SPE-195751 Galapagos Field Redevelopment (NW Hutton And Darwin) in the East Shetland Basin JEB TYRIE, BRIDGE PETROLEUM LIMITED

Upload: others

Post on 31-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

SPE-195751Galapagos Field Redevelopment (NW Hutton

And Darwin) in the East Shetland Basin

JEB TYRIE, BRIDGE PETROLEUM LIMITED

Page 2: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

2

Disclaimer• The purpose of this confidential presentation (collectively, the “Presentation”) is to acquaint and familiarize prospective investors with Bridge Petroleum Ltd and its subsidiaries

(“Bridge”) and Project Galapagos. Bridge is seeking investors for Project Galapagos. In order to properly obtain and read this Presentation, you are required to have signed therelevant Confidentiality Agreement. This Presentation and any additional information provided by Bridge or contained in any online data room is provided subject to theConfidentiality Agreement. Do not read this Presentation unless you have signed a Confidentiality Agreement furnished by Bridge.

• This Presentation is confidential and private. Distribution is restricted. It may not be reproduced, copied or replicated in any form including print and digital media without theexpress and written authorization of Bridge. This Presentation is and at all times shall remain the exclusive property of Bridge. You are responsible for protecting theconfidentiality and propriety of the information contained in this Presentation. Improper disclosure may harm Bridge and you will be held responsible for any damages resultingfrom an improper disclosure on your part. Should it become necessary to present this Presentation to third parties as part of a due‐diligence investigation or to obtain financing,you should advise the third parties that this Presentation is confidential and that you have signed a Confidentiality Agreement in order to obtain it.

• You are responsible for maintaining and protecting the confidentiality of this Presentation and that obligation extends to your employees, advisors, representatives, agents andany other third parties who subsequently receive this Presentation and the information contained herein.

• No representations or warranties, expressed or implied, are made regarding the accuracy or completeness of the information contained herein and any such representations andwarranties are not authorized.

• This Presentation contains statements, estimates and projections provided by Bridge concerning anticipated future performance. Such forward looking statements, estimatesand projections reflect assumptions by Bridge concerning anticipated results, which may or may not prove to be correct. No representations, expressed or implied are made asto the accuracy of such statements, estimates and projections and potential investors or buyers should rely on their own due diligence investigations.

• The directors, including the presenter(s), of Bridge Petroleum Ltd, as presenters of this Presentation represent Bridge. It is expressly understood that they are not agents orrepresentatives of any prospective investor, buyer or recipient of this Presentation and that they are not acting and shall not act as a fiduciary of an investor into or buyer ofBridge. Bridge does not and shall not provide legal, tax, accounting and risk management advice. Prospective investors or buyers are advised to seek and obtain the counsel ofcompetent professionals. Each of Bridge Petroleum Ltd and its related bodies corporate and affiliates and their respective directors, partners, employees, agents and advisersexpressly disclaim any liability for any direct, indirect or consequential loss or damages suffered by any person as a result of relying on any statement in, or omission from, thisPresentation.

• The foregoing is in addition to and without prejudice to all other disclaimers and agreements which a recipient of the Presentation shall be deemed to have agreed to or bebound by as provided in the Presentation.

Page 3: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Location UKCS BLOCK 211/27

• Galapagos Field Development• East Shetland Basin• BRENT Province• Re-development of North West

Hutton and extended to Darwin• Concept Select

• FSPO • 4 Sub-Sea Drill Centres• Horizontal wells• Artificial Lift• Flow Control Valves

• 90 mmstboe in base case• Low risk brownfield development,

supplemented by well understood greenfield area

Page 4: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

The Problem

Page 5: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Galapagos Structural Map

• Compartmentalised Terraces

• Full throw faults down to zero throw

• NW Hutton • 11 Exploration / Appraisal wells (1970s)• 52 Production wells (1983-2002 CoP)

• Darwin• 3 Exploration / appraisal wells (2013)

