14_list of works

346
LIST OF WORKS (66 kV AND ABOVE) 2009-10 document.xls Page 1 of 346 400 kV Name of substation or line section Code Remarks 400 kV Works 1 400 kV Kirori (Hisar) 4N0940* 10300.00 2009-10 REC 350041 2 23 4L0874* 1250.00 2009-10 REC 350041 3 90 4L0875* 4500.00 2009-10 REC 350039 4 4G0877* REC 350041 Included in the cost of s 5 Daultabad (Gurgaon) 3x315 400/220 4N0997* 7539.68 2010-11 REC 350044 6 140 4L0998* 7000.00 2010-11 REC 350045 7 48 2400.00 2010-11 REC 350045 8 4D1064* 300.00 2010-11 REC 350045 9 400 kV Nawada 4N1124* 8200.00 2010-11 World Bank Sr. No. Line Length (Ckt - km) Transformer Capacity (MVA) Voltage Ratio (kV) Tentative Cost in Rs lac Tentative completion Schedule Funds Arrangement 3x315 2x100 400/220 400 kV double circuit line from Hisar TPS (Khedar) to proposed 400 kV substation Kirori (Hisar) with 85ºC conductor design. 400 kV double circuit line from Hisar TPS to 400 kV substation Fatehabad PGCIL. Provision of Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Kirori (Hisar) 400 kV D/C line from Jhajjar TPS to Daultabad (Gurgaon) with twin moose conductor with 85 ºC conductor design. Ceation of 400 kV D/C line from Daultabad (Gurgaon) - 400 kV substation Sector 72, Gurgaon (PGCIL) with quad moose conductor in place of earlier approval of creation of this line with twin Moose conductor with 85 0 C 4L1308* 4L1063A Two 400 kV bays at 400 kV GIS substation Sector-72 Gurgaon (PGCIL) by PGCIL at HVPNL cost. 2x315 2x100 1x100 400/220 220/66

Upload: sumit-nema

Post on 08-Feb-2016

105 views

Category:

Documents


0 download

DESCRIPTION

GF

TRANSCRIPT

Page 1: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 1 of 180 400 kV

Name of substation or line section Code Remarks

400 kV Works1 400 kV Kirori (Hisar) 4N0940* 10300.00 2009-10 REC 350041 Yes

2 23 4L0874* 1250.00 2009-10 REC 350041 Yes

3 90 4L0875* 4500.00 2009-10 REC 350039 Yes

4 4G0877* REC 350041 Included in the cost of substatio

5 Daultabad (Gurgaon) 3x315 400/220 4N0997* 7539.68 2010-11 REC 350044 Yes

6 140 4L0998* 7000.00 2010-11 REC 350045 Yes

7 48 2400.00 2010-11 REC 350045 Yes

8 4D1064* 300.00 2010-11 REC 350045 Yes

9 400 kV Nawada 4N1124* 8200.00 2010-11 World Bank Yes

Sr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

3x315 2x100 1x10/16

400/220 220/132

400 kV double circuit line from Hisar TPS (Khedar) to proposed 400 kV substation Kirori (Hisar) with 85ºC conductor design.

400 kV double circuit line from Hisar TPS to 400 kV substation Fatehabad PGCIL.

Provision of Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Kirori (Hisar)

Covered under Sr. No. 1

400 kV D/C line from Jhajjar TPS to Daultabad (Gurgaon) with twin moose conductor with 85 ºC conductor design.

Ceation of 400 kV D/C line from Daultabad (Gurgaon) - 400 kV substation Sector 72, Gurgaon (PGCIL) with quad moose conductor in place of earlier approval of creation of this line with twin Moose conductor with 850C conductor design.

4L1308*

4L1063A

Two 400 kV bays at 400 kV GIS substation Sector-72 Gurgaon (PGCIL) by PGCIL at HVPNL cost.

2x315 2x100 1x100

1x1

400/220 220/66

220/33

Page 2: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 2 of 180 400 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

10 4G1054* Included in cost of substation

11 4 4L1241* 200.00 2010-11 Yet to be posed Yes

12 400 kV Nuhiyawali 4N1071* 7500.00 2010-11 World Bank Yes

13 170 4L1072* 7500.00 2010-11 World Bank Yes

14 4G1073* Included in cost of substation

15 4B1074* 300.00 2009-10 REC 350039 Yes

16 4B1317* 1000.00 2011-12 No

17 140 4B1318* 12250.00 2011-12 Yes

18 4B1319* 1000.00 2011-12

Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Nawada

Covered under Sr. No. 9

LILO of 400 kV Samaypur - G. Noida line at proposed 400 kV substation Nawada (Faridabad)

By PGCIL as deposit work of HVPNL.

2x315 2x100 1x16/20

400/220

220/132 132/11

Lower capacity 132/11 kV transformer can also be provided in place of 16/20 MVA transformer if available

LILO of one circuit of 400 kV D/C Hisar TPS- Fatehabad line at proposed 400 kV substation Nuhiyawali.

Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Nuhiyawali.

Covered under Sr. No. 12

Creation of two 400 kV bays at 400 kV substation Fatehabad (PGCIL) by PGCIL at HVPNL cost for 400 kV Hisar TPS – Fatehabad D/C line with LILO of one circuit at Sirsa.

Creation of two no. 400 kV bays at Dhanonda (Mohindergarh) HVPNL substation to receive Adani Power.

Creation of 400 kV Mohindergarh (Dhanonda) - Daultabad quad moose conductor D/C line.

Being executed under PPP

mode

Creation of two no. 400 kV bays at Daultabad HVPNL substation to receive 400 kV Mohindergarh (Dhanonda) - Daultabad quad D/C line.

Covered under Sr. No. 17

Page 3: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 3 of 180 400 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

19

20 Deepalpur 4N1334* 10000.00 2011-12 Yes

21 4G1335*

22 170 4G1336* 11900.00 2011-12 Yes

23 4 4L1337* 200.00 2011-12 Yes

24 Dhanonda 3x315 400/220 4N1338* 8000.00 2011-12 Posed to PFC Yes

Construction of Mohindergarh (Adani HVDC) - Mohindergarh (Dhanonda) HVPNL 400 kV D/C line with triple moose conductor as a dedicated transmission line to be constructed by M/s Adani Power Ltd.

HPPC to convey to M/s Adani Power Ltd. The decision of 26th standing committee meeting that for the power over and above the power to be supplied to Haryana, connectivity with CTU network through LILO of one circuit of Bhiwadi - Moga 400 kV D/C line could be considered. For tying-up connectivity and open access to CTU network, Adani Power would need to seek open access from CTU.HPPC to be informed to convey the above decision to M/s Adani.

Not required to be covered

under Investment Plan

2x315 2x100 1x16/20

2x2

400/220

220/132

132/33

Being executed under PPP

mode

Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Deepalpur

Covered under sr. No. 20

Creation of 400 kV D/C line from Jhajjar TPS (Case 2) - Rohtak (400kV) - Deepalpur with quad moose conductor

Being executed under PPP

mode

LILO of one circuit of 400 kV Abdullapur - Bawana line at Deepalpur

Being executed under PPP

mode

Page 4: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 4 of 180 400 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

25 4G1339* Posed to PFC Cost included in substation

26 80 4L1340* 4000.00 2011-12 Posed to PFC Yes

27 60 4L1341A

28 4L1443* 300.00 2010-11 Yet to be posed No

29 Rohtak area 2x315 400/220 4N1342* 10000.00 2011-12 Yes

30 4G1343* Cost included in substation

31 80 4L1344* 4000.00 2011-12 Yet to be posed No

Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation Dhanonda

Covered under sr. No. 24

Creation of Jhajjar TPS (Case-2) - Dhanonda 400 kV D/C line with twin moose conductor

To cancel earlier approval of LILO of one circuit of 400 kV Moga - Bhiwadi line at 400 kV substation Dhanonda

Arrangement for meeting the pre-commissioning testing & start-up power requirement to CLP thermal power project by LILO of one circuit of 400 kV D/C Jharli (Aravali) - Daultabad line at CLP thermal power plant Jharli.

Being executed under PPP

mode

Enroute 400 kV Jhajjar - Deepalpur quad D/C line. The exact requirement of 220/132 kV and/ or 220/33 kV transformers at 400 kV substation Rohtak will be finalised after identification of land and underlying transmission system.

Provision of a Diesel Generating set of suitable capacity for emergency auxiliary services in 400 kV substation in Rohtak area.

Covered under sr. No. 29

400 kV D/C Bhiwani - Rohtak line with twin moose conductor matching with commissioning of 765 kV PGCIL substation at Bhiwani.

To establish connectivity with 765 kV substation to be constructed by PGCIL in Bhiwani area.

Page 5: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 5 of 180 400 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

32 4B1345* 1000.00 2011-12 Yet to be posed No

33 80 4B1346* 4000.00 2011-12 Yet to be posed No

34 4B1347* 1000.00 2011-12 Yet to be posed No

35 4B1348* 1000.00 2011-12 Yet to be posed No

Total (400 kV) 1089 126639.68

2 no. 400 kV bays at 765 kV substation Bhiwani for 400 kV D/C Bhiwani - Rohtak line

By PGCIL as deposit work of HVPNL on cost plus basis at applicable consultancy fees on the final actual executed cost of the work alongwith the applicable service tax on consultancy fee.

400 kV D/C Kirori (Hisar) - Jind line with twin moose conductor matching with commissioning of 400 kV PGCIL substation at Jind.

2 No. 400 kV bays at 400 kV substation Kirori for 400 kV D/C Kirori - Jind line.

2 No. 400 kV bays at 400 kV substation Jind PGCIL for 400 kV D/C Kirori - Jind line

By PGCIL as deposit work of HVPNL on cost plus basis at applicable consultancy fees on the final actual executed cost of the work alongwith applicable service tax on consultancy fee.

Page 6: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 6 of 180 220 kV

Name of substation or line section Code Remarks

220 kV Works

1 Bhuna 2020.12 2009-10 REC 350031 Yes

2 140 2L0454* 2503.20 2009-10 REC 350030 Yes

3 106 2L0742* 2385.00 2009-10 REC 350036 Yes

4 2B0743* 200.00 2009-10 REC 350036

5 220 kV Isharwal 1x100 2600.00 2009-10 REC 350033 Yes

1x20/25 132/33 1N0735*

1x10/16 132/11 1N0736*

1x20/25 132/33 1A0939* REC 350042

6 106 2L0737* 2385.00 REC 350033 Yes

Sr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

2x100 1x8

220/132 132/11

2N0448*

1N0449*

Substation commissioned with 1x100 MVA 220/132 kV transformer on 14.10.2008. 1x8 MVA 132/11 kV transformer commissioned on 17.10.2008.

Construction of YTPP - Nilokheri 220 kV D/C

Construction of 220 kV D/C line with 0.4□” ACSR/ AAAC from 220 kV Cheeka to 220 kV substation Durala

Creation of two No. 220 kV bay at 220 kV substation Cheeka for accommodating 220 kV D/C line from 220 kV Cheeka to 220 kV substation Durala

Covered under Sr. No. 3

220/132

2N0734*

Substation commissioned with 1x100 MVA 220/132 kV transformer on 04.03.2009. 1x10/16 MVA 132/11 kV transformer commissioned on 05.03.2009. 1x20/25 MVA 132/33 kV T/F commissioned on 27.05.09

For meeting the auxuiliary consumption demand of the substation.

220 kV D/C line with 0.4□” ACSR from 400 kV substation Mayyar (Hisar) to 220 kV substation Isharwal

Reqiuired two No. 220 kV emanating bays would be provided by PGCIL while erecting 3rd transformer. 2nd ckt commissioned on 28.01.2009

Page 7: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 7 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

7 11.6 2L0432* 104.05 2009-10 No

8 220 kV bay one number at Badshahpur 2B0433* 100.00 2009-10 No

9 2B0434* 100.00 2009-10 No

10 2B0848A NCRPB No

11 220 kV Bastra (Gharaunda) 2N0837* 2880.49 2010-11 Yes

12 50 2L0838* 1250.00 2010-11 Yes

13 2B0839* 214.00 2010-11 Yes

14 2x100 220/132 2N0948* 2421.88 2010-11 Yes

Stringing of 2nd Ckt. of Badshahpur (220 kV) - IMT Manaser (220 kV), 220 kV line on D/C towers.

For accomodating 2nd 220 kV Ckt. between Badshahpur and IMT Manaser

220 kV bay one number at IMT Manesar substation

For accomodating 2nd 220 kV Ckt. between Badshahpur and IMT Manaser

2 Nos 220 kV line bays at 400 kV substation Bhiwadi by PGCIL.

Being carried our by PGCIL as a regional work. Revised approval conveyed vide memo No. R 600/Ch.161/HSS-152/ Bhiwadi dated 09.03.2009.

2x100 1x4

220/132

132/11

JICA through REC 350051 HR-IC-DIS-035-2009-

100845

Suitable spare bays to be provided for further expansion both for transformers and lines.1x4 MVA T/F for auxiliary supply and supply to village Bastra.

Construction of a new 220 kV D/C line with 0.4 sq” ACSR from PTPP to proposed 220 kV substation Bastra

JICA through REC 350053 HR-IC-DIS-035-2009-

1008472 No. 220 kV bays at 220 kV PTPP yard for PTPP-Bastra line

JICA through REC 350061 HR-IC-DIS-035-2009-

100855

220 kV Sampla (Upgradation of 132 kV substation Sampla)

JICA through REC 350049 HR-IC-DIS-035-2009-

100843

Page 8: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 8 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

15 2x100 220/132 2N0949* 2268.78 2010-11 Yes220 kV Samalkha (Upgradation of 132 kV substation Samalkha)

JICA through REC 350049 HR-IC-DIS-035-2009-

100843

Additional land to be taken from Gram Panchayat on payment. The cost of replacement of equipment of 5 no. 220 kV bays of HVPNL at BBMB substation Panipat including erection, testing & commissioning and interconnection with Control Room & any work incidental thereto, shall be fully borne by HVPNL. The cost of replacement of equipment of 1 No. 220 kV bay of PGCIL at BBMB substation Panipat including erection, testing & commissioning and interconnection with Control Room & any work incidental thereto, shall not be charged to common pool. The issue of bearing this cost shall be taken up with PGCIL by HVPNL and in case PGCIL does not agree to bear this cost, the same shall be borne by HVPNL.

Page 9: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 9 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

16 220 kV Chhajpur 2N0950* 2748.44 2010-11 Yes2x100 1x4

220/132 132/11

JICA through REC 350051 HR-IC-DIS-035-2009-

100845

Land to be taken from Gram Panchayat on DC rates. The study for Residual Life Assessment of 220 kV breakers and associated equipment to be replaced shall be got done by BBMB at the cost of HVPNL. Accordingly, HVPNL shall pay, for the said study and for the residual life left at present day cost minus depreciation for the service period, to BBMB and the cost of new equipment and interconnection with Control Room towards this replacement shall be charged to the common pool.

The cost of 220 kV breakers and associated equipment already procured by BBMB, if any, shall be charged to HVPNL or PGCIL/HVPNL or to the common pool as per approval.

All the equipment and material required for creation of proposed bays (two no. 220 kV and one no. 400 kV substation) and for their interconnection with Control Room shall be supplied by HVPNL after getting their technical specification approved from BBMB.

Page 10: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 10 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

The expenditure on other additions/alterations/rearrangement etc. incidental to the construction of the proposed bays at BBMB Sewah shall be borne by HVPNL.

The expenditure for future replacement and annual O&M charges in respect of proposed bays at BBMB Sewah shall be borne by HVPNL. BBMB shall, however, go ahead with procurement/ replacement of equipment at HVPNL’s cost, wherever necessary on technical grounds, the cost of which would be borne by HVPNL.

The expenditure on account of dismantlement/ shifting of existing structures/ features of any bay at BBMB Sewah, if any required to make way for the proposed bays, shall be borne by HVPNL.

All other related works outside BBMB substation Panipat shall be carried out by HVPNL at their cost.

The load shall be restricted to the present load drawn from the BBMB substation Panipat.

Page 11: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 11 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

17 47 2L0951* 1175.00 2010-11 Yes

18 56 2L0952* 1512.00 2010-11 Yes

19 220 kV Mohana (Sonepat) 2N1125* 3762.19 2010-11 Yes

After disbanding 33 kV system at 400 kV substation BBMB Panipat the possibility to use two No. 220/66-33 kV, 60 MVA transformers alongwith associated equipment, thus rendered spare, in BBMB system shall be explored by BBMB, otherwise it shall be obligatory for HVPNL to take them at present day cost minus depreciation for the service period.

LILO of 220 kV D/C Rohtak-Bahadurgarh line at 220 kV proposed substation Sampla.

JICA through REC 350052 HR-IC-DIS-035-2009-

100845

Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from proposed 220 kV substation Sampla to proposed 220 kV substation Samalkha. {The line is 220 kV Sampla - Mohana - Smalkha}

JICA through REC 350052 HR-IC-DIS-035-2009-

100846

1x100 1x100

2x0.2

220/132 220/33 33/0.4

JICA through REC 350049 HR-IC-DIS-035-2009-

100843

Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed. for auxiliary supply

Page 12: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 12 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

20 3 2L1126* 90.00 2010-11 Yes

21 2 2L1127* Covered under Sr. No. 18 Yes

22 48 2L0953* 1200.00 2010-11 Yes

23 32 2L0954* 800.00 2010-11 Yes

24 2B0955* 200.00 2009-10 Yes

25 2x100 220/132 2N0975* 2540.19 2010-11 Yes

Erection of 220 kV D/C line with 0.5 Sq” ACSR conductor from 400 kV substation Jajjy (PGCIL) to 220 kV substation Mohana.

Posed to NCRPB

The already approved new 220 kV D/C line with 0.5 Sq.” ACSR from proposed 220 kV substation Sampla to proposed 220 kV substation Samalkha will be LILOed at 220 kV substation Mohana.

Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from proposed 220 kV substation Samalkha to 220 kV substation Chhajpur.

JICA through REC 350053 HR-IC-DIS-035-2009-

100847

Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from proposed 400 kV substation BBMB Sewah to 220 kV substation Chhajpur.

JICA through REC 350053 HR-IC-DIS-035-2009-

100847

Creation of two no. 220 kV bay at 400 kV substation BBMB Sewah to receive 220 kV D/C line from Chhajpur to be carried out by BBMB.

JICA through REC 350061 HR-IC-DIS-035-2009-

100885

220 kV Kaul (Upgradation of 132 kV substation)

JICA through REC 350051 HR-IC-DIS-035-2009-

100845

Page 13: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 13 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

26 40 2L0976* 1000.00 2010-11 Yes

27 2B0977* 200.00 2010-11 Yes

28 1G0986* 2010-11

29 1G0987* 2010-11

30 100 2L0978* 2500.00 2010-11 Yes

31 2B0979* 200.00 2010-11

32 220 kV Sector-72 Gurgaon 2N1083* 3000.00 2010-11 Yes

Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from 220 kV substation Pehowa to proposed 220 kV substation Kaul.

JICA through REC 350053 HR-IC-DIS-035-2009-

100847

Creation of 2 No. 220 kV bays at 220 kV substation Pehowa for Pehowa- Kaul line.

JICA through REC 350061 HR-IC-DIS-035-2009-

100855

Demolition of existing 17 Nos. residential structures in the colony at 132 kV substation Kaul for utilizing space to facilitate upgradation of 132 kV substation Kaul to 220 kV level.

Not required to be included in

Investment Plan

Demolition of existing control room at 132 kV substation Kaul after making the new control room functional at 220 kV substation Kaul.

Not required to be included in

Investment Plan

Construction of a new 220 kV D/C line with 0.4 Sq. inch ACSR from 220 kV substation Bastra to proposed 220 kV substation Kaul.

JICA through REC 350053 HR-IC-DIS-035-2009-

100847Creation of 2 No. 220 kV bays at 220 kV substation Bastra for Bastra - Kaul line.

JICA through REC 350051 HR-IC-DIS-035-2009-

100845

Covered under Sr. No.11

2x100 1x100

2x0.2

220/66 220/33

33/0.4

JICA through REC 350059 HR-IC-DIS-035-2009-

100853

Page 14: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 14 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

33 220 kV Kherikanker (Nuh) 2N1116* 2500.00 2011-12 Yes

1. Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints.2. Out of six circuits equivalent to 0.5 sq” ACSR being provided by PGCIL for HVPNL use, four 220 kV circuits will directly feed 220 kV substation sector-72 Gurgaon bus. The remaining two circuits will be taken from 400 kV substation PGCIL to proposed 220 kV substation Kankerkheri (Nuh). Provision of 10 no. 33 kV bays at 220 kV substation sector-72 Gurgaon to enable DHBVNL to take out 10 no. 33 kV outgoing feeders to meet ultimate load requirement in surrounding area

1x100 1x100

2x0.2

220/66 220/33

33/0.4

Yet to be posed

Provision of 10 No. 33 kV bays at 220 kV substation Kheri Kanker (Nuh) to enable DHBVNL to take out 10 No. 33 kV outgoing feeders to meet their ultimate load requirement in surrounding area.

Page 15: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 15 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

34 220 kV Chormar 2N1130* 2500.00 2010-11 Yes

35 192 2L1131* 5760.00 2010-11 Yes

In view of scarcity of land around Sohna a part of the land offered by village Panchayat Kher Kanker (Approx. 32 acre) will be used for construction of 220 kV substation and the remaining land will be kept reserved for creation of a new 400 kV substation in future keeping in view the development of load along KMP expressway and surrounding area.

1x100 1x100

2x0.2

220/132

220/33 33/0.4

JICA through REC 350055 HR-IC-DIS-035-2009-

100849

7 nos. 220 kV bays, 6 nos. 132 kV bays and 5 nos. 33 kV bays. However, provision will be made for 10 nos. each 220 kV , 132 kV and 33 kV bays keeping the scope for future expansion. 2x0.2 T/F for auxiliary supply

To allow DHBVN to connect proposed 33 kV S/Stn. Pipli (1x10 MVA) with approx. 9 Kms new 33 kV line from Chormar to Pipli & proposed 33 kV S/S Khokhar (1x10 MVA) with approx. 16 kms new 33 kV line from Chormar to Khokhar

Construction of 220 kV D/C Fatehabad (400 kV)-Chormar line with 0.5 sq. inch ACSR

JICA through REC 350057 HR-IC-DIS-035-2009-

100851

Page 16: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 16 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

36 32 2L1132* 960.00 2010-11 Not Required

37 2B1133* 200.00 2010-11

38

a) 48 2L1084* 1440.00 2010-11 Yes

b) 21 2L1085* 630.00 2010-11 Yes

Construction of 220 kV D/C Nuhiyanwali (400 kV)-Chormar line with 0.5 sq. inch ACSR

Not to be executed .Covered under Chormar - Rania line via Nuhiyawali.

Construction of 2 nos. 220 kV bays at 400 kV substation Nuhiyanwali (Sirsa) for 220 kV D/C Nuhiyanwali (400kV)-Chormar line

No separate funds required. Covered under

400 kV substation Nuhiyawali

under World Bank project.

Erection of following three 220 kV lines from proposed 220 kV substation sector-72 Gurgaon:-

Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints.

220 kV D/C sector 72 – Sector 20 (0.5 Sq” ACSR)

JICA through REC 350048 HR-IC-DIS-035-2009-

100842

220 kV D/C sector 72 – Sector 56 (0.5 Sq” ACSR)

JICA through REC 350048 HR-IC-DIS-035-2009-

100842

Page 17: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 17 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

c) 25 2L1086* 750.00 2010-11 Yes

39 2B1089* 200.00 2010-11 Yes

40 2B1090* 200.00 2010-11 Yes

41 48 2L0879* 1271.00 2009-10 REC 350064 Line test charged on 19.05.09 Yes

42 2x100 220/66 2U1056* 8500.00 2010-11 World Bank Yes

43 10 2L1057* 300.00 2010-11 World Bank Yes

44 2B1058* 200.00 2010-11

220 kV D/C sector 72 – Sector 52 A (0.5 Sq” ACSR)

JICA through REC 350048 HR-IC-DIS-035-2009-

100842

Provision of two 220 kV bays at sector 56 Gurgaon

JICA through REC 350061 HR-IC-DIS-035-2009-

100855

Provision of two 220 kV bays at sector 52 A Gurgaon

JICA through REC 350061 HR-IC-DIS-035-2009-

100855

220 kV double circuit with 0.5 □” ACSR from 400 kV substation Kirori (Hisar) to proposed 220 kV substation Hansi area (Masudpur).

220 kV A-4 Faridabad (Upgradation of 66 kV substation) GIS

Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from proposed 400 kV substation Nawada to 220 kV substation A-5 Faridabad.

Creation of two 220 kV bays at A-3 Palla substation for 220 kV D/C A-3 Palla to A-5 Faridabad line.

Yet to be posed

Covered under Sr. No. 45

Page 18: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 18 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

45 30 900.00 2010-11 World Bank Yes

46 2x100 220/66 2U1055* 3000.00 2010-11 World Bank Yes

47 8 2L1060* 2010-11 World Bank Yes

48 25 2L0878* 750.00 2009-10 REC 350064 Line work completed on 01.04.2009 Yes

49 7 2L0880* 240.00 2009-10 REC 350064 Line test charged on 19.05.09 Yes

50 50 2L0881* 1250.00 2009-10 REC 350039 Line test charged on 31.03.2009 Yes

51 2B0941* 200.00 2009-10 REC 350039

52 2x100 220/66 2U0903* 2803.00 2009-10 REC 350043 Yes

53 2 2L0904* 45.00 2009-10 REC 350043 Yes

Construction of a new 220 kV D/C line with 0.5 Sq. inch ACSR from A-3 Palla to A-5

2L1059*

6L0915A

In place of already approved 66 kV D/C A-3 Palla to A-5 line.

220 kV A-5 Faridabad (Upgradation of 66 kV level)

LILO of one circuit of 220 kV D/C A-3 Palla to A-5 line at proposed 220 kV substation A-4 Faridabad.

Loop in of Jind - Hisar IA 220 kV double circuit at 400 kV substation Kirori (Hisar) making it Jind – Kirori double circuit line.

Construction of link between proposed 220 kV substation Hansi to the LILO point of Jind - Hisar IA line in order to complete Hansi - Hisar IA line.

Creation of 220 kV double circuit with 0.5 □” ACSR from 400 kV substation Kirori (Hisar) to under construction 220 kV substation Bhuna.

Creation of two 220 kV line bays at 220 kV substation Bhuna (under construction) to receive 220 kV D/C line from proposed 400 kV substation Kirori.

Covered under Sr. No.50

220 kV Sector-56 Gurgaon {Upgradation from 66 kV level}

LILO of 220 kV D/C Palli-sector-52A Gurgaon line at proposed 220 kV substation Sector-56 Gurgaon.

Page 19: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 19 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

54 2N1139* 3000.00 2010-11 World Bank Yes

55 104 2600.00 2010-11 World Bank Yes

56 110 2L1141* 2750.00 2010-11 World Bank Yes

57 2B1142* 200.00 2011-12

58 2B1143* 200.00 2010-11

59 Mau (Dharuhera) 1x100 220/66 2N1149* 5200.00 2010-11 Yes

1x100 220/33

2x0.2 33/0.4

1x100 220/66 2A1218*

220 kV Rangala Rajpur (Firozpurzirka)

1x100 1x100

2x0.2

220/66 220/33 33/0.4

To make provision of 10 Nos. 220 kV bays including 3 no. spare bays, 10 nos. 66 kV bays including 5 no. spare bays & 10 no. 33 kV bays including 4 no. spare bays at 220 kV substation Rangala Rajpur (Firojpur Zirka).

220 kV D/C Kheri Kanker (Nuh) – Rangala Rajpur (Firozpurzirka) with 0.4 Sq.” ACSR conductor.

2L1140* Out of six circuits equivalent to 0.5 sq” ACSR being provided by PGCIL for HVPNL use, four 220 kV circuits will directly feed 220 kV substation sector-72 Gurgaon bus. The remaining two circuits will be taken from 400 kV substation PGCIL to proposed 220 kV substation Kankerkheri (Nuh).

