REFERRAL DOCUMENT 2 PROJECT DESCRIPTION 2.1 STATEMENT OF HARRIET POINT DREDGING PROPOSAL BHPBIO is seeking approval under Part IV of the Environmental Protection Act 1986 for dredging at Harriet Point. The proposal is a component of the RPG5 works to increase the system capacity of BHPBIO’s operations to 205 Mtpa. The proposal involves the dredging of approximately 3.9 Mm 3 of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point to accommodate vessels of approximately 250,000 dead weight tonnes (DWT). The management of the dredged material to DMMA will be dependent on its characteristics. PASS material will be disposed offshore at the PHPA Spoil Ground ‘I’ with the remaining material placed at DMMA B1 and B2 and excess fines stored at DMMA A. The key characteristics of this proposal are outlined below in Table 2.1. Table 2.1 – Project Key Characteristics Element Description Proponent BHP Billiton Iron Ore Duration of Dredging Approximately 40 weeks Volume of material to be dredged Approximately 3.9 Mm 3 Area of marine disturbance for dredging Not more than 25 ha at Harriet Point & Stanley Point Area of land disturbance for dredging Not more than 4 ha at Harriet Point & Stanley Point Offshore disposal of dredged material Not more than 800,000 m 3 offshore disposal of material to PHPA Spoil Ground ‘I’ Onshore disposal of dredged material Dredge Material Management Area B1: Area of not more than 26 ha Dredge Material Management Area B2: Area of not more than19 ha Dredge Material Management Area A: Area of not more than 85 ha (70 ha settlement area) Final height of DMMA B1 and B2 Seawalls: Not more than 7 m AHD Berms: Not more than 17 m AHD 2.2 JUSTIFICATION AND CONTEXT OF PROPOSAL BHPBIO is one of Australia’s largest iron ore producers with mine, rail and port operations located in the Pilbara region of Western Australia (Figure 1.1). BHPBIO exports its products to steelmakers in Japan, Korea, Taiwan, China, Europe and Australia through Port Hedland, which is one of the busiest commodity ports in the world. BHPBIO is in a phase of significant growth and has been focused on growing the business via a phased approach to meet market demand. This has been, and continues to be, achieved by a series of Rapid Growth Projects which enables the export capacity to be increased incrementally (i.e. Rapid Growth Projects 2, 3 and 4). The expansion program will continue to grow with market demand for iron ore, which is expected to remain strong for some time as China continues its industrialisation phase. This growth will also have a flow-on effect to other steel producers in the Asian region and will underpin current and proposed expansion activities. OCTOBER 2008 Page 2-1

Upload: vannga

Post on 21-Mar-2018

224 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

2 PROJECT DESCRIPTION

2.1 STATEMENT OF HARRIET POINT DREDGING PROPOSAL

BHPBIO is seeking approval under Part IV of the Environmental Protection Act 1986 for dredging at Harriet Point. The proposal is a component of the RPG5 works to increase the system capacity of BHPBIO’s operations to 205 Mtpa.

The proposal involves the dredging of approximately 3.9 Mm3 of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point to accommodate vessels of approximately 250,000 dead weight tonnes (DWT).

The management of the dredged material to DMMA will be dependent on its characteristics. PASS material will be disposed offshore at the PHPA Spoil Ground ‘I’ with the remaining material placed at DMMA B1 and B2 and excess fines stored at DMMA A.

The key characteristics of this proposal are outlined below in Table 2.1.

Table 2.1 – Project Key Characteristics Element Description

Proponent BHP Billiton Iron Ore Duration of Dredging Approximately 40 weeks Volume of material to be dredged

Approximately 3.9 Mm3

Area of marine disturbance for dredging

Not more than 25 ha at Harriet Point & Stanley Point

Area of land disturbance for dredging

Not more than 4 ha at Harriet Point & Stanley Point

Offshore disposal of dredged material

Not more than 800,000 m3 offshore disposal of material to PHPA Spoil Ground ‘I’

Onshore disposal of dredged material

Dredge Material Management Area B1: Area of not more than 26 ha Dredge Material Management Area B2: Area of not more than19 ha Dredge Material Management Area A: Area of not more than 85 ha (70 ha settlement area)

Final height of DMMA B1 and B2

Seawalls: Not more than 7 m AHD Berms: Not more than 17 m AHD

2.2 JUSTIFICATION AND CONTEXT OF PROPOSAL

BHPBIO is one of Australia’s largest iron ore producers with mine, rail and port operations located in the Pilbara region of Western Australia (Figure 1.1).

BHPBIO exports its products to steelmakers in Japan, Korea, Taiwan, China, Europe and Australia through Port Hedland, which is one of the busiest commodity ports in the world.

BHPBIO is in a phase of significant growth and has been focused on growing the business via a phased approach to meet market demand. This has been, and continues to be, achieved by a series of Rapid Growth Projects which enables the export capacity to be increased incrementally (i.e. Rapid Growth Projects 2, 3 and 4).

The expansion program will continue to grow with market demand for iron ore, which is expected to remain strong for some time as China continues its industrialisation phase. This growth will also have a flow-on effect to other steel producers in the Asian region and will underpin current and proposed expansion activities.

