2010/11 construction projects update board meeting august 17, 2010 prepared by: mr. douglas barge...

21
2010/11 Construction 2010/11 Construction Projects Update Projects Update Board Meeting Board Meeting August 17, 2010 August 17, 2010 repared by: repared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie Hargis Ms. Carrie Hargis Y:\Business Services\Financial Modeling\Construction Planning\Waterfall #9 \ B08-17-10

Upload: saul-boniface

Post on 31-Mar-2015

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

2010/11 Construction Projects 2010/11 Construction Projects UpdateUpdate

Board MeetingBoard MeetingAugust 17, 2010August 17, 2010

Prepared by:Prepared by: Mr. Douglas BargeMr. Douglas Barge Mr. Art HandMr. Art Hand Ms. Carrie HargisMs. Carrie Hargis Y:\Business Services\Financial Modeling\Construction Planning\Waterfall #9 \ B08-17-10

Page 2: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Table of Table of ContentsContents

DESCRIPTION PAGE #

A. Opening CommentsB. Certificates of Participation (COPs)C. State Construction FundsD. Measure “K” Project DetailE. Measure “L” Project DetailF. Closing Comments

G. Appendix COPs Debt Service Analysis

12

3-45-78-910

A-1

i

Page 3: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Opening Opening CommentsComments

1

• We will start by reporting on the 2007 Certificates of Participation (COPs) debt and a plan to buy down the debt using the $7.7M the District has received from the State for the Tokay mold abatement project

• Next we will show an updated construction plan with funding provided

• To arrive at a funding plan staff has:– Incorporated the impact of previous Waterfall #8 (July 2010 report)– Adjusted funding between projects to cover existing obligations and recaptured

resources no longer needed– Accounted for all new income from the State

• Including paying back “temporary borrowing” between projects

– Accounted for impact of recent Qualified School Construction Bond (QSCB)

• It is important to remember these funds cannot be used to support general operations

Page 4: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Certificates of Participation Certificates of Participation (COPs)(COPs)

Debt Re-Payment StatusDebt Re-Payment Status

ii

Page 5: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

COPs Debt Re-COPs Debt Re-Payment StatusPayment Status

Project Description

Debt Svc Pmt

COPSPrincipal

Paid

B. Tokay Repairs - Local 2,868,273

C. Tokay Repairs - State 7,731,727

A. Lawrence Repairs $2,900,000 $2,497,316

^ Principal balance equals $3,065,000; Payments will increase to $292,763 during course of re-payment

$13,500,000$13,500,000 $10,435,000$10,435,000E. Total

Williams

R.R.M.

St Facilities

Source

2

*

On-Going

Annual Pmt

$143,669

$143,669$143,669

^

D. Unspent COPs Proceeds COPs

Note: Project increased prior to finalizing sale of COPs

7,590,000

347,684

* Received State funds of $7,771,669 to apply towards repayment of debt

Page 6: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Arrival of State Arrival of State Construction FundsConstruction Funds

iii

Page 7: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

New State Funds - New State Funds - ReceivedReceived

MGMT DESCRIPTION AMOUNT8711 Delta Sierra Science Classroom 1,132,491$

8712 Morada Science Classroom 1,179,172

8916 Tokay High Addition (Science) 1,725,209

8928 Lodi High Addition 594,260

8958 Lodi High Modernization 4,571,430

9,202,562$

3

Total New State Funds

Page 8: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Waterfall Summary Waterfall Summary by Fundby Fund

State Funds Measure K Measure L Dev Fee Spec ResvFund # 35 21 22 25 40 TOTAL

State Funds 35 ($9,202,562) $5,165,690 $2,311,663 $1,725,209 $0

Measure K 21 $4,833,092 ($3,458,043) ($1,375,049) $0

Measure L 22 $0

Dev Fee 25 $0

Spec Reserve 40 ($150,000) $150,000 $0

Total ($9,202,562) $9,848,782 $2,311,663 ($1,732,834) ($1,225,049) $0

Fund Desc

4

Page 9: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “K” BondsMeasure “K” Bonds

Waterfall #9

iv

Page 10: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “K” Measure “K” Project DetailProject Detail

D. Live Oak (160,000) 100,000

Project Description Waterfall #8 ** Change Waterfall #9

A. Elkhorn $600,000 $100,000

C. Tokay Colony

F. Total Modernization $1,339,271 $4,119,271

II. Renovations

I. Modernization

A. Lodi High $250,000 $4,700,000

($500,000)

$2,780,000

B. Lodi Middle 300,000

F. Total Renovations $2,100,000 $5,825,000

(310,000)

$4,450,000

(450,000)

$3,725,000

C. Vinewood 550,000 275,000D. Lakewood 300,000

(275,000)(250,000)

B. Lodi High 0 3,750,000 3,750,000

360,000

260,000

750,000

550,000

50,000

E. Independence North 250,000250,000

E. Needham 119,271 119,271

*Includes approved budget transfers following Waterfall #8. 5

0

0

Page 11: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “K” Project Measure “K” Project Detail – cont.Detail – cont.

Project Description Waterfall #8 ** Change Waterfall #9

$8,288,006$8,288,006 $9,848,782$9,848,782 $18,136,788$18,136,788V. Total Projects

A. Lockeford $3,000,000 $4,375,049III. Additions

$1,375,049

6*Includes approved budget

transfers following Waterfall #8.