• 2 successful oil wells in south

-112

00

- 14200

-150

00- 1

5200

-154

00 -140

00

-156

00

-132

00-136

00

-160

00

-1480

0

-13000

-14600

-1340

0

-14 400

-14 200

-104

00

-12400

-12600

-12800

-13800

-14000

-122

00

-152

00-1

5000

-130

00

-132

00

-126

00

-14800 -1

2400

-150

00

-138

00-1

360

0

-152

00

-12200

-116

00

-128

00

-118

00

-144

00-1

420

0

-120

00

-12400

-126

00

-16200-1

6400

-136

00

-160

00-1

5600

-130

00

-13000

-132

00

-13400-13600

4 04 0 00 4 06 0 00 4 08 0 00 4 10 0 0 0 41 2 00 0 41 4 00 0

4 04 0 00 4 06 0 00 4 08 0 00 4 10 0 0 0 41 2 00 0 41 4 00 0

6766

000

6768

000

6770

000

6772

000

6774

000

6776

000

6778

000

6780

000

67660006768000

67700006772000

67740006776000

67780006780000

0 0 .5 1 1 .5 2km

Page 6: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

DATA

Flint

• 2008/2014 Seismic

• Logs / Cores

• RFTs / PLTs

• Production Data

• BHP

• Studies, papers

Modified from Flint et al 1999

Page 7: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

DATA

Flint

• 2008/2014 Seismic

• Logs / Cores

• RFTs / PLTs

• Production Data

• BHP

• Studies, papers

Modified from Flint et al 1999

Summary of all PLTs

0 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20%

Page 8: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Correlation – NORTH SOUTH Flattened on Mid Ness Shale

Page 9: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Upper Ness Correlation

Page 10: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

STOIIP and Remaining Oil MMSTB

8%

8%16%

20%

12% 29%

10%21%

STOIIP vs STOCIP by FIP

8%

12%

11%

7%

20%

STOIIP vs STOCIP by Formation

P90-P50-P10: 790 -- 883 -- 937

Page 11: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

• 4 Drill Centres• Producer Injector Pairs• Horizontal Wells

• 3000 ft md cf 350 ft tvd

• Differential Pressure risk• Use inclination of formation

to simplify wells• Cut all zones• Straight reservoir section

Field Development

Page 12: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

The Challenge

• 20 years of Production History -- 20 years shut-in• Monitor forecast performance against History Match Simulation Model

• New wells, new information(?)• How much performance?

• What parameters?• Model updates, how often?

• 75 FCV on Injectors and Producers• 5 Injectors 11 Producers

• Set FCV valve position for X months ahead (?)

Page 13: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

FCV Completion and Optimised Valve Positions

Page 14: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

The Solution

Page 15: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Forecast

• 250 uncertainty runs were conducted, excluding structure:

• Range of 796 – 888 – 943 mmstbo• Upscaled 16 cases P90/P50/P10 bins:

• Forward models selected on match to history without further edits• FIP and well• Cumulative oil, cumulative water, • BHP and RFT

Page 16: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

FCV Completion and Optimised Valve Positions

Page 17: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

How to Shrink the Facilities (FSPO Case)

Constraints Oilmmstb

Watermmstb

Injectionmmstb

P50 - No FCV 197 692 926P50 - No FCVRate & GLO 192 465 688P50 - FCV 207 312 595P50 - FCV Rate & GLO 207 230 484

120130

140

150

160

170180

190

200

210220

Jan-20 Jan-30 Jan-40 Jan-50

Cu

mu

lati

ve O

il P

ro

du

cti

on

, stb

Millions

P50 - No FCV - No rate limitations

P50 - No FCV - Rate constraints & GLO

P50 - FCV - No rate limitations

P50 - FCV - Rate constraints & GLO

100

200

300

400

500

600

700

800

Jan-20 Jan-30 Jan-40 Jan-50

Cu

mu

lativ

e W

ater P

ro

du

ctio

n,

stb

Millions

P50 - No FCV - No rate limitations

P50 - No FCV - Rate constraints & GLO

P50 - FCV - No rate limitations

P50 - FCV - Rate constraints & GLO

200

300

400

500

600

700

800

900

1000

Jan-20 Jan-30 Jan-40 Jan-50

Cu

mu

lativ

e W

ater In

jectio

n,

scf

Millions

P50 - No FCV - No rate limitations

P50 - No FCV - Rate constraints & GLO

P50 - FCV - No rate limitations

P50 - FCV - Rate constraints & GLO

FCV• Monitoring• 90 45 MBL/D Smaller Boat!

Page 18: 20191002 Galapagos SPE Aberdeen Inwell Monitoring ... · Microsoft PowerPoint - 20191002 Galapagos SPE Aberdeen Inwell Monitoring & Surveillance - Presentation Upload Author: Bridge

Confidential and subject to the disclaimer

Monitoring

• Monitor forecast performance• History Match Simulation Model

• New wells, new information(?)• Logs, RFTs, (no DST or core)

• How much performance?• Every 3 months

• Model updates, how often?• Initial 6 month rebuild based on

• New wells• Pressure Pulse tests

• Automated History Match quarterly• Rates, Water Cut, BHP, THP

• Weekly data

• Rebuild annually

• 75 FCV on Injectors and Producers• 5 Injectors 11 Producers

• PLT every day!• Rate and BHP per zone• Water cut to 40%• Tracers as back up

• Production test for Scale and rate monthly

• Set FCV valve position for 1 year (?) ahead

• Optimisation is demanding• Automated work flow

• Use Forecast windows and FIPs• 1 year ahead