The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda Page 265 SLOPE OPTIMIZATION AT ESCONDIDA NORTE OPEN PIT Mr. Manuel Rapiman Chief Geotechnical Engineering, Minera Escondida Ltd. BHP Billiton Base Metals, Chile Mr. Ricardo Sepulveda Geotechnical Consultant A. Karzulovic & Assoc. Ltd., Chile ABSTRACT The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in which Compañia Minera Zaldívar (CMZ) gained in its phase 4, a slope of similar geotechnical characteristics will be exposed in the West Wall of Phase 1 (Premine) and of the Final Pit, with an interramp angle 53º and with very good stability results. In this regard, Minera Escondida Ltd. (MEL) performed a study of the slope angles for the phases mentioned and according to this delivered the results of this evaluation, the recommendations and/or the necessary conclusions in the design to ensure that the slopes are stable enough and may enable safe operational management of them. INTRODUCTION The objective of the study developed, is to perform a revision and evaluation of the slope angles for Phase 1 (Premine) and the West Wall of the Final Pit of ENorte pit. The work described in this paper is directed towards the stability analyses of slopes, evaluating the degree of stability for potential slides on failure surfaces. The details of the stability analyses developed by limit equilibrium methods are included. The present work is supported by the following data and report sources: Plane and vertical sections design of ENorte for Phase 1 and Final Pit. (a) Geotechnical report used in the study performed for CMZ, related to the in- teraction between Phase 4 and the Final Pit of ENorte of MEL. (b) Geotechnical report of previous studies for ENorte. (c) Technical data provided by MEL, regarding the geotechnical properties of the geotechnical units present in the pit and the groundwater level in the ENorte sector. GENERAL CONSIDERATIONS The good results obtained from the analyses, according to the point of view of the sta- bility of slopes during the feasibility study developed by MEL for Project ENorte, and

Upload: andres-alejandro-molina-alvarez

Post on 14-Sep-2015

231 views

Category:

Documents


0 download

DESCRIPTION

estabilidad de taludes 3232

TRANSCRIPT

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 265

    SLOPE OPTIMIZATION AT ESCONDIDA NORTE OPEN PIT

    Mr. Manuel Rapiman Chief Geotechnical Engineering, Minera Escondida Ltd.

    BHP Billiton Base Metals, Chile Mr. Ricardo Sepulveda

    Geotechnical Consultant A. Karzulovic & Assoc. Ltd., Chile

    ABSTRACT

    The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in which Compaia Minera Zaldvar (CMZ) gained in its phase 4, a slope of similar geotechnical characteristics will be exposed in the West Wall of Phase 1 (Premine) and of the Final Pit, with an interramp angle 53 and with very good stability results. In this regard, Minera Escondida Ltd. (MEL) performed a study of the slope angles for the phases mentioned and according to this delivered the results of this evaluation, the recommendations and/or the necessary conclusions in the design to ensure that the slopes are stable enough and may enable safe operational management of them.

    INTRODUCTION

    The objective of the study developed, is to perform a revision and evaluation of the slope angles for Phase 1 (Premine) and the West Wall of the Final Pit of ENorte pit. The work described in this paper is directed towards the stability analyses of slopes, evaluating the degree of stability for potential slides on failure surfaces. The details of the stability analyses developed by limit equilibrium methods are included. The present work is supported by the following data and report sources: Plane and vertical sections design of ENorte for Phase 1 and Final Pit.

    (a) Geotechnical report used in the study performed for CMZ, related to the in-teraction between Phase 4 and the Final Pit of ENorte of MEL.

    (b) Geotechnical report of previous studies for ENorte. (c) Technical data provided by MEL, regarding the geotechnical properties of

    the geotechnical units present in the pit and the groundwater level in the ENorte sector.

    GENERAL CONSIDERATIONS

    The good results obtained from the analyses, according to the point of view of the sta-bility of slopes during the feasibility study developed by MEL for Project ENorte, and

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 266

    N

    P01P01--N1N1

    P16P16--N1N1

    P03P03--N1N1

    P04P04--N1N1

    P17P17--N1N1

    P15P15--N1N1

    N

    P01P01--N1N1

    P16P16--N1N1

    P03P03--N1N1

    P04P04--N1N1

    P17P17--N1N1

    P15P15--N1N1

    Figure 2: Plan of Design for Phase 1 of ENorte, with the sections of Design evalu-ated.