OCTOBER 2008 Page 2-1

Page 2: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

To meet the expected growth in demand for iron ore, BHPBIO is embarking on a development program to achieve a target of 300 Mtpa at its Western Australia Iron Ore operations. Maximising the output from the harbour is an essential step in this program and the RGP5 expansion includes the development of additional iron ore loading and berthing facilities on Finucane Island. The proposed dredging at Harriet Point is a component of RGP5, which is the subject of this referral document.

In pursuing ongoing growth plans, BHPBIO is committed to working with local communities to support sustainable development in the region and ensure their needs are incorporated into growth plans.

2.3 ALTERNATIVE OPTIONS CONSIDERED

Several berth locations, dredging and dredge material management options were initially investigated to identify an approach that best met BHPBIO’s project goals, environmental management requirements, technical achievability, legislative compliance, PHPA planning requirements and local community expectations. Nelson Point, Harriet Point and Burgess Point were all considered as potential sites for additional iron ore loading and berthing facilities to support a capacity increase to 205 Mtpa. All of the above factors were considered as part of the assessment of the preferred site. However, Harriet Point was the preferred site due to the shorter timeframes available to achieve the expanded export capacity.

Following selection of Harriet Point, an options evaluation assessment was undertaken to identify the preferred dredging method and material management approach. The methodology developed to assist in the determination of the preferred option included three phases:

• Phase 1 Option Identification – determination of the different suite of options for both the dredging and dredge material management options;

• Phase 2 Option Assessment Criteria – development of appropriate assessment criteria to evaluate all options. A range of categories, including broad environmental and socio-economic criteria were considered; and

• Phase 3 Measurement and Evaluation – application of a weighting to each criteria (essential, desirable and important), before the evaluation of the option against that criteria.

The various options were subjected to an assessment against environmental and socio-economic criteria. Table 2.2 provides an example of some of these criteria applied as part of the option assessment process. During the assessment process it was recognised that no single option would fully meet all of the criteria and it was therefore BHPBIO’s goal to find the option that best met the greatest number of criteria.

OCTOBER 2008 Page 2-2

Page 3: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

Table 2.2 – Example of Option Assesment Environmental and Socio-economic Criteria

   Several sites were initially identified as possible DMMA and the potential sites were narrowed down to include three land-based sites and one ocean-based site. These locations were: • Offshore Spoil Ground ‘I’;

• Intertidal DMMA B1 and B2; and

• Onshore DMMA A.

OCTOBER 2008 Page 2-3

Page 4: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

An important consideration for these different options was the management approach for PASS material found within the Harriet Point dredging footprint. Dredging and dredge disposal management options for the preferred locations also considered whether PASS material could be co-disposed with non-PASS material on land, segregation of PASS material and disposal on land, or segregation of PASS material and disposal offshore.

The evaluation process resulted in the selection of two preferred options for the dredging project. The two highest scoring options were:

• Co-disposal of PASS material and disposal of all material to PHPA’s offshore Spoil Ground ‘I’; and

• Segregation of PASS material for offshore disposal to Spoil Ground ‘I’, and maximum disposal of non-PASS material to DMMA B1 and B2 with the remainder to DMMA A.

Of the two preferred options, the second option was carried forward to the design stage based on the recognition that if the dredged material is appropriately managed, it may provide a valuable commodity for use in future developments.

2.4 HARRIET POINT DREDGING PROPOSAL

2.4.1 Overview

Dredging at Harriet Point is required to allow for the construction of two new shipping berths to accommodate vessels of approximately 250,000 DWT. The proposed existing and proposed berths are shown in Figure 2.1.

The dredging program is comprised of the following:

• Dredging of two new berth pockets to a depth of approximately -20 m CD;

• Extending and deepening the existing departure channel adjacent to the berths to approximately -15 m CD to allow for safe departure of loaded vessels; and

• Extending and deepening the swing basin at Harriet Point to a maintained depth of -10 m CD in order for arriving vessels to gain access to the new berths.

In order to effectively manage the dredged material, one offshore and three onshore sites have been identified as DMMA. The offshore DMMA (Spoil Ground ‘I’) is located 11 km north of Port Hedland while the three onshore DMMA (A, B1 and B2) are located in the intertidal area of the Port Hedland harbour (Figure 1.5).

Capital works for these onshore DMMA will involve the following:

• Establishment of footings for a seawall at DMMA B1 & B2;

• Construction of sea walls to approximately 7 m Australian Height Datum (AHD) using rock armour, core material and geotextile at DMMA B1 & B2;

• Construction of berms to approximately 17 m AHD at DMMA B1 and B2;

• Construction of earth bunds to approximately 7.5 m AHD using suitable insitu material, clean sourced fill and rock armour at DMMA A;

• Clearing of approximately 3.4 ha of mangroves at DMMA A and B1;

• Clearing of approximately 34 ha of other marine habitat (samphire-dominated) and terrestrial vegetation;

• Installation of one discharge outlet/weir each at DMMA A, B1 and B2; and

• Installation of pipes and pumps for the distribution of dredged material between DMMA B1, B2 and A.