220 kV D/C Palwal – Rangala Rajpur (Firojpurzirka ) with 0.4 Sq” ACSR conductor.

Creation of 2 no. 220 kV bays at 220 kV substation Kheri Kanker (Nuh) for new 220 kV D/C Kheri Kanker) Rangala Rajpur line.

Yet to be posed

Covered under Sr. No. 33

Creation of 2 No. 220 kV bays at 220 kV substation Palwal for new 220 kV D/C Palwal – Rangala Rajpur line.

Yet to be posed

Covered under Sr. No. 56

JICA through REC 350059 HR-IC-DIS-035-2009-

100853

2x0.2 MVA 33/0.4 kV transformer for auxiliary supply

with total provision of 10 no. 33 kV bays to provide supply to upcoming 33 kV substations of DHBVNL in nearby area.

Page 20: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 20 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

60 40 2L1150* 1000.00 2010-11 Yes

61 60 2L1151* 1500.00 2011-12 Yes

62 24 2L1152* 600.00 2010-11 Yes

63 2B1153* 200.00 2011-12

64 2B1154* 200.00 2010-11 Yes

65 3B1157* 2010-11

66 Sector-20 Gurgaon (GIS) 2N1158* 9400.00 2010-11 Yes

220 kV D/C 0.5 Sq" ACSR line from 220 kV substation Daultabad to 220 kV substation Mau

JICA through REC 350048 HR-IC-DIS-035-2009-

100842

220 kV D/C 0.5 Sq" ACSR line from proposed 220 kV substation Kheri kanker to 220 kV substation Mau

Yet to be posed

LILO of one circuit of 220 kV D/C Badshahpur-Rewari line at 220 kV substation Mau on D/C towers.

JICA through REC 350057 HR-IC-DIS-035-2009-

100851

The second circuit can be LILOed in future.

Creation of 2 no. 220 kV bays at 220 kV substation Kheri Kanker to accommodate 220 kV Mau - Kheri Kanker line.

Yet to be posed

Covered under Sr. No. 33

Creation of 2 no. 220 kV bays at 220 kV substation Daultabad to accommodate 220 kV Mau – Daultabad line.

JICA through REC 350061 HR-IC-DIS-035-2009-

100855

Erection of 6 no. 33 kV bays at 220 kV substation Mau

Covered under Sr. No. 59

2x100 2x25/31.5

2x0.2

220/66

66/11

JICA through REC 350062 HR-IC-DIS-035-2009-

100856

2x0.2 MVA 11/.4 kV transformers for auxiliary supply.

Page 21: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 21 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

66

67 220 kV substation Samain (Tohana) 2N1162* 3500.00 2010-11 World Bank Yes

JICA through REC 350062 HR-IC-DIS-035-2009-

100856 Advising DHBVNL that proposal of 2x25/31.5 MVA 66/11 kV transformers has been agreed subject to condition that high capacity connectivity is used by DHBVNL for all 11 kV feeders so that the number of panels is kept to a minimum.

Space will be kept reserved for creation of a 400 kV GIS substation at Sector-20 Gurgaon in future depending upon the availability of ROW for feeding 400 kV line.

2x100 1x100

2x0.2

220/33

220/132

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply

One 100 MVA 220/33 kV transformer shall be installed in the first instance while the second shall be installed as per load requirement in future for which space shall be provided in the switchyard.

To make provision of 10 nos. 220 kV bays including 3 nos. spare bays, 5 nos. 132 kV bays including 1 no. spare bay and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Samain (Tohana).

Page 22: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 22 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

68 80 2L1163* 2000.00 2010-11 World Bank Yes

69 100 2L1164* 2500.00 2010-11 World Bank Yes

70 Lula Ahir (Rewari) 2N1165* 3500.00 2010-11 Yes

220 kV D/C line from the proposed 400 kV substation Kirori to proposed 220 kV substation Samain (Tohana) with 0.5 Sq" ACSR conductor.

To allow DHBVNL to connect the proposed and already approved new 33 kV substation Bithmara with the proposed 220 kV substation Samain (Tohana).

220 kV D/C line from the proposed 220 kV substation Samain (Tohana) to proposed 220 kV substation Masudpur (Hansi) with 0.5 Sq" ACSR conductor.

1x100 1x100

2x0.2

220/132 220/33

33/0.4

JICA through REC 350060 HR-IC-DIS-035-2009-

100854

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply, in the first instance, in the 24 acre land offered by Gram Panchayat of Lula Ahir

To allow DHBVNL to connect existing 33 kV substations Jharoda (16 MVA) with approx. 3 km new 33 kV line, Khushpura (9MVA) with approx. 3 km new 33 kV line and Bishowa (8 MVA) with approx. 10 km new 33 kV line by extending 33 kV line from Jharoda to Bishowa respectively from proposed 220 kV substation Lula Ahir ( Rewari).

To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Lula Ahir.

Page 23: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 23 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

70

71 30 2L1166* 514.00 2010-11 Yes

72 Dhanonda 2N1168* 3400.00 2010-11 Yes

Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard.

LILO of 220 kV S/C Charkhi Dadri-Rewari line at the proposed 220 kV substation Lula Ahir with 0.4 sq inch ACSR.

JICA through REC 350057 HR-IC-DIS-035-2009-

100851

1x100 1x100

2x0.2

220/132

220/33

33/0.4

JICA through REC 350060 HR-IC-DIS-035-2009-

100854

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply in the first instance in the 34 acre land offered by Gram Panchayat of Dhanonda.

To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Dhanonda (Mohindergarh)

Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard

Page 24: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 24 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

73 40 2L1169* 1080.00 2010-11 Yes

74 Masudpur (Hansi ) 1x100 220/132 2N1175* 3000.00 2010-11 World Bank Yes

2N0882A

75 90 2L1180* 2430.00 2010-11 Yes

220 kV D/C line with 0.5 Sq" ACSR from the proposed 220 kV substation Lula Ahir (Rewari) to the proposed 220 kV substation Dhanonda (Mohindergarh)

JICA through REC 350057 HR-IC-DIS-035-2009-

100851

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply in the first instance, in the 17 acre land offered by Gram Panchayat of Masudpur.1x100

2x0.2220/33

33/0.4

Approval revised to provide one each transformer of 220/132 kV and 220/33 kV rating in place of both of 220/132 kV rating

Additional 100 MVA 220/132 kV or 220/33 kV transformer will be installed in future as per load requirement for which space shall be provided in the switchyard

To make provision of 10 no. 220 kV bays including 3 no. spare bays, 10 nos. 132 kV bays including 5 nos. spare bays and 10 nos. 33 kV bays including 4 nos. spare bays at 220 kV substation Masudpur (Hansi) .

220 kV D/C Chormar-Rania line with 0.5 Sq. inch ACSR via the proposed 400 kV substation Nuhiyanwali (Sirsa).

JICA through REC 350057 HR-IC-DIS-035-2009-

100851

Page 25: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 25 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

76 Sector-57 Gurgaon (GIS) 2N1197* 8500.00 2010-11 Yes

77 1 2L1198* 27.00 2010-11 Yes

78 Gignow (Loharu) 2N1205* 3000.00 2010-11 World Bank Yes

1x100 1x100

2x0.2

220/66

220/33 33/0.4

JICA through REC 350062 HR-IC-DIS-035-2009-

100856

Erection of 10 no. 33 kV bays including 4 no. spare bays for feeding upcoming 33 kV substations of DHBVN in sector-49, 62 and Faridabad Road area.

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply

The third transformer whether 220/66 kV or 220/33 kV can be decided later on as the system develops. Space would be reserved for installation of the same.

LILO of proposed 220 kV D/C Sector 72 (220 kV) - Sector 52A Gurgaon line (on multi circuit towers) at 220 kV substation Sector 57 Gurgaon using 0.5 Sq" ACSR conductor.

JICA through REC 350048 HR-IC-DIS-035-2009-

100842

1x100 1x100

2x0.2

220/132

220/33 33/0.4

To make provision of 15 nos. 220 kV bays including spare, 12 nos 132 kV bays including spare and 10 nos. 33 kV bays including spare at proposed 220 kV substation Gignow.

Provision of space shall be made to accommodate 3rd 100 MVA transformer, if required, in future.

Page 26: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 26 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

78

79 100 2L1206* 2700.00 2010-11 World Bank Yes

To allow DHBVNL to connect 33 kV substations Singhani (10 MVA), Baralu (10 MVA), Kari Dharni (10 MVA), Sohansara (10 MVA) and Bishalwas (10 MVA) besides any other existing/ proposed 33 kV substation with proposed 220 kV substation Gignow. The left out 33 kV substations Budhera (10 MVA) and Chahar Kalan (10 MVA) shall be fed from 132 kV substation Digawan Jattan after shifting of earlier substations Baralu and kari Dharni.

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply

Permission for clearance of trees at site for 220 kV substation Gignow shall have to be arranged from Forest Department.

Advising DHBVNL to create new 33 kV substations matching their completion with the commissioning of feeding 220 kV or 132 kV substation.

Construction of 220 kV D/C line with 0.5 Sq" ACSR from proposed 220 kV substation Dhanonda (Mohindergarh) to proposed 220 kV substation Gignow (50 km)

Page 27: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 27 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

80 100 2L1207* 1620.00 2010-11 World Bank Yes

81 Sagwan (Near Tosham) 2N1212* 3000.00 2010-11 World Bank Yes

Construction of 220 kV D/C line with 0.5 Sq" ACSR from proposed 220 kV substation Isharwal (under construction) to proposed 220 kV substation Gignow (30 km)

1x100 1x100

2x0.2

220/132 220/33 33/0.4

To make provision of 15 nos. 220 kV bays including spare, 12 nos. 132 kV bays including spare and 10 nos. 33 kV bays including spare at 220 kV substation Sagwan.

Provision of space to be made to accommodate 3rd 100 MVA transformer, if required, in future.

To allow DHBVNL to connect 33 kV substations Baliyali (10 MVA), Dhani Mau (10 MVA), Bapora (10 MVA), Nigana Canal (16.3 MVA) and any other existing/ proposed 33 kV substation with proposed 220 kV substation Sagwan.

Advising DHBVNL to create new 33 kV substations matching their completion with the commissioning of feeding 220 kV or 132 kV substation.

2x0.2 MVA 33/0.4 kV transformers for auxiliary supply

Page 28: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 28 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

82 40 2L1213* 2000.00 2010-11 World Bank Yes

83 Dadhi Bana 2N1419* 2500.00 2011-12 Yet to be posed Yes

2U1269A

LILO of both circuits of existing 220 kV D/C Hisar (400 kV substation Mayyar of PGCIL) - Isharwal line at the proposed 220 kV substation Sagwan by erecting about 40 km 220 kV D/C line (20 km either way) with 0.4 Sq" ACSR.

1x100+1x100+2x.200

220/132+220/33+

33/.4

Subject to finalisation of land at village Dadhi Bana.

220 kV Dadhi Bana aproved in place of earlier approval of upgradation of existing 132 kV substation Jhojju Kalan to 220 kV level conveyed vide R 543 daed 2.9.08 with 2x100 MVA 220/132 kV transformers.

To make provision of 12 no. 220 kV bays including spare bays, 12 no. 132 kV bays including spare bays and 15 no. 33 kV bays including spare bays at proposed 220 kV substation Dadhi Bana.

Page 29: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 29 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

83

84 38 1140.00 2011-12 Yet to be posed Yes

85 40 2L1427* 1200.00 2011-12 World Bank Yes

86 Batta 2N1277* 3000.00 2010-11 Yes

To allow DHBVNL to feed following new 33 kV substations: i) Khudana (10 MVA) from proposed 220 kV substation Dadhi Bana in place of earlier approved (R 567 dated 03.11.2008) from 132 kV substation Jhojju Kalan. Ii) Mandola (10 MVA) and Changrod (10 MVA) from proposed 220 kV substation Dadhi Bana in place of earlier approved (R 543 dated 02.09.2008) from proposed 132 kV substation Makrani. iii) Dhareru (10 MVA) from 132 kV substation dadri-II matching with shifting of load of 33 kV substation Makrana from 132 kV substation Dadri II to proposed 132 kV substation Makrani.

Construction of 220 kV D/C Dhanonda - Dadhi Bana line with 0.5 Sq" ACSR conductor

2L1426*

2L1270A

2L1420A

Construction of 220 kV D/C Dadhi Bana - Gignow line with 0.5 Sq" ACSR conductor

1x100 1x100

2x0.2

220/132

220/33 33/0.4

Yet to be posed

Page 30: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 30 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

87 2L1278* 2010-11 Yes

88 Raiwali 2N1322* 2500.00 2010-11 World Bank

89 10 2L1323* 225.00 2010-11 World Bank Yes

90 20 2L1324* 550.00 2010-11 World Bank Yes

LILO of 220 kV Narwana – Kaithal double circuit line at proposed 220 kV substation Batta.

Yet to be posed

Informing Hon'ble CM Haryana about change in site and voltage level i.e. creating 220 kV substation Batta in place of upgradation of 33 kV Kalayat to 132 kV level.

2x100 1x12.5/16

220/66 66/11

1x12.5/16 MVA 66/11 kV transformer for auxiliary supply

• Additional 100 MVA 220/66 kV or 220/33 kV transformer shall be installed in future as per load requirement for which space shall be provided in the switchyard.

• 33 kV yard shall not be created at this stage but space shall be kept for the same.

To make provision of 15 no. 220 kV bays including spare bays, 15 nos. 66 kV bays including spare bays and 10 nos. 33 kV bays including spare bays at proposed 220 kV substation Raiwali.

LILO of one circuit of 220 kV D/C Tepla - Madanpur line with 0.4 □” ACSR at proposed 220 kV substation Raiwali.

Construction of 220 kV D/C line with 0.5 sq” ACSR from 400 kV substation PGCIL (to be constructed near Barwala) to proposed 220 kV substation Raiwali.

The execution shall be in the time frame matching with commissioning of 400 kV PGCIL substation.

Page 31: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 31 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

91 2L1320A

92 Sector-3 Gurgaon (GIS) No

93 Sector-2 Gurgaon (GIS) No

94 13 390.00 2011-12 No

Cancellation of earlier approved feeding of 220 kV substation Sector 20 Gurgaon by creation of Daultabad - Sector 20 Gurgaon line with 220 kV D/C quad moose conductor as provided at Sr. No. 6 of approval issued by CE/ Planning HVPNL Panchkula vide memo No. R. 563/Ch-23/HSS-348 dated 30.10.2008.

Not required to be included in

Investment Plan

In principle approval for creation of 220 kV GIS substation at sector-3 Gurgaon subject to allotment of land for the same by HUDA

In-principle approval for up-gradation of existing 66 kV substation sector-2 Gurgaon to 220 kV GIS substation in case suitable land is not made available by HUDA in adjoining sector-3 Gurgaon subject to suitability of spare land at 66 kV substation sector-2 Gurgaon for the purpose of upgradation.

220 kV D/C overhead line with twin moose AAAC conductor with total line length of 6.5 km approx. from Daultabad to Railway line.

Page 32: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 32 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

95 5 2L1444* 1500.00 2011-12 No

96 13 3900.00 2011-12 No

97 Rampur Kamboan 2N1370* 3501.00 2010-11 PFC 03403021 Yes

2N1235A

220 kV D/C line with power cable equivalent to twin moose AAAC conductor with total line length of 2.5 km approx. from Railway line to proposed 220 kV GIS substation sector-2 or 3 Gurgaon.

220 kV D/C line with power cable equivalent to single moose AAAC conductor with total line length of 6.5 km approx. from proposed 220 kV GIS substation sector 2 or 3 Gurgaon to proposed 220 kV substation sector-20 Gurgaon.

1x100 MVA1x100 MVA2x0.2 MVA

220/66220/33 33/0.4

220kV substation Rampur Kamboan approved in place of Malikpur Bangar approved vide R574 dated 8/12/08

Additional 100 MVA 220/66 kV transformer shall be installed in future as per load requirement for which space shall be provided in the switchyard.

To make provision of 15 nos. 220 kV bays including spare bays, 15 no. 66 kV bays including spare bays and 10 no. 33 kV bays including spare bays at 220 kV substation Rampur Kamboan

Page 33: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 33 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

97

98 40 1500.00 2010-11 PFC 03403021 Yes

99 10 2L1381* 300.00 2009-10 To be Posed No

100 6G1382* 2009-10 To be posed No

101 2B1383* 200.00 2009-10 To be posed No

To allow UHBVNL to feed 33 kV substations Rampur Kamboj (proposed 10 MVA), Malikpur Banger (proposed 10 MVA), Dhimo (proposed 10 MVA), Ledi (proposed 10 MVA) and Taharpur (proposed 10 MVA) from proposed 220 kV substation Rampur Kamboan.

LILO of one circuit of 220 kV D/C YTPP - Abdullapur line with 0.5 sq" ACSR at proposed 220 kV substation Rampur Kamboan. It is likely to construct 220 kV D/C line from 400 kV PGCIL substation (to be constructed near Barwala) to proposed 220 kV substation Rampur Kamboan via another proposed 220 kV ss being planned at village Sarawan

2L1371*2L1236A

Erection of 220 kV D/C Sector 72 - Badshahpur line with 0.5 Sq inch ACSR

Shifting of a portion of exisitng overhead 66 kV D/C Badshahpur - Sohna line passing through 220 kV substation Badshahpur yard with 66 kV XLPE underground cable to provide space for erection of 220 kV bay.

Erection of 2 no. 220 kV bays at 220 kV substation Sector 72 Gurgaon for accomodating 220 kV D/C Sector 72- Badshahpur line.

Page 34: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 34 of 180 220 kV

Name of substation or line section Code RemarksSr. No.

Line Length

(Ckt - km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangement

Works covered under

Investment Plan 2009-10

102 2B1384* 200.00 2009-10 To be posed No

Total (220 kV) 2347.224 169186.34

2 no. 220 kV bays at 220 kV substation Badshahpur for acomodating 220 kV D/C Sector 72 - Badshahpur line

Page 35: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 35 of 180 132 kV

Code Remarks

132 kV WorksA Works to be executed with financial assistance from REC

1 Jakhal 2x10/16 132/11 1U0467* 431.00 2009-10 REC 350023 Yes

2 25 1L0468* 369.00 2009-10 REC 350023 Yes

3 Arya Nagar (Hissar) 1x10/16 132/11 1U0480* 633.00 2009-10 REC 350031 Yes

4 3 1L0481* 17.00 2009-10 REC 350031 Yes

5 20 1L0482* 496.00 2009-10 REC 350031 Yes

6 38 1L0483* 211.00 2009-10 REC 350031 Yes

• 1B0484* 2009-10 REC 350031 Yes

7 16 1L0485* 254.00 2009-10 REC 350029 Yes

7 b One 132 kV bay at Dadri 1B0486* 86.00 2009-10 REC 350029 Yes

Sr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

One No 10/16 MVA, 132/11 kV T/F would be installed in the 1st instance and the 2nd susequently, as load grows

132 kV S/C line from proposed 220 kV substation Bhuna to 132 kV substation Jakhal in place of earlier approved Tohana - Jakhal line

Proposed 132 kV S/S Jakhal would be constructed in the available space in the existing 33 kV substation Jakhal. Space for one 132 kV bay at 132 kV Jakhal shall be provided for future expansion/ use.

Stringing of 2nd. ckt. of Beer (132 kV)-to T-off point (Tower No.45) on already erected D/C Towers & Const. of 132 kV line bay at Beer (132 kV substation)

132 kV S/C line on D/C towers from Location No. 45 (T-off point) to 132 KV Arya Nagar S/S with associated bays at Arya Nagar

Stringing of 2nd. ckt. from Hisar I.A to Arya Nagar (direct).

132 kV bay one number at Hissar I.A substation.

Dadri- Jhojjukalan S/C ine with 0.2 Sq" ACSR in place of earlier approved 2nd Ckt. of Dadri-Atela line

Page 36: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 36 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

7 c Two 132 kV bays at Jhojjukalan 1B0487* 86.00 2009-10 REC 350029 One bay covered in the scheme Yes

8 17 1L0493* 270.00 2009-10 REC 350029 Yes

9 38 1L0497* 577.00 2009-10 REC 350031 Yes

10 19 1L0498* 425.00 2009-10 REC 350031 Commissioned on 20.05.09 Yes

11 25 1L0511* 427.00 2009-10 REC 350031 Yes

12 1B0512* 56.00 2009-10 REC 350031 Yes

13 20 1L0505* 280.00 2009-10 REC 350030 Yes

14 Nagla Megha 2x10/16 132/11 1U0506* 712.00 2009-10 REC 350030 Yes

15 7 1L0507* 111.00 2009-10 REC 350030 Commissioned on 9.3.09 Yes

16 1L0508* 56.00 2009-10 REC 350030 Commissioned on 9.3.09 Yes

132 kV S/C line from 220 kV Pehowa to 132 kV Malikpur and connecting it to present 132 kV Malikpur - Ismailabad line just beyond Malikpur.

I) Vacation of 132 kV bay at 132 kV Malikpur currently feeding 132 kV Ismailabad. II) First few spans of this line will be constructed with D/C towers to preserve the right of way for any new 132 kV emanating from adjacent bay to take care of future load growth requirement of the area.

LILO of Tohana - Dharsul S/C line at 220 kV substation Bhuna

LILO of 132 kV Dharsul - Telewara S/C line at 220 kV substation Bhuna

132 kV S/C line from 220 kV proposed substation Bhuna to 132 kV substation Uklana

one No. 132 kV bay at 132 kV substation Uklana for accommodating Bhuna line

LILO of 132 kV Karnal - Indri S/C line at 220 kV Nilokheri.

Commissioned with 1st T/F on 10.04.09 & 2nd T/F Commissioned on 24.04.09

132 kV Madhuban to Nagla Megha S/C line.

132 kV bay at 132 kV substation Madhuban for accommodating Nagla Megha line -1 No

Page 37: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 37 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

17 Halluwas (Dadri Road Bhiwani) 10/16 132/11 1N0522* 531.00 2009-10 REC 350028 Yes

18 1 1L0523* 17.50 2009-10 REC 350028 Yes

1B0524* 20.00 2009-10

19 1 1L0525* 16.00 2009-10 REC 350028 Yes

20 Bhutan Kalan 2x20/25 132/33 1U0533* 954.00 2009-10 REC 350031 Yes

1x5 33/11 1N0534* 2009-10 REC 350031

21 15 1L0535* 372.00 2009-10 REC 350031 For auxiliary load of 220 kV Bhuna Yes

22 1x20/25 132/33 1U0761* 940 2009-10 REC 350035 Yes

4 33/11 1U0762* REC 350035

At 6 acre land given by Gram Panchayat free of cost.

Feeding 132 kV Halluwas from 220 kV substation Dadri by utilising idle portion of 132 kV S/C Dadri - Bhiwani line.

Earlier work of augmentation of 220 kV substation Bhiwani with additional 1x10/16 MVA 132/11 kV transformer vide memo No. R. No. 298 / Ch.151/408/K-35 dated 8.4.2005 be treated as cancelled.

*Refurbishing of 132 kV bay at 220 kV substation Dadri for Halluwas

Additional 132 kV S/C line from the end of existing portion of Dadri-Bhiwani line upto the site of proposed 132 kV substation Halluwas with 0.2 Sq" ACSR.

To feed / connected to 33 kV substaions Bhutan, Bhuna and Bhirdana etc.

132 kV S/C line on D/C towers from 220 kV substation Bhuna to proposed 132 kV substation Bhutan Kalan with 0.2 Sq" ACSR

Kirmich (Upgradation from 33 kV level)

With double bus arrangement to provide connectivity with both 220 kV Nissing and 220 kV Nilokheri matching with commissioning of 220 kV substation Nilokheri and shifting of 132 kV substation Amin on 220 kV substation Nilokheri.

Page 38: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 38 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

23 48 1L0763* 760 2009-10 REC 350035 Yes

24 18 1L0764* 465 2009-10 REC 350035 Yes

25 Seka 2x20/25 132/33 1N0812* 1020.00 2009-10 REC 350035 Yes

1x4 33/11 3N0813* 2009-10 REC 350035

26 10 1L0814* 300.00 2009-10 REC 350035 Yes

27 60.00 2009-10 REC 350035 Yes

28 11 1L0815* 210 2009-10 REC 350035 Yes

29 20 1L0816* 380 2009-10 REC 350035 Yes

1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Kirmitch would feed existing 33 kV substation Kirmitch and any future/ proposed nearby substation by UHBVN.

LILO of 132 kV Sagga – Amin line at 132 kV substation Kirmitch.

132 kV S/C line on D/C tower from 220 kV substation Nilokheri to proposed 132 kV substation Kirmitch

2x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Seka would feed 33 kV substations Shobhapur, Bhungarka and Bhilwara and any future/ proposed nearby substation by DHBVN.132 kV S/C line on D/C tower with

0.4 sq” ACSR from 220 kV substation Narnaul to proposed 132 kV substation Seka.

One No. 132 kV bay at 220 kV substation Narnaul for accommodating Narnaul – Seka 132 kV line

132 kV S/C line with 0.2 sq” ACSR from 132 kV substation Ateli to 132 kV substation Mundia Khera.

Creation of two No. 132 kV bays at 132 kV substation Ateli and one No. bay at 132 kV substation Mundia Khera for accommodating of Seka – Ateli and Ateli - Mundia Khera 132 kV lines -

132 kV S/C line with 0.2 sq” ACSR from proposed 132 kV substation Seka to 132 kV substation Ateli.

Page 39: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 39 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

30 Habri 1x20/25 132/33 1N0822* 930.00 2009-10 REC 350035 Yes

1x20/25 132/33 1A0829* 2009-10 REC 350035

31 12 1L0823* 310.00 2009-10 REC 350035 Yes

32 1B0824* 80.00 2009-10 REC 350035

33 29 1L0783* 171 2009-10 REC 350036 Yes

i 1B0784* 60 2009-10 REC 350036

ii 1B0785* 60 2009-10 REC 350036

Matching with the augmentation of 220 kV substation Nissing with additional 1x100 MVA 220/132 kV transformer.

1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Habri would feed load of existing 33 kV substation Habri (16 MVA) and proposed new 33 kV substation Deeg (10 MVA)

To facilitate feeding of proposed new 33 kV substation Barsana (10 MVA)

132 kV S/C line on D/C towers with 0.2 sq” ACSR from 132 kV substation Rasina to proposed 132 kV substation Habri.

132 kV bays at 132 kV substation Rasina for accommodating S/C line on D/C towers from 132 kV substation Rasina to proposed 132 kV substation Habri.

Covered under Sr. No.

31

Stringing of 3rd 132 kV circuit between 220 kV substation Bhiwani and 132 kV substation Jui.

132 kV bay at 220 kV Bhiwani - For connecting to Jui (One No.)

Covered under Sr. No.

33

132 kV bay at 132 kV Jui - For connecting to Bhiwani (One No.)

Covered under Sr. No.

33

Page 40: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 40 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

34 36 1L0779* 660 2009-10 REC 350033 Yes

35 12.5 1L0780* 242 2009-10 REC 350033 Yes

36 28 1L0781* 517 2009-10 REC 350033 Yes

37 21 1L0782* 393 2009-10 REC 350033 Yes

38

i 1B0786* 65 2009-10 REC 350033

ii 1B0787* 65 2009-10 REC 350033

iii 1B0788* 65 2009-10 REC 350033

iv 1B0789* 65 2009-10 REC 350033

39 Bhusthala 2x20/25 132/33 1N0765* 800 2009-10 REC 350036 Yes

2x200 kVA 33/0.4 3N0766* 2009-10 REC 350036

132 kV S/C line from 220 kV substation Isharwal to 132 kV substation Jui with 0.2 sq" ACSR.

132 kV S/C line 220 kV substation Isharwal to Miran with 0.2 sq" ACSR.

132 kV S/C line 220 kV substation Isharwal to Tosham with 0.2 sq" ACSR.

132 kV S/C line 220 kV substation Isharwal to Behal with 0.2 sq" ACSR.