IV. Other ProjectsA. Playground Equip. Replace. $315,000B. Cafeteria Upgrades 600,000

H. Total Other Projects $1,848,735 $3,817,468$1,968,733

G. Unallocated 279,425230,901

C. McNair 2,433,043$1,733,043700,000

48,524

$315,000

600,000

D. Bear Creek Phase I (2,834)2,834E. Borchardt/Larson Painting 120,000120,000F. Morada Bus Loop 70,00070,000

0

0

0

Page 12: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “K” Project Measure “K” Project HighlightsHighlights

• Lodi High Renovation – Project will address deficiencies in theclassrooms of the school’s permanent wings, including flooring, painting and window replacement

• Cafeteria Upgrades – In cooperation with Food Services, this project will improve the efficiency and aesthetics of the serving areas at Lodi High, Lodi Middle and Morada Middle Schools

• Borchardt/Larson Painting – Portions of the original paint applications at each of these schools have failed over time. This expanded warranty repair project will repaint each school in total.

• Independent Study High (North) Renovation – This site requires upgrades in many areas, including sliding replacement, new flooring, handicap accessibility modifications and window replacement.

7

Page 13: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “L” BondsMeasure “L” Bonds

Waterfall #2

v

Page 14: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “L” Measure “L” Project DetailProject Detail

B. Academy High 2,000,000 2,000,000

Project Description Waterfall #1 Change Waterfall #2

A. Future K-6 D $2,000,000 $2,000,000

C. Safety Projects 1,700,000 1,700,000

$17,568,173$17,568,173 $2,311,663$2,311,663 $19,879,836$19,879,836F. Total

E. Unallocated 11,568,173 13,879,836

D. Playground 300,000

$2,311,663

300,000

8

0

0

0

0

Page 15: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Measure “L” Project Measure “L” Project HighlightsHighlights

• Academy High School - This “green technology” themed small high school will provide state-of-the-art learning opportunities in a school-of-choice environment

• Atlas Tract Elementary – Anticipated to be the first new K-8 elementary school constructed in the LUSD

• Measure L Safety Projects – With the last phase of Measure L safety money expenditures, several North Stockton school sites will receive critically needed fire alarm and intercom replacements

9

Page 16: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Closing CommentsClosing Comments

vii

Page 17: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Closing CommentsClosing Comments• With funding having arrived from the State we can continue with our

original plan of paying down the COPs debt

• Reorganizing existing resources and declaring the new State resources gives the District the ability to move forward with its capital improvement program

• The projects shown here represent a shift in the District's construction philosophy from new school needs to modernization/ rehabilitation of existing facilities

• Future state reimbursements for projects such as the Lockeford Addition will become available to support other construction needs

• Regular updates on the progress of this latest phase of District construction will be provided to the Board and the Superintendent

10

Page 18: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

The EndThe End

Page 19: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

AppendixAppendix

• Debt Service Analysis A-1

• Project Funding Details B-1

Page 20: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

A-1

Debt Service AnalysisDebt Service Analysis

Page 21: 2010/11 Construction Projects Update Board Meeting August 17, 2010 Prepared by: Mr. Douglas Barge Mr. Douglas Barge Mr. Art Hand Mr. Art Hand Ms. Carrie

Project Funding Details – Project Funding Details – All FundsAll FundsRESC MGMT C. ADJUSTED BALANCE

CODE CODE DESCRIPTION FUND 21 FUND 22 FUND 25 FUND 35 FUND 40 TOTAL0000 0000 Unallocated $279,425 $13,879,836 $72,602 $31,402 $14,263,2650000 0000 Unalloc. - Reserve for income not rec'd $769,109 $769,1090800 5800 F & P $197,197 $197,1970882 8055 Needham Modernization $119,271 $119,2710811 8096 07-08 Growth Portables $18,245 $18,2450815 8102 08-09 Growth Portables $5,780 $5,7800878 8103 Needham Portables $50,000 $50,0000818 8711 Delta Sierra Science Classroom

0819 8712 Morada Science Classroom

0824 8904 McNair $2,433,043 $2,433,0430831 8911 Lockeford Addition $4,375,049 $4,375,0490836 8916 Tokay High Addition

0840 8921 Future Elem D (Atlas Track) $2,000,000 $2,000,0000845 8927 BCHS Addition Phase I

0846 8928 Lodi High Addition

0850 8934 SFID Safety $1,700,000 $1,700,0000854 8951 Elkhorn Mod $100,000 $100,0000858 8955 Live Oak Mod $100,000 $100,0000861 8958 Lodi High Mod $3,750,000 $3,750,0000863 8960 Tokay Colony Mod $50,000 $50,0000866 8963 Vinewood Mod $275,000 $275,0000873 8125 Lodi High Career Tech Ed $1,897,070 $1,897,0700874 8974 Academy High School $2,000,000 $2,000,0000879 8104 Playground Equip. Lodi $315,000 $315,0000880 8106 Playground Equip. Stockton $300,000 $300,0000881 8730 Cafeteria Upgrades $600,000 $600,0000883 8965 Lodi High Renovation $4,700,000 $4,700,0000886 8972 Lodi Middle Renovation $300,000 $300,0000887 8973 Lakewood Renovation $300,000 $300,0000884 8937 McNair Field $600,000 $600,0008885 8938 Lawrence Parking $550,000 $550,000

ISP North Renovation $250,000 $250,000Borchardt/Larson Painting $120,000 $120,000Morada Bus Loop $70,000 $70,000

TOTAL 18,136,788 19,879,836 3,010,003 31,402 1,150,000 42,208,029 B-1