OCTOBER 2008 Page 2-4

Page 5: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

The overlying sediment layer within the dredging footprint has been characterised as PASS material (SKM 2007b). Initial investigations have found that the majority of the PASS material is likely to extend to a depth of 2 m below the seabed surface. However, there is potential for ‘pockets’ of PASS material to extend beyond 2 m. Details of the PASS material is described in Section 4, Marine Existing Environment.

Dredged material characterised as PASS will be disposed of at the PHPA offshore Spoil Ground ‘I’ using split hopper barges. Once the barges have been loaded, they will transport the PASS dredged material to the offshore Spoil Ground ‘I’ via the existing shipping channel. Other dredged material (non-PASS) will be transferred to the DMMA B1, B2 and A (Figure 1.5).

Given that the exact volume of PASS material requiring offshore disposal has been conservatively defined, this assessment considers two potential disposal scenarios:

• Scenario 1 represents the conservative estimate of a maximum depth of 2 m below the seabed surface being dredged and treated as PASS material. In this case approximately 800,000 m3 of PASS material would be disposed of at Spoil Ground ‘I’ with the remaining 3.1 Mm3 managed onshore.

• Scenario 2 represents the best case estimate that the sediment profile contains minimal PASS material. In this case 250,000 m3 of PASS material would be disposed of at Spoil Ground ‘I’ with the remaining 3.7 Mm3 managed onshore.

These two scenarios represent the best and worst case scenarios with regards to the volume of PASS material. It should be noted that the actual volume of PASS material will fall within these two scenarios.

2.4.2 Capital Dredging Works

2.4.2.1 Overview

The Harriet Point Dredging Program will require approximately 3.9 Mm3 of material to be dredged from a footprint area of 29 ha. These volumes are provided in Table 2.3.

Table 2.3 – Volume of Material to be Dredged

Location Depth of Dredging (m CD)

Approximate Dredge Volume

(Mm3)

Approximate Footprint (ha)

Proposed berth pockets -20 1.9 13 Departure areas -15 1.8 14 Manoeuvring area -10 0.2 2 Total N/A 3.9 29

Based on the current geotechnical information for the Harriet Point footprint, pre-treatment of the material via drilling and blasting will not be required. The dredging works will involve:

• The removal of mangroves from Harriet Point and Stanley Point (3.08 ha);

• The dredging of the PASS material with a Backhoe Dredge (BHD) or Grab Dredge (GD) with subsequent offshore disposal via split hopper barges; and

• The dredging of the remaining material with a Cutter Suction Dredge (CSD) and the pumping of the material to DMMA B1, B2 and A.

OCTOBER 2008 Page 2-5

Page 6: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

2.4.2.2 Mangrove Removal

As part of the dredging program, approximately 3.1 ha of mangroves will need to be cleared from the south-eastern tips of Harriet Point and Stanley Point.

The mangroves will be cleared via land based and floating equipment. The land based equipment will preferentially remove the mangroves from limestone based areas and where possible, from the surrounding mud areas.

Any land based equipment will be unloaded at the site from a barge to avoid the requirement for an onshore access path. Procedures will be established to minimise the loss of any cleared material (e.g. mangrove roots) into the harbour. Any floating debris will be removed.

All cleared mangrove material will be removed from site via a barge again eliminating the requirement to clear further mangroves to create a land based path. Mangroves will be transferred to a waste management facility where they will be treated as green waste.

2.4.2.3 Backhoe Dredge / Grab Dredge

The overlying PASS material will be removed using a BHD or GD which will transfer material to a barge for transportation to the offshore DMMA Spoil Ground ‘I’. These activities are expected to take approximately 20 weeks.

2.4.2.4 Cutter Suction Dredge

The CSD will remove the harder consolidated material beneath the unconsolidated surface layer. Due to the 5-6 m draught of a large CSD, it is anticipated that dredging will progressively occur from the north-east, where the water is sufficiently deep for the dredge to operate and move towards the shallower areas to the west of the proposed dredge areas. These activities are expected to take approximately 24 weeks, some of which will occur in parallel with dredging of the PASS material.

2.5 DREDGED MATERIAL MANAGEMENT

Approximately 3.9 Mm3 of material will be dredged from the Harriet Point footprint. As described in Section 2.4.1, it is estimated that between 3.1 Mm3 and 3.7 Mm3 of non-PASS material will be directed to onshore DMMAs. The majority of the material will be placed at DMMA B1 and B2 and fine material will be pumped to DMMA A. It is estimated that up to 20% by volume of total insitu material will be fines.

Due to bulking of materials as they are broken up from consolidated layers into a slurry for transportation to DMMA, the final volume to be placed on land is greater than the volume actually dredged from the harbour. The estimated maximum volume (based on the minimum volumes placed offshore) in each DMMA is indicated in Table 2.4.

Table 2.4 – Maximum Bulked Volume of Material to be placed in each DMMA DMMA Volume of Material

(Mm3) DMMA B1 & B2 3.1 DMMA A 2.8

Total 5.9

2.5.1.1 Offshore DMMA - Spoil Ground ‘I’

The PHPA Spoil Ground ‘I’ which is currently approved for disposal of dredge spoil from maintenance dredging activities within the Port Hedland harbour will be utilised for the disposal of PASS material.