132 kV bays at following substations:

Construction of 33 kV bays (two per transformer of 132/33 kV rating) as and when required to meet the load requirement in the area.132 kV Jui - For connecting to

Isharwal (One No.)Covered

under Isherwal

substation132 kV Miran - For connecting to Isharwal (One No.)

Covered under

Isherwal substation132 kV Tosham - For connecting to

Isharwal (One No.)Covered

under Isherwal

substation132 kV Behal - For connecting to Isharwal (One No.)

Covered under

Isherwal substation

At the land being provided by gram Panchayat free of cost.

This substation will also cater to the load demand of Ajrana and surrounding area.

Page 41: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 41 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

40 25 1L0767* 375 2009-10 REC 350036 Yes

41 12 1L0768* 300 2009-10 REC 350036 Yes

42 1B0769* 60 2009-10 REC 350036 Yes

43 Adhon 800 2009-10 REC 350036 Yes

2009-10 REC 350036

44 3 1L0772* 75 2009-10 REC 350036 Yes

45 800 2009-10 REC 350036 Yes

46 9 1L0775* 225 2009-10 REC 350036 Yes

47 23 1L0776* 345 2009-10 REC 350036 Yes

132 kV D/C line from 220 kV substation Durala to 132 kV substation Bhusthala with 0.4 sq. inch ACSR

132 kV S/C line on D/C towers from 132 kV substation Bhusthala to 132 kV substation Ismailabad with 0.4 sq. inch ACSR

One no.132 kV bay at 132 kV substation Ismailabad for accommodating above line.

2x20/25 2x200

kVA

132/33 33/0.4

1N0770*

3N0771*

At the land being provided by gram Panchayat free of cost.

This substation will also cater to the load demand of Jhansa Road Kurukshetra and surrounding area.

132 kV S/C line on D/C towers from 220 kV substation Durala to 132 kV substation Adhon with 0.4 sq. inch ACSR

Lukhi (Up gradation from 33 kV level)

2x20/25 2x200

kVA

132/33

33/0.4

1U0773*

3U0774*

This substation will also cater to the load demand of Lukhi, Jyotisar and surrounding area.

132 kV S/C line on D/C towers from 220 kV substation Durala to 132 kV substation Lukhi with 0.4 sq. inch ACSR

LILO of 132 kV Pehowa – Bhore line at 132 kV substation Lukhi.

Page 42: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 42 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

48 800 2009-10 REC 350037 Yes

49 15 1L0778* 225 2009-10 REC 350037 Yes

50 1G0473* 35 2009-10 NCRPB No

51 2 1L0536* 32.00 2009-10 NCRPB Yes

52 21 1L0537* 124.00 2009-10 NCRPB Yes

53 2X20/25 132/33 1N0845* 1000 2009-10 World Bank Yes

Bodhni (Up gradation from 33 kV level)

2x20/25 2x200

kVA

132/33

33/0.4

1N0777*

3U0811*

LILO of S/C line 220 kV Pehowa –132 kV Ismailabad line at 132 kV substation Bodhni.

Provisison of double bus arrangement at existing 132 kV Bahadurgarh facilitating exchange of power on both 220 kV substation Narela & 220 kV substation Bahadurgarh side

LILO of 132 kV Rohtak—Dadri line at 132 kV substation Kalanaur in place of present T-off arrangement

Stringing of 2nd ckt of Rohtak—MDU—Sampla 132 kV line with 0.2 sq. inch ACSR.

132 kV bays four numbers i.e. one No. each at 220 kV substations Rohtak & 132 kV substations Sampla and two Nos. at 132 kV substation MDU Rohtak for accommodating of stringing of 2nd ckt of Rohtak -MDU - Sampla 132 kV line

132 kV Sataundi {Upgradation from 33 kV level}

At the land offered free of cost by Gram Panchayat Sataundi adjacent to existing 33 kV substation. Only one 132/33 kV T/F shall be commissioned in the first instance. The second T/F shall be added as the load grows.

Page 43: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 43 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

54 12 1L0846* 268.00 2009-10 REC 350065

55 Beholi 1N0958* 1000.00 2010-11 Yes

56 Bega 1N0959* 800.00 2010-11 Yes

57 Naultha 1N0960* 800.00 2010-11 Yes

58 8 1L0962* 280.00 2010-11 Yes

The existing 33 kV substation sataundi will continue to be fed from proposed 132 kV Sataundi which will also feed proposed 33 kV substations Bastra and raipur Jattan.

LILO of one circuit of Bastra-Jundla line at proposed 132 kV substation Sataundi.

The route of bastra-Sataundi-Jundla line shall be selected in such a way that D/C line from Bastra reaches Sataundi and then proceeds to Jundla but only one of the circuits enters Sataundi; the other circuit by passes. Second circuit can be connected in future when required.

2x20/25 2x500 kVA

132/33

33/0.4

JICA through REC 350050 HR-IC-DIS-035-2009-

100844

2x20/25 2x500 kVA

132/33

33/0.4

JICA through REC 350050 HR-IC-DIS-035-2009-

100844

1x20/25 2x500

kVA

132/33 33/0.4

JICA through REC 350050 HR-IC-DIS-035-2009-

100844

132 kV S/C line on D/C towers with 0.4 Sq. inch ACSR from Samalkha-Beholi line.

JICA through REC 350054 HR-IC-DIS-035-2009-

100848

Page 44: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 44 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

59 16 1L0963* 448.00 2010-11 Yes

60 12 1L0964* 336.00 2010-11 Yes

61 4 1L0965* 40.00 2010-11 Yes

62 13 1L0966* 455.00 2010-11 Yes

63 1 1L0968* 17.53 2010-11 Yes

64 9.7 1L0969* 331.06 2010-11 Yes

65 1B0970* 55.32 2010-11

66 132 kV Kairu 1x20/25 132/33 1N1037* 800.00 2010-11 World Bank Yes

132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from Samalkha-Naultha line.

JICA through REC 350054 HR-IC-DIS-035-2009-

100848

132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from Samalkha to Bega.

JICA through REC 350054 HR-IC-DIS-035-2009-

100848

LILO of 132 kV S/C line from 400 kV substation Sewah to 132 kV substation Israna at 132 kV substation Naultha.

JICA through REC 350054 HR-IC-DIS-035-2009-

100848

132 kV S/C line on D/C towers with 0.4 Sq. inch ACSR from Beholi to Chhajpur.

JICA through REC 350054 HR-IC-DIS-035-2009-

100848

LILO of 132 kV S/C Chandoli-Chhajpur line at 220 kV substation Chhajpur.

Posed to NCRPB on 05.05.2009

132 kV S/C line on D/C tower with 0.4 Sq. inch ACSR from 220 kV substation Chhajpur to 132 kV substation Sector-29, Panipat.

Posed to NCRPB on 05.05.2009

One no.132 kV bay at 132 kV substation Sector-29, Panipat for accommodating line from 220 kV substation Chhajpur.

Posed to NCRPB on 05.05.2009

Covered under sr. No.

64

Page 45: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 45 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

67 1L1038* World Bank Yes

68 132 kV Khurana 2x20/25 132/33 1N1043* 1000.00 2009-10 REC 350066 Yes

2x200 kVA 33/0.4 REC 350066

69 75.00 2009-10

70 20 1L1046* 350.00 2009-10 REC 350066 Yes

71 10 1L1047* 280.00 2009-10 REC 350066 Yes

LILO of 132 kV Isharwal-Jui S/C line at 132 kV substaion Kairu

Matching with augmentation of 220 kV substation Cheeka by providing additional 1x100 MVA 220/132 kV transformer.

Initially 1x20/25 MVA 132/33 kV transformer would be installed at 132 kV substation Khurana to feed existing 33 kV substation Siwan gate Kaithal and Kawartan.

2nd 20/25 MVA 132/33 kV transformers would be installed at 132 kV substation Khurana matching with creation of new 33 kV substation by UHBVN to be proposed in the area for which the UHBVN may be asked to create new 33 kV substations.

2 Nos 33 kV bays at 132 kV subatation Khurana to accommodate 33 kV lines for feeding existing 33 kV substations Siwan gate Kaithal and Kwartan.

3B1044* 3B1045*

Included in the cost of

subsstation

Covered under Sr. No.

68

LILO of 132 kV Kaithal – Sewan line at 132 kV substation Khurana.

132 kV S/C line on D/C tower with 0.2 sq” ACSR from upcoming 132 kV substation Kheri Gulam Ali to proposed 132 kV substation Khurana.

Page 46: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 46 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

72 1B1048* 120.00 2009-10

73 132 kV Dablain 1x16/20 132/33 1N1078* 800.00 2009-10 REC 350064 Yes

74 2 1L1079* 50.00 2009-10 REC 350064 Yes

75 50.00 2009-10 REC 350064

76 16 1L1075* 280.00 2009-10 Yes

77 Kheri Gulam Ali 1N0934* 800.00 2009-10 REC 350064 Yes

78 25 1L0935* 875.00 2009-10 REC 350064 Yes

132 kV line bay at 132 kV substation Kheri Gulam Ali for accommadating above line.

Included in the cost of

subsstation

Covered under Sr. No.

77

LILO of 132 kV Narwana – Uklana line at proposed 132 kV substation Dablain.

Two numbers 33 kV bays at proposed 132 kV substation Dablain to feed existing 33 kV substation Dhanoda (9 MVA) and the already approved 33 kV substation Lochab (8 MVA) from it

3B1080*3B1081*

Covered under Sr. No.

73

LILO of 132 kV S/C Sirsa - Odhan line at proposed 400 kV substation Nuhiyawali.

JICA through REC 350058 HR-IC-DIS-035-2009-

100852

1x20/25 1x200

kVA

132/33 33/0.4

Matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka to feed existing 33 kV substation Kheri Gulam Ali.

132 kV S/C line on D/C towers with 0.4 sq. inch ACSR from 220 kV substation Cheeka to the proposed 132 kV substation Kheri Gulam Ali

Matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka.

Page 47: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 47 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

79 1B0936* 60.00 2009-10 REC 350064

80 1A0937* 200.00 2009-10 REC 350064 Yes

81 1G0491* 35.00 2008-09 Work completed and commissioned. No

82 1G0492* 35.00 2008-09 No

83 10 1L0840* 175.30 2009-10 REC 350065 Yes

84 30 1L0841* 668.00 2009-10 REC 350065 Yes

85 1B0842* 110.64 2009-10 REC 350065 Yes

86 44 1L0843* 980.00 2009-10 REC 350065 Yes

One number 132 kV bay at 220 kV substation Cheeka for accommodating Cheeka (220 kV) - Kheri Gulam Ali, 132 kV S/C line on D/C towers.

Covered under Sr. No.

78

2nd 20/25 MVA 132/33 kV transformers proposed at 132 kV substation Kheri Gulam Ali

Matching with commissioning of proposed 33 kV substation Naagal (Lader Keena), Serta and Atela/Budha Khera by UHBVN for which the proposal from UHBVN is still awaited.

Conversion of existing 132 kV main and transfer bus into double bus at 132 kV substation Safidon

Yet to be posed

To provide Double bus arrangement at 132 kV substation Jui

Yet to be posed

LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra.

132 kV D/C line with 0.4 sq” ACSR from propopsed 220 kV substation Bastra to 132 kV substation Naglamegha.

Two No. 132 kV bays at 132 kV substation Naglamegha for Bastra-Naglamegha line.

132 kV D/C line with 0.4 sq” ACSR from proposed 220 kV substation Bastra to 132 kV substation Jundla via Sataundi.

Page 48: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 48 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

87 1B0844* 110.64 2009-10 REC 350065

88 11 1E0749* 55.00 2009-10 Yes

89 14 1L0854* 280.00 2009-10 REC 350042 Yes

a) 1B0855* 80.00 2009-10 REC 350042

b) 1B0856* 80.00 2009-10 REC 350042

90 Nidana 1x20/25 132/33 953.00 2009-10 REC 350065 Yes

Two 132 kV bays at 132 kV substation Jundla for Bastra-Jundla line.

Covered under Sr. No.

86

Replacement of conductor between 132 kV substation Rohtak and 132 kV Sec-3, Sonepat Road Rohtak from existing 0.15 sq” ACSR to maximum current carrying capacity conductor physically in the same range and which can be accommodated on the existing tower structures without requiring mid span installation (5.5 km.).

Yet to be posed

132 kV S/C line with 0.2 Sq" ACSR from 132 kV substation Jalmana to 132 kV substation Assandh

132 kV bay at 132 kV Jalmana - For connecting to Assandh (One No.)

Covered under sr. No.

89

132 kV bay at 132 kV Assandh - For connecting to Jalnama (One No.)

Covered under sr. No.

89

1N0860*

With double bus arrangement matching with the augmentation of 220 kV substation Nissing with 1x100 MVA 220/132 kV transformer

Page 49: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 49 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

1x4 33/11 3N0861* 2009-10 REC 350065

91 12 1L0862* 211.00 2009-10 REC 350065 Yes

92 3B0863* 25.00 2009-10

93 20 1L0943* 700.00 2009-10 REC 350039 Yes

94 1B0944* 60.00 2009-10 REC 350039

95 25 1L0942* 875.00 2009-10 REC 350039 Yes

1x20/25 MVA 132/33 kV transformer being proposed at 132 kV substation Naraina would feed load of existing 33 kV substation Taraori (16 MVA) and proposed 4 MVA 33/11 kV transformer at proposed 132 kV substation Naraina.

LILO of existing 132 kV idle line from 132 kV Karnal to 220 kV Nissing at proposed 132 kV substation Nidana

4 MVA 33/11 kV transformer is proposed to be provided for feeding village Naraina as land is being offered free of cost by local Panchayat for proposed 132 kV substation. Therefore, it will ensure an independent feeder to the concerned village and also to provide auxiliary supply.

One 33 kV bay at 132 kV substation Nidana for feeding the existing 33 kV substation Taraori.

Included in the cost of

subsstation

Covered under sr. No.

91

132 kV S/C line on D/C towers with 0.4 □”ACSR from 400 kV substation Kirori (Hisar) to 132 kV substation Barwala.

2nd circuit shall be strung subsequently as per system requirement

Creation of one 132 kV line bay at 132 kV substation Barwala to receive 132 kV line from proposed 400 kV substation Kirori.

Covered under sr. No.

93

132 kV S/C line with 0.4 Sq" ACSR from 400 kV substation Kirori (Hisar) to 132 kV substation Adampur. First few spans from Kirori (2-3 km) shall be on double circuit tower.

Page 50: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 50 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

96 1B0945* 60.00 2009-10 REC 350039

97 1G0946* 25.00 2009-10 REC 350039 No

98 1G0947* 25.00 2009-10 REC 350039 No

One 132 kV line bay at 132 kV substation Adampur to receive 132 kV line from proposed 400 kV substation Kirori.

Covered under Sr. No.

95

Double bus arrangement at 132 kV substation Adampur making it capable to receive power from both Fatehabad and Kirori side.

Double bus arrangement at 132 kV substation Barwala making it capable to receive power from both Uklana and Kirori side.

Page 51: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 51 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

99 132 kV Sector-29, Part-II, Panipat 1x16/20 132/11 1N0912* 1400.00 2009-10 REC 350047 Yes

3x20/25 132/33 1N0914*

100 2 1L0913* 32.00 2009-10 REC 350047 Yes

101 22 1L0956* 435.38 2009-10 Yes

102 1B0957* 60.00 2009-10

With double bus arrangement.Initially 1x16/20 MVA 132/11 kV transformer be installed to feed the load of dye chemical units due to feeding constraints. Load management may be carried out during real peak hours by the local HVPN and UHBVN authorities. 3x20/25 MVA 132/33 kV transformers be installed matching with ultimate feeding of proposed 132 kV substation Sector-29, Part-II Panipat from proposed 220 kV substation Chhajpur.

LILO of 132 kV line from 400 kV substation Sewah to 132 kV substation Samalkha at proposed 132 kV substation Sector-29, Part-II, Panipat

3x20/25 MVA 132/33 kV transformer to be installed at 132 kV substation sector 29 Panipat would be utilize to feed the 33 kV substations Industrial area, Sewah & Sanoli Road, Panipat as proposed by Superintending Engineer/ TS Rohtak vide Memo No. Ch-5/ TSR-146 dated 25.6.2006.

To initially feed the 132 kV substation Sector-29, Part-II, Panipat. Ultimate feeding of proposed 132 kV substation Sector-29, Part-II Panipat would be from proposed 220 kV substation Chhajpur.

132 kV S/C line with 0.2 Sq. inch ACSR from 220 kV substation Sampla to 132 kV substation Beri.

Posed to NCRPB on 05.05.2009

One 132 kV bay at 132 kV substation Beri for 132 kV Sampla-Beri line.

Posed to NCRPB on 05.05.2009

Covered under Sr. No.

101

Page 52: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 52 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

103 132 kV Hisar (TPS) 2x16/20 132/11 1N1023* 1000.00 REC 350039 Yes

104 16 1L1024* 280.00 REC 350039 Yes

105 Kabri 1x20/25 132/33 1N0961* 800.00 2009-10 World Bank Yes

2x500 kVA 33/0.4 2009-10 World Bank

106 5 1L0967* 87.50 2009-10 World Bank Yes

107 16 1L0980* 280.00 2009-10 REC 350042 Yes

108 1G0981* 25.00 2009-10 REC 350042 No

109 1B0982* 120.00 2009-10 REC 350042

The above two works shall be carried out at HVPNL cost in case the same is allowed by HERC, alternatively the cost shall be borne by HPGCL. Substation commissioned on 12.12.2008 with 1x16/20 MVA 132/11 kV transformer. 2nd 16/20 MVA transformer commissioned on 14.12.2008.

LILO of one circuit of already approved 132 kV Kirori (400 kV) - Barwala D/C line at proposed 132 kV substation Hisar TPS.

To execute the work departmentally for speedy execution. Barwala - Khather line commissioned on 03.12.2008.

LILO of one circuit of 132 kV D/C PTPS-Chandoli line at 132 kV substation Kabri.

132 kV D/C line with 0.2 Sq. inch ACSR from 220 kV substation Kaul to 132 kV substation Dhand.

Provision of 2nd 132 kV bus at 132 kV substation Dhand.

2 No. 132 kV bays at 132 kV substation Dhand for Kaul-Dhand line.

Covered under Sr. No.

107

Page 53: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 53 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

110 20 1L0983* 560.00 2009-10 REC 350042 Yes

111 1B0984* 60.00 2009-10 REC 350042

112 1G0985* 25.00 2009-10 REC 350042 No

113 132 kV Hisar Road Rohtak 2x20/25 132/33 1N1034* 1000.00 2009-10 REC 350047 Yes

1X200 kVA 33/0.4 REC 350047 For auxiliary supply

114 1 1L1035* 40.00 2009-10 REC 350047 Yes

115 9 1L1097* 307.17 2009-10 REC 350065 Yes

132 kV S/C line on D/C towers with 0.2 Sq. inch ACSR from 220 kV substation Kaul to 132 kV substation Habri.

One 132 kV bay at 132 kV substation Habri for 132 kV Kaul-Habri line.

Covered under Sr. No.

110

Provision of 2nd 132 kV bus at 132 kV substation Habri.

To feed existing 33 kV substations IDC (18 MVA), existing 33 kV substation Jhajjar Road (18 MVA) and proposed 33 kV substation New Grain Market Rohtak (10 MVA) as proposed by UHBVN.

Loop in loop out of 132 kV Rohtak – Kalanaur line at 132 kV substation Hisar Road Rohtak.

Permanent feeding of 33 kV substation Senior Secondary School Rohtak from 132 kV substation Khokharakot Rohtak instead of 132 kV substation Hisar Road Rohtak after shifting of load of 33 kV substation IDC to 132 kV substation Hisar Road Rohtak.

132 kV S/C link line on double circuit towers between 132 kV substations staundi and Munak with 0.4 Sq" ACSR. The conductor to be provided on one side of tower to avoid shutdown in any eventuality.

Page 54: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 54 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

116 110.64 2009-10 REC 350065

117 132 kV Khairkan 2x20/25 132/33 1N1109* 1000.00 2009-10 Yes

118 6 1L1110* 105.00 2009-10 Yes

119

i) 42 1L1128* 736.26 2009-10 Yes

Two 132 kV bays one each at 132 kV substation Staundi & Munak for interconnectivity of both substations as detailed above

1B1098* 1B1099*

Covered under Sr. No.

115

JICA through REC 350056 HR-IC-DIS-035-2009-

100850

LILO of Nuhiyawali- Sirsa 132 kV S/C line at 132 kV substation Khairekan, matching with creation of 220 kV substation at Chormar and LILO of 132 kV Sirsa- Odhan S/C line at 400 kV substation Nuhiyawali

JICA through REC 350058 HR-IC-DIS-035-2009-

100852

The creation of 132 kV substation Khairekan earlier approved vide memo No. R. No. 496/Ch-38/HSS-304 dated 28-3-08 matching with creation of 400 kV substation Nuhiyanwali (Sirsa) now amended as matching with creation of 220 kV substation Chormar in view of its earlier commissioning w.r.to 400 kV substation Nuhiyanwali Sirsa)

Erection of following 132 kV lines from proposed 220 kV substation Mohana: -

132 kV D/C Mohana-Mundlana line with 0.2 Sq” ACSR conductor.

Posed to NCRPB on 05.05.2009

Page 55: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 55 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

ii) 34 185.24 2009-10 Yes

120 1B1129* 110.64 2009-10

121 250.00 2009-10

122 6 1L1134* 105.18 2009-10 REC 350065 Yes

LILO of existing 0.15 Sq” ACSR 132 kV S/C Harsana Kalan-Kharkhoda line at 220 kV substation Mohana with augmentation of 132 kV S/C Sonepat-Harsana Kalan-Kharkhoda line (17 Kms) with 0.15 Sq” all alloy aluminum conductor (AAAC) to improve its current carrying capacity. The LILO portion will also be constructed with similar AAAC conductor.

Posed to NCRPB on 05.05.2009

2 No. 132 kV bays at 132 kV substation Mundlana to receive power from 132 kV D/C Mohana-Mundlana line.

Posed to NCRPB on 05.05.2009

Covered under Sr. No.

119

Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed.

Covered under Sr. No. 19 of 220 kV

works

LILO of 132 kV Sirsa-Dabwali S/C line at proposed 220 kV substation Chormar

Page 56: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 56 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

123 132 kV S/S Dhudhianwali 1x20/25 132/33 1N1135* 800.00 2009-10 Yes

124 20 1L1136* 700.00 2009-10 Yes

125 132 kV S/S Kurangawali 2x20/25 132/33 1N1137* 1000.00 2009-10 Yes

JICA through REC 350056 HR-IC-DIS-035-2009-

100850

With 3 nos. 33 kV bays, one for connecting existing 33 kV S/S Keharwala, second for connecting the proposed 33 kV S/S Mohmadpura and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Keharwala with approx. 7 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Keharwala and proposed 33 kV S/S Mohamadpura with approx. 11.5 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Mohamadpura

132 kV S/C line on D/C towers with 0.4 sq inch ACSR from 400 kV substation Nuhiyanwali (Sirsa) to Dhudhianwali.

JICA through REC 350058 HR-IC-DIS-035-2009-

100852

JICA through REC 350056 HR-IC-DIS-035-2009-

100850

With 2x20/25 MVA 132/33 kV T/F with 3 No. 33 kV bays, one for connecting existing 33 kV S/S Kalanwali, second for connecting the existing 33 kV S/S Rori and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Kalanwali with approx. 2 km new 33 kV line from proposed 132 kV S/S Kurangawali to Kalanwali and existing 33 kV S/S Rori with approx. 2 Km new 33 kV line from proposed 132 kV S/S Kurangawali to Rori

Page 57: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 57 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

126 25 1L1138* 875.00 2009-10 Yes

127 1G1115* 1131.00 2009-10 REC 350047 Yes

128 13 1L1167* 443.69 2010-11 Yes

129 Nangal Mohanpur 1N1170* 1150.00 2010-11 World Bank Yes

130 10 1L1171* 400.00 2010-11 World Bank Yes

131 Pali 1N1172* 1100.00 2010-11 World Bank Yes

132 10 1L1173* 400.00 2010-11 World Bank Yes

133 15 1L1174* 297.00 2010-11 Yes

132 kV S/C line on D/C towers with 0.4 Sq” ACSR from proposed 220 kV substation Chormar to Kurangawali

JICA through REC 350058 HR-IC-DIS-035-2009-

100852

Procurement of one No. 16/20 MVA 132/11 kV Mobile substation

132 kV S/C line on D/C towers with 0.4 sq inch ACSR from proposed 220 kV substation Lula Ahir to existing 132 kV substation Kosli.

Posed to NCRPB on 05.05.2009

2x20/25 1x4

132/33 33/11

132 kV S/C line on D/C towers with 0.4 Sq" ACSR from the proposed 220 kV substation Dhanonda to the proposed 132 kV substation Nangal-Mohanpur.

2x20/25 1x4

132/33 33/11

132 kV S/C line on D/C towers with 0.4 Sq" ACSR from the proposed 220 kV substation Dhanonda to the proposed 132 kV substation Pali

Extension of existing 132 kV S/C line Dadri - Bahu line upto proposed 220 kV substation Dhanonda to enable feeding of existing 132 kV substation Bahu from the proposed 220 kV substation Dhanonda.

Posed to REC on 30.4.09

Page 58: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 58 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

134 36 1L1176* 630.00 2010-11 World Bank Yes

135 Bibipur 1x10/16 132/11 1N1177* 638.84 2009-10 REC 350064 Yes

136 14 1L1178* 250.00 2009-10 REC 350064 Yes

137 Sitamai 2x20/25 132/33 1N1186* 1100.00 2009-10 REC 350064 Yes

138 11 1L1187* 380.00 2009-10 REC 350064 Yes

139 1B1188* 56.00 2009-10 REC 350064

140 Gangaicha Jat (Rewari) 1N1190* 1542.00 2009-10 Yes

LILO of existing 132 kV S/C Hansi - Narnaund line at proposed 220 kV substation Masudpur (Hansi).

matching with already approved augmentation of 220 kV substation Jind by installing 3rd 100 MVA 220/132 kV transformer and shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur (Hansi).

LILO of 132 kV S/C Jind-Narnaund line at proposed 132 kV substation Bibipur.

To allow UHBVNL to feed existing 33 kV substation Jamba (14.3 MVA), Nigdu (8 MVA) and the proposed 33 kV substation Sitamai (8 MVA) from 132 kV substation Sitamai through new 33 kV lines.

132 kV S/C line on D/C towers with 0.4 Sq" ACSR from 220 kV substation Kaul to the proposed 132 kV substation Sitamai.

One no. additional 132 kV bay at 220 kV substation kaul for feeding line for 132 kV substation Sitamai

2x20/25 1x0.2

132/33 33/0.4

Posed to NCRPB on 05.05.2009

The land required for construction of substation will be acquired at government rates from Panchayat of village Gangaicha Jat by SE/ TS HVPNL Gurgaon. 1x0.2 MVA 33/0.4 kV transformer for auxiliary supply

Page 59: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 59 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

141 6 1L1191* 105.18 2009-10 Yes

142 60 1L1192* 1763.60 2009-10 Yes

143 1B1193* 112.00 2009-10 Yes

144 3B1194* 2009-10

145 24 1L1195* 768.00 2009-10

LILO of one circuit of 132 kV Rewari - Kosli line at 132 kV substation Gangaicha Jat.

Posed to NCRPB on 05.05.2009

132 kV D/C Lula Ahir - Gangaicha Jat line with 0.4 Sq" ACSR conductor.

Posed to NCRPB on 05.05.2009

2 number 132 kV bays at 220 kV substation Lula Ahir for giving supply to 132 kV substation Gangaicha Jat.

To make provision of 10 nos 33 kV bays (including 4 no. spare bays) at 132 kV substation Gangaicha Jat to supply power to existing 33 kV substations Palhawas & Jatusana and proposed 33 kV substations Guruwara, Kaluwas & Kakoria and others to be created by DHBVNL in future.

Posed to NCRPB on 05.05.2009

Covered under Sr. No.