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    SECTOR D

    SECTOR C

    SECTOR B

    SECTOR A

    SECTOR J

    SECTOR I

    SECTOR E

    SECTOR H

    SECTOR F

    SECTOR G

    SECTOR LSECTOR K

    48

    48

    48

    43

    43

    43

    43

    45

    44

    47

    4748

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    SECTOR D

    SECTOR C

    SECTOR B

    SECTOR A

    SECTOR J

    SECTOR I

    SECTOR E

    SECTOR H

    SECTOR F

    SECTOR G

    SECTOR LSECTOR K

    48

    48

    48

    43

    43

    43

    43

    45

    44

    47

    4748

    Figure 1: Plan of design for the Final Pit, with theinterramp angles recommended in the stage of thefeasibility study ENorte, with the sectors of design.

    E-1

    7500

    E-18

    000

    E-18

    500

    E-19

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    N

    P01P01--PFPF

    P16P16--PFPF

    P03P03--PFPF

    P04P04--PFPF

    P17P17--PFPF

    P15P15--PFPF

    E-1

    7500

    E-18

    000

    E-18

    500

    E-19

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    N

    P01P01--PFPF

    P16P16--PFPF

    P03P03--PFPF

    P04P04--PFPF

    P17P17--PFPF

    P15P15--PFPF

    Figure 3: Plan of Design for the Final Pit of ENorte, with the sections of Design evalu-ated.

    the experience during the geotechnical analyses of Phase 4 of CMZ have enabled to consider a study of the slope angles in some stages of the design ENorte, mainly to-wards the West sector of the pit. Figure 1 shows the sectors design for the Final Pit, considered in the stage of feasibility study, with the respective interramp angles recommended. The sectors revised are of the West side and correspond to A, B, C, K and L. The two phases of designs of slopes whose stability is to be evaluated, with their respective evaluation sections are: Phase 1 or Premine, which was not evaluated during the feasibility study, and the Final Pit for the West side (sector adjacent to Phase 4 of CMZ) as described in Table 1. The locations of the stages of design are shown in Figure 2, and Figure 3.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 267

    Table 1 STAGES OF DESIGN CONSIDERED IN THIS STUDY

    Stage Maximum Slope Height (m) Vertical Section(s)

    Phase1 364 P01-N1, P03-N1, P04-N1, P15-N1, P16-N1, P17-N1

    Final Pit 505 P01-FP, P03-PF, P04-FP, P15-PF, P16-FP, P17-FP

    This study is also based on the following considerations and suggestions: The following data was provided by the feasibility study of ENorte:

    (a) Geological report, location and geometry of the geological contacts. (b) Structural systems, limits of structural domains, location of fault zones. (c) Hydrogeological report. (d) The geotechnical parameters of the rock mass and structures present in the sec-

    tions of analyses. (e) For the angle of the face of the benches the same criteria in the feasibility study

    of project ENorte is used. This is supported by the report of Minera Escondida Limited (March 2003): Feasibility Study Escondida Norte.

    The designs suggested here are valid, considering all the previous suggestions de-scribed.

    The evaluation and/or optimization were performed using the limit equilibrium analysis method for the sections previously determined for the pit in design for Phase 1 and Final Pit. In every one of the cases described, 6 geotechnical sections design were analyzed. The sections had priority over the side adjacent to the pit of Phase 4 of CMZ, since it is over that side where the final wall of the pit ENorte was first determined. It operationally interacts with pit CMZ. For the stability analyses the limit equilibrium methods (Program SLIDE, ROC-SCIENCE (2003), Geomechanics Software & Research) were used, and, aiming to de-termine the sliding safety factor, FS, the option to analyze by the General Limit Equilib-rium method (GLE) was used. The Probability of Failure, PF was evaluated according to recent suggestions from Duncan (2000).