PHPA has provided approval for BHPBIO to utilise Spoil Ground ‘I’ for the disposal of up to 800,000 m3. Some non-PASS material may be inadvertently collected through the dredging process and disposed of offshore.

OCTOBER 2008 Page 2-6

Page 7: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

The coordinates for the PHPA Spoil Ground ‘I’ are provided in Table 2.5.

Table 2.5 - Location of Port Hedland Spoil Ground ‘I’ Latitude (South) Longitude (East)

20°11’25” 118°34’14” 20°11’25” 118°35’22” 20°12’29” 118°35’22”

20°12’29” 118°34’14”

2.5.1.2 Onshore – DMMA B1 and B2

DMMA B1 and B2 are two existing bays located on the eastern side of Finucane Island and will cover an area of 26 ha and 19 ha, respectively.

Prior to the commencement of dredging both bays will require the construction of seawalls which will consist of rock armour and core material constructed at a slope of 1:2 up to a height of approximately 7.0 m AHD (Figure 2.2 and Figure 2.3). Rock material will be placed at the toe of the seawalls to avoid the need to excavate the mud substrate.

Construction of the seawalls will involve the use of earthmoving equipment, typically excavators and dump trucks. The inside face of the wall will be lined with geotextile material to enable initial seepage through the wall. The seepage will reduce as the work progresses and the fines build up against the geotextile layer. The excess water discharge structures will be designed to prevent seawater ingress at high tide.

It is estimated that approximately 100,000 m3 of rock armour and 200,000 m3 of core material will be required for construction of seawalls at DMMA B1 and B2. These materials will be sourced from third party suppliers within the region. Where possible, existing rock armour material will be reclaimed from existing seawalls that are currently located behind the proposed new seawalls. Storage of rock armour will be within the existing cleared footprints on the Finucane Island site.

The outfall weirs will be designed to incorporate scouring protection. The outlet structure will include an adjustable weir box with approximately eight to ten, 900 mm diameter pipelines used to decant the water from the discharge location to the adjacent creek or harbour. The weir box will be used as a tool to adjust retention time within the DMMA, by adding or removing planks and thereby adjusting the water level at the outlet.

Dredged material will be pumped directly from the CSD to DMMA B1 and B2. Settlement of competent material from the fine material and excess water will occur over the DMMA area. Water that has had its fines content sufficiently reduced will be discharged back to the marine environment. Excess water with significant fines content will be pumped to DMMA A for further settlement of the fine material. Settlement times will typically be a minimum of 48 hours, but may be adjusted based on monitoring of discharge water and will be achieved through alternating inflow between the three DMMA.

Berms will be constructed behind the seawalls to a height of approximately 17 AHD to minimise visual impacts of the Finucane Island infrastructure on Port Hedland. Competent dredged material will be stored behind the berms in DMMA B1 and B2. Some of the material may potentially be used for future developments.

2.5.1.3 DMMA A – Storage and Settlement Pond

DMMA A will be used for the receipt and processing of excess fines material pumped from DMMA B1 and B2 for final settlement before the discharge of the excess water into the creek system. Preferential discharge of dredged material will be via DMMA B1 and B2. Although unlikely, to provide flexibility in the management of dredge material and discharge water quality, discharge of dredged material directly to DMMA A may also be undertaken via the same onshore route as proposed for fines/water that is forwarded from DMMA B1.

DMMA A is located onshore, west of the access road leading to Finucane Island in an area characterised by hypersaline, supratidal mudflats with scattered vegetation. The construction footprint

OCTOBER 2008 Page 2-7

Page 8: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

for DMMA A is approximately 85 ha, with 70 ha required for the actual DMMA (Figure 1.3). An area south of the DMMA will be utilised as a laydown area.

DMMA A will require a perimeter bund wall around the 70 ha footprint. This will consist of both core material and rock armour to prevent erosion (Figure 2.4). Of the 2.3 km long bund wall, rock armour will cover approximately 500 m and will require a total volume of 1,000 m3 of rock. Approximately 300,000 m3 of core material will be used. The design height of the bund is approximately 7.5 m AHD.

Some clearing of vegetation will be required to provide access for earthmoving plant building the perimeter bunds at DMMA A. Vegetation under the bund wall footprint will be removed as required. Supratidal areas will be cleared and topsoil stored for potential reuse while remaining tidal areas will be covered with dredged material.

Excess water will be discharged from DMMA A on an as needs basis which may be up to 24 hours per day with volumes ranging from 2,500 m3 to 4,500 m3 per hour for the duration of the project. Discharge will be via a non return water outlet at the northern end of the DMMA (Figure 2.5). Outflow will be designed to regulate the flow rates and timing to achieve settlement requirements.

Ongoing monitoring will be undertaken to assess temperature, salinity and turbidity levels and where necessary, retention methods will be altered to achieve the desired water quality for the discharge waters.