140

LILO of existing 132 kV S/C line from 220 kV substation BBMB, Narela to 132 kV substation Bahadurgarh at 132 kV traction substation of Railways Asaudha (near Bahadurgarh) to provide two phase power supply for Shakur Basti – Rohtak Railway line electrification.

The LILO line will be constructed by HVPNL up to Asaudha traction substation of Railways as a deposit work and the bay arrangement for LILO in the Railway substation will be constructed by the Railways.

No required to be covered

under Investment

Plan

Page 60: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 60 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

146 30 1L1208* 525.90 2009-10 Yes

147 8 1L1209* 273.04 2009-10 Yes

148 1B1210* 55.32 2009-10

LILO of existing 132 kV S/C line from 220 kV substation BBMB, Narela to 132 kV substation Bahadurgarh at 132 kV traction substation of Railways Asaudha (near Bahadurgarh) to provide two phase power supply for Shakur Basti – Rohtak Railway line electrification. The equipment installed in the Railway

premises for LILO arrangement will be operated and maintained by Railway authorities. The equipment for LILO arrangement in the Railway traction substation will be provided as per specification of HVPNL by Railways.

a) The metering arrangement for traction will be finalized by CE/ S.O.& Comml. HVPNL, Panchkula.b) SE/ TS, HVPNL, Rohtak will inform the Railways about the cost to be deposited with HVPNL for construction of LILO line.

Necessary tripartite agreement will be executed between Railways, UHBVNL& HVPNL before commencement of work.

LILO of existing 132 kV S/C Jui - Digwan Jattan line at 220 kV substation Gignow with 0.2 Sq" ACSR

Posed to REC on 30.4.09

132 kV S/C line on D/C towers with 0.4 Sq" ACSR from proposed 220 kV substation Gignow to existing 132 kV substation Loharu (8 km)

Posed to REC on 30.4.09

132 kV bay at existing 132 kV substation Loharu to accommodate 132 kV Gignow - Loharu line.

Posed to REC on 30.4.09

Covered under Sr. No.

147

Page 61: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 61 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

149 1G1211* 44.00 2009-10 REC 350065 No

150 Khanak 1N1214* 1150.00 2010-11 REC 350064 Yes

151 10 1L1215* 240.00 2010-11 REC 350064 Yes

152 Berla 2x20/25 132/33 1100.00 2010-11 PFC 03403022 Yes

Provision of double bus arrangement at 132 kV substation Loharu

2x20/25 1x0.2

132/33 33/0.4

To allow DHBVNL to connect 33 kV substations Khanak (18 MVA), Baganwala (10 MVA) and Pinjokhera (10 MVA) with the proposed 132 kV substation Khanak.

1x0.2 MVA 33/0.4 kV transformer for auxiliary supply

132 kV D/C line with 0.4 Sq" ACSR from proposed 220 kV substation Sagwan to proposed 132 kV substation Khanak (5 km)

1N1422*

1N1271A

Matching with commissioning of 220 kV substation Dadhi Bana subject to permission of clearance of standing trees by forest department.

To allow DHBVNL to feed 33 kV substations Dokha Dina (proposed 10 MVA) from 132 kV substation Atela.

To allow DHBVNL to feed 33 kV substations Berla (existing 15 MVA), Nandha (existing 14 MVA), Mandhi (existing 13 MVA), Kadma (existing 15 MVA) and Chandwas (proposed 10 MVA) from proposed 132 kV substation Berla.

Page 62: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 62 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

153 44 990.00 2010-11 PFC 03403022 Yes

154 Makrani 1x20/25 132/33 1377.46 2009-10 Yes

155 8 1L1274* 140.24 2009-10 Yes

156 Biana 1N1275* 1205.41 2009-10 REC 350065 Yes

157 30 1L1276* 525.00 2009-10 REC 350065 Yes

158 1U1289* 1320.00 2009-10 REC 350065 Yes

159 10 1L1290A REC 350065

132 kV double circuit line with 0.4 Sq” ACSR conductor from proposed 220 kV substation Dhadhi Bhana to the proposed 132 kV substation Berla.

1L1423*

1L1272A

1N1424*

1N1273A

Posed to REC on 30.4.09

To allow DHBVNL to feed 33 kV substations Makrana (existing 15 MVA) from proposed 132 kV substation Makrani in place of earlier approval (R 543 dated 02.09.2008) with 2x20/25 MVA 132/33 kV transformer which were to feed 33 kV substations Makrana, Changrod and Mandola. 2nd 20/25 MVA 132/33 kV transformer will be installed as and when load grows in the Makrani area.

Loop in loop out of 132 kV single circuit Dadri – Bahu line at the proposed 132 kV substation Makrani.

Posed to REC on 30.4.09

2x20/25 1x0.2

132/33

33/0.4

To feed 33 kV substations Gheer (existing 12 MVA), Biana (existing 8 MVA) and Rindle (proposed 8 MVA).

LILO of 132 kV Karnal - Nilokheri S/C line section at proposed 132 kV substation Biana.

This section will come into existence after LILO of 132 kV S/C Karnal - Indri line at 220 kV substation Nilokheri.

Rambha (Upgradation of 33 kV substation Rambha)

2x20/25 1x0.2

132/33

33/0.4

Matching with the commissioning of 220 kV substation Nilokheri.

Cancellation of LILO of existing 132 kV Karnal - Nilokheri S/C line at proposed 132 kV substation Rambha.

Page 63: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 63 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

160 5 1L1415* 112.50

161 Ballah 1N1291* 1178.00 2009-10 REC 350065 Yes

162 26 1N1292* 888.00 2009-10 REC 350065 Yes

163 Ghoghrian 1N1295* 1217.78 2009-10 REC 350065 To allow UHBVNL to feed Yes

164 No

165 11 1L1296* 192.83 2009-10 REC 350065 Yes

166 Dabri 1N1309* 1100.00 2009-10 PFC 03403021 In place of earlier proposed at NDRI Karnal No

167 12 1L1310* 210.00 2009-10 PFC 03403021 No

168 30 1L1304* 525.00 2009-10 No

LILO of existing S/C Karnal - Biana section of existing 132 kV S/C Karnal - Indri line) at proposed 132 kV substation Rambha.

2x20/25 1x0.2

132/33

33/0.4

With provision of 3rd 20/25 MVA 132/33 kV transformer matching with the commissioning of 132 kV substation Sataundi

132 kV S/C line on D/C towers with 0.4 Sq" ACSR from proposed 132 kV substation Ballah to 132 kV substation Sataundi.

1x20/25 1x10/16

132/33 132/11Provision for 2nd 20/25 MVA 132/33

kV transformer for future load growth of the area.

To allow UHBVNL to feed proposed 33 kV substation Badana (proposed 10 MVA) and existing 33 kV substation Chattar (Second connectivity) from proposed 132 kV substation Ghoghrian. Provision for future connectivity to other 33 kV.

LILO of 132 kV Jind (O) - Uchana S/C line at proposed 132 kV substation Ghoghrian.

To feed 33 kV substations NDRI Ram Nagar (Existing 16 MVA), Kachhwa (existing 16 MVA), Dabri (proposed 10 MVA) and Hansi Road Karnal (Proposed 10 MVA).

2x20/25 1x0.2

132/33 33/0.4

LILO of 132 kV Karnal - Nissing line at proposed 132 kV substation Dabri.

132 kV D/C Mundlana - Israna line with 0.2 Sq" ACSR conductor.

Yet to be posed

Page 64: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 64 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

169 1B1305* 100.00 2009-10 No

170 1B1306* 100.00 2009-10 No

171 1G1307* 50.00 2009-10 No

172 Barsi 1N1386* 1309.63 2010-11 No

173 60 1L1387* 1324.80 2010-11 No

174 1B1388* 100.00 2010-11 No

2 no. 132 kV bays at 132 kV substation Mundlana for accommodating Mundlana - Israna D/C line

Yet to be posed

2 no. 132 kV bays at 132 kV substation Israna for accommodating Mundlana - Israna D/C line

Yet to be posed

132 kV double bus-bar arrangement at 132 kV substation Israna along with provision of 132 kV bus coupler to have flexibility of operation.

2x20/25 1x0.2

132/33 33/0.4

Posed to REC on 30.04.2009

To allow DHBVNL to feed following 33 kV substations:• Mundhal (existing 12 MVA), Bawani Khera (existing 14 MVA), Mandhana (Proposed 10 MVA) and Barsi (proposed 10 MVA) with proposed 132 kV substation Barsi • Majra (new 10 MVA) & Kheri Lochab (new 10 MVA) with proposed 220 kV substation Masudpur

132 kV D/C line with 0.4 Sq" ACSR from proposed 220 kV substation Masudpur to proposed 132 kV substation Barsi.

Posed to REC on 30.04.2009

2 nos. 132 kV bays at 220 kV substation Masudpur to accommodate 132 kV D/C masudpur - Barsi line.

Page 65: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 65 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

175 2010-11 No

176 Chander Khurd 1N1393* 1309.63 2010-11 No

177 1G1394* 2010-11 No

178 24 1L1395* 530.00 2010-11 No

179 100.00 2010-11 No

180 1G1400* 53.61 2010-11 PFC 03403022 No

Two nos. new 33 kV bays at 220 kV substation Masudpur to accommodate feeding lines for new 33 kV substations Majra and Kheri Lochab.

3B1389* 3B1390*

2x20/25 1x0.2

132/33 33/0.4

Posed to REC on 30.04.2009

1x0.2 MVA 33/0.4 kV transformer for auxiliary supply Provision of space for one additional power transformer shall be kept at proposed 132 kV substation Chander Khurd.

Plinth for 2nd Power transformer at proposed 132 kV substation Chander Khurd be made in the first instance.

To allow DHBVNL to feed following 33 kV substations:• Chander Khurd (proposed 10 MVA) and Bawan (proposed 10 MVA) from proposed 132 kV substation Chander Khurd.• Nangla (proposed 10 MVA) from proposed 220 kV substation Samain.

132 kV D/C line with 0.4 sq” ACSR from proposed 220 kV substation Samain to proposed 132 kV substation Chander Khurd.

Posed to REC on 30.04.2009

Advising DHBVNL to create new 33 kV substations Chander Khurd, Bawan and Nangla matching their completion with commissioning of proposed 132 kV substation Chander Khurd as well as proposed 220 kV substation Samain.

2 nos. 132 kV bays at 220 kV substation Samain to accommodate 132 kV D/C Samain– Chander Khurd line.

1B1396*1B1397*

2nd 132 kV Bus Bar at 132 kV substation Jundla in view of connectivity with 220 kV substations Nissing and Bastara (under construction)

Page 66: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 66 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

181 Assaudha 1N1408* 912.65 2010-11 No

182 10 175.30 2010-11 No

183 1D1410* 2010-11

184 1D1411* 2010-11

185 1N1417* 1000.00 2010-11 No

186 5 1L1418* 112.50 2010-11 No

1x20/25 1x0.2

132/33 33/0.4

Posed to NCRPB on 05.05.2009

LILO of existing 132 kV S/C 0.2 Sq" ACSR line from 220 kV substation BBMB Narela to 132 kV substation Bahadurgarh at 132 kV substation Assaudha

1L1409*

1L1195*

Posed to NCRPB on 05.05.2009

132 kV D/C (two phase) line with 0.2 sq" ACSR conductor from 132 kV substation Assaudha to 132 kV traction substation of Railways at Assaudha as a deposit work of Railways.

The metering arrangement for traction supply to Railways will be finalised by CE/ SO Comml. HVPNL Panchkula.

Not required to be covered

under Investment

Plan

2 no. 132 kV bays at 132 kV substation Assaudha for providing power supply to traction substation of Railways as a deposit work of Railways.

SE/TS HVPNL Rohtak will inform the Railways about the cost to be deposited with HVPNL after getting the estimate sanctioned from the competent authority

Not required to be covered

under Investment

Plan

Necessary tripartite agreement will be executed between Railways, UHBVN & HVPN before commencement of work.

Patti Khot at Sirta Road Bye Pass on Padla Road (Kaithal)

2x20/25 1x0.2

132/33 33/0.4

Yet to be posed

For auxiliary supply. To allow UHBVN to feed 33 kV unmanned substations Chandana Gate (10 MVA), Bidkyar Lake (10 MVA) and Sirta Road Bye-Pass in Kaithal (10 MVA) from proposed 132 kV substation Patti Khot at Sirta Road Bye Pass on Padla Road Kaithal.

LILO of existing S/C 132 kV Kaithal - Siwan line at proposed 132 kV substation Patti Khot.

Yet to be posed

Page 67: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 67 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

187 12 1L1421* 270.00 2010-11 No

188 2010-11

189 2010-11

190 Machhrauli 1N1445* 1000.00 2010-11 No

132 kV D/C line from 220 kV substation Dadhi Bana to 132 kV substation Jhojju Kalan with 0.4 sq" ACSR conductor.

Yet to be posed

To demolish 2 nos. Type III quarters and 4 nos. type II quarters at 132 kV substation Jundla infringing in making provision of 2nd bus bar arrangement and associated line connectivity. The work shall be executed in phases as per site requirement.

Not required to be covered

under Investment

Plan

To demolish the HVPNL building occupied by SDO (Operation), DHBVNL at 132 kV substation Adampur for making provision of 132 kV 2nd bus bar arrangement .

Not required to be covered

under Investment

Plan

2x20/25 1x0.2

132/33 33/0.4

Yet to be posed

1x0.2 MVA 33/0.4 kV transformer for auxiliary supply. In the first instance onlt one transformer of 20/25 MVA 132/33 kV will be provided. The second transformer of similar capacity may be provided later on depending upon load growth in the area.

The existing 33 kV substations at Machhrauli (16 MVA), Kunjiya (8 MVA) and Babepur (9 MVA) will be fed from 132 kV substation Machhrauli for which separate proposals will be submitted by UHBVNL for concurrence of HVPNL.

Page 68: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 68 of 180 132 kV

Code RemarksSr. No.

Name of substation or line section

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

191 2 1L1446* 45.00 2010-11 No

Total (132 kV) 1675.2 84956.58

LILO of existing S/C Jhajjar - Rewari line with 0.2 sq" ACSR at 132 kV substation Machhrauli.

Page 69: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 69 of 180 66 kV

Name of substation or line section Code Remarks

66 kV Works1 15 6L0538* 113.00 2009-10 PFC 03403019 Work to be carried out departmentally. Yes

2 16 6L0544* 49.00 2009-10 REC 350014 Yes

3 30 6L0545* 196.00 2009-10 REC 350014 Yes

4 6B0546* 59.00 2009-10 REC 350014

5 26 6L0550* 158.00 2009-10 REC 350014 Yes

6 6B0551* 59.00 2009-10 REC 350014

7 Sector-15 HUDA Jagadhari 2x12.5/16 66/11 6N0608* 738.00 2009-10 REC 350028 Yes

Sr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Y.Nagar 220 KV to Jathlana 66 kV S/C line (0.2, ACSR) disbanding LILO of Yamunanagar - Radaur line at Jathlana

LILO of Badshahpur - Sector 56 - Dundahera, 66 kV D/C line at 220 kV substation Sector-52A Gurgaon with 0.4 Sq" ACSR instead of earlier approved 0.15 sq" ACSR

IMT Manaser (220 kV) - Harsaru 66 kV D/C line with 0.2 Sq" ACSR

66 kV bay at IMT Manaser 220 kV S/S - 2 Nos for accommodating IMT Manesar - Harsaru D/C line.

Covered under Sr. No. 3

Daultabad (220 kV) - Sector 10 Gurgaon, 66 kV D/C line with 0.15 Sq" ACSR

i) SE/Const O&M HVPN Gurgaon will use already errected towers / stubs of the line section of Sector 10 - Sector 23A Gurgaon for the above line

ii) SE/TS HVPN Gurgaon will obtain approval from competent authority, in case some of the already errected stubs and errected towers can not be utilized for constructing Daultabad (220 kV) - Sector 10 Gurgaon D/C line

66 kV bay at Sector-10 Gurgaon - 2 No. for accommodating 66 kV D/C Daultabad (220 kV) - Sector 10 line.

Cost of 66 kV line bays at Daultabad included in cost estimates of Daultabad substation.

Covered under Sr. No. 5

Page 70: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 70 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

8 0.16 6L0609* 2.00 2009-10 REC 350028 Yes

9 66 kV Mohra 1x12.5/16 66/11 6N0835* 600 2009-10 REC 350035 Yes

10 6 6L0836* 85 2009-10 REC 350035 Yes

11 36 6E0598* 720.00 NCRPB Yes

12 24 6E0599* 360.00 NCRPB Yes

13 66 kV Nimoth 1x12.5/16 66/11 6N1007* 800 2009-10 Yes

14 3.5 6L1008* 43.75 2009-10 Yes

15 Sector-15 II Gurgaon 2x16/20 66/11 6N0603* 750.00 2009-10 REC 350047 Yes

LILO of one circuit of 66 kV WYC - Yamunanagar D/C line at proposed 66 kV substation Sector-15 Jagadhari.

On the land alrady in possession of HVPN

LILO of one circuit of Dukheri - Layalpur Basti (Circuit other than feeding 66 kV Sonda) at proposed 66 kV substation Mohra with 0.2 Sq" ACSR.

Upgradation of Badshahpur - Dundahera 66 kV D/C line from existing 0.15 sq" to 0.4 sq"

Line commissioned on 02.02.2009

Upgradation of Badshahpur - Mehrauli Road 66 kV D/C line from existing 0.15 sq" to 0.4 sq"

Line commissioned on 08.02.2009

Posed to NCRPB on 01.04.2009

Matching with shifting of load of 66 kV Dhauj on 220 kV substation Palli on commissioning of 66 kV D/C line from 220 kV substation Palli to 66 kV substation Dhauj with 0.4 Sq” ACSR conductor.

LILO of 66 kV line from Ballabgarh to Sohna at proposed 66 kV substations Nimoth with 0.2 Sq” ACSR.

Posed to NCRPB on 01.04.2009

Commissioned with 1x16/20 MVA 66/11 kV T/F on 18.05.09

Page 71: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 71 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

16 2 6L0604* 35.00 2009-10 REC 350047 Yes

17 Sector-3 Gurgaon 1x25/31.5 66/11 6N0605* 600.00 2009-10 To be posed Yes

18 4 6L0606* 50.00 2009-10 To be posed Yes

19 4 6L0573* 44.00 2009-10 Yes

20 22 6L0574* 93.00 2009-10 To be posed Yes

21 6B0575* 34.00 2009-10 To be posed

• 6B0576* 34.00 2009-10 To be posed

22 One bay at Nuh 66 kV substation 6B0577A 32.00 2009-10 To be posed No

• 6L0578* 2009-10 To be posed No

23 6G0579* 300.00 2009-10 To be posed No

LILO of 66 kV D/C line from Badshahpur to Mehrauli Road at the site proposed 66 kV substation Sector-15 II Gurgaon

LILO of 66 kV D/C line from 220 kV substation Rohtak Road Delhi to 66 kV substation Mehrauli Road at the proposed 66 kV substation Sector-3 Gurgaon.

LILO of 2nd circuit of Badshahpur–Dundahera 66 kV line at 66 kV substation "Q" block, Gurgaon.

Stringing 2nd ckt of Sector 23A - Dundahera, 66 kV line.

66 kV bays - 1 No. for accomodating Dundahera line at Sector - 23A Gurgaon

Covered under Sr. No. 20

66 kV bays - 1 No. for accomodating Sector 23 A line at Dundahera Gurgaon

Covered under Sr. No. 20

Connecting Sohna - Nagina line with Mandkola - Nuh line

For diverting the load of Nagina Substation from Badshahpur 220 KV Substation to Palwal 220 KV Substation

Replacement of RCC structures with steel structures and refurbishment of A-2 substation Faridabad

Page 72: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 72 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

24 5 6L0584* 20.00 2009-10 To be posed No

• 6B0585* 50.00 2009-10 To be posed No

25 6G0595* 2009-10 To be posed No

2009-10 To be posed

2009-10 To be posed

2009-10 To be posed

26 66 kV Lohara - Babain S/C line. 10 6L0596* 200.00 2009-10 REC 350034 Yes27 66 kV bay at Babain - 1 No. 6B0597* 90.00 2009-10 REC 350034

28 6G0607* 25.00 2009-10 To be posed No

Stringing of 2nd circuit of 66 kV S/C on D/C towers from Manesar to Pataudi T-off point at tower location No. 32 (for Bhorekalan) to Pataudi

To continue feeding Bhoerkalan on S/C 66 kV line by solid tap (at tower location No. 32) on one circuit of 66 kV D/C Manesar-Pataudi line. To feed Part load of 66 kV Dharuhera from Badshahpur-Pataudi-Manaser route and the remening load on Badshahpur-Sohna-Dharuhera route.

66 kV bay one number at 66 kV substation Pataudi

Rearrangement of 66 kV system in 220 kV substation (BBMB) khera to

Work in BBMB yard to be carried out by BBMB as deposit work of HVPN while the same outside BBMB yard to be carried out by HVPN.i) Vacate bus No. 1 for BBMB use by

vacating two 66 kV bays.ii) Gobindpuri - II ckt and 45/60 MVA 132/66 kV transformer to operate one unit.

iii) Take off point for Gobindpuri ckt to be shifted to bay no. 15 by extending bus.

To utilise bay No. 9 in 220 kV substation Khera for supply to 66 kV substations Mullana / Saha.

Covered under Sr. No. 26

Modification in the bus arrangement at 66 kV substation Gobindpuri.- To provide isolators in the spare bay for connecting 66 kV bus at Gobindpuri substation to the 66/11 kV transformers for flexible operation.

Page 73: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 73 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

29 Hathin - Punhana 66 kV S/C line 28 6L0610* 497.00 2009-10 NCRPB Yes

30 6B0611* 38.00 2009-10 NCRPB

31 40 6E0890* 800.00 2009-10 NCRPB Yes

32 Sector-2 Gurgaon 2x25/31.5 66/11 6N0895* 1000.00 2009-10 REC 350043 Yes

33 4 80.00 2009-10 REC 350043 Yes

34 16 6L0909* 184.00 2009-10 REC 350047 Yes

35 6B0910* 80.00 2009-10 REC 350047

One number 66 kV bay at 66 kV substation Hathin for accommodating Hathin - Punhana 66 kV S/C line

Covered under Sr. No. 29

Up gradation of old 66 kV Mehrauli Road Gurgaon - Pataudi circuit on H-rail pole having 0.1 Sq” ACSR to D/C 0.4 Sq” ACSR on tower line in the section between 66 kV substation Harsaru and 66 kV substation Pataudi and connecting with 66 kV substation Harsaru and 66 kV substation Pataudi by creating two Nos 66 kV bays at both the substations.

The detailed proposal for utilization of balance portion of old 66 kV Mehrauli Road Gurgaon - Pataudi (upto Harsaru) circuit on H-rail pole having 0.1 Sq” ACSR would be submitted separately by SE/ TS, HVPN, Gurgaon for further strengthening of Gurgaon area.

The cost to be borne by HUDA would be decided by SE/ TS, HVPN, Gurgaon in consultation with SE/ Op, DHBVN, Gurgaon. Commissioned on 28.04.09 with 1x25/31.5 MVA 66/11 kV transformer.

LILO of 66 kV D/C line from Daultabad to Sector 23 at proposed 66 kV substation Sector-2 Gurgaon with 0.4 Sq” ACSR.

6L0896A

6L1016*

In place of LILO of one ckt of 66 kV D/C line from Daultabad to Sector 23 at proposed 66 kV substation Sector-2 Gurgaon with 0.4 Sq” ACSR

66 kV D/C link with 0.4 Sq” ACSR from 220 kV substation Palli to 66 kV substation Dhauj.

Two 66 kV bays at 220 kV substation Palli for Palli - Dhauj D/C line.

Covered under Sr. No. 34

Page 74: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 74 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

36 6B0911* 80.00 2009-10 REC 350047

37 66 kV Rattangarh 1x12.5/16 66/11 6N0916* 700.00 2009-10 REC 350042 Yes

38 0.5 6L0917* 6.00 2009-10 REC 350042 Yes

39 66 kV Ugala 2x12.5/16 66/11 6N0918* 1000.00 2009-10 REC 350040 Yes

40 52 6L0919* 600.00 2009-10 REC 350040 Yes

41 - No

42 6B0922* 40.00 2009-10 No

43 6G0924* 25.00 2009-10 No

Two 66 kV bays at 66 kV substation Dhauj for Palli - Dhauj D/C line.

Covered under Sr. No. 34

To approach BBMB for providing two 66 kV bays at 220 kV substation Ballabgarh for taking out two underground feeders to existing 66 kV substations.

The construction, operation and maintenance of both bays shall be at HVPNL cost.

LILO of old Jorian – Radaur 66 kV S/C H-pole line at proposed 66 kV substation Rattangarh with 0.2 Sq” ACSR.

Matching with augmentation of 220 kV substation Tepla with 3rd (additional) 1x100 MVA 220/66 kV transformer.66 kV D/C line from 220 kV

substation Tepla to 66 kV substation Ugala with 0.2 Sq” ACSR.

To retain LILO of old Jorian - Radaur 66 kV S/C line at 66 kV substation Jathlana.

One No. 66 kV bay at 66 kV substation Jathlana for accommodating newly constructed Jorian – Jathlana 66 kV S/C line.

2nd 66 kV bus arrangement at 66 kV substation Pataudi.

Yet to be posed

Page 75: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 75 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

44 66 kV Sector-51 Gurgaon (GIS) 2x25/31.5 66/11 6N0991* 2500 2009-10 REC 350043 Yes

45 4 6L0992* 86 2009-10 REC 350043 Yes

46 6B0993* 120 2009-10 REC 350043

47 66 kV Sector-43 Gurgaon (GIS) 2x25/31.5 66/11 6N0994* 2500 2009-10 REC 350043 Yes

48 3.5 6L0995* 75.25 2009-10 REC 350043 Yes

49 42 6E1028* 500.00 2008-09 REC 350066 Yes

With GIS technology matching with the augmentation of 220 kV substation Sector-52A Gurgaon with 3rd 100 MVA 220/66 kV transformer.

66 kV D/C line from 220 kV substation Sector-52A Gurgaon to proposed 66 kV substation Sector-51 Gurgaon with 0.4 Sq” ACSR conductor .

Construction of 66 kV D/C line from proposed 220 kV substation Sector-72 Gurgaon to proposed 66 kV substation Sector 51 Gurgaon would be considered while approving 220 kV substation sector-72 Gurgaon.

Two No. 66 kV bays at 220 kV substation Sector-52A Gurgaon for accommodating of 66 kV D/C line from 220 kV substation Sector-52A Gurgaon to proposed 66 kV substation Sector-51 Gurgaon.

The cost to be borne by HUDA would be decided by SE/ TS, HVPN, Gurgaon in consultation with SE/ Op, DHBVN, Gurgaon.

Covered under Sr. No. 45

with GIS technology matching with the up gradation of 66 kV substation 56 Gurgaon to 220 kV level and up gradation of 66 kV Badshahpur – sector 56 – DLF line from 0.15 sq” to 0.4 Sq” conductor.

LILO of 66 kV D/C Badshahpur – sector 56 – DLF line with 0.4 Sq” ACSR at proposed 66 kV substation Sector-43 Gurgaon

The cost to be borne by HUDA would be decided by SE/ TS, HVPN, Gurgaon in consultation with SE/ Op, DHBVN, Gurgaon.

Replacement of the existing 0.15 sq” ACSR conductor from Madanpur (220 kV) – Barwala - Shahzadpur- Naraingarh 66 kV line with AAAC wolf on existing towers.

Page 76: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 76 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

50 102 6E1030* 2500.00 2009-10 Yes

51 6G1049* 35.00 2008-09 No

52 18 6L1061* 405.00 2009-10 Yes

53 6B1062* 80.00 2009-10

54 80.00 2009-10 Yes

55 200.00 2009-10 Yes

To augment the 66 kV conductor in Faridabad ring main to improve the power supply position in Faridabad by enhancing current carrying capacity of the ring main after augmentation.

REC 350047 (Part funding)

and PFC 03403021 (Part

funding)

2nd 66 kV bus arrangement at 66 kV substation Harsaru.