    GEOLOGY & GEOTECHNICS

    Regarding the points described in General Considerations, the geological and geo-technical reports are the same ones used during the feasibility study of Project ENorte, including the following aspects: Location and geometry of the geological contacts Main failure systems

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 268

    Phreatic level location In Figure 4 an example of the ge-ometries with the geological con-tacts and the phreatic level of the water are shown. The previously mentioned report for each of the sections evaluated in this case for Phase 1 and West Wall of the Pit can be appreciated. In Figures 5 and 6, plans with the lithologies corresponding to Phase 1 and Final Pit are provided. There, it can be appreciated that the pre-dominant rocks towards the West side, next to Phase 4 of CMZ, are rhyolites. According to the wall exposed by CMZ operation they show good geotechnical conditions.

    RAJO ESCONDIDA NORTE RAJO ESCONDIDA NORTE

    FASE IFASE I

    SECCIN P1

    RIOL(QSA)-1

    GRD(QSA)-2

    GRD(QSA)-8

    RIOL(QSA)-1

    C(BIO)-5

    ZONA

    FALL

    A

    NIVEL FRETICO

    RAJO ESCONDIDA NORTE RAJO ESCONDIDA NORTE

    FASE IFASE I

    SECCIN P1

    RIOL(QSA)-1

    GRD(QSA)-2

    GRD(QSA)-8

    RIOL(QSA)-1

    C(BIO)-5

    ZONA

    FALL

    A

    NIVEL FRETICO

    Figure 4: Section P01-N1, of the design of Phase 1 from ENorte, which show the geotechnical units with their respective contacts, a failure zone and the phreatic level.

    Sector E

    Sector B

    Sector A

    Sector C

    Sector L

    Sector K

    Sector F

    Sector J

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    Sector E

    Sector B

    Sector A

    Sector C

    Sector L

    Sector K

    Sector F

    Sector J

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    Figure 5: Plan for Phase 1 with the lithologies present in the pit. It can be appreciated that at the east side, next to Phase 4 of CMZ, the predomi-nant rock is rhylolite.

    Sector A

    Sector I

    Sector G

    Sector JSector H

    Sector F

    Sector E

    Sector L

    Sector B

    Sector K

    Sector C

    Sector D

    P_17

    P_3

    P_16

    P_4

    P_1

    P_15

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    Sector A

    Sector I

    Sector G

    Sector JSector H

    Sector F

    Sector E

    Sector L

    Sector B

    Sector K

    Sector C

    Sector D

    P_17

    P_3

    P_16

    P_4

    P_1

    P_15

    Sector A

    Sector I

    Sector G

    Sector JSector H

    Sector F

    Sector E

    Sector L

    Sector B

    Sector K

    Sector C

    Sector D

    P_17

    P_3

    P_16

    P_4

    P_1

    P_15

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    GranodioritaVolcnicoGrabasBrechaGranodiorita Complex.Riolita

    Figure 6: Plan for the Final Pit with the litholo-gies present in the pit.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 269

    GEOTECHNICAL PROPERTIES OF THE ROCK MASS

    Table 2 provides the geotechnical parameters used in each of the evaluation sections. They are the same for both stages of the design.

    Table 2: GEOTECHNICAL CHARACTERIZATION OF SECTIONS ESCONDIDA PIT NORTH (Sections for Phase 1 and West Wall for the Final Pit)

    c (KN/m3) (Kpa) ()

    P1 RIOLITA QSA 62,01 109,01 24,8 545 45P1 GRANODIORITA SCC 45,47 41,88 25 546 39P1 GRANODIORITA KBIO 54,78 58,13 25 689 47P1 VOLCNICO BIO 58,21 55,76 25 671 45P1 GRANODIORITA QSA 50,38 31,98 25 552 39P3 GRANODIORITA KBIO 52,4 38,5 25 260 29P3 RIOLITA QSA 66,1 114,3 24,8 460 41P3 GRANODIORITA QSA 72,4 102,6 24,7 420 39P3 VOLCNICO QSA 54,7 46,1 25 593 41P3 VOLCNICO KBIO 52,6 37,1 25 539 38P4 GRANODIORITA KBIO 47,03 31,99 25 260 29P4 GRANODIORITA QSA 53,15 31,00 25 410 40P4 RIOLITA QSA 59,94 54,00 25 684 45P4 VOLCNICO QSA 55,96 31,00 25 545 38P4 VOLCNICO SCC 45,13 25,63 25 435 30