During the operational period of DMMA A (i.e. when dredged material is pumped to this area), the perimeter bund and spigot bund will be constructed up to 9.5 m AHD to ensure appropriate water holding capacity to allow for suitable retention time. At the completion of Harriet Point dredging, DMMA A will contain fine material within bunds to a height of approximately 7.5 m AHD, roughly to the same height as the overland conveyor. This material will be investigated for use as engineering fill for future projects once the settlement process is complete.

BHPBIO will commit to either reusing this material within five years of final landform, or will develop and implement a rehabilitation plan accordingly. Prior to a decision on final land use, the area will be stabilised through use of chemical suppressants or capping material to minimise dust lift-off.

The intertidal environment will not be able to be reinstated to pre-DMMA conditions due to the relative change in level from the dredge material deposition i.e. it will sit above the tidal influence.

2.6 ANCILLARY REQUIREMENTS

2.6.1 Pipes and Pumps

There will be a need to transfer water and entrained fines in either direction between DMMA B1 and B2 through steel pipelines. The pipelines will cross under the trestle supporting the Berth C and D conveyor where it spans from the previous reclamation completed for Berth C and D.

The pipeline from DMMA B1 and B2 to DMMA A will be via the existing overland conveyor causeway. It is estimated that two steel or polypipe pipelines, each with an internal diameter of 900 mm will be required. This will not be on the conveyor itself, but will run along the existing causeway between the overland conveyor and BHPBIO’s Finucane Island rail line. Crossing the overland conveyor will be required at a number of locations to cover alternative spigot locations within the northern and southern boundaries of DMMA A, and will be achieved by removing modules of the conveyor. Figure 2.5 shows the related infrastructure for the project.

It is estimated that two to three large diesel pumps will be required to pump the water and fines to DMMA A. The pumps will be installed within the footprint of DMMA B1 and B2 and used on an as needs basis. Transfer of materials between DMMA B1 and DMMA B2 may also require the use of a pump.

2.6.2 Laydown Areas

Laydown areas required for this project will utilise already cleared land managed by BHPBIO as well as a newly cleared area south of DMMA A.

OCTOBER 2008 Page 2-8

Page 9: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

REFERRAL DOCUMENT

2.6.3 Plant and Equipment

Equipment will be required for earthworks to establish the DMMA, as well as for the dredging operation itself. It is anticipated that the following dredges, plant and vehicles will be required:

• Cutter Suction Dredge;

• Backhoe Dredge or Grab Dredge;

• Split Hopper barges;

• Bulldozers;

• Excavators;

• Trucks and water trucks;

• Rollers; and

• Graders.

2.7 PROJECT SCHEDULE

Subject to project approval from relevant regulatory bodies, it is anticipated that the dredging program will commence in Q1 2009. Dredging and dredged material management will continue for 24 hours/day, seven days a week and is anticipated to last for approximately 40 weeks.

This timeframe includes a contingency for expected operational delays and regular maintenance activities including:

• Spud movements or repositioning after every approximate 8 m of dredge progression;

• Anchor changes after every approximate 50 m of dredge progression;

• Cutter blockage and checks;

• Cutter changes if necessary;

• Mechanical breakdowns and bunkering;

• Delays for shipping movements; and

• Movement between dredge cuts.

Construction work for the establishment of the project DMMA is also expected to commence in the first quarter of 2009 and continue for approximately 4 months.

OCTOBER 2008 Page 2-9

Page 10: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

Burgess Pt

Anderson Pt

Nelson Pt

Hunt Pt

FINUCANEISLAND

PORT HEDLAND

Airey Pt

D

C

Utah Pt

Harriet Pt

Stanley Pt

Owen Pt

1

2

A

B

F1

F2

F3

NELSON POINT

663000 664000 665000 66600077

5100

0

7751

000

7752

000

7752

000

7753

000

7753

000

7754

000

7754

000

7755

000

7755

000

LegendExisting and Proposed Berths

BHPBIO Berth - RGP 5 Proposed

BHPBIO Berth - Existing

FMG Berth - Existing

FMG Berth - Proposed

PHPA Berth - Existing

PHPA Berth - Proposed

Source:Orthorectified Aerial Photograph: 15/06/2007 (BHPBIO)Berth Locations: BHPBIO, 11/2/2008Harriet Pt Berth: MPD JV 14/04/2008 F112-C-00148 Rev D

Rev No. 1Project: WV03418Drawn: 15/05/2008Drawing: WV03418_G_037_1

EXISTING & PROPOSED BERTH DEVELOPMENTSFIGURE 2.1

Datum: GDA94Map Grid: MGA94 Zone 50

0 200 400 600

metres

°Scale @ A4: 1:20,000

Page 11: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

Mine and Port Developments Joint Venture

LOCATION PLAN

CN17

7754000 N1. 2. 3. 4. 5.

THIS DRAWING TO BE READ CONJUNCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS. HORIZONTAL COORDINATE SYSTEM: (PROJECTION: MGA94 ZONE 50) (DATUM GDA94) ALL LEVELS ARE AHD. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE. CONTOUR INTERVAL 0.2m

7.48m

6.67m

4.61m

3.19m

0.88m

3.892m

0.00m

H.A.T.