Yet to be posed

The modification required, if any, in the switch yard of 66 kV substation Harsaru, may be got done by SE/ TS, HVPN, Gurgaon after getting the GELO approved from Design wing HVPN, Panchkula

66 kV D/C line with 0.4 Sq. inch ACSR from proposed 400 kV substation Nawada to 66 kV substation Fatehpur Biloch.

Posed to NCRPB on 01.04.2009

Two 66 kV bays at Fatehpur Biloch substation for receiving 66 kV D/C line from 400 kV substation Nawada.

Posed to NCRPB on 01.04.2009

Covered under sr. No. 52

Two 66 kV bays at 220 kV substation BBMB Ballabgarh at the cost of HVPNL for taking out one 66 kV underground cable connection each to existing 66 kV substations Hyderabad Asbestos and Globe Steel.

6B1065*

6B1066*

Posed to NCRPB on 01.04.2009

To provide four single core cable connection (one core spare) for both 66 kV circuits i.e. 220 kV Ballabgarh to 66 kV Hyderabad Asbestos and 220 kV Ballabgarh to 66 kV Globe Steel.

6L1067*

6L1068*

Posed to NCRPB on 01.04.2009

Page 77: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 77 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

56 80.00 2009-10 Yes

57

a) 17 6L1087* 382.50 2009-10 Yes

b) 8 6L1088* 122.00 2009-10 Yes

58 6B1091* 80.00 2009-10

59 2009-10

a) 66 kV D/C Kheri Kanker - Taoru line. 40 6L1117* 800.00 2009-10 Yes

One 66 kV bay each at 66 kV substation Hyderabad Asbestos and 66 kV substation Globe Steel for receiving cable connection mentioned above.

6B1069*

6B1070*

Posed to NCRPB on 01.04.2009

Erection of following 66 kV lines from proposed 220 kV substation sector-72 Gurgaon:-

66 kV D/C sector 72 – sector 51 (0.4 Sq” ACSR)

Posed to NCRPB on 01.04.2009

LILO of existing 66 kV (0.15 Sq”) D/C line Badshahpur – sector 34 – sector 10 line at sector-72 Gurgaon. Augmentation of Badshahpur – sector 72 – sector 34 – sector 10 line with higher capacity INVAR conductor so that maximum amount of power can be transported by this line from 220 kV substation sector-72 Gurgaon to both sides.

Posed to NCRPB on 01.04.2009

Wherever needed multi circuit towers will be used to take out 220 kV & 66 kV lines from 220 kV substation sector-72 Gurgaon in view of Right of Way constraints.

Provision of two 66 kV bays at sector 51 Gurgaon

Posed to NCRPB on 01.04.2009

Covered under Sr. No. 57

Erection of following 66 kV lines from proposed 220 kV substation at village Kheri Kanker (Nuh) with 0.4 Sq" ACSR:

Yet to be posed

Page 78: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 78 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

b) 66 kV D/C Kheri Kanker - Sohna line. 16 6L1118* 320.00 2009-10 Yes

c) 2 6L1119* 40.00 2009-10 Yes

60 6B1120* 80.00 2009-10

61 6B1121* 80.00 2009-10

62 6B1122* 80.00 2009-10

63 6B1123* 80.00 2009-10

64

a) 36 810.00 2010-11 Yes

b) 80 1800.00 2010-11 Yes

65 85.00 2010-11

Yet to be posed

This 66 kV line will be constructed on 220 kV towers.

66 kV D/C Kheri Kanker - Nagina line with LILO of one circuit at 66 kV substation Nuh.

Yet to be posed

Provision of 2 No. 66 kV bays at 66 kV substation Taoru

Yet to be posed

Covered under Sr. No. 59 a)

Provision of 2 No. 66 kV bays at 66 kV substation Nagina

Yet to be posed

Covered under Sr. No. 59 c)

Provision of 2 No. 66 kV bays at 66 kV substation Sohna

Yet to be posed

Covered under Sr. No. 59 b)

Provision of 2 No. 66 kV bays at 66 kV substation Nuh

Yet to be posed

Covered under Sr. No. 59 c)

Erection of following 66 kV D/C lines with 0.4 Sq. inch ACSR conductor.

66 kV D/C Rangala Rajpur - Nagina line.

6L1144*6L1145*

Posed to NCRPB on 01.04.2009

66 kV S/C Rangala Rajpur – Punhana line on D/C towers

Posed to NCRPB on 01.04.2009

2 No. 66 kV bays at 66 kV substation Nagina for 66 kV D/C Rangala Rajpur – Nagina line.

6B1146* Posed to NCRPB on 01.04.2009

Covered under Sr. No.64 a)

Page 79: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 79 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

66 6B1147* 85.00 2010-11

67 6L1107* 2009-10 Yes

68 6E1108* 2009-10 Yes

69 6G1114* 1088.00 2009-10 REC 350047 Yes

70 22 6L1155* 259.93 2010-11 Yes

71 6 6L1156* 70.89 2010-11 Yes

72 8 6L1159* 300.00 2010-11 To be posed Yes

73 20 6L1160* 800 2010-11 To be posed Yes

1 No. 66 kV bays at 66 kV substation Punhana for 66 kV D/C Rangal Rajpur – Punhana line.

Posed to NCRPB on 01.04.2009

Covered under Sr. No.64 b)

66 kV S/C Mandkola – Nuh line with 0.2 Sq” ACSR on D/C towers along with connected 66 kV bays at 66 kV substations Mandkola and Nuh

Posed to NCRPB on 01.04.2009

Augmentation of 66 kV S/C Sohna – Nuh – Nagina line from 0.1 Sq” ACSR to 0.15 Sq” All Aluminium Alloy conductor (AAAC)

Posed to NCRPB on 01.04.2009

Procurement of one No. 16/20 MVA 66/11 kV Mobile substation

LILO of existing 0.15 Sq” ACSR 66 kV S/C Tarau-Dharuhera line at Mau.

Posed to NCRPB on 05.05.2009

LILO of existing 0.15 Sq” ACSR 66 kV S/C Pataudi-Dharuhera line at Mau.

Posed to NCRPB on 05.05.2009

Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV substation Phase- IV Dundahera.

Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV proposed substation Sector-17 Gurgaon

Page 80: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 80 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

74 8 6L1161* 300.00 2010-11

75 Company Bagh Ambala City 1x12.5/16 66/11 6N1183* 586.05 2009-10 REC 350064 Yes

76 12 6L1184* 25.00 2009-10 REC 350064 Yes

77 0.8 6L1185* 40.00 2009-10 Yes

78 4 6L1199* 140 2010-11

Underground cable connection at 66 kV level (double circuit nature with one core spare) from proposed 220 kV substation Sector-20 Gurgaon to 66 kV proposed substation HLF (Ambience).

Not required to be included in

Investment Plan

LILO of one circuit of 66 kV D/C Dukheri - Layalpur Basti line at 66 kV substation Company Bagh Ambala City on D/C towers.

Laying of cable in the portion between point where LILO line crosses railway line and 66 kV substation Company Bagh Ambala City (distance less than 800 m)

66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV substation Ardee City Gurgaon.

The supply will be given through underground cables or overhead system equivalent to 0.4 Sq” ACSR conductor as per availability of RoW and the proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case.

Not required to be included in

Investment Plan

Page 81: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 81 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

79 8 6L1200* 300 2010-11 Yes

80 12 6L1201* 420 2010-11

81 Sector-17 Gurgaon (GIS) 6N1202* 2500.00 2010-11 To be posed Yes

82 Baliyar Kalan 6N1219* 864.06 2010-11 Yes

83 28 6L1220* 577.22 2010-11 Yes

84 6B1221* 80.00 2010-11

85 16 6L1223* 336.00 2010-11 Yes

66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV substation Sector-45 Gurgaon.

The supply will be given through underground cables or overhead system equivalent to 0.4 Sq” ACSR conductor as per availability of RoW and the proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case..

66 kV double circuit line from 220 kV substation Sector-57 Gurgaon to proposed 66 kV (DMRC) Metro.

The supply will be given through underground cables or overhead system equivalent to 0.4 Sq” ACSR conductor as per availability of RoW and the proportionate cost will be recovered from concerned agency/ developers by SE/TS HVPNL Gurgaon as per merits of the case.

Not required to be included in

Investment Plan

2x25/31.5

1x0.2

66/11

11/0.42x16/20

1x0.266/11

11/0.4

Posed to NCRPB on 05.05.2009

1x0.2 MVA 11/0.4 kV T/F for auxiliary supply

66 kV D/C Mau - Baliyar Kalan line with 0.4 Sq" ACSR

Posed to NCRPB on 05.05.2009

2 No. 6 kV bays at 220 kV substation Mau for providing feeding arrangement for 66 kV substation Baliyar Kalan.

Being posed to NCRPB

Covered under Sr. No. 83

D/C Mau - Bhora Kalan line with 0.4 Sq" ACSR

Posed to NCRPB on 01.04.2009

Page 82: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 82 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

86 6B1224* 80.00 2010-11

87 6B1225* 80.00 2010-11

88 6B1226* 80.00 2010-11

89 Sector-64 Ballabgarh 6N1265* 800.00 2010-11 Yes

90 20 6L1266* 420.00 2010-11 Yes

91 10 6L1267* 210.00 2010-11 Yes

92 6B1268* 80.00 2010-11

93 Sector-5 Panchkula (GIS) 2x25/31.5 66/11 6N1279* 2500.00 2009-10 World Bank Yes

1x0.2 11/0.4 2009-10 For auxiliary supply

2 No. 6 kV bays at 220 kV substation Mau for providing feeding arrangement to 66 kV substation Bhora Kalan

Covered under Sr. No. 85

2 No. 6 kV bays at 66 kV substation Bhora Kalan for receiving power supply from 220 kV substation Mau through D/C line.

Posed to NCRPB on 01.04.2009

Covered under Sr. No. 85

2 No. 6 kV bays at 220 kV substation Mau to provide feeding arrangement for 66 kV substation Pachgaon in future.

Covered under Sr. No. 59 of 220 kV works

2x12.5/16 1x0.2

66/11 11/0.4

Posed to NCRPB on 01.04.2009

66 kV D/C line with 0.4 Sq” ACSR conductor from 400 kV substation Nawada to 66 kV substation Sector-64 Ballabgarh.

Posed to NCRPB on 01.04.2009

LILO of one circuit of 66 kV D/C A-1 (BBMB) – A/5 line at proposed 66 kV substation Sector 64 Ballabgarh.

Posed to NCRPB on 01.04.2009

2 Nos 66 kV bays at 400/220 kV substation Nawada for 66 kV D/C Nawada - Sector 64 Ballabgarh line.

Covered under sr. No. 9 of

400 kV works

Page 83: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 83 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

94 2.5 6E1280* 75.00 2009-10 Yes

95 1 6L1281* 21.00 2009-10 Yes

96 5.5 6E1282* 165.00 2009-10 Yes

97 6G1283* 40.00 2009-10 PFC 03403022 No

98 250.00 2010-11

99 Santokhi 2x12.5/16 66/11 6N1325* 800.00 2010-11 PFC 03403022 No

Augmentation of existing 66 kV Sector 1 - Sector 3 Panchkula S/C line from 0.15 Sq" ACSR to 0.4 Sq" ACSR by putting mid span towers wherever necessary (with coordination/ consent of HUDA)

Both circuits of lines shall be strung with 0.4 sq: ACSR wherever these lines are running on D/C towers and even if the other circuit forms a part of other lines.

LILO of 66 kV Sec 1- Sec 3 Panchkula S/C line at the proposed 66 kV GIS sec 5 with 0.4 sq” ACSR.

Augmentation of both circuits of under construction 66 kV Madanpur-sec 3, Panchkula S/C line on D/C towers from 0.2 sq” to 0.4 sq” ACSR by putting mid span towers wherever necessary (with coordination/ consent of HUDA).

Provision of double bus arrangement at 66 kV substation Sector 3 Panchkula in place of present single bus arrangement.

Providing one number 66 kV bay each at 220 kV substation Sector 52A and Sector 57 Gurgaon for giving power supply to 66 kV DMRC receiving receiving substation at sector-29 Sushant Lok Gurgaon.

6B1301* &

6B1302*

The Government of Haryana may be approached to advise about the name of agency from which the cost of above mentioned 2 no. 66 kV bays is to be charged by HVPNL.

Not required to be included in

Investment Plan

Page 84: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 84 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

100 60 6L1328* 1260.00 2010-11 PFC 03403022 No

101 Berkheri 1x12.5/16 66/11 6N1326* 600.00 2010-11 PFC 03403022 No

102 50 6L1329* 1050.00 2010-11 PFC 03403022 No

103 20 6L1327* 420.00 2010-11 PFC 03403022 No

104 68.64 2010-11 PFC 03403022 No

105 20 6L1330* 420.00 2010-11 PFC 03403022 No

106 68.64 2010-11 PFC 03403022 No

66 kV D/C line from proposed 220 kV substation Raiwali to proposed 66 kV substation Santokhi with 0.4 □” ACSR.

66 kV D/C line from proposed 66 kV substation Santokhi to proposed 66 kV substation Berkheri with 0.4 □” ACSR.

66 kV D/C line from proposed 220 kV substation Raiwali to existing 66 kV substation Barwala with 0.4 □” ACSR.

2 nos 66 kV bays at existing 66 kV substation Barwala for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 220 kV substation Raiwali.

6B1353* 6B1354*

66 kV D/C line from proposed 66 kV substation Berkheri to existing 66 kV substation Naraingarh with 0.4 □” ACSR.

2 nos 66 kV bays at existing 66 kV substation Naraingarh for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 66 kV substation Berkheri.

6B1355* 6B1356*

Page 85: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 85 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

107 36 6L1331* 756.00 2010-11 PFC 03403022 No

108 68.64 2010-11 PFC 03403022 No

109 68.64 2010-11 PFC 03403022 No

110 40 6L1332* 840.00 2010-11 PFC 03403022 No

111 68.64 2010-11 PFC 03403022 No

112 10 6L1333* 350.00 2010-11 PFC 03403022 No

66 kV D/C line from existing 66 kV substation Naraingarh to existing 66 kV substation Raipur Rani with 0.4 □” ACSR.

2 nos 66 kV bays at existing 66 kV substation Naraingarh for accommodating 66 kV D/C line (0.4 sq" ACSR) from existing 66 kV substation Raipur Rani.

6B1357* 6B1358*

2 nos 66 kV bays at existing 66 kV substation Raipur Rani for accommodating 66 kV D/C line (0.4 sq" ACSR) from existing 66 kV substation Naraingarh.

6B1360* 6B1361*

66 kV D/C line from existing 66 kV substation Raipur Rani to proposed 220 kV substation Raiwali with 0.4 □” ACSR.

2 nos 66 kV bays at existing 66 kV substation Raipur Rani for accommodating 66 kV D/C line (0.4 sq" ACSR) from proposed 220 kV substation Raiwali.

6B1362* 6B1363*

66 kV S/C line from existing 66 kV substation Shahzadpur to existing 66 kV substation Naraingarh with 0.4 □” ACSR.

Page 86: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 86 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

113 34.32 2010-11 PFC 03403022 No

114 34.32 2010-11 PFC 03403022 No

115 40 716.60 2010-11 PFC 03403021 Yes

116 25 287.45 2010-11 PFC 03403021 Yes

117 30 344.94 2010-11 PFC 03403021 Yes

118 6B1375* 68.64 2010-11 PFC 03403021

119 6B1376* 68.64 2010-11 PFC 03403021

1 no 66 kV bay at existing 66 kV substation Naraingarh for accommodating 66 kV S/C line (0.4 sq" ACSR) from existing 66 kV substation Shahzadpur.

6B1359*

1 no 66 kV bay at existing 66 kV substation Shahzadpur for accommodating 66 kV S/C line (0.4 sq" ACSR) from existing 66 kV substation Naraingarh.

6B1364*

66 kV D/C line with 0.4 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Chhachharauli.

6L1372*

6L1237A

66 kV D/C line with 0.2 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Bilaspur

6L1373*

6L1238A

66 kV D/C line with 0.2 sq" ACSR between 220 kV substation Rampur Kamboan and 66 kV substation Sadhaura

6L1374*

6L1239A

2 nos. 66 kV bays at 66 kV substation Chhachharauli for connectivity with proposed 220 kV substation Rampur Kamboan.

Covered in Sr. No. 115

2 nos. 66 kV bays at 66 kV substation Bilaspur for connectivity with proposed 220 kV substation Rampur Kamboan.

Covered in Sr. No. 116

Page 87: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 87 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

120 68.64 2010-11 PFC 03403021 No

121 6G1379* 45.90 2010-11 PFC 03403021 No

122 6G1380* 45.90 2010-11 PFC 03403021 No

123 6G1399* 43.79 2010-11 PFC 03403022 No

124 6G1412* 45.00 2010-11 No

3 nos. 66 kV bays (two nos. for 66 kV lines and one no. for bus coupler) at 66 kV substation Sadhaura for connectivity with proposed 220 kV substation Rampur Kamboan.

6B1377*

6B1378*

2nd 66 kV bus bar arrangement at 66 kV substation Sadhaura to facilitate4 handling of different existing supplies (220 kV BBMB substation Khera, 220 kV substation Madanpur and 220 kV substation Jorian and proposed 220 kV substation Rampur Kamboan)

2nd 66 kV bus bar arrangement at 66 kV substation Bilaspur

2nd 66 kV Bus Bar at 66 kV substation Babain in view of connectivity with 220 kV substations Shahbad and Salempur

2nd 66 kV Bus Bar at 66 kV substation Raipur Rani in view of connectivity with 66 kV substation Barwala and proposed 220 kV substation Raiwali.

Yet to be posed

Page 88: 14_List of Works

LIST OF WORKS (66 kV AND ABOVE) 2009-10

document.xls Page 88 of 180 66 kV

Name of substation or line section Code RemarksSr. No.

Line Length (Ckt

- km)

Transformer Capacity

(MVA)

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

125 6G1425* 2009-10 NoTo feed proposed 66 kV substations MES and Air Force at Ambala Cantt. “as a temporary measure” by charging them from 66 kV S/C Dhulkote-Babyal-IOC line through solid T-off from its tower location no. 80. The proposed 66 kV substations will ultimately be fed from 220 kV substation Tepla as per original approval bearing no. R 304 dated 17.05.2005.

Page 89: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 89 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

66 kV AUGMENTATIONS

1 Sector-9 Gurgaon 66/11 1x25/31.5 2x16/20 8.5 6N0560* 200.00 Yes

2 Sector 10 Gurgaon 66/11 12.5/16 16 6G0670* 250.00 2009-10 REC 350025 Spare power transformers along with bays No

3 Sector-34 Gurgaon 66/11 12.5/16 16 6G0671* 250.00 2009-10 REC 350025 Spare power transformers along with bays No

4 Oswal Steel Faridabad 66/11 12.5/16 16 6G0674* 250.00 2009-10 REC 350025 Spare power transformers along with bays No

5 Nalvi 66/11 12.5/16 16 6G0675* 250.00 2009-10 REC 350025 Spare power transformers along with bays No

6 Pataudi 66/11 12.5/16 16 6G0673* 250.00 2009-10 REC 350025 Spare power transformers along with bays No

7 Ford Faridabad 66/11 2x12.5/16 3x12.5/16 16 6A0680* 250.00 2009-10 NCRPB Yes

8 Dharuhera (Gurgaon) 66/33 16/20 16/20

66/11 12.5/16 12.5/16

66/11 10/12.5 12.5/16 3.5 6A0687* 150.00 2009-10 Yet to be posed Yes

9 Yamunanagar 66/11 2x10/12.5 2x10/12.5

66/11 1x6 1x6

66/11 1x8 1x10/12.5 4.5 40.00 2009-10 Yet to be posed Yes

10 Pataudi 66/11 2x12.5/16 3x12.5/16 16 6A0908* 250.00 2009-10 Yet to be posed

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

a) Subject to management of load on the feeding line within the line capacity by the field office

b) To shift 1x12.5/16 MVA 66/11 kV transformer removed from 66 kV substation Maruti to 66 kV substation Dharuhera to replace sick & overloaded 10/12.5 MVA 66/11 kV transformer

Matching with the up gradation of old 66 kV Mehrauli Road Gurgaon - Pataudi circuit on H-rail pole having 0.1 Sq” ACSR to D/C 0.4 Sq” ACSR on tower line in the section for connecting 66 kV substation Harsaru and 66 kV substation Pataudi.

Page 90: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 90 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

11 Jathlana 66/11 1x12.5/16 2x12.5/16 16 6A0990* 250.00 2009-10 REC 350042 Yes

12 Dabriwala 66/11 1x12.5/16 2x12.5/16 16 6A0996* 250.00 2009-10 REC 350047 Yes

13 Naraingarh 66/11 2x12.5/16 3x12.5/16 16 6A1029* 250.00 2009-10 REC 350042 Yes

14 Nagina 66/11 1x7.5 1x7.5 along with its controlling 66 kV bay.

66/33 1x10 1x1066/33 1x6 1x6

66/33 1x8 8 6A1106* 50.00 2009-10 Yes

15 Aurangabad 66/11 1x12.5/16 2x12.5/16 16 6A1102* 250.00 2009-10 Yes

16 Bhagola 66/11 1x12.5/16 2x12.5/16 16 6A1103* 250.00 2009-10 Yes

subjected to shifting of complete load of 66 kV substation Ladwa to 220 kV substation Salempur. 1x8 MVA 66/11 kV T/F commissioned on 29.12.2008

The cost to be borne by any developers, HUDA etc, if any, would be decided by SE/ TS, HVPNL, Faridabad and SE/ Op, DHBVNL, Faridabad.

The consumer M/s BSL (P) Ltd. Faridabad shall be required to deposit the share cost for providing additional 12.5/16 MVA 66/11 kV transformer at 66 kV substation Dabriwala with its controlling bay along with full cost of 66 kV lines, metering CTs and other protection equipments etc. required to be augmented to facilitate extension of load as per cost estimate to be prepared by SE/ TS HVPNL Faridabad.

Matching with the replacement of the existing 0.15 sq” ACSR conductor from Madanpur (220 kV) – Barwala - Shahzadpur- Naraingarh 66 kV line with AAAC wolf.

Posed to NCRPB on 01.04.2009

Posed to NCRPB on 01.04.2009

Page 91: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 91 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

17 Chandhut 66/11 1x12.5/16 2x12.5/16 16 6A1104* 250.00 2009-10 Yes

18 Palwal (220 kV) 66/11 1x12.5/16 2x12.5/16 16 6A1105* 250.00 2009-10 Yes

19 66/11 1x10/12.5 1x12.5/16 3.5 6A0869* 150.00 2009-10 Yes

20 Manesar 66/11 1x12.5/16 1x25/31.5 15.50 6A1181* 300.00 2009-10 Yes

21 Chhachharauli 66/33 1x8 8.00 6A1182* 75.00 2009-10 Yes

22 Sector-56 Gurgaon 66/11 1x12.5/16 1x12.5/16

66/11 1x12.5/16 1x25/31.5 15.5 6A1203* 300.00 2009-10 Yes

23 Barwala 66/11 1x8 1x12.5/16 8 6A1204* 200.00 2009-10 REC 350066 Yes

24 Hathin 66/33 1x8 8.00 6A1216* 80.00 2009-10 Yes

Posed to NCRPB on 01.04.2009

Posed to NCRPB on 01.04.2009

Suitable modification of existing 66 kV bus coupler bay at 220 kV substation Palwal to provide additional 12.5/16 MVA 66/11 kV transformer.

Universal Steel Alloy (USA) Faridabad

Proportionate cost of installation of 1x12.5/16 MVA 66/11 kV transformer would be shared by NHPC.

Posed to NCRPB on 09.03.2009

Temporarily arrangement to enable UHBVNL to release the pending LT/HT industrial connections from 33 kV substation Bilaspur during off period of rural feeders till such time the underlying system to be connected with 220 kV substation Chhachharauli (Malikpur Bangar) is finally approved/ decided.

Subject to and matching with the up gradation of Badshahpur - Sector 56 section of 66 kV D/C line from existing 0.15 sq" to 0.4 sq" ACSR which is in progress.Posed to

NCRPB on 09.03.2009

Subject to restriction of current on 66 kV Madanpur - Barwala D/C line to 600amp. Till such time its proposed augmentation of existing 0.15 Sq" ACSR to equivalent AAAC on existing towers is completed.

To concur for creation of 33 kV substation at village Bahin by DHBVNL with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from 66 kV substation Hathin.

Page 92: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 92 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

6B1217* 40.00 2009-10

25 66/33 1x6 1x8 6A1006A

3B1240* 20.00 2009-10

26 Bhore Kalan 66/11 2x12.5/16 2x25/31.5 31 6A1222* 300.00 2009-10 Yes

27 Dabriwala 66/11 200.00 2009-10 Yes

28 Oswal Steel Faridabad 66/11 1x10 1x10

Erection of required 66 kV bay at 66 kV substation Hathin for controlling the 8 MVA 66/33 kV transformer.

To concur erection of approximately 14 km 33 kV line by DHBVN from existing 66 kV substation Hathin to proposed 33 kV substation Bahin as proposed by DHBVN.

Nagina (Cancellation of approval)

Cancellation of earlier approved augmentation of 6 MVA 66/33 kV transformer to 8 MVA 66/33 kV transformer at 66 kV substation Nagina as mentioned at Sr. No. 3 of approval conveyed vide this office memo No. R. 453/ Ch-146/408/K-43 dated 02.01.2008.

Proposal cancelled

Erection of 33 kV outgoing bay by HVPNL for feeding proposed 33 kV substation Bahin.

Posed to NCRPB on 09.03.2009

1X12.5/16 (As Hot T/F)

To load all the three 66/11 kV transformers at 66 kV substation Oswal and keep one number 66/11 kV transformer at 66 kV substation Dabriwala, however the above decision is subject to the condition that:1. This is without prejudice to court orders issued in respect of power infrastructure in the area. No court order is to be violated.2. There should be no additional burden financially to HVPNL with this arrangement. The commercial aspect thus needs to be looked into before executing the proposal in field.

Page 93: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 93 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

66/11 1x12.5/16 1x25/31.5 15.5 6A1250* 300.00 2010-11 Yes

29 Hydrabad Asbestos 66/11 2x25/31.5 31 6A1251* 600.00 2010-11 Yes

30 NH-3 Faridabad 66/11 1x10 1x25/31.5 21.5 6A1252* 300.00 2010-11 Yes

66/11 1x12.5/16 1x25/31.5 15.5 300.00 2010-11

31 Sector-46 Faridabad 66/11 1x12.5/16 1x25/31.5 15.5 6A1253* 300.00 2010-11 Yes

32 Sector-31 Faridabad 66/11 1x12.5/16 1x12.5/16 Yes

66/11 1x12.5/16 1x25/31.5 15.5 6A1254* 300.00 2010-11

33 Palla (220 kV) 66/11 1x12.5/16 1x12.5/16

66/11 1x10/12.5 1x10/12.5

66/11 1x12.5/16 1x25/31.5 15.5 6A1256* 300.00 2009-10 Yes

34 Pali (220 kV) 66/11 1x7.5 1x12.5/16 8.5 6A1255* 200.00

Posed to NCRPB on 09.03.2009

Subject to laying of 66 kV XLPE underground cables from 220 kV substation BBMB Ballabgarh to both 66 kV substation Globe Steel and 66 kV substation Hydrabad Asbestos

2x12.5/16 Posed to NCRPB on 09.03.2009

Subject to laying of 66 kV XLPE cables from 220 kV substation BBMB Ballabgarh to 66 kV substation Hydrabad Asbestos.

Posed to NCRPB on 09.03.2009

Subject to providing 100 MVA 220/66 kV transformer at 220 kV substation Pali.

Posed to NCRPB on 09.03.2009

Subject to replacement of 66 kV ring main conductor with ‘INVAR’ conductor and upgradation of existing 66 kV substations A-4 and A-5 to 220 kV level along with creation of 400 kV substation Nawada.

