASGross Total Glass

ft^' {%)

Floor 2,088Part 0

Int Door 0

ExFIr 0

Roof 2,088 0 0

Wall 1,309 0 0

Ext Door 0 0 0

TEMPERATURES

Cooling HeatingSADB 55.0 73.5

Ra Plenum 79.8 68.0

Return 79.8 68.0

Ret/OA 79.8 68.0

Fn MtrTD 0.0 0.0

Fn BIdTD 0.0 0.0

Fn Frict 0.0 0.0

AIRFLOWS

Cooling HeatingDiffuser 972 972

Terminal 972 972Main Fan 972 972

Sec Fan 0 0

Nom Vent 0 0

AHU Vent 0 0

Infil 0 0

MinStop/Rh 0 0

Return 972 972

Exhaust 0 0

Rm Exh 0 0

Auxiliary 0 0

Leakage Dwn 0 0

Leakage Ups 0 0

ENGINEERING CKS

Cooling Heating%0A 0.0 0.0

cfm/ft® 0.47 0.47

cfm/ton 406.76

ftVton 873.97

Btu/hr-ft^ 13.73 -2.83

No. People 8

HEATING COIL SELECTIONCapacityColl Airflow Ent

MBh cfm °F

Main HtgAux Htg

Preheat

Humidif

Opt Vent

Total

-5.9

0.0

0.0

0.0

0.0

-5.9

972 68.0

0 0.0

0 0.0

0 0.0

0 0.0

Lvg'F

73.5

0.0

0.0

0.0

0.0

Project Name:

Dataset Name:

ERAU - Print Shop Building

19005 TRACE CALCS.TRC

TRACE® 700 v6.3.4 calculated at 09:52 AM on 06/21/2019

Alternative -1 System Checksums Report Page 3 of 3