L.A.T.

M.S.L.

M.H.W.S.

M.H.W.N.

M.L.W.N.

M.L.W.S.

0.00m

-3.892m

DATUM KEY DIAGRAM

AUSTRALIANHEIGHT DATUM

(AHD)

CHARTDATUM

(CD)

-3.01m

-0.70m

+0.72m

+2.78m

+3.59m

664000 E

7753500 N 664000 E

7753000 N

7753500 N

7754000 N

663500 E

663500 E

AREA B1 - PLAN

BERTH D

BERTH C

AREA B1

AREA B2

SETTING OUT POINTS

REF EASTINGNORTHINGSOP 1

SOP 2

SOP 3

SOP 4

663,684.657,752,863.90

7,752,894.54 663,658.42

7,753,139.82 663,612.41

7,753,756.35 663,828.53

SOP 4

SOP 3

SOP 2

SOP 1

KEY

REDUNDANT ARMOUR ROCK

RECLAMATION AREA B1

R 250.00

RECLAMATION WALL B1

0

SEAWALL

LOCATION PLAN

CN17

1. 2. 3. 4. 5.

THIS DRAWING TO BE READ CONJUNCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS. HORIZONTAL COORDINATE SYSTEM: (PROJECTION: MGA94 ZONE 50) (DATUM GDA94) ALL LEVELS ARE AHD. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE. CONTOUR INTERVAL 0.2m

7.48m

6.67m

4.61m

3.19m

0.88m

3.892m

0.00m

H.A.T.

L.A.T.

M.S.L.

M.H.W.S.

M.H.W.N.

M.L.W.N.

M.L.W.S.

0.00m

-3.892m

DATUM KEY DIAGRAM

AUSTRALIANHEIGHT DATUM

(AHD)

CHARTDATUM

(CD)

-3.01m

-0.70m

+0.72m

+2.78m

+3.59m

AREA B1

AREA B2

Rev No. 1Project: WV03418Drawn: 3/07/2008Drawing: WV03418_G_117_1

DREDGED MATERIAL MANAGEMENT AREA B1

FIGURE 2.2

0 100 200

metres

Source:B1 Seawall: F112-C-00153 Rev E 2/07/2008 (MPD JV)Seawall Cross Section:F112-C-00153 Rev C, 14/04/2008 (MPD JV)

Datum: GDA94Map Grid: MGA94 Zone 50

°

Scale @ A4: 1:6,000

1.5

12.0

1

EXISTING SURFACE

2.0%

CORE MATERIAL

2.0%

.

TOE ROCK (TYP)M> 4t

1.51

ARMOUR (2 LAYERS)M =4.0tRANGE= 1.0t - 7.0t

50

(EXISTING SITE LEVEL)

BIDUM A34 GEOFABRIC

HIGH TIDE H.A.T. 3.59 MHWS 2.78

AREA B - PLANSCALE 1:2500 HOR.

DREDGE SPOIL BYDREDGING CONTRACTOR

AREA B1 SEAWALL CROSS SECTION

4.50

GENERAL NOTES

Page 12: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

LOCATION PLAN

GENERAL NOTES

CN17P812

P804

P802P807

TS702

TS722

TS810

TS811

BERTH 'C'BERTH 'D'

TS704

LRPTS808

TS800

TS801

WESTERN STOCKYARD

CN16B

7.48m

6.67m

4.61m

3.19m

0.88m

3.892m

0.00m

H.A.T.

L.A.T.

M.S.L.

M.H.W.S.

M.H.W.N.

M.L.W.N.

M.L.W.S.

0.00m

-3.892m

DATUM KEY DIAGRAM

AUSTRALIANHEIGHT DATUM

(AHD)

CHARTDATUM

(CD)

-3.01m

-0.70m

+0.72m

+2.78m

+3.59m

664000 E

7753500 N

7754000 N 663500 E

BERTH B

7754500 N

7754500 N

CH

: 677

N 7,753,799.33E 663,817.97

1.

P2.

P3.

P4.

P5.

P6.

THIS DRAWING TO BE READ CONJUNCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS.

PHORIZONTAL COORDINATE SYSTEM: (PROJECTION: MGA94 ZONE 50) (DATUM GDA94)

PALL LEVELS ARE AHD.

PALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.