Subject to providing 100 MVA 220/66 kV transformer at 220 kV substation Pali and providing ‘INVAR’ conductor in the 66 kV ring-main of Faridabad.

Posed to NCRPB on 09.03.2009

Subject to upgradation of existing 66 kV substations A-4 and A-5 to 220 kV level and creation of 400 kV substation Nawada.

Posed to NCRPB on 09.03.2009

Subject to providing 100 MVA 220/66 kV transformer at 220kV substation Pali.

Page 94: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 94 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

35 66/11 1x12.5/16 1x25/31.5 15.5 6A1257* 300.00 2010-11 Yes

36 A-2 Faridabad 66/11 2x12.5/16 2x12.5/16 Yes

66/11 1x12.5/16 1x25/31.5 15.5 6A1258* 300.00 2010-11

37 66/11 1x12.5/16 1x12.5/16 Yes

66/11 1x12.5/16 1x25/31.5 15.5 6A1259* 300.00 2010-11

38 Fatehpur Biloch 66/11 1x8 1x866/11 1x12.5/16 16 6A1260* 200.00 2010-11 Yes

39 A-5 Faridabad 66/11 1x12.5/16 1x12.5/16

66/11 1x12.5/16 1x25/31.5 15.5 6A1261* 300.00 2010-11 Yes

40 Escort-II Faridabad With its controlling 66 kV bay

Northern India Faridabad

Posed to NCRPB on 09.03.2009

Subject to provision of ‘INVAR’ conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substations A-2 and A-5 to 220 kV level as well as creation of 400 kV substation Nawada.

Subject to upgradation of existing 66 kV substation A-2 to 220 kV level (provision of bays for connectivity is under consideration with BBMB authorities).

Posed to NCRPB on 09.03.2009

A-4 (Sector-18) Faridabad

Posed to NCRPB on 09.03.2009

Subject to augmentation of existing 66 kV substation A-4 to 220 kV level and creation of 400 kV substation Nawada.

Posed to NCRPB on 01.04.2009

Subject to provision of ‘INVAR’ conductor in the 66 kV ring-main Faridabad and augmentation of existing 66 kV substation A-5 to 220 kV level as well as creation of 220 kV substation Nawada.

Posed to NCRPB on 09.03.2009

Subject to augmentation of 66 kV substation A-5 to 220 kV level and laying of 66 kV underground XLPE cable from 220 kV substation BBMB Ballabgarh to 66 kV substation Globe Steel and 66 kV substation Hydrabad.

Page 95: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 95 of 180 66 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

66/11 1x12.5/16 2x12.5/16 16 6A1262* 250.00 2010-11 Yes

41 Badrola 66/11 1x12.5/16 2x12.5/16 16 6A1263* 250.00 2010-11 Yes

42 Chhainsa 66/11 1x12.5/16 2x12.5/16 16 6A1264* 250.00 2010-11 Yes

43 Jalkheri 66/11 1x12.5/16 2x12.5/16 16 6A1405* 250.00 2009-10 Yet to be posed Yes

44 Sector-2 IMT Manesar 66/11 1x12.5/16 2x12.5/16 16 6A1435* 250.00 2010-11 Yet to be posed No

45 Sector-4 IMT Manesar 66/11 1x12.5/16 2x12.5/16 16 6A1436* 250.00 2010-11 Yet to be posed No

46 Raipur Rani 66/11 1x12/4/8 1x12/4/8

66/11 1x7.5 1x12.5/16 8.5 6A1440* 115.00 2010-11 Yet to be posed No

47 66/11 1x12.5/16 2x12.5/16 16 6U0588* 250.00 2009-10 NCRPB Yes

Total (66 kV Augmentation) 595.00 11470.00

Posed to NCRPB on 01.04.2009

Subject to provision of ‘INVAR’ conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-2 to 220 kV level (provision of bays for connectivity is under consideration with BBMB authorities).

Posed to NCRPB on 01.04.2009

Along with its controlling 66 kV bay. Subject to provision of ‘INVAR’ conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-5 to 220 kV level.

Posed to NCRPB on 01.04.2009

Along with its controlling 66 kV bay. Subject to provision of ‘INVAR’ conductor in the 66 kV ring-main of Faridabad and upgradation of existing 66 kV substation A-5 to 220 kV level.

To be done by HVPNL. One No. 66 kV transformer controlling bay at 66 kV substation Sector-2 IMT Manesar will be created by HVPNL.

To be done by HVPNL. One No. 66 kV transformer controlling bay at 66 kV substation Sector-4 IMT Manesar will be created by HVPNL.

To allow UHBVNL to augment 33 kV substation Morni from 2 MVA to 4 MVA 33/11 kV transformer subject to 80% loading of its feeding transformer.

Escort-1

Substation commissioned on 05.07.08 with 1x12.5/16 MVA 66/11 kV T/F.

Page 96: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 96 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

132 kV AUGMENTATIONS 1 MDU Rohtak 132/33 2x20/25 5 1A0624* 87.00 2009-10 Yes

2 Ding 132/11 1x10/16 1x10/16

132/33 1x16/20 1x16/20

132/33 - 1x10/16 16 1A0644* 182.00 2009-10 REC 350029 Yes

3 Ellenabad 132/11 1x10/16 1x10/16

132/33 - 1x16/20 20 1A0645* 182.00 2009-10 REC 350029 Yes

4 Safidon (220 kV) 132/33 16/20 20/25 5 1A0792* 200.00 2009-10 REC 350034 Yes

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

1x16/20 + 1x20/25

To utilise 12.5 MVA 132/33 kV transformer available at Ismailabad, the same shall be installed for the time being.

1x12.5 MVA 132/33 kV T/F Commossioned on 28.12.2007

i) Installation of 16/20 MVA, 132/33 kV T/F alongwith 132 kV & 33 kV bays will be executed departmently out of Nigam funds.

ii) 33 kV line from 132 kV S/S Ellanabad to connect existing Ellanabad - Bhuratwala 33 kV line with 0.1 Sq" ACSR about 3 Km will be constructed by DHBVN. 1x10/16 MVA 132/33 kV T/F commissioned on 30.01.2008

Allow UHBVN to feed new 33 kV substation Didwara with installed capacity of 8 MVA 33/11 kV transformer from 220 kV substation Safidon by making LILO arrangement of 33 kV Safidon – Jalmana S/C line at 33 kV proposed substation Didwara matching with the augmentation of 220 kV substation Safidon by replacing 1x16/20 MVA 132/33 kV transformer by 20/25 MVA transformer.

Page 97: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 97 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

5 Adampur 132/33 1x20/25 25 1A0793* 200.00 REC 350034 Yes

6 Satnali 132/33 1x20/25 25 1A0794* 200.00 2008-09 REC 350034 Yes

UHBVN shall work out the time frame for execution of creation of 33 kV substation Didwara keeping in view the time taken by HVPN to augment 220 kV substation Safidon.

Allow DHBVN to feed new 33 kV substations Nangthala (1x6.3/8 MVA) and Modakhera (1x6.3/8 MVA). 33 kV new substation Modakhera will be fed through 33 kV Siswal – Modakhera line and 33 kV new substation Nangthala will be fed through T-off from 33 kV Adampur - Agroha line. 1x20/25 MVA T/F commissioned on 27.02.2009

Allow DHBVN for shifting the 2 Nos. 33 kV substations Zerpur (6.3/8 MVA) and Barda (6.3 MVA) from 220 kV substation Mohindergarh to 132 kV substation Satnali.Creation of 2 Nos. 33 kV bays at 132 kV substation Satnali to accommodate the lines feeding the 33 kV substations Zerpur and Barda.The relief available and bay vacated at 220 kV substation Mohindergarh after shifting of above 2 Nos. 33 kV substations Zerpur and Barda to 132 kV substation Satnali, would be utilized for feeding of new proposed 33 kV substations Budeen (6.3/8 MVA) and Sehlang (5 MVA).

Page 98: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 98 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

7 Ateli 132/33 20/25 25 1A0817* 250.00 2008-09 REC 350034 Yes

8 Dadri-II 132/33 2x10/16 2x20/25 18 1A0795* 400.00 REC 350034 Yes

Transformer T-2 of 10/16 MVA 132/11 kV may be shifted on the new bay which can be created at the entrance side in the yard so that new transformer of 20/25 MVA can be installed at the present location of T-2 as proposed by SE/ TS, HVPN, Gurgaon.

Allow DHBVN to feed new 33 kV substation Mandola with installed capacity of 6.3/8 MVA 33/11 kV transformer from 132kV substation Charkhi-Dadri-II.Allow DHBVN to feed new 33 kV substation Kheri Butter with installed capacity of 6.3/8 MVA 33/11 kV transformer from 132kV substation Charkhi-Dadri-II.Creation of one 33 kV bay at 132 kV substation Charkhi-Dadri-II for feeding the new 33 kV substation Kheri Butter.Allow DHBVN to augment 33 kV substation Sanjarwas from 2x4 + 1x6.3 MVA, 33/11 kV to 1x 4 + 1x6.3 + 1x6.3/8 MVA, 33/11 kV transformers. Both the 20/25 MVA T/F commissioned on 5.5.2008 & 31.5.2008 respectively.

Page 99: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 99 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

9 132/33 1x20/25 25 1U0759* 200.00 REC 350021 Yes

10 Rasina 132/11 1x10/16 2x10/16 16 1U0517* 250.00 2009-10 REC 350025 Yes

11 Kaul 132/11 1x10/16 16 1G0636* 250.00 2009-10 REC 350025 No

12 Uklana 132/11 1x10/16 16 1G0638* 250.00 2009-10 REC 350025 No

13 Bhiwani 132/11 1x10/16 16 1G0639* 250.00 2009-10 REC 350025 No

14 Sonepat (220 kV) 132/11 1x10/16 1x10/16

132/33 1x20/25 1x20/25

132/11 - 1x10/16 16 1A0657* 250.00 NCRPB No

15 Murthal 132/11 1x10/16 1x10/16

132/33 1x20/25 1x20/25

132/33 1x20/25 25 1A0658* 315.00 2009-10 NCRPB Commissioned on 13.04.2009 Yes

Dhanauri (Amendment of earlier approval)

REC Scheme No.350021 (Rs. 6.03 Crore) Creation of 132 kV substation Dhanouri with 1x20/25 MVA 132/33 kV + 1x10/16 MVA 132/11 kV transformers against already approved capacity of 2x10/16 MVA 132/11 kV transformers. T/F commissioned on 18.10.2008

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Commissioned with 1x10/16 MVA 132/11 kV T/F on 30.5.2006

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays. Commissioned on 20.04.09

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

Page 100: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 100 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

16 Kosli 132/11 10/16 16 1A0818* 250.00 2009-10 NCRPB Yes

17 132 kV Rai (HSIDC) 132/11 1x10/16 16 1A0867* 250.00 2009-10 NCRPB Yes

Augmentation of 132 kV substation Kosli by installation of 10/16 MVA 132/11 kV transformer in place of existing (2x5 + 1x4) MVA 33/11 kV transformer matching with commissioning of additional 1x50 MVA 220/132 kV transformer at 220 kV substation Rewari.

No additional 11 kV feeders would be allowed to DHBVN from this substation and subject to load management by HVPN and DHBVN field officers/ official during real peak time.

Installation of 1x10/16 MVA 132/11 kV transformer at upcoming 132 kV substation Rai (HSIDC) at the cost of HVPN to take care the load of the area other than that of HSIDC.

Installation of additional 1x10/16 MVA 132/11 transformer approved at 132 kV substations Rai vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0659A)

Page 101: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 101 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

18 132 kV HSIIDC Kundli 132/11 1x10/16 16 250.00 2009-10 NCRPB Yes

19 Pehowa (220 kV) 132/33 - -20

20 Mattanhail 132/33 1x10/16 16 1A0799* 140.00 2008-09 Yes

1N0865* Creation of 132 kV substation HSIDC Kundli with installed capacity of 1x16/20 MVA 132/11 kV transformer by HSIDC at their own cost. 1x10/16 MVA 132/11 kV transformer would be installed at this substation by HVPN at HVPN cost to take care the load of the area other than that of HSIDC.

Installation of additional 1x10/16 MVA 132/11 kV transformer approved at 132 kV substations Kundli vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0660A)

1x16/20 or 20

One of 16/20 or 20 MVA transformer to be removed after commissioning of 132 kV Dhand.

1x10/16 MVA 132/33 kV transformer being spared on augmentation of 132 kV substation Dadri-II subject to load managements during peak hours by the local HVPN personnel.

Page 102: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 102 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

132/33/11 8/4/4 -8

21 Gharaunda 132/33 - 20/25 25 1A0886* 250.00 2009-10 REC 350042 Yes

2009-10

22 132 kV Jalmana 132/11 1x10/16 1x10/16

132/33 1x20/25 25 1A0972* 250.00 2009-10 REC 350042 Yes

Allow UHBVN to augment 33 kV substation Sasroli from 2x4 MVA 33/11 kV transformers to (4 + 6.3) MVA transformers matching with augmentation of 132 kV substation Mattanhail.The sick transformer of 8/4/4 MVA 132/33/11 kV rating may be utilized after repair during emergency in system.

Matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra.

Creation of 2 Nos. 33 kV bays at 132 kV substation Gharaunda to accommodate the lines feeding the 33 kV substations Kamla and Kalram.

3B0887*&

3B0888*

Allow UHBVN for feeding the 2 Nos. 33 kV substation Kamla (10 MVA) and Kalram (10 MVA) from 132 kV substation Gharaunda matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra.

to feed 33 kV substations Sekhupur and Chochra subject to completion of 132 kV Assandh – Jalmana S/C line.

Creation of two 33 kV bays at 132 kV substations Jalmana to feed the new 33 kV substations Sekhupur and Chochra.

Page 103: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 103 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

23 132 kV Kharkhoda 132/33 1x20/25 25 1A1001* 250.00 2009-10 REC 350047 Yes

24 132 kV Digwan Jattan 132/33 1x20/25 25 1A1009* 250.00 2009-10 350042 Yes

132/11 2x10/16 2x10/16

Cancellation of already approved installation of additional 1x10/16 MVA 132/11 kV and 1x8 MVA 132/33 kV transformers at 132 kV substation Kharkhoda vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.3.2006 and to delete these works from the list of works of HVPN for the year 2007-08.

Augmentation of 132 kV substation Kharkhoda with installation of additional 1x20/25 MVA 132/33 kV transformer.

To allow UHBVN to feed proposed new 33 kV substations Sisana (8 MVA), Kharkhoda (8 MVA) and Firozpur Bangar (8 MVA) from 132 kV substation Kharkhoda subject to above augmentations.

Creation of three Nos. 33 kV bays at 132 kV substation Kharkhoda to accommodate the line feeding 33 kV substation Kharkhoda, Sisana and Firozpur Bangar.

matching with the shifting of load of 132 kV substation Behal from 220 kV substation Bhiwani to upcoming 220 kV substation Isharwal.

Allow DHBVN to feed new 33 kV substations Kari Dharni and Baralu with installed capacity of 10MVA 33/11 kV transformer each from 132 kV Dighawan Jattan matching with above.

Page 104: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 104 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

132/33 1x16/20 1x16/20

25 132 kV Gohana 132/11 2x10/16 2x10/16 Yes

132/33 1x16/20 1x20/25 5 1A1017* 200.00 2009-10 REC 350047

26 132 kV Chajjpur 132/33 1x12.5 1x20/25 12.5 1A1014* 200.00 2009-10 REC 350047 Yes

Creation of two nos. 33 kV bay at 132 kV substation Dighawan Jattan to feed 33 kV substations Kari Dharni and Baralu matching with above

matching with the creation of 220 kV substation Sampla and shifting of feeding of 132 kV substations Sampla & MDU Rohtak from 220 kV substation Rohtak to 220 kV substation Sampla.

Allow UHBVN for the augmentation of 33 kV substation Khanpur-Kalan from (1x6.3/8 + 4) MVA 33/11 kV to 2x6.3/8 MVA 33/11 kV transformers matching with above.

Advising UHBVN to create a 33 kV line from 132 kV Mundlana to 33 kV Khanpur Kalan for reliability and alternative source. HVPN shall provide necessary bay at feeding end on receipt of confirmation from UHBVN.

matching with the creation of 220 kV substation Chhajpur and shifting of feeding source of 132 kV substation Chhajpur from 220 kV substation PTPS Panipat to 220 kV substation Chhajpur

Allow UHBVN for feeding the 33 kV substation Jalalpur (10 MVA) from 132 kV substation Chhajpur matching with above.

Page 105: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 105 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

Creation of 1 Nos. 33 kV bays at 132 kV substation Chhajpur to accommodate the lines feeding the 33 kV substation Jalalpur matching with above.

Page 106: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 106 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

27 132 kV Badhra 132/33 1x10/16 1x20/25 1A1012A Cancelled

132/11 1x10/16 1x10/16132/33 1x10/16 1x10/16132/33 1x20/25 25 1A1406* 250.00 REC 350042 Yes

28 132 kV Miran 132/33 1x20/25 2x20/25 25 1A1031* 250.00 2009-10 REC 350042 Yes

132/11 1x8 1x8

3B1032* 2009-10

Proposal cancelled

Matching with shifting of enough load of 132 kV substation Behal/ Miran/ Jui/ Tosham from 220 kV substatioin Bhiwani to upcoming 220 kV substation Isharwal.

Subject to commissioning of 220 kV substation Isharwal.

Concurring proposal for creation of new 33 kV substation Hassan (2x6.3/8 MVA) with approximately 12 km 33 kV Miran - Hassan line by DHBVN.

Concurring proposal for creation of new 33 kV substation Bhera (1x6.3/8 MVA) by erecting 7.5 km T-off line from existing 33 kV Miran - Isharwal line with feeding from 132 kV substation Miran opening from Isharwal side by DHBVN.

Concurring proposal for augmentation of 33 kV substation Siwani from 5+6.3 MVA to 6.3/8+6.3 MVA 33/11 kV by DHBVN.

Creation of one No. 33 kV bay at 132 kV substation Miran for 33 kV Miran - Hassa line proposed.

Utilisation of existing bay and 33 kV Miran - Isharwal line by extending in between by 7.5 km for Miran - Bhera 33 kV line.

Page 107: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 107 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

29 132 kV Nautch 132/33 1x20/25 25 1A1041* 250.00 2009-10 REC 350042 Yes

3B1042* 2009-10

30 132 kV Madhosinghana 132/11 2x10/16 2x10/16

132/33 1x20/25 25 1A1076* 250.00 2009-10 REC 350066 No

1) Matching with the commissioning of 220 kV substation Kaul and shifting of load of 132 kV substation Kaul (32 MVA) and Pundri (69.5 MVA) from 220 kV substation Kaithal to 220 kV substation Kaul.

Concurrence to create new 33 kV substation Jagdishpura (10 MVA) with approxomately 13 km 33 kV line from 132 kV substation Nautch matching with as above (1).

Concurrence to augment 33 kV substation Kawartan from 2x4 MVA to 4+10 MVA 33/11 kV with 33 kV feeding from 132 kV Nautch by utilising the existing 33 kV bay and Nautch - Kawartan - Sewan line also matching with as above

Creation of 1 No. 33 kV bay at 132 kV substation Nautch to accommodate 33 kV feeding line for 33 kV substation Jagdishpura.

Allow DHBVN to shift 2 nos. 33 kV substations Sahidanwali (8MVA) & Titukhera/ Dhani kahan singh (8 MVA ) from 220 kV substation Sirsa to 132 kV substation MadhoSinghana through above mentioned 132/33 kV transformer.

Page 108: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 108 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

3B1077* 2009-10

31 Mohindergarh 132/11 1x12.5 1x10/16 3.5 1A1092* 125.00 2009-10 REC 350066 Yes

132/11 1x10/16 1x10/16

132/33 2x10/16 2x10/16

132/33 1x12.5 1x12.5

32 Kanina Khas 132/11 1x10/16 2x10/16 9.7 1A1093* 200.00 2009-10 Yes

33/11 1x6.3

132/33 1x16/20 1x16/20

33 Mundia Khera 132/11 1x10/16 1x10/16

132/33 1x20/25 1A1094* 250.00 2009-10 REC 350066 Yes

Creation of one no. 33 kV bay at 132 kV substation Madhosinghana to accommodate the 33 kV line feeding 33 kV substations Sahidanwali & Titukhera/Dhani kahan singh.

Allow DHBVN to create new 33 kV substation Ahmadpur Road Sirsa (8MVA) with feeding from 220 kV substation Sirsa by utilizing idle 33 kV Sirsa-Ram Nagaria line and 33 kV bay at 220 kV substation Sirsa

As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works.

As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works.

As per HVPNL policy 16/20 MVA 132/11 kV transformers shall br procured in place of 10/16 MVA 132/11 kV transformers for the above works.

Page 109: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 109 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

2009-10

34 Narnaund 132/11 2x10/16 2x10/16

132/33 1x20/25 25 1A1179* 250.00 2009-10 REC 350066 Yes

35 Ellenabad (Mithisurera) 132/11 1x10/16 1x10/16

132/33 1x10/16 1x10/16

132/33 1x20/25 25 1A1189* 250.00 2009-10 REC 350066

Construction of 2 No. 33 kV bays at 132 kV substation Mundia Khera one of the existing 33 kV Nangal Sirohi line and other for 33 kV line for connecting 5 No. NB PHs (by providing approximately 2.5 km 33 kV link line by DHBVNL)

3B1095* 3B1096*

With shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur(Hansi).

Matching with installation of 2nd 100 MVA 220/132 kV transformer at 220 kV substation Rania

To allow DHBVNL to feed already approved loads of 33 kV substations Keharwala (9 MVA with proposed augmentation to 15.3 MVA), Mohamadpuria (8 MVA), Mastangarh (10 MVA) and Haripura (10 MVA) from 132 kV substation Jiwan Nagar and feed 33 kV loads of existing Ellenabad (18.3 MVA), proposed Kuttabad (8 MVA), Bhuratwala (9 MVA likely to be augmented to 15 MVA) and newly identified 33 kV Dholpalia (10 MVA) from 132 kV substation Ellenabad.

Page 110: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 110 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

36 Hisar Road Rohtak 132/33 2x20/25 2x20/25132/11 1x16/20 20 1A1242* 200.00 2009-10 Yes

1B1243* 50.00 2009-10

37 Rewari (220 kV) 132/33 2x20/25 3x20/25 25 1A1245* 250.00 2009-10 Yes

1B1246*

38 Kaithal (Titram) 220 kV 132/33 1x20/25 25 1A1288* 250.00 2009-10 PFC 03403021 Yes

1B1287* 50.00 2009-10

Creation of one number 132 kV bay at 132 kV substation Hisar Road Rohtak for controlling 16/20 MVA 132/11 kV transformer.

SE/ TS, HVPNL Gurgaon will create the necessary bay space by dismantlement of transformer plinth and equipment foundation of abandoned 66 kV substation at 220 kV substation Rewari and shifting of existing 33 kV Jonawas line and 11 kV capacitor bank for which the necessary estimate will be got sanctioned before start of work.

Creation of new 132 kV bay for providing additional 20/25 MVA 132/33 kV transformer at 220 kV substation Rewari.

To request UHBVNL to take out 33 kV feeders through under ground cable in view of space constraints for right of way.

Construction of one no. 132 kV bay for shifting of existing 10/16 MVA 132/11 kV transformer from its existing plinth at 220 kV substation Kaithal (Titran)

Page 111: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 111 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

The additional 20/25 MVA 132/33 kV transformer shall be installed on the bay spared by shifting of existing existing 10/16 MVA 132/11 kV transformers.

Page 112: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 112 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

39 Bawal (HSIIDC) 132/11 1x16/20 1x16/20

132/33 1x20/25 25 1A1247* 409.20 2009-10 Yes

1B1248* 50.00 2009-10

3B1249* 20.00 2009-10

The 4.5 MVA load of M/s IOCL will be released by DHBVNL from 1x20/25 MVA 132/33 kV T/F to be provided at 132 kV substation HSIIDC Bawal by HVPNL. However the proportionate cost of 20/25 MVA 132/33 kV T/F and other allied equipments for release of 4.5 MVA load will be got deposited by SE/TS HVPNL Gurgaon from M/s IOCL before execution of work. A necessary tripartite agreement will also be executed by M/s IOCL with HVPNL and DHBVNL before release of their connection.

Posed to NCRPB on 05.05.2009

Creation of one no. 132 kV bay for 132 kV substation HSIIDC Bawal for controlling 20/25 MVA 132/33 kV transformer.

Providing relief to overloaded 66 kV substation Dharuhera by shifting the existing 8.5 MVA load of 33 kV substation ACCIL Bawal from 66 kV substation Dharuhera to 132 kV substation HSIIDC Bawal. The load of 33 kV substation Mohanpur (1x10 MVA) being proposed by DHBVN will also be fed from 132 kV substation HSIIDC Bawal.

Creation of 1 No. incoming and 3 no. outgoing 33 kV bays at 132 kV substation HSIIDC Bawal to feed 33 kV substations proposed by DHBVNL.

Due to RoW problem the 33 kV outgoing lines from 132 kV substation HSIIDC Bawal will be taken out through underground 33 kV cable.

Page 113: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 113 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

40 Jui 132/33 1x20/25 25 1A1284* 250.00 2009-10 PFC 03403022 Yes

41 Kheri Gulam Ali 132/33 1x20/25 2x20/25 25 1A1285* 250.00 2009-10

42 Naultha 132/33 1x20/25 25 1A1293* 250.00 2009-10

43 Kirmitch 132/33 1x20/25 25 1A1294* 250.00 2009-10

44 Israna 132/33 1x20/25 25 1A1303* 250.00 2010-11

45 Teliwara 132/33 1x20/25 25 1A1311* 250.00 2009-10

46 40.00 2009-10

47 Atela (132 kV) 132/11 2x10/16 2x10/16

132/33 1x10/16 1x10/16132/33 1x20/25 1A1407* 250.00 2009-10 PFC 03403022 No

48 Kaithal (132 kV) 132/33 1x16/20 1x20/25 5 1A1431* 200.00 2009-10

To allow DHBVN to feed 33 kV substations: Nangla and Pohkarwas from 132 kV substation Jui matching with the commissioning of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Jui. 2) Gopalwas and mandoli Khurd (in place of already approved 33 kV substations Jhumpa and Pataudi) from 220 kV substation Isherwal.

To allow DHBVN to connect proposed 33 kV substations Chando Khurd (10 MVA) and Nanheri (10 MVA) matching with the augmentation of 132 kV substation Teliwara.

Creation of one no. 132 kV bay for accommodating transformer as above and 2 nos. 33 kV bays to connect proposed 33 kV substations Chando Khurd and nanheri at 132 kV substation Teliwara.

3B1312*, 3B1313*

Matching with completion of S/C 132 kV Dadri - Jhojju Kalan line.

Page 114: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 114 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

49 Bhagal (132 kV) 132/33 1x10/16 1x20/25 9 1A1413* 200.00 2009-10 Yes

3B1414*

50 Bahadurgarh 132/33 1x16/20 1x20/25 5 1A1447* 200.00 2010-11 No

51 Khurana 132/33 1x20/25 25 1A1441* 250.00 2010-11 No

52 Nautch 33/0.4 1x0.2 1G1385* 4.00 2009-10 No

53 132/11 1x10/16 2x10/16 16 1U0474* 200.00 2009-10 REC 350027 Yes

54 Bhadson 132/11 1x10/16 2x10/16 16 1U0503* 200 2009-10 REC 350030 Yes

55 Dahina 132/11 1x10/16 2x10/16 16 1U0509* 200.00 2009-10 NCRPB Yes

Subject to commissioning of already approved 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka.

Creation of one 33 kV bay at 132 kV substation Bhagal to accommodate 33 kV line for proposed 33 kV substation Balbera (20 MVA)

Allow UHBVNL to augment 33 kV substation Paprala from 1x8 + 1x6.3 MVA to 2x8 MVA 33/11 kV transformers (fed from 132 kV susbatation Bhagal) matching with augmentation of 132 kV substaion Bhagal

To allow UHBVNL to feed proposed 33 kV substation Balbera (20 MVA) from 132 kV substation Bhagal matching with augmentation of 132 kV subsation Bhagal

Dhand

Substation commissioned with 1x10/16 MVA 132/11 kV transformer on 23.12.2008

Commissioned with 1x10/16 MVA T/F on 10.02.2009

One transformer will be installed in the first instance while the second will be added as the load grows. Substation commissioned on 26.6.2008 with 1x10/16 MVA 132/11 kV transformer.