    P15 VOLCNICO QSA 54,9 20,0 25 479 33P15 VOLCNICO KBIO 58,2 20,0 25 505 35P15 GRANODIORITA KBIO 54,8 27,0 25 567 40P15 GRANODIORITA SCC 38,4 25,0 25 410 40P15 GRANODIORITA QSA 49,7 27,0 25 390 39P15 RIOLITA QSA 66,2 75,0 24,8 550 45P15 RIOLITA PROP 55,6 75,0 25 689 45P15 RIOLITA SCC 55,6 75,0 25 689 45P15 GRANODIORITA PROP 50,0 27,0 25 526 38P16 VOLCNICO KBIO 62,1 31,0 25 610 42P16 GRANODIORITA KBIO 49,8 45,9 25 597 43P16 GRANODIORITA SCC 51,0 49,3 25 619 44P16 GRANODIORITA QSA 61,8 53,0 25 768 50P16 RIOLITA QSA 54,2 75,0 25 669 45P16 BRECHA QSA 57,8 54,0 25 670 45P16 RIOLITA QSA 59,6 64,0 25 718 46P17 GRANODIORITA KBIO 47,0 32,0 25 524 37P17 GRANODIORITA SCC 47,0 36,0 25 539 39P17 BRECHA QSA 64,3 54,0 25 775 49P17 VOLCNICO KBIO 50,0 31,0 25 493 35P17 GRANODIORITA QSA 51,4 36,0 25 577 41P17 RIOLITA QSA 49,8 39,5 25 517 36

    SECTION UCSRMRLITHOLOGY ALTERATION

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 270

    SEISMICITY AND SEISMIC RISK Karzulovic et al. (1989) and Araya (1990) evaluated the seismicity and the seismic risk of the II Region, considering the geotectonics, the seismic history, the frequency of oc-currence of seismicity and the attenuation of seismic intensity with distance from the seismic focus. This characterization was updated, adding the earthquake of Antofagasta, July 30, 1995, whose Richter magnitude was 7.8 and focal depth 36 km. The seismicity and the seismicity risk where the Minera Escondida pit is located may be described as follows: o The frequence of seismic occurrence may be represented by the empirical law of

    Gutenberg and Richter:

    obMaLogN =

    Where N is the number of seismic events per year with a Richter magnitude equal or greater than Mo, and the constants a and b represent the geoseismic characterization of the region. In the area of the coast of the II Region a is equal to 4.35 and b is equal to 0.86, while in the area close to the mountains a is equal to 6.57 and b is equal to 1.20; with probable maximum magnitudes of 8.1 and 7.5, respectively. Using these scales it is possible to generate a probability density function of the magnitude of the seismicity that takes place in each of these areas.

    o To estimate the attenuation of the seismic intensity, defined in terms of the maximum horizontal acceleration at surface, it is possible to use the relation:

    ( ) 6.171.0

    60346.2

    +=

    Re

    aM

    MAX

    Where aMAX is the maximum horizontal acceleration at surface (in g units), M is the Richter magnitude of the seismic event considered and R is the hypocentral distance in kilometers.

    o It is possible to associate the length of failure to the magnitude of the seismic event using the following empirical relation.

    ( ))062.3013.1

    =M

    R eL

    Where LR is the average length of the failure zone, in kilometers, and M is the Rich-ter magnitude of the seismic event.

    o It is possible to use the Poisson model to determine the return period associated with the different seismic intensities.

    o According to this, the earthquake and seismic risk of the II Region were evaluated, concluding that in order to evaluate the stability of the mining residue deposits, the possible occurrence of two types of seismic events should be considered.

    OPERATIONAL EARTHQUAKE: corresponding to a moderate seismic magnitude, but with a relatively high possibility that it may occur during the operational life of the mining residue deposits.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 271

    MAXIMUM PROBABLE EARTHQUAKE: corresponding to a very violent seismic event with earthquake characteristics, but with a low possibility that it may occur during the operational life of the mining deposits. The operational earthquake and the maximum probable earthquake that could affect the mining residue deposits in the II Region show the following characteristics: OPERATIONAL EARTHQUAKE: Richter Magnitude: 7.5 to 7.8 Probable epicenter: Calama / Coquimbo / Antofagasta Focal Depth: Approximately 100 km Probable maximum duration: 65 seconds Maximum horizontal acceleration at surface: 0.20 g Probability of occurrence in 50 years : Approximately 50%