PCONTOUR INTERVAL

PLAN C LEASE BOUNDARY

663500 E

664000 E

664500 E

BH-06

BH-02 BH-04

BH-08

BH-01

BH-05

RGP5 F1 MARINE WORKS

ptz;PEAHR BOUNDARY

0

SCALE 1 2000

40 4020 120 Metres80

BH-03BH-07

BH-09

CH

: 0

CH

: 100

CH

: 200

CH

: 300

CH

: 40 0

CH

: 500 C

H: 6

00

CH

: 700

CH

: 717

N 7,754,448.72E 664,052.66

EXISTING ROCK OUTCROP

BEACH SAND

N 7,754,167.59E 664,076.74

-18.4

-18.4

-9.9

-9.4

-5.4

-4.9

-4.4

-4.4

-4.4

-3.4

-3.4

-3.4

-3.4

-3.4

-2.9

-2.9

-2.9

-2.9

-2.9

-2.9

-2.4

-2.4 -2.4

-2.4

-2.4

-2.4

-2.4

-2.4

-2.4

-1.9

-1.9

-1.9

-1.9

-1.9

-1.9

-1.9

-1.9

-1.9

-1.9

-0.9 -

0.9

-0.9 -

0.9

-0.9

-0.9

-0.9

-0.9

-0.9

-0. 9

-0.9

-0.9

-0.4 -0.4 -0.4

-0.4

-0.4

4.0

4.0

4.0

4.0

4.0

0.1

4.5

4.5

4.5

-0.4

-0.4

-0.4

-0.4

-0.4

-0.4

-0.4

-0.4

-0.4

-0.9

-0.9

-0.9-0.9

-10.4-

10.9

-12.4

RETURN WATER OUTLETSTRUCTURE c/w NON RETURNVALVES SCOUR PROTECTIONBY DREDGING CONTRACTOR

ARMOUR AND CORE STOCKPILEFOR SEAWALL CONSTRUCTION

AREA (BY OTHERS) NOM 7423 m2

RGP5 F1 MARINE WORKSPEAHR BOUNDARY

PLAN C LEASE BOUNDARY

66350066

3500

6640

00

6640

0066

4500

7753500 7754000 7755000

7755

000

Rev No. 1Project: WV03418Drawn: 20/06/2008Drawing: WV03418_G_118_1

DREDGED MATERIAL MANAGEMENT AREA B2

FIGURE 2.3

0 100 200

metres

Source:Reclamation Areas B2: F112-CSK-01004 Rev B, 20/06/2008 (MPD JV)Seawall Cross-section:F112-C-00162 Rev A (14/04/2008) (MPD JV)

Datum: GDA94Map Grid: MGA94 Zone 50

°

Scale @ A4: 1:6,000

AREA B2(THIS DRG)

1. THIS DRAWING TO BE READ IN CONJUCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS2. HORIZONTAL COORDINATE SYSTEM: (PROJECTION: MGA94 ZONE 50) (DATUM GDA94)3. ALL LEVELS ARE AHD4. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.5. CONTOUR INTERVAL 0.2m6. BATHYMETRY SHOWN IS INDICATIVE ONLY AND IS NOT THE RESULT OF A DETAILED SURVEY.

GENERAL NOTES

LOCATION PLAN

1.5

12.0

1

EXISTING SURFACE

2.0%

CORE MATERIAL

2.0%

.

TOE ROCK (TYP)M> 4t

1.51

ARMOUR (2 LAYERS)M =4.0tRANGE= 1.0t - 7.0t

50

(EXISTING SITE LEVEL)

BIDUM A34 GEOFABRIC

HIGH TIDE H.A.T. 3.59 MHWS 2.78

AREA B2 - PLANSCALE 1:2500 HOR.

DREDGE SPOIL BYDREDGING CONTRACTOR

4.50

AREA B2 SEAWALL CROSS SECTION

Page 13: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

Mine and Port Developments Joint VentureSINCLAIR KNIGHT MERZ

LOCATION PLAN

0

SCALE 1 : 2500

10050 50 150 Metres

AREA A - PLAN

HARBOUR FACILITIES - DREDGING PIPELINE CORRIDORS - GA

F112-C-00150

HARBOUR FACILITIES - DREDGING RECLAMATION AREA A PROFILES

F112-C-00152

1 -

11:100 - SECTION

1.5

1

2.01

1.51

4

4

4

4

4

finicane island

nelson point

Port Hedland

TS72

2

TS8 1

1BE

RT

H 'C

'BE

RT

H 'D

'

L RP

012 2 4 6 Metres

SCALE 1 : 100

AREA B

AREA A(THIS DRG)

GENERAL NOTES

GENERAL FILL

1.51

EXISTING SURFACE

DREDGE SPOILBY OTHERS

2.0% 2.0%

TENSAR OR BIDIM A34 GEOFABRIC

FOUNDATION TYPICALLYMARINE MUD

BIDIM A34 GEOFABRIC

RIP RAPFACING CLASS300 MIN.

THIS DRAWING TO BE READ CONJUNCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS.

HORIZONTAL COORDINATE SYSTEM: (PROJECTION: MGA94 ZONE 50) (DATUM GDA94)

ALL LEVELS ARE AHD.

ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.

CONTOUR INTERVAL 0.2m

CONTRACTOR TO CONSTRUCT PASSING BAYS AND ACCESSRAMPS AS REQUIRED WITHIN RECLAIMED AREA.

1.

2.

3.

4.

5.

6.

7.48m

6.67m

4.61m

3.19m

0.88m

3.892m

0.00m

H.A.T.

L.A.T.

M.S.L.

M.H.W.S.

M.H.W.N.

M.L.W.N.

M.L.W.S.