Page 115: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 115 of 180 132 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV) Tentative

Cost in Rs lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

55

Total (132 kV Augmentation) 859 12354.20

Advising HVPN field officers about 132 kV Dahina to be normally fed from Mohindergarh side with facility to feed it from Rewari side in case of emergency / exigency including routine maintenance.

Page 116: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 116 of 180 220 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

220 kV AUGMENTATIONS 1 Pehowa 220/132 2x100+50 3x100 50 400.00 2009-10 REC 350034 Commissioned on 28.04.09 Yes

2 Nissing 220/132 2x100 3x100 100 500.00 2009-10 REC 350034 Yes

• 1G0820* 2009-10

• 2G0821* 2009-10

3 Palli 220/66 1x100 100 644.00 2009-10 REC 350025 No

4 Sirsa 220/132 1x100 100 534.00 2009-10 REC 350025 No

5 Karnal 220/132 1x100 100 534.00 2009-10 REC 350025 No

6 IMT Manaser 220/66 1x100 2x100 100 500.00 2009-10 Yes

7 Jind 220/132 2x100 3x100 100 2A0889* 625.00 2009-10 REC 350042 Yes

Sr. No.

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

2A0791*

2A0819*Aug. of 132 kV bus bar

conductor from twin Zebra to Twin tarantulla at 220 kV substation Nissing.

Dismantlement of 5 Nos category III residences and their reconstruction at suitable place within 220 kV substation Nissing as identified by SE/ TS, HVPN, Karnal.

2G0617*

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

2G0618*

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

2G0619*

REC Scheme No.350025.(Rs.51.05 Cr)- Under procurement of T/Fs only. Spare power transformers along with bays

2A0620*

Yet to be posed

Page 117: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 117 of 180 220 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

8 Cheeka 220/132 2x100 3x100 100 2A0900* 625.00 2009-10 REC 350042 Yes

9 Isherwal 220/132 1x100 3x100 200 1300.00 REC 350042 Yes

10 Rohtak 220/132 1x50 1x100 50 2A1036* 400.00 2009-10 No

11 Rewari 220/132 2x100 2x100

220/132 1x50 1x100 50 2A1244* 550.00 2009-10 Yes

12 Daultabad 220/66 2x100 3x100 100 2A1433* 600.00 2010-11

13 Nuna Majra (Bahadurgarh) 220/132 2x100 3x100 100 2A1434* 550.00 2010-11 No

2A0938*

2A1039*

2009-10 2009-10

SE/ TS, HVPNL Gurgaon will create the necessary bay space by dismantlement of transformer plinth and equipment foundation of abandoned 66 kV substation at 220 kV substation Rewari and shifting of existing 33 kV Jonawas line and 11 kV capacitor bank for which the necessary estimate will be got sanctioned before start of work.

Yet to be posed

Yet to be posed

Provision of one no. 220 kV bay on primary side of additional 100 MVA transformer at 220 kV substation Daultabad.

Provision of one no. 66 kV bay on secondary side of additional 100 MVA transformer at 220 kV substation Daultabad.

Yet to be posed

Provision of one no. 220 kV bay on primary side of additional 100 MVA transformer at 220 kV substation Nuna Majra.

Provision of one no. 132 kV bay on secondary side of additional 100 MVA transformer at 220 kV substation Nuna Majra.

Page 118: 14_List of Works

AUGMENTATION WORKS (66 KV AND ABOVE) 2009-10

document.xls Page 118 of 180 220 kV Augmentations

Name of substation Capacity in MVA RemarksExisting Proposed Code

Sr. No.

Voltage Ratio (kV)

Tentative Cost in Rs

lac

Tentative completion Schedule

Funds Arrangements

Works covered under

Investment Plan 2009-10

Net Addition

Total (220 kV Augmentation) 950 7762.00

Page 119: 14_List of Works

ANNEXURE-1

document.xls Page 119 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks Code

1 Bhatgaon 132 kV Harsana Kalan For out going feeder from 132 kV S/S Harsana Kalan to 33 kV Bhatgaon 3B0713*

2 Teak 132 kV Thana Matching with augmentation of 132/33 kV T/F at 132 kV S/S Thana 3B0714*

3 Safidon/Hatt 132 kV Safidon Matching with 33 kV 2nd Ckt. between Safidon 132 kV S/S and Safidon 33 kV S/S. 3B0715*

4 City Railway Stn. Bhiwani 132 kV Bhiwani 3B0716*5 Pataudi 132 kV Miran 3B0717*6 M.C.III Pump House 132 kV Kanina Khas Matching with Kanina Khas - MCD-III Pump House 33 kV line. 3B0718*

7 Rudrol 132 kV Jhojju Kalan Matching with 2nd 33 kV Ckt. between Jhojju Kalan & Rudrol 3B0719*

8 Siswal 132 kV Adampur 3B0720*9 Budhanpur 132 kV Munak 3B0721*

10 UHBVN consumers 132 kV Samalkha 3B0722*

11 Shamgarh 132 kV Nilokheri 3B0723*

12 Sardana 132 kV Gannaur 3B0725*

13 Mahmoodpur 132 kV Cheeka 3B0726*

14 Gheer & Nalipur 132 kV Newal 3B0727*

15 Bishowa 132 kV Kosli 3B0728*

16 Behrampur 132 kV Kosli 3B0729*

17 Sector 6/3 Rohtak 132 kV Sector-3 Rohtak 3B0730*

18 Hassangarh 132 kV Sampla 3B0731*

19 Rohand 132 kV Sampla 3B0732*

20 Ferozpur Banger 132 kV Kharkhoda 3B0733*

Sr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

Creation of 33 kV bay in space available between capacitor bank and control room to feed UHBVN consumer loads through one feeder.

One no. 33 kV bay at 132 kV substation Cheeka is spared on upgradation of 33 kV Baghal to 132 kV level

Two nos bays at 132 kV substation Newal to facilitate feeding of 33 kV substations Nalipur & Gheer.

Page 120: 14_List of Works

ANNEXURE-1

document.xls Page 120 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

29 Banyani 132 kV Kalanaur Matching with the upgradation of 33 kV substation Beri to 132 kV level. 3B0804*

30 Zerpur 132 kV Satnali 3B0805*

31 Barda 132 kV Satnali 3B0806*

32 Kheri Butter 132 kV Charkhi Dadri-II 3B0807*

33 Mundri 132 kV Pundri 3B0808*

34 Guhna 132 kV Padla 3B0809*

35 Kurar 132 kV Padla 3B0810*

36 Deeg 132 kV Habri new 33 kV substation Deeg (10 MVA)

37 Barsana 132 kV Habri 33 kV substation Barsana (10 MVA) .

38 Kiloi 132kV Jhajjar 33 kV substation Kiloi with installed capacity of 8 MVA 132/33 kV transformer 3B0831*

39 Sampla Road Jhajjar 132kV Jhajjar 3B0832*

40 Jaitpura 132 kV Bhusthala 33 kV new substation Jaitpura with installed capacity of 10 MVA, 33/11 kV transformer 3B0833*

41 Shobhapur 132 kV Seka

42 Bhungarka 132 kV Seka

43 Bhilwara 132 kV Seka

Matching with installation of 20/25 MVA 132/33 kV T/F at 132 kV S/S Satnali. Bay vacated at 220 kV substation Mohindergarh after shifting of 33 kV substations Zerpur and Barda to 132 kV substation Satnali would be utilized for feeding of new proposed 33 kV substations Budeen and Sehlang.

Matching with the augmentation of 132 kV substation Charkhi Dadri-II with installation of 2x20/25 MVA 132/33 kV transformers in place of existing 2x10/16 MVA 132/33 kV transformers.

Matching with the augmentation of 132 kV substation Pundri with installation of additional 20/25 MVA 132/33 kV transformer.

Matching with the augmentation of 132 kV substation Padla with installation of additional 20/25 MVA 132/33 kV transformer.

33 kV substation Sampla Road Jhajjar with installed capacity of 8 MVA 132/33 kV transformer

Page 121: 14_List of Works

ANNEXURE-1

document.xls Page 121 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

44 Bichpari 132 kV Mundlana 3B0834*

45

46

47 Dabarthala 132 kV Sagga 3B0852*

48 Shahpur 132 kV Sagga 3B0853*

49 Kakrod 132kV Uchana 3B0857*50 Chhattar 132kV Uchana 3B0858*

To allow UHBVN to feed 33 kV new substation Bichpari with installed capacity of 10 MVA 33/11 kV transformer in place of already approved 33 kV substation Khanpur Khurad from 132 kV substation Mundlana matching with the commissioning to 132 kV substation Mundlana.

To allow UHBVN to feed 33 kV new substation Karora with installed capacity of 1x8 MVA, 33/11 kV transformer by making Tee off from existing 33 kV line from 132 kV substation Pai to 33 kV substation Rajound matching with the commissioning of 132 kV substation Rajound and shifting of all load of existing 33 kV substation Rajound to 132 kV substation Rajound.

To allow UHBVN to feed 33 kV new substation KDB near Brahm Sarover, Kirmitch with installed capacity of 10 MVA, 33/11 kV transformer Kirmitch by making Tee – Off from existing 33 kV line from 220 kV substation BBMB, Kurukshetra to 33 kV substation Kirmitch with ensuring its feeding from 132 kV substation Kirmitch matching with the commissioning to 132 kV substation Kirmitch.

Allow UHBVN to feed new 33 kV substation Dabarthala with installed capacity of 8 MVA 33/11 kV transformer from 132kV substation Sagga.

Allow UHBVN to feed new 33 kV substation Shahpur with installed capacity of 10 MVA 33/11 kV transformer from 132kV substation Sagga.

Allow UHBVN to augment 33 kV substation Nigdu from 1x8 MVA 33/11 kV transformer to (1x8 + 1x5) MVA 33/11 kV transformers.

Allow UHBVN to feed new 33 kV substations Kakrod and Chhattar with installed capacity of 10 MVA 33/11 kV and 8 MVA 33/11 kV transformer respectively from 132kV substation Uchana matching with the installation of 1x20/25 MVA, 132/33 kV

D55
XENPLG:
Page 122: 14_List of Works

ANNEXURE-1

document.xls Page 122 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

51 Dubal Dhan 132 kV Beri 3B0859*

52

53

54 Bhogipur 132kV Murthal 3B0870*

To allow UHBVN to feed 33 kV new substation Dubal Dhan with installed capacity of 8 MVA, 33/11 kV transformer from 132 kV substation Beri matching with upgradation of 33 kV substation Beri to 132 kV level. The existing 33 kV substation Jahazgarh would continue to be fed from 132 kV substation Jhajjar.

Allow UHBVN to feed new 33 kV substation Brass with installed capacity of 8 MVA 33/11 kV transformer from 220 kV substation Nissing by erecting a new 33 kV line 3.5 km in length to be tapped off at a distance 5.5 km from Nissing on existing 33 kV Nissing- Rasina line subject to load management by field officers during real peak hours as and when required

Allow UHBVN to feed new 33 kV substation Kharawar with installed capacity of 8 MVA 33/11 kV transformer from 132 kV substation MDU, Rohtak by erecting a new 33 kV line from 132 kV substation MDU, Rohtak to proposed site of 33 kV substation Kharawar.

33 kV bay available at 132 kV substation MDU Rohtak as intimated by Superintending Engineer/ TS, HVPN, Rohtak vide Memo No. Ch-15/WM-227 dated 18.9.06 (Ch-92) may be utilized to feed 33 kV substation Kharawar.

Allow UHBVN to feed new 33 kV substation Bhogipur with installed capacity 1x8 MVA 33/11 kV transformer from 132kV substation Murthal matching with the augmentation of 132 kV substation Murthal by installation of additional 1x20/25 MVA 132/33 kV transformer.

Allow UHBVN to augment existing 33 kV substation Sugar Mill Sonepat from 6.3/8 MVA to 2x8 MVA 33/11 kV transformer

Page 123: 14_List of Works

ANNEXURE-1

document.xls Page 123 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

55

56 Sector-10 Rewari 220 kV Rewari

57 Ahrod. 132 kV Ateli

58 Baraguda 132 kV Odhan

59 Bahri 132 kV Alewa

60 Popra 132 kV Alewa

61 Dighal 132 kV Beri

62 Gangoli 132 kV Kheri Taloda

63 Brahman Majra 132 kV Matlauda 3B0884*

Allow UHBVN to feed new 33 kV substation Manoharpur with installed capacity 1x10 MVA 33/11 kV transformer from 132kV substation Kheri Taloda Taloda by making T- Off from existing 33 kV line from 132 kV Jind to Kheri Taloda by ensuring its energization from 132 kV substation Kheri Taloda matching with the augmentation of 132 kV substation Kheri Taloda by installation of additional 1x20/25 MVA 132/33 kV transformer.

Linked with augmentation of 220 kV substation Rewari by installation of 20/25 MVA 132/33 kV transformer in place of existing 8 MVA 132/33 kV transformer matching with commissioning of additional 1x50 MVA 220/132 kV transformer.

Linked with augmentation of 132 kV substation Ateli by installation of additional 20/25 MVA 132/33 kV transformer.

Linked with installation of 132/33 kV 20/25 MVA additional transformer at 132 kV substation Kheri Taloda to feed the loads of 33 kV substations Kheri Taloda, Gangoli and others proposed by UHBVN in future.Allow UHBVN to feed new 33 kV substations Brahman Majra and Dahar with installed capacity of 10 MVA 33/11 kV transformer each from 132kV substation Matlauda matching with the installation of 1x20/25 MVA, 132/33 kV transformer at 132 kV substation Matlauda.

Page 124: 14_List of Works

ANNEXURE-1

document.xls Page 124 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

64 Dahar 132 kV Matlauda 3B0885*

65 Kamla 132 kV Gharaunda

66 Kalram 132 kV Gharaunda 3B0888*

67 Jindran 132 kV Jassia

68 Songri Gulana 132 kV Naguran

69 Samdo 132 kV Naguran 3B0899*

70 Neemwala 132 kV Bhagal 3B0906*

Creation of 2 Nos 33 kV bays at 132 kV substation Matlauda for feeding the new 33 kV substations Brahman Majra and Dahar matching with the installation of 1x20/25 MVA, 132/33 kV transformer at 132 kV substation Matlauda.

Allow UHBVN for feeding the 2 Nos. 33 kV substation Kamla (10 MVA) and Kalram (10 MVA) from 132 kV substation Gharaunda matching with the commissioning of 220 kV substation Bastra and LILO of 132 kV S/C line between Gharaunda and Madhuban at 220 kV substation Bastra.

3B0887*

Creation of 2 Nos. 33 kV bays at 132 kV substation Gharaunda to accommodate the lines feeding the 33 kV substations Kamla and Kalram.

1x20/25 MVA 132/33 kV transformer proposed at 132 kV substation Jassia would be utilized to feed new 33 kV substation Jindran as proposed by UHBVN and any other 33 kV substations proposed by UHBVN in this area in future.

Creation of 33 kV level at 132 kV substation Naguran by installation of additional 20/25 MVA 132/33 kV transformer matching with the commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Jind.

3B0898*

Allow UHBVN for feeding the 2 Nos. 33 kV substation Songri Gulana (10 MVA) and Samdo (8 MVA) from 132 kV substation Naguran matching with creation of 33 kV level at 132 kV substation Naguran by installation of additional 20/25 MVA 132/33 kV transformer and commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Jind.

Creation of 2 Nos. 33 kV bays at 132 kV substation Naguran to accommodate the lines feeding the 33 kV substations Songri Gulana and Samdo.

Allow UHBVN for feeding the 33 kV substation Neemwala (10 MVA) from 132 kV substation Bhagal matching with the augmentation of 132 kV substation Bhagal by providing additional 1x20/25 MVA 132/33 kV transformer and commissioning of 3rd 100 MVA 220/132 kV transformer at 220 kV substation Cheeka.

Page 125: 14_List of Works

ANNEXURE-1

document.xls Page 125 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

71 Sec-6 Rohtak 132 kV Sector-3 Rohtak

3B0923*

72 Sekhupur 132 kV Jalmana 1A0972*

73 Chochra. 132 kV Jalmana

74 Sirta 132 kV Padla

3B0988*

75 132 kV Sector-29 Panipat

76 Deora 132 kV Nautch 3B0989*

Allow UHBVN to feed new 33 kV substation Sec-6 Rohtak with installed capacity 1x8 MVA 33/11 kV transformer in place of earlier approved 33 kV substation Sec-3 Rohtak vide Memo No. R. No.342/ Ch-10/ 407/ K-187 dated 02.03.2006 from 132kV substation Sec-3 Rohtak.

Creation of 1 no. 33 kV bay at 132 kV substation Sec-3 Rohtak for feeding the new 33 kV substation Sec-6 Rohtak in place of 33 kV substation sector 3 Rohtak and keeping provision for sufficient number of 33 kV bays to shift the load of 33 kV substations Bhalout (10 MVA) and Kansala (8 MVA) from 132 kV substation Khokharakot to 132 kV substation sec-3 Rohtak.

Augmentation of 132 kV substation Jalmana from 1x10/16 MVA 132/11 kV transformer to 1x10/16 MVA 132/11 kV + 1x20/25 MVA 132/33 kV transformers to feed 33 kV substations Sekhupur and Chochra subject to completion of 132 kV Assandh – Jalmana S/C line.

Creation of two 33 kV bays at 132 kV substations Jalmana to feed the new 33 kV substations Sekhupur and Chochra.

3B0973* & 3B0974*

Allow UHBVN to create 33 kV substation Sirta (1x10 MVA) from 132 kV Padla matching with the installation of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Padla.

Creation of one No. 33 kV bay at 132 kV substation Padla to accommodate the line feeding 33 kV substation Sirta.

Sanoli Road Panipat, Industrial Area Panipat and Sewah

Allow UHBVN to create 33 kV substation Deora (1x8 + 1x6.3) MVA 33/11 kV transformers from upcoming 132 kV substation Nautch.

Creation of one No. 33 kV bay at 132 kV substation Nautch to accommodate the line feeding 33 kV substation Deora.

Page 126: 14_List of Works

ANNEXURE-1

document.xls Page 126 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

77 Kharkhoda 132 kV Kharkhoda 3B1002*

78 Sisana 132 kV Kharkhoda 3B1003*

79 Firozpur Bangar 132 kV Kharkhoda 3B1004*

80 Kari Dharni and Baralu 132 kV Dighawan Jattan

81 Kakroli sardara 132 kV Badhra 1A1012*

Cancellation of already approved installation of additional 1x10/16 MVA 132/11 kV and 1x8 MVA 132/33 kV transformers at 132 kV substation Kharkhoda vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.3.2006 and to delete these works from the list of works of HVPN for the year 2007-08.

Augmentation of 132 kV substation Kharkhoda with installation of additional 1x20/25 MVA 132/33 kV transformer.

To allow UHBVN to feed proposed new 33 kV substations Sisana (8 MVA), Kharkhoda (8 MVA) and Firozpur Bangar (8 MVA) from 132 kV substation Kharkhoda subject to above augmentation of 132 kV Kharkhoda.

Creation of three Nos. 33 kV bays at 132 kV substation Kharkhoda to accommodate the line feeding 33 kV substation Kharkhoda, Sisana and Firozpur Bangar.

Allow DHBVN to feed new 33 kV substations Kari Dharni and Baralu with installed capacity of 10MVA 33/11 kV transformer each from 132 kV Dighawan Jattan matching with the augmentation of 132 kV Dighawan Jattan by providing additional 1x20/25 MVA 132/33 kV T/F

Creation of two nos. 33 kV bay at 132 kV substation Dighawan Jattan to feed 33 kV substations Kari Dharni and Baralu matching with the augmentation of 132 kV Dighawan Jattan by providing additional 1x20/25 MVA 132/33 kV T/F

3B1010* &

3B1011*

Augmentation of 132 kV substation Badhra from 1x10/16 MVA 132/33 kV to 1x20/25 MVA 132/33 kV transformer matching with the shifting of enough load of 132 kV substation Behal/ Miran/ Jui/ Tosham from 220 kV substation Bhiwani to upcoming 220 kV substation Isharwal.

Page 127: 14_List of Works

ANNEXURE-1

document.xls Page 127 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

3B1013*

82 Kagdana 132 kV Begu

83 Jalalpur 132 kV Chajjpur 1A1014*

3B1015*

Allow DHBVN to feed new 33 kV substation Kakroli Sardara with installed capacity of 2x5 MVA 33/11 kV transformer from 132 kV Badhra matching with the augmentation of 132 kV substation Badhra

Creation of one number 33 kV bay at 132 kV substation Badhra to feed 33 kV substation Kakroli Sardara matching with the augmentation of 132 kV substation Badhra

Allow DHBVN to feed new 33 kV substation Kagdana with installed capacity of 10 MVA 33/11 kV transformer from 132 kV Shahpur Begu, by extending the existing 33 kV line from 132 kV substation Begu to 33 kV substation Nathusari upto proposed 33 kV substation Kagdana.

Augmentation of 132 kV substation Chhajpur by providing 1x20/25 MVA 132/33 kV transformer in place of existing 1x12.5 MVA 132/33 kV transformer matching with the creation of 220 kV substation Chhajpur and shifting of feeding source of 132 kV substation Chhajpur from 220 kV substation PTPS Panipat to 220 kV substation Chhajpur

Allow UHBVN for feeding the 33 kV substation Jalalpur (10 MVA) from 132 kV substation Chhajpur matching with the augmentation of 132 kV substation Chhajpur

Creation of 1 Nos. 33 kV bays at 132 kV substation Chhajpur to accommodate the lines feeding the 33 kV substation Jalalpur matching with the augmentation of 132 kV substation Chhajpur

Page 128: 14_List of Works

ANNEXURE-1

document.xls Page 128 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

84 Dadlana 132 kV Munak 1A1018*

3B1019*

85 Bagthala 132 kV Lukhi 3B1020*

86 Lukhi 132 kV Lukhi 3B1021*

87 Sirsla 132 kV Adhaun

Augmentation of 10/16 MVA 132/33 kV transformer at 132 kV substation Munak to 20/25 MVA 132/33 kV transformer thereby raising the existing capacity of the substation from 10/16 MVA 132/11 kV + (10/16 + 20/25) MVA 132/33 kV to 10/16 MVA 132/11 kV + 2x20/25 MVA 132/33 kV transformers to enable both 20/25 MVA 132/33 kV transformers run in parallel and share the load equally.

To allow UHBVNL to create 33 kV substation Dadlana with 1x8 MVA 33/11 kV transformer with feeding from 132 kV substation Munak through approximately 7.5 km 33 kV line from Munak to Dadlana.

Erection of one no. new 33 kV bay at 132 kV substation Munak for the above proposed 33 kV substation Dadlana

To allow UHBVN to feed 33 kV new substation Bagthala with installed capacity of 1x8 MVA, 33/11 kV transformer from 132 kV substation Lukhi matching with the commissioning to 132 kV substation Lukhi.

To allow UHBVN to feed 33 kV existing substation Lukhi with installed capacity of 2x8 MVA, 33/11 kV transformer from 132 kV substation Lukhi matching with the commissioning to 132 kV substation Lukhi

Creation of 2 nos. 33 kV bays at 132 kV substation Lukhi to feed the new 33 kV substation Bagthala and existing 33 kV substation Lukhi.

To allow UHBVN to feed 33 kV new substation Sisrla with installed capacity of 2x8 MVA, 33/11 kV transformer from 132 kV substation Adhon matching with the commissioning to 132 kV substation Adhon.

To allow UHBVN to feed 33 kV existing substation Jhansa Road Kurukshetra with installed capacity of 1x8 MVA, 33/11 kV transformer from 132 kV substation Adhon matching with the commissioning to 132 kV substation Adhon

Page 129: 14_List of Works

ANNEXURE-1

document.xls Page 129 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

3B1022*

88 Kuttabad

3B1027*

89 Hassan & Bhera 132 kV Miran 3B1032*

90 Dhani Batota 132 kV Seka

Creation of 1 No. 33 kV bay at 132 kV substation Adhon to feed the new 33 kV substation Sisrla

132 kV Ellenabad (Meethi Surera)

To allow DHBVNL to create 33 kV substation Kuttabad with 1x6.3/8 MVA 33/11 kV transformer with feeding from 132 kV substation Ellenabad (Meethi Surera) through approx. 5 km 33 kV line from Ellenabad to Kuttabad subject to installation of 132/33 kV transformer at 132 kV substation Ellenabad (Meethi Surera) already approved (reference this office memo No. R. No. 196 Ch. 42/ 407/K-100 dated 27.08.2002).

Creation of 33 kV bay at 132 kV substation Ellenabad (Meethi Surera) to feed proposed 33 kV substation Kuttabad

Concurring proposal for creation of new 33 kV substation Hassan (2x6.3/8 MVA) with approximately 12 km 33 kV Miran - Hassan line by DHBVN.

Concurring proposal for creation of new 33 kV substation Bhera (1x6.3/8 MVA) by erecting 7.5 km T-off line from existing 33 kV Miran - Isharwal line with feeding from 132 kV substation Miran opening from Isharwal side by DHBVN.

Concurring proposal for augmentation of 33 kV substation Siwani from 5+6.3 MVA to 6.3/8+6.3 MVA 33/11 kV by DHBVN.

Creation of one No. 33 kV bay at 132 kV substation Miran for 33 kV Miran - Hassa line proposed.Concurrence of proposal for creation of new 33 kV substation Dholera (1x10 MVA) with feeding from 220 kV substation Narnaul by making T-off from existing Narnaul-Dhani Batota 33 kV line after shifting of 33 kV substation Dhani Batota (5x10 MVA) load from 220 kV substation Narnaul to 132 kV substation Seka by DHBVN.

Page 130: 14_List of Works

ANNEXURE-1

document.xls Page 130 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

3B1033*

91

92 Umed Garh (Sonepat) 132 kV Bega

3B1040*

93 Jagdishpura 132 kV Nautch

3B1042*

94 132 kV Khurana

Construction of additional 33 kV bay at already approved 132 kV substation Seka for feeding load of 33 kV substation Dhani Batota.

Existing 33 kV IDC, Existing Jhajjar Road and Proposed 33 kV Grain Market Rohtak

132 kV Hisar Road Rohtak (3 No. Bays)

To feed existing 33 kV substations IDC (18 MVA), existing 33 kV substation Jhajjar Road (18 MVA) and proposed 33 kV substation New Grain Market Rohtak (10 MVA) as proposed by UHBVN.

Concurrence of proposal for creation of new 33 kV substation Umedgarh (1x8 MVA) with feeding through approx. 12 km new 33 kV line from proposed 132 kV substation Bega to 33 kV substation Umedgarh matching with creation of 132 kV substation Bega with installed capacity of 1x20/25 MVA 132/33 kV transformer.

Creation of 1 No. 33 kV bay at 132 kV substation Bega to accommodate the lines feeding the 33 kV substation Umedgarh.

Concurrence to create new 33 kV substation Jagdishpura (10 MVA) with approxomately 13 km 33 kV line from 132 kV substation Nautch matching with the augmentation of 132 kV substation Nautch with 2nd 20/25 MVA 132/33 kV T/F

Creation of 1 No. 33 kV bay at 132 kV substation Nautch to accommodate 33 kV feeding line for 33 kV substation Jagdishpura.

Existing 33 kV Siwan Gate Kaithal and Kwartan

Creation of 2 No 33 kV bays at 132 kV substation Khurana to accommodate 33 kV lines for feeding existing 33 kV substations Siwan Gate Kaithal and Kwartan.