    MAXIMUM PROBABLE EARTHQUAKE: Richter Magnitude: 8.0 to 8.5 Probable epicenters: Calama / Coquimbo / Antofagasta Focal depth : Approximately 135 km Probable maximum duration: 200 seconds Maximum horizontal acceleration at surface : 0.47 g Probability of occurrence in 50 years: Approximately 10%

    According to this and considering the existing experience regarding the pseudo statistics analyses of slopes in seismic condition, to evaluate the stability of slopes of ENorte Pit: OPERATIONAL EARTHQUAKE : kH = 0.05 g MAXIMUM PROBABLE EARTHQUAKE : kH = 0.12 g It is advisable to note that the magnitude of the seismic coefficient is NOT similar to the maximum horizontal acceleration at surface, especially in the cases of the slopes of in-terest described here, due to the simplification introduced by the pseudo static analysis. Nevetheless, it must be pointed out that the probable seismic risk will not be the main factor in the geotechnical design of slopes of ENorte Pit.

    STABILITY ANALYSIS

    In order to analyze the stages of the designs of ENorte the following steps were taken: Six vertical sections of the design of each one of the stages were defined as shown in

    Figure 2 and Figure 3. Each section was analyzed by the limit equilibrium method using GLE and program SLIDE.

    It was assumed that the slopes could show tension cracks of up to 10% of the slope height.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 272

    The Probability of Failure, PF, was evaluated according to recent recommendations from Duncan (2000). For this purpose it was assumed that the uncertainty in the properties could be represented through coefficients of variation of 10% and 40% of the friction angle and the cohesion respectively.

    To evaluate the stability in seismic conditions a pseudo static analysis was performed. According to the previous section, it was considered that the occurrence of an operational earthquake is equivalent to a seismic horizontal coefficient equal to 0.05g, and that the occurrence of the maximum probable earthquake is equivalent to a horizontal seismic coefficient equal to 0.12g.

    Program SLIDE was used to perform the stability analysis. In Figure 7 a typical evaluation with this method is shown, the input data to this program are summarized as follows: The geometry of the slope to be analyzed is provided, including the contacts

    between each of the geotechnical units. The geotechnical parameters in each of the geotechnical units were input for every

    section. These parameters are shown in Table 2. The phreatic level is included

    for every section. Since the material is a rock

    mass, the search for the critical surface will be performed for a non-circular surface using the GLE option in SLIDE.

    If desired, a probabilistic analysis is used to cater for the uncertainties.

    When the pseudo static analysis is carried out, the seismic coefficients are defined.

    Nivel Fretico

    Superficie Crtica de Deslizamiento

    SECCIN P4SECCIN P4

    Nivel Fretico

    Superficie Crtica de Deslizamiento

    SECCIN P4SECCIN P4

    Figure 7: Results for interramp stability analysis forSection P04-N1, of the design of Phase 1 of ENortefor the static condition. This design has a Safety Factorregarding method GLE of 2.849 and a ProbabilisticFailure < 1.0%.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 273

    Table 3: Stability Analyses Results, Phase 1

    ESTATICO DINAMICO

    FS SECTOR SECCIN CONDICIN H (m) G ()

    IR ()

    W (Kt/m)

    FS PF (%) So Tmp GLOBAL 330 54.17 1.657 1.548 1.412

    CONTACTO 1 176 22.23 1.901 1.772 1.613 CONTACTO 2 86 8.16 2.908 2.732 2.492

    A P01-N1

    CONTACTO 3 195

    50 50

    19.70 1.997

    < 1

    1.882 1.745

    GLOBAL 330 69.32 1.424 4 1.323 1.201 CONTACTO 1 120 8.90 2.433 2.317 2.136 C, K, L P03-N1 CONTACTO 2 210

    51 50 28.45 1.693

    < 1 1.579 1.439

    C, K, L P04-N1 INTERRAMPA 1 111 50 14.53 2.849 < 1 2.656 2.420 GLOBAL 292 56.99 1.720 1.597 1.453

    CONTACTO 1 142 17.78 2.366 2.206 2.012 CONTACTO 2 187 24.12 2.028 1.886 1.715

    J P15-N1

    CONTACTO 3 135

    49 50

    9.11 2.789

    < 1

    2.648 2.442

    GLOBAL 364 90.34 2.112 1.953 1.756 CONTACTO 1 188 30.57 2.781 2.583 2.337 CONTACTO 2 308 58.94 2.207 2.055 1.865 CONTACTO 3 285 44.26 2.408 2.266 2.083