0.00m

-3.892m

DATUM KEY DIAGRAM

AUSTRALIANHEIGHT DATUM

(AHD)

CHARTDATUM

(CD)

-3.01m

-0.70m

+0.72m

+2.78m

+3.59m

TO BHPB FINUCANE ISLAND OPERATIONS

CONVEYOR CV 725

E 661,246.0N 7,750,277.0

N 7,750,135.0E 661,106.0

661000 E

7750000 N

N 7,749,891.0

E 661,042.0

STARTER EMBANKMMENT

E 661,095.0N 7,749,698.0

7749500 N

N 7,749,141.0E 660,943.0

7749000 N

661000 E

10.0m WIDE ACCESSROAD TO HBI SITE

E 661,314.0N 7,748,774.0

661500 E

7749000 N

7749500 N

7750000 N

DREDGE PIPE STRUCTUREACROSS ROAD, RAIL ANDCONVEYOR (BY OTHERS)

E 661,756.0N 7,750,416.0

7750500 N

7750500 N

661500 E

20m WIDE WORK PAD

SCALE 1:2500 HOR.

RETURN WATER OUTLET STRUCTUREC/W CONTROL NON RETURN VALVES

SCOUR PROTECTION BY DREDGINGCONTRACTOR

REFERENCE DOCUMENTS

CONTRACT NUMBEROR PURCHASE ORDER NUMBER

DOC NO

3

3

3

3

3

33

3

3 3 3

3

3

3

3

3

3 3

3

3

3

3

3 3

3

3

3

3

3

3

3

3

3

44

4

4

4

4

44

4444

4

44

444

4

4

4

4

4

4

4

44 4 4 4 4 4 4

4

4

4

4

4

4

4

4

4

4

44 4 4

4

4

4

4 4

4

4

4

4

4

44

4

4 444

4

4

5

5

5

5

5

5

5 55

55

5

5

555

55

5

5

5

5

5 5 5 5 5 5 5 5 5 5 55

5

5555555555

5

5

5

5

5

6

2.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.03.0 3.0 3.0 3.0 3.0 3.0

3.0

3.0

3.03.0

3.03.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.03.0

3.0

3.0 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0 3.0

3.0

3.0

3.0

3.0

3.0 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

4.04.04.04.04.04.04.04.04.

0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.04.0

4.0 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

5.05.05.0 5.0

5.05.0

5.0 5.0

5.0

5.05.05.0 5.0

5.0

5.05.0 5.05.0

5.0

5.0

5.0

5.0

CH: 0

CH: 200

CH: 400

CH

: 600

CH

: 800

CH

: 1000

CH: 1200

CH

: 1400

CH: 1600

CH: 1800

CH: 2000

CH: 2200

CH: 2277

1.50 4.00 0.75

0.50

Rev No. 0Project: WV03418Drawn: 13/06/2008Drawing: WV03418_G_116_0

DREDGED MATERIAL MANAGEMENT AREA A

FIGURE 2.4

0 100 200

metres

Source:Reclamation Areas A: F112-C-00151 Rev C, 14/04/2008 (MPD JV)

Datum: GDA94Map Grid: MGA94 Zone 50

°

Scale @ A4: 1:7,500

AREA A CROSS SECTION

Page 14: 2 PROJECT DESCRIPTION 2.1 STATEMENT OF … STATEMENT OF HARRIET POINT DREDGING PROPOSAL ... preferred dredging method and material management approach. The methodology developed to

"

"

"

AndersonPt

Nelson Pt

Hunt Pt

LumsdenPt

OwenPt

StanleyPt

HarrietPt

Utah Pt

FINUCANEISLAND

PORT HEDLAND

INDIAN OCEAN

West Ck

B2

B1

Salm

on Ck

661000 662000 663000 664000 66500077

4800

0

7748

000

7749

000

7749

000

7750

000

7750

000

7751

000

7751

000

7752

000

7752

000

7753

000

7753

000

7754

000

7754

000

7755

000

7755

000

PROJECT INFRASTRUCTURE

Legend

" Indicative Discharge Outlet

Inlet Pipe

Dredged Material Pipeline

DMMA Construction Footprint

Dredged Material Management Area

Harriet Pt Proposed Dredging Footprint

Rev No. 2Project: WV03418Drawn: 1/07/2008Drawing: WV03418_G_049_2

FIGURE 2.5

Discharge Location:A: F112-C-00151 Rev C, 14/04/2008B1: F112-C-00153 Rev C. 14/04/2008B2: F112-CSK-01004 Rev B, 20/06/2008Construction Footprint: MPD JV, A: 11/07/2008 B2: 24/07/2008Inlet pipe's: MPD JV, 20/06/2008

Datum: GDA94Map Grid: MGA94 Zone 50

0 500 1,000

metres

°Scale @ A4: 1:30,000

Source:Orthorectified Aerial Photograph - BHPBIO (15/06/2007)Proposed Dredge Pipeline - MPD JV (12/02/2008)Harriet Pt Footprint: F112-C-00148 Rev D 14/04/2008 (MPD JV)Reclamation Areas (MPD JV)A: F112-C-00151 Rev C, Modified 20/06/2008B1, B2: DES Seawall_Recl Both_Opt1 3d.dxf 09/04/2008B2 Seawall: F112-CSK-01004_B.dgn, 20/06/2008