    B P16-N1

    CONTACTO 4 165

    50 50

    15.73 2.968

    < 1

    2.801 2.595

    GLOBAL 247 66.09 2.501 2.297 2.038 INTERRAMPA 1 110 12.53 2.840 2.663 2.439 C, D, K P17-N1 INTERRAMPA 2 138

    41 50

    22.45 2.778 < 1

    2.672 2.517

    The results obtained are summarized in Tables 3 and 4. These results (OUTPUT), are also shown in Figure 7, and give the following results: Safety Factor of the most critical surface using the method chosen (GLE, for this

    case). Location of the central point that defines the most critical surface (it is normally

    identified in the figure of the section selected). The critical height fault that determines the surface may also be appreciated.

    Probability of Failure, when this result has been obtained from probabilistic analysis.

    From the results obtained, it may be determined if the evaluated interramp and global angles satisfy the acceptability criteria, previously defined by the mine management.

    Finally, the program delivers the critical failure tonnage that would result per linear metre of the slope (bear in mind that the sections have a unit thickness, in this case, one metre).

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 274

    EVALUATION OF THE RESULTS

    Where an eventual instability would not involve significant consequences and perhaps a relatively superficial slide would take place, the designs carried out can be considered valid. Criteria for acceptability should consider the following: In static conditions, the slopes must be stable enough, and with a probability of

    failure low enough to allow safe operation.

    In a seismic operational condition, or alternatively in a moderate magnitude seis-mic event, but with a relatively high probability of occurrence during the opera-tional life of the slopes, which is the case of the operational earthquake, the slopes must be stable, with a probability of failure from medium to low.

    In an extreme seismic condition, that is, in the case of a very violent seismic event or with earthquake characteristics, but with a low probability of occurrence during the operational life of the slopes, which is the case of the maximum probable earthquake, the slopes must not reach the condition of limit equilibrium.

    Table 4: Stability Results Final Pit (West Wall) ESTATICO DINAMICO

    FS SECTOR SECCIN CONDICIN H (m) G ()

    IR ()

    W (Kt/m)

    FS PF (%) So Tmp GLOBAL 420 117.00 1.798 1.661 1.487

    INTERRAMPA 1 300 50.82 1.994 1.845 1.662 INTERRAMPA 2 105 10.98 2.684 2.514 2.306 INTERRAMPA 3 315 65.29 1.854 1.716 1.540

    A P01-PF

    INTERRAMPA 4 120

    45 50

    12.79 2.468

    < 1

    2.301 2.095

    GLOBAL 255 42.53 1.516 2 1.412 1.275 C, K, L P03-PF CONTACTO 1 195

    51 50 25.04 1.751 < 1 1.643 1.492

    GLOBAL 396 159.84 1.849 1.699 1.519 CONTACTO 1 283 147.23 2.592 2.384 2.151

    INTERRAMPA 1 201 30.87 2.743 < 1

    2.559 2.328 C, K, L P04-PF

    INTERRAMPA 2 165

    46 50

    20.98 1.416 5 1.319 1.206

    GLOBAL 505 159.60 1.542 1.414 1.273 INTERRAMPA 1 340 72.21 1.868 1.730 1.553 INTERRAMPA 2 160 19.53 2.262 2.116 1.936 INTERRAMPA 3 345 80.69 1.681 1.560 1.397 INTERRAMPA 4 165 23.83 1.823 1.719 1.576

    J P15-PF

    INTERRAMPA 5 180

    45 50

    22.33 2.138

    < 1

    2.004 1.834

    GLOBAL 414 92.67 1.700 1.588 1.446 B P16-PF

    CONTACTO 1 360 51 50

    72.60 1.763 < 1

    1.635 1.485

    C, D, K P17-PF GLOBAL 274 51 50 53.67 2.195 < 1 2.059 1.864

    H: Height of the slope analyzed G: Global Slope Angle IR: Interramp Slope Angle W: Fault Ton by linear meter of the slope So: FS with operational seism Tmp: FS with max seism. Probable

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 275

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    RAJO ESCONDIDA NORTE

    RECOMENDACIN

    NGULOS INTERRAMPA

    PIT FINAL

    SECCIN P4FSGLE = 1.42PF = 5 %IR = 50

    N

    SECCIN P1FSGLE = 1.80PF = < 1 %IR = 50

    SECCIN P17FSGLE = 2.20PF = < 1 %IR = 50

    SECCIN P16FSGLE = 1.70PF = < 1 %IR = 50

    SECCIN P3FSGLE = 1.52PF = 2 %IR = 50

    SECCIN P15FSGLE = 1.54PF = < 1 %IR = 50

    IRIR = 50= 50

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    RAJO ESCONDIDA NORTE

    RECOMENDACIN

    NGULOS INTERRAMPA

    PIT FINAL

    SECCIN P4FSGLE = 1.42PF = 5 %IR = 50

    N

    SECCIN P1FSGLE = 1.80PF = < 1 %IR = 50

    SECCIN P17FSGLE = 2.20PF = < 1 %IR = 50

    SECCIN P16FSGLE = 1.70PF = < 1 %IR = 50

    SECCIN P3FSGLE = 1.52PF = 2 %IR = 50

    SECCIN P15FSGLE = 1.54PF = < 1 %IR = 50

    IRIR = 50= 50

    Figure 9: The hatching zone shows the interramp angle rec-ommended (optimized), for ENorte, for the west Wall. The rest of the walls keep the angles recommended in the feasibility study.

    RAJO ESCONDIDA

    NORTE

    NGULOS

    INTERRAMPA

    RECOMENDADOS

    FASE I

    SECCIN P4FSGLE = 2.85PF = < 1 %IR = 50

    NSECCIN P1FSGLE = 1.66PF = < 1 %IR = 50

    SECCIN P17FSGLE = 2.50PF = < 1 %IR = 50

    SECCIN P16FSGLE = 2.11PF = < 1 %IR = 50

    SECCIN P3FSGLE = 1.42PF = 4 %IR = 50

    SECCIN P15FSGLE = 1.72PF = < 1 %IR = 50

    IR = 50

    IR = 45

    IR = 49

    RAJO ESCONDIDA

    NORTE

    NGULOS

    INTERRAMPA

    RECOMENDADOS

    FASE I

    SECCIN P4FSGLE = 2.85PF = < 1 %IR = 50

    NSECCIN P1FSGLE = 1.66PF = < 1 %IR = 50

    SECCIN P17FSGLE = 2.50PF = < 1 %IR = 50

    SECCIN P16FSGLE = 2.11PF = < 1 %IR = 50

    SECCIN P3FSGLE = 1.42PF = 4 %IR = 50

    SECCIN P15FSGLE = 1.72PF = < 1 %IR = 50

    IR = 50

    IR = 45

    IR = 49

    Figure 8: Interramp angles recommended for Phase 1 design of ENorte.

    Thus, the stability analyses results enable the following to be pointed out: For the conditions of design for the stages evaluated here for ENorte from MEL, stability problems would not be introduced in a static or seismic condition. The Figure 8 shows the interramp angles recommended for Phase 1 or premine. Even though the evaluations of sections P15 and P17 indicated that the interramp angles may be 50, mine planning MEL determined that the angles to be used would be 45 for the North and 49 for the Southeast. The Figure 9 shows the angles recommended for the final wall, where only the angles towards the west side of pit ENorte would be modified, keeping the design evaluated in the fea-sibility study for the rest of the walls. As in the previous case, sections, P15 y P17, fulfill the criteria for an interramp angle of 50, but mine planning MEL decided that the angles to be used would be 43 for the North side and 47for the Southwest. The Figure 10 shows a consolidation between the angles recommended and the old angles for the sec-tors that have been kept. Nevertheless, the good results achieved in that stage, would allow an increment of the slope angles.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 276

    This would be performed once the type of rock mass and the structural conditions in the sectors are known, when the mining of the first phases expose the rock mass in order to carry out a new geotechnical characterization.

    CONCLUSIONS AND RECOMMENDATIONS

    The following are the most relevant conclusions and recommendations from this revi-sion of the designs of Phase 1 and Final Pit, sector West from ENorte: It is possible to increase the interramp slope angle by 2, without risking the sta-

    bility of the interramp slopes, in every sector evaluated. Accordingly, the global angles will also increase by at least 1, and maintain the

    stability condition of the whole wall. The results of the sections evaluated for both stages of design, are shown in Ta-

    bles 3 and 4. It is necessary to continue considering the structures present in the rock mass, i.e.

    the strength of the rock mass has a directional and anisotropic behavior. It is common that any failure in the rock mass may be, at least partially, affected by the presence of structures, since they define the planes of weakness.

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    SECTOR D

    SECTOR C

    SECTOR B

    SECTOR A

    SECTOR J

    SECTOR I

    SECTOR E

    SECTOR H

    SECTOR F

    SECTOR G

    SECTOR LSECTOR K5050(48)

    4343

    4545

    4444

    4747

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    SECTOR D

    SECTOR C

    SECTOR B

    SECTOR A

    SECTOR J

    SECTOR I

    SECTOR E

    SECTOR H

    SECTOR F

    SECTOR G

    SECTOR LSECTOR K5050(48)

    4343

    4545

    4444

    4747

    E-17

    500

    E-18

    000

    E-18

    500

    E-19

    000

    E-19

    500

    E-20

    000

    N-113000

    N-113500

    N-114000

    N-114500

    N-115000

    SECTOR D

    SECTOR C

    SECTOR B

    SECTOR A

    SECTOR J

    SECTOR I

    SECTOR E

    SECTOR H

    SECTOR F

    SECTOR G

    SECTOR LSECTOR K5050(48)

    4343

    4545

    4444

    4747

    Figure 10: Consolidated between the present interramp angles recom-mended and old ones in the sectors that have been kept in the feasibility study for the Final Pit design of ENorte. For the West sector, the interramp angle recommended during the feasibility study is shown in brackets.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 277

    Maintain permanent visual observational control on the behaviour of the slopes, as well as a monitoring and implementation plan. This enables circumstances of instability to be detected immediately.

    Maintain a tight control of the program. As a result of the geotechnical evaluations, all the present designs, for every stage

    evaluated, satisfy the acceptability criteria described. They are stable enough in static conditions, as well as in seismic conditions. Figures 8, 9 and 10 summarize these results.

    REFERENCES

    [1] Araya R. (1990): Sismicidad y Riesgo Ssmico, en Levantamiento Catastral de los Tranques de Relaves en Chile, Etapa C: Regiones II y III, Tramo 1. Technical Report, Ingeniera & Geotecnia Ltda.

    [2] Duncan, J. M. (2000): Factors of Safety and Reliability in Geotechnical Engineer-ing, J. Geotechnical and Geoenvironmental Eng., ASCE, Vol. 126, N 4.

    [3] Harr, M. (1987): Reliability-Based Design in Civil Engineering, Dover: New York.

    [4] Hoek, E. & Bray, J. (1981): Rock Slope Engineering, 3rd ed., IMM, London. [5] Karzulovic, A., Aguirre, A. & Araya, R. (1989): Definicin del Sismo de Opera-

    cin y del Terremoto Mximo Probable para el Anlisis de Estabilidad Ssmica de Depsitos de Relaves. Anales VI Simposium de Ingeniera de Minas, Universidad de Santiago de Chile.

    [6] Minera Escondida Limitada (2003): Feasibility Study Escondida Norte. [7] Rocscience (2003): Slide 5.0: 2D Limit Equilibrium Slope Stability for Soil and

    Rock Slopes, Rocscience, Geomechanics Software & Research. [8] Seplveda, R. & Mena, C. (2003): Optimizacin ngulos de Taludes Escondida

    Norte, Estudio N ML-CG-2003-01, Final Report, A. Karzulovic & Asoc. Ltda. [9] Sepulveda, R & Mena, C. (2003): Evaluacin Geotcnica Explotacin Simultnea

    Rajos Zaldvar y Escondida Norte (Transicin CMZ- MEL), Estudio N CMZ 2003-05, A. Karzulovic & Asoc. Ltda.

  • The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes Ricardo Sepulveda

    Page 278

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /Unknown

    /Description >>> setdistillerparams> setpagedevice