3B1044* &

3B1045*

Concurrence to create 33 kV substation by UHBVNL at village Kathwar with 1x10 MVA 33/11 kV transformer by erecting 8 km new 33 kV line from 132 kV substation Khurana to proposed 33 kV substation Kathwar

Page 131: 14_List of Works

ANNEXURE-1

document.xls Page 131 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

95 Existing 33 kV Sirla and Mithi 132 kV Kairu

96 Jhansa Road Kurukshetra 132 kV Adhon

3B1050*

97 Rajpur (Sonepat) 132 kV Murthal

3B1051*

98 132 kV Madhosinghana

To utilise one 33 kV bay at 132 kV substation Khurana out of two 33 kV bays already approved to accommodate 33 kV lines for feeding existing 33 kV substations Sewan Gate Kaithal and Kawartan for the proposed 33 kV substation Kathwar.

To allow UHBVN to augment 33 kV substation Jhansa Road, Kurukshetra from 1x6.3/8 MVA to 1x6.3/8 + 1 x10 MVA, 33/11 kV transformers and connect it with 132 kV substation Adhon by erecting approx. 9 Km new 33 kV line from 132 kV substation Adhon to the site of existing 33 kV substation Jhansa Road Kurukshetra, matching with creation of 132 kV substation Adhon with installed capacity of 2x20/25 MVA , 132/33 kV transformer.

Creation of 1 No. new 33 kV bay at 132 kV substation Adhon to feed existing 33 kV substation Jhansa Road Kurukshetra.

Allow UHBVN to create new 33 kV substation Rajpur with 10 MVA 33/11 kV with approximately 10 km 33 kV line from 132 kV substation Murthal matching with the commissioning of additional 20/25 MVA 132/33 kV transformer at 132 kV substation Murthal

Creation of 1 No. 33 kV bay at 132 kV substation Murthal to accommodate 33 kV feeding line for 33 kV substation Rajpur

33 kV Sahidanwali & Titukhera/Dhani kahan singh.

Allow DHBVN to shift 2 nos. 33 kV substations Sahidanwali (8MVA) & Titukhera/ Dhani kahan singh (8 MVA ) from 220 kV substation Sirsa to 132 kV substation MadhoSinghana through above mentioned 132/33 kV transformer.

Page 132: 14_List of Works

ANNEXURE-1

document.xls Page 132 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

99

100 132 kV Mundia Khera

101

Creation of one no. 33 kV bay at 132 kV substation Madhosinghana to accommodate the 33 kV line feeding 33 kV substations Sahidanwali & Titukhera/Dhani kahan singh.

Allow DHBVN to create new 33 kV substation Ahmadpur Road Sirsa (8MVA) with feeding from 220 kV substation Sirsa by utilizing idle 33 kV Sirsa-Ram Nagaria line and 33 kV bay at 220 kV substation Sirsa

Existing Dhanoda and proposed Lochab

132 kV Dablain (2 No. bays)

Creation of two numbers 33 kV bays at proposed 132 kV substation Dablain to feed existing 33 kV substation Dhanoda (9 MVA) and the already approved 33 kV substation Lochab (8 MVA) from it.

3B1080* &

3B1081*

220 kV Sector-72 Gurgaon

Provision of 10 no. 33 kV bays at 220 kV substation sector-72 Gurgaon to enable DHBVNL to take out 10 no. 33 kV outgoing feeders to meet ultimate load requirement in surrounding area.

Existing 33 kV Nangal Sirohi line and other for 33 kV line for connecting 5 No. NB PHs

Construction of 2 No. 33 kV bays at 132 kV substation Mundia Khera one of the existing 33 kV Nangal Sirohi line and other for 33 kV line for connecting 5 No. NB PHs (by providing approximately 2.5 km 33 kV link line by DHBVNL)

3B1095* &

3B1096*

existing 33 kV substation Panjuana and proposed 33 kV substation Bansudhar & for future expansion

132 kV Khairekan (3 No. bays)

To allow DHBVN to connect existing 33 kV substation Panjuana (22.3 MVA) with approximately 3 km 33 kV line from proposed 132 kV substation Khairekan to Panjuana and proposed 33 kV substation Bansudhar (10 MVA) with approximately 5 km 33 kV line from proposed 132 kV substation Khairekan to Bansudhar.

3B1111* 3B1112* 3B1113*

Page 133: 14_List of Works

ANNEXURE-1

document.xls Page 133 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

102

103 220 kV Mohana

104 220 kV Chormar

Provision of 5 No. 33 kV bays at 220 kV substation Chormar.

105 132 kV Dhudhianwali

106 132 kV Kurangawali

107

220 kV Kheri Kanker (Nuh)

Provision of 10 No. 33 kV bays at 220 kV substation Kheri Kanker (Nuh) to enable DHBVNL to take out 10 Nos 33 kV outgoing feeders to meet their ultimate load requirement in surrounding area.

Provision of 10 No. 33 kV bays at 220 kV substation Mohana. However initially only 6 No. 33 kV bays will be constructed.

To allow DHBVN to connect proposed 33 kV S/Stn. Pipli (1x10 MVA) with approx. 9 Kms new 33 kV line from Chormar to Pipli & proposed 33 kV S/S Khokhar (1x10 MVA) with approx. 16 kms new 33 kV line from Chormar to Khokhar

Existing 33 kV S/S Keharwala, proposed 33 kV S/S Mohmadpura

With 3 nos. 33 kV bays, one for connecting existing 33 kV S/S Keharwala, second for connecting the proposed 33 kV S/S Mohmadpura and the third for future expansion. To allow DHBVN to connect existing 33 kV S/S Keharwala with approx. 7 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Keharwala and proposed 33 kV S/S Mohamadpura with approx. 11.5 Km new 33 kV line from proposed 132 kV S/S Dhudhianwali to Mohamadpura

existing 33 kV S/S Kalanwali and existing 33 kV S/S Rori

To allow DHBVN to connect existing 33 kV S/S Kalanwali with approx. 2 km new 33 kV line from proposed 132 kV S/S Kurangawali to Kalanwali and existing 33 kV S/S Rori with approx. 2 Km new 33 kV line from proposed 132 kV S/S Kurangawali to Rori

220 kV Rangala Rajpur (Firozpurzirka)

To make provision of 10 no. 33 kV bays including 4 no. spare bays at 220 kV substation Rangala Rajpur (Firojpur Zirka).

Page 134: 14_List of Works

ANNEXURE-1

document.xls Page 134 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

108 400 kV Nawada

109

110 Kathura (Augmentation)

111 Madina (Augmentation)

112 Mandi Sadran

113 Panihari.

To make provision of 10 no. 33 kV bays including 4 no. spare bays at 400 kV substation Nawada for feeding proposed 33 kV substations at Sector75-76, Sector 77, Sector 79-80

Police Line Rohtak {unmanned substation}

Allow UHBVN to feed new 33 kV unmanned substation Police Line Rohtak with installed capacity 1x8 MVA 33/11 kV transformer from 132kV substation Khokharakot Rohtak by T-off of existing 33 kV line.

Allow UHBVN to augment existing 33 kV substation Kathura, Madina and Balout from 2x4 MVA to 4+6.3 MVA 33/11 kV, 1x6.3 MVA to 4+6.3 MVA 33/11 kV and 1x5 MVA to 2x5 MVA 33/11 kV transformers.

The work will be carried out matching with the commissioning of new 132 kV substations Jassia and Sec-3 Rohtak and shifting of load of 33 kV substations Bhalout (10 MVA) and Kansala (8 MVA) to 132 kV substation sec-3 Rohtak and 14.3 MVA load of 33 kV subs

To allow UHBVNL to create 33 kV substation Mandi Sardana to be fed from 132 kV substation Sewan by T-off of idle 33 kV Sewan-Kangthali line matching with creation of new 132 kV substation Kheri Gulam Ali and shifting of complete load of 33 kV substation Kheri Gulam Ali to 132 kV substation Kheri Gulam Ali.

Allow DHBVN to create new 33 kV substation Panihari with installed capacity of 1x6.3/8 MVA 33/11 kV transformer by erecting 6.54 km 33 kV line by making T-off from the existing 33 kV Farwain – Darbi line subject to shifting of load of 33 kV substation Darbi (5+4 MVA) and 33 kV substation Rasulpur Theri (6.3/8MVA) on 10/16 MVA,132/33 kV transformer under commissioning at 132 kV substation Sikanderpur by erecting about 3.7 Km 33 kV line from 33 kV substation Rasulpur Theri to 33 KV substation Darbi i.e.after realignment of 33 kV loads on 220 kV substation Sirsa and 132 kV substation Sikanderpur.

Page 135: 14_List of Works

ANNEXURE-1

document.xls Page 135 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

114 M/s China Light Power 132 kV Bahu 3B1300*

The cost of dismantlement after the disconnection by M/s China Light Power.

115 Siwan Gate Kaithal

Creation of one 33 kV bay at 132 kV substation Bahu to feed construction power to M/s China Light Power at 33 kV level (Load 6 MVA). HPGCL to intimate before execution of work, keeping in view the provisions of PPA, whether the cost of following works is recoverable from M/s China Light Power or UHBVNL or DHBVNL.

To share the proportionate cost of augmentation of 132 kV Bahu substation with 1x10/16 MVA 132/33 kV transformer with M/s APCPL in the ratio of sanctioned contract demands.

Creation of 33 kV bay at 132 kV substation Bahu to feed construction power to M/s China Light Power at 33 kV level (load 6 MVA).

UHBVNL/ DHBVNL to explore the possibility of utility of creating one 33 kV bay at 132 kV substation Bahu after the utilisation of temporary connection to M/s China Light Power.

To allow UHBVNL to augment 33 kV substation Siwan Gate Kaithal from 4+6.3/8 MVA to 2x6.3/8 MVA 33/11 kV with 33 kV feeding from existing 132 kV substation Kaithal temporarily till the commissioning of already approved 132 kV substation Khurana . The feeding of 33 kV substation Sewan Gate Kaithal shall be shifted from 132 kV substation Kaithal to 132 kV substation Khurana after commissioning of 132 kV substation Khurana.

To allow UHBVNL to augment 33 kV substation Pehowa Chowk Kaithal from 2x6.3 MVA to 6.3+10 MVA 33/11 kV with 33 kV feeding from existing 132 kV substation Kaithal.

Page 136: 14_List of Works

ANNEXURE-1

document.xls Page 136 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

116

117

3B1196*

To allow UHBVNL to change already approved feeding of 33 kV substation Manas (8 MVA) from 132 kV substation Kaithal to 132 kV substation Padla temporarily through already existing 33 kV line from 132 kV substation Kaithal to 132 kV substation Padla. The 33 kV feeding of 33 kV substation Manas (8 MVA) shall be shifted back from 132 kV substation Padla to 132 kV substation Kaithal, after shifting back the feeding of 33 kV substation Sewan Gate Kaithal from 132 kV substation Kaithal to 132 kV substation Khurana as per S. no. 1 above.

To allow UHBVNL to feed the already proposed 33 kV substation Sirta (10 MVA) temporarily from 132 kV substation Kheri Gulam Ali till such time the feeding of 33 kV substation Manas (8 MVA) is shifted back on 132 kV substation Kaithal as per S.No. 3 above. The feeding of 33 kV substation Sirta (10 MVA) shall be shifted back on already approved 132 kV substation Padla.

To allow DHBVNL to feed already approved loads of 33 kV substations Keharwala (9 MVA with proposed augmentation to 15.3 MVA), Mohamadpuria (8 MVA), Mastangarh (10 MVA) and Haripura (10 MVA) from 132 kV substation Jiwan Nagar and feed 33 kV loads of existing Ellenabad (18.3 MVA), proposed Kuttabad (8 MVA), Bhuratwala (9 MVA likely to be augmented to 15 MVA) and newly identified 33 kV Dholpalia (10 MVA) from 132 kV substation Ellenabad.

To allow UHBVNL to augment 33 kV substation Rahra from 1x6.3/8 MVA to 2x6.3/8 MVA 33/11 kV with shifting of its 33 kV feeding from the present 132 kV substation Pai to 132 kV substation Assandh by erecting approx. 11 km new 33 kV line from 132 kV substation Assandh to 33 kV substation Rahra and shifting of 33 kV load of 33 kV substation Alewa (16 MVA) from 132 kV substation Assandh to 132 kV substation Alewa after its commissioning.

Creation of new 33 kV bay at 132 kV substation Assandh for feeding existing 33 kV substation Rahra.

Page 137: 14_List of Works

ANNEXURE-1

document.xls Page 137 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

118

119

To allow UHBVNL to create new 33 kV substation Sisla Sismore (8 MVA) with feeding from 132 kV substation Pali by erecting approximately 7 km new 33 kV line from 132 kV substation Pai to the proposed 33 kV substation Sisla Sismore, subject to commissioning of 132 kV substation Rajound and shifting of load of 33 kV substation Rajound (14.3 MVA) from the present 132 kV substation Pai to 132 kV substation Rajound.

The 33 kV bay at 132 kV substation Pai for 33 kV substation Rahra will now be used for feeding proposed 33 kV substation Sisla Sismore.

To concur UHBVN proposal for augmentation of existing 33 kV substation Bupania from (4+6.3) to (6.3+10) MVA 33/11 kV transformers along with erection of independent 33 kV line (7.5 km approximately) with 130 mm2 ACSR conductor from 132 kV substation Bahadurgarh to 33 kV substation Bupania. The augmentation is subject to shifting of 33 kV load of 33 kV substation MIE Bahadurgarh from 132 kV substation Bahadurgarh to 132 kV substation MIE Bahadurgarh. The existing 33 kV bay at 132 kV substation Bahadurgarh feeding 33 kV substation MIE Bahadurgarh can later on be used for feeding 33 kV substation Bupania after erection of new 33 kV line.

To concur creation of new 33 kV substation at village Khanda near Sonepat with 1x10 MVA 33/11 kV transformer to be fed from 220 kV substation Mohana along with erection of 15 km new 33 kV line with 130 mm2 ACSR from 220 kV substation Mohana to proposed 33 kV substation at village Khanda. The proposal is subject to commissioning of 1x100 MVA 220/33 kV transformer at 220 kV substation Mohana.

Page 138: 14_List of Works

ANNEXURE-1

document.xls Page 138 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

120

121

122

123

To allow UHBVN to create new 33 kV substation at Old Power House Colony Rohtak with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation MDU Rohtak along with erecting connected line by Tee-off from existing 33 kV MDU Rohtak – Jhajjar Road Rohtak line. The concurrence of HVPNL is subject commissioning of 132 kV substation Hisar Road Rohtak and consequent shifting of 18 MVA load of 33 kV substation Jhajjar Road, Rohtak from 132 kV substation MDU Rohtak to 132 kV substation Hisar Road Rohtak.

To allow UHBVN to create new 33 kV substation at officer’s colony Delhi Road Rohtak with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation MDU Rohtak with erection of connected 33 kV line from 132 kV substation MDU Rohtak. The concurrence of HVPNL is subject commissioning of 132 kV substation Hisar Road Rohtak and consequent shifting of 18 MVA load of 33 kV substation Jhajjar Road, Rohtak from 132 kV substation MDU Rohtak to 132 kV substation Hisar Road Rohtak.

To allow UHBVNL to connect 33 kV substations Rampur Kamboj (10 MVA), Malikpur Banger (10 MVA), Dhimo ( 10 MVA), Ledi (10 MVA), HSIDC Complex Manakpur (10 MVA), Taharpur (10 MVA) and shifting of 33 kV substation Bhudkalan (13 MVA) from 66 kV substation Chhachharauli to 220 kV substation Malikpur Banger.

Allow DHBVNL to connect 33 kV substation Nangal Pathani (10 MVA) from already approved 220 kV substation Lula Ahir after its commissioning. DHBVNL is advised to match execution of 33 kV substation in such a way that both substations are commissioned simultaneously. The tentative date of commissioning of proposed 220 kV substation Lula Ahir is March 2010.

Allow DHBVNL to connect 33 kV substation Bajaar (10 MVA) from 132 kV substation Ateli.

Page 139: 14_List of Works

ANNEXURE-1

document.xls Page 139 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

124

Kalayat from 2x8 MVA to 2x10 MVA 33/11 kV transformers.Rahra from 1x8 MVA to 1x10 MVA 33/11 kV transformer.Naraina from 2x8 MVA to 2x10 MVA 33/11 kV transformers.Sector-1 Rohtak from 2x8 MVA to 2x10 MVA 33/11 kV transformers.Siwan Gate Kaithal from 1x8 MVA to 1x10 MVA 33/11 kV transformers.Dadlana from 1x8 MVA to 1x10 MVA 33/11 kV transformers.Umedgarh from 1x8 MVA to 1x10 MVA 33/11 kV transformers.Sisla Sismore from 1x8 MVA to 1x10 MVA 33/11 kV transformers.

125

126

To regularize the connectivity of 33 kV substation Ahrod from 132 kV substation Barauli instead of 132 kV substation Ateli already approved vide this office memo No. R-374/Ch-86/407/K-39 dated 30.11.2006.

Installation of 10 MVA instead of 8 MVA 33/11 kV power transformers at following 33 kV substatons

To allow UHBVN to augment 33 kV substation KUK from 2x6.3 MVA to 2x10 MVA, 33/11 kV transformer with 33 kV feeding from 132 kV substation Bhore, subject to shifting of load of 33 kV substation Lukhi (16 MVA) from 132 kV substation Bhore to 132 kV substation Lukhi and already approved shifting of 18 MVA load of 33 kV substation Jhansa Road Kurukshetra (after augmentation from 1x6.3/8 MVA to 6.3/8+10 MVA) from 132 kV substation Bhore to 132 kV substation Adhon.

To allow UHBVNLto augment 33 kV substation Naraina from 2x5 MVA to 2x8 MVA 33/11 kV capacity matching with the creation of 132 kV substation Beholi and shifting of 33 kV load of Beholi and Dikadla from 132 kV substation Samalkha to 132 kV substation Beholi as per approval conveyed vide R. No. 438 / Ch-30 / HSS-318 dated 08.10.2007.

Page 140: 14_List of Works

ANNEXURE-1

document.xls Page 140 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

127

128

3B1286*

129

130

To allow DHBVN to feed 33 kV substations: Nangla and Pohkarwas from 132 kV substation Jui matching with the commissioning of additional 1x20/25 MVA 132/33 kV transformer at 132 kV substation Jui. 2) Gopalwas and mandoli Khurd (in place of already approved 33 kV substations Jhumpa and Pataudi) from 220 kV substation Isherwal.

33 kV substation Harnola/ Budha Khera.

132 kV substation Kheri Gilam Ali

To allow UHBVNL to feed new/ proposed 33 kV substations from 132 kV substation Kheri Gulam Ali including substations already approved/ under consideration viz: Kher Gulam Ali (Existing 14.3 MVA), Serta (Temporarily 10 MVA), LanderKeema (Proposed 20 MVA), Budha Khera (Proposed 10 MVA), Harnola (Proposed 10 MVA), To install both 20/25 MVA 132/33 kV transformers at 132 kV substation Kheri Gulam Ali.

To create new necessary 33 kV bay(s) at 132 kV substation Kheri Gilam Ali to accommodate feeding line for 33 kV substation Harnola/ Budha Khera.

To allow UHBVNL to feed proposed 33 kV substations Kutubpur (10 MVA) and Chandana (10 MVA) from 220 kV substation Kaithal (Titram) matching with commissioning of additional 20/25 MVA 132/33 kV transformer. To request UHBVNL to take out 33 kV feeders through under ground cable in view of space constraints for right of way.

To allow UHBVNLto augment 33 kV substation Mastgarh from 2x6.3 MVA to (1x6.3+10) MVA 33/11 kV capacity to be fed from 132 kV substation Cheeka

To allow UHBVNLto augment 33 kV substation Pindara from 5+8 MVA to 2x10 MVA 33/11 kV capacity to be fed from 132 kV substation Jind (N)

Page 141: 14_List of Works

ANNEXURE-1

document.xls Page 141 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

131

132

133

134 3B1316*

135

136

To allow DHBVNL to connect proposed 33 kV substations Budana (10 MVA) and Thurana (10 MVA) with 132 kV substation Narnaund matching with commissioning of already approved 1x20/25 MVA 132/33 kV transformer and shifting of 132 kV feeding of 132 kV substation Narnaund from 220 kV substation Jind to proposed 220 kV substation Masudpur (Hansi).

33 kV substations Budhana and Thurana

132 kV substation Narnaund

To create two numbers new 33 kV bays at 132 kV substation Narnaund to accommodate feeding line for new 33 kV substations Budhana and Thurana

3B1314*, 3B1315*

To concur creation of 33 kV substation by UHBVNL at BPS Mahila Vishwavidyalya Khanpur Kalan with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from approved 132 kV substation Mundlana.

To concur erection of 10 km new 33 kV line with 130 mm2 ACSR conductor from 132 kV substation Mundlana to the site of proposed 33 kV substation at BPS Mahila Vishwavidyalya Khanpur Kalan

33 kV substation at BPS Mahila Vishwavidyalya Khanpur Kalan

32 kV substation Mundlana

Erection of 33 kV bay by HVPNL at 132 kV substation Mundlana for feeding 33 kV substation at BPS Mahila Vishwavidyalya Khanpur Kalan

To allow UHBVNL to feed proposed 33 kV substation Badana (proposed 10 MVA) and existing 33 kV substation Chattar (Second connectivity) from proposed 132 kV substation Ghoghrian. Provision for future connectivity to other 33 kV.

To concur for creation of 33 kV substation at village Dondal by DHBVNL with installed capacity of 1x5 MVA 33/11 kV transformer to be fed from proposed 220 kV substation Rangla Rajpur (Forozpur Zhirka)

To concur erection of approximately 17.2 km 33 kV line by DHBVNL from proposed 220 kV substation Rangla Rajpur (Firozpur Zhirka) to proposed 33 kV substation Dondal.

Page 142: 14_List of Works

ANNEXURE-1

document.xls Page 142 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

137

138 3B1194*

139

To concur for creation of 33 kV substation at village Dakia by DHBVNL with installed capacity of 1x10 MVA 33/11 kV transformer to be fed from proposed 220 kV substation Mau (Dharuhera).

To allow DHBVN to connect proposed 33 kV substations Chando Khurd (10 MVA) and Nanheri (10 MVA) matching with the augmentation of 132 kV substation Teliwara.

Erection of 6 no. 33 kV bays at 220 kV substation Mau with total provision of 10 no. 33 kV bays to provide supply to upcoming 33 kV substations of DHBVNL in nearby area.

To make provision of 10 nos 33 kV bays (including 4 no. spare bays) at 132 kV substation Gangaicha Jat to supply power to existing 33 kV substations Palhawas & Jatusana and proposed 33 kV substations Guruwara, Kaluwas & Kakoria and others to be created by DHBVNL in future.

To concur for providing additional power transformer of 10 MVA 33/11 kV at 33 kV substation Jonawas by DHBVNL subject to the following conditions:

i) Augmentation of 50 MVA 220/132 kV transformer to 100 MVA 220/132 kV transformer at 220 kV substation Rewari.Commissioning of new 132 kV substation Gangaicha Jat thereby shifting of load of 3 no. 33 kV substations namely Pallawas, Jatusana & Kaluwas from 220 kV substation Rewari to 132 kV substation Gangaicha Jat.

Commissioning of 3rd 20/25 MVA 132/33 kV power transformer at 220 kV substation Rewari.

Shifting of existing 33 kV line and feeding arrangement of 33 kV substation sector-10 Rewari from 33 kV Jonawas line to independent 33 kV line from 220 kV substation Rewari as proposed by DHBVN.

Page 143: 14_List of Works

ANNEXURE-1

document.xls Page 143 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

140 3B1391*

141

To construct one no. 33 kV bay at 132 kV substation Tosham 3B1392*

142

143

Augmentation of existing conductor of 33 kV Jonawas line with required size of conductor as proposed by DHBVNL.

Construction of 33 kV bay at proposed 132 kV substation Khanak to feed proposed 33 kV substation Jamalpur (10 MVA)

To allow DHBVNL to connect proposed 33 kV substation Jamalpur (10 MVA) with proposed 132 kV substation Khanak.

Advising DHBVNL to create new 33 kV substation Jamalpur matching their completion with commissioning of proposed 132 kV substation Khanak as well as proposed 220 kV substation Sanwan.

To allow DHBVNL to create new 33 kV substation Aalampur (10 MVA) with feeding from 132 kV substation Tosham matching with shifting of load of 33 kV substation Khanak on already approved 132 kV substation Khanak.

33 kV substation Aalampur (10 MVA)

132 kV substation Tosham

To allow DHBVNL to connect proposed 33 kV substation Jamalpur Shekhon (10 MVA) with 132 kV substation Tohana matching with shifting of load of 33 kV substation Jakhal (15.3 MVA) to 132 kV substation Jakhal.

Advising DHBVNL to create new 33 kV substation Jamalpur Shekhon matching their completion with commissioning of 132 kV substation Jakhal and shifting load of 33 kV substation Jakhal to 132 kV substation Jakhal.

To allow DHBVNL to connect proposed 33 kV substation Dhabi Kalan (5 MVA) with 132 kV substation Fatehabad subject to load management by DHBVNL.

Page 144: 14_List of Works

ANNEXURE-1

document.xls Page 144 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

144 132 kV substation Atela Kalan

145 3B1404*

146

147

148

Formal approval to already connected 33 kV substation Hazarwan Kalan (10 MVA) by DHBVNL with 132 kV substation Fatehabad subject to load management by DHBVNL.

33 kV substations Pichhopa Kalan (5 MVA) and Chhappar (10 MVA)

Creation of two nos. 33 kV bays at 132 kV substation Atela Kalan to connect 33 kV substations Pichhopa Kalan (5 MVA) and Chhappar (10 MVA).

3B1402*

3B1403*

Formal approval to already connected 33 kV substations Pichhopa Kalan (5 MVA) and Chhappar (10 MVA) by DHBVNL with 132 kV substation Atela Lakan subject to load management by DHBVNL.

33 kV substation Nadhori (10 MVA)

132 kV substation Bhutan Kalan

Construction of 33 kV bay at under construction 132 kV substation Bhutan Kalan to feed proposed 33 kV substation Nadhori (10 MVA).

To allow DHBVNL to connect proposed 33 kV substation Nadhori (10 MVA) with under construction 132 kV substation Bhutan Kalan

Advising DHBVNL to create new 33 kV substation Nadhori matching their completion with commissioning of 132 kV substation Bhutan Kalan.

Allow UHBVNL to augment 33 kV substation Dacher from 5+8 MVA to 10+8 MVA 33/11 kV transformers from 220 kV substation Nissing matching with the shifting of load of 33 kV substation Habri to under construction 132 kV substation Habri

To allow DHBVNL to feed proposed 33 kV substation Chamar Khera (10 MVA) from 132 kV substation Uklana. Advising DHBVNL to create new 33 kV substation Chamar Khera matching its completion with commissioning of 132 kV substation Bhuthan Kalan and shifting load of 33 kV substation Bhuna to 132 kV substation Bhuthan Kalan.

To concur creation of 33 kV substation by UHBVNL at village Chhadia with installed capacity of 2x8 MVA 33/11 kV transformer to be fed from 132 kV substation Samalkha.

Page 145: 14_List of Works

ANNEXURE-1

document.xls Page 145 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

149 3B1414*

150

151

To concur erection of about 9.5 km new 33 kV line with 130 mm2 ACSR conductor by UHBVNL from 132 kV substation Samalkha to the site of proposed 33 kV substation Chhadia.

The creation of 33 kV substation at village Chhadia is subject to shifting of 33 kV load of 33 kV substation Beholi (16.6 MVA) and 33 kV substation Dikadla (17.6 MVA) from 132 kV substation Samalkha to proposed 132 kV substation Beholi after the same is commissioned by HVPNL.The 33 kV bay to be spared after shifting the load of 33 kV Dikadla/ Beholi from 132 kV Samalkha to 132 kV substation Beholi may be used for feeding new 33 kV substation at village Chhadia.

33 kV substation Balbera (20 MVA)

132 kV substation Bhagal

Creation of one 33 kV bay at 132 kV substation Bhagal to accommodate 33 kV line for proposed 33 kV substation Balbera (20 MVA)

To concur for augmentation of 33 kV substation Bapoli from (1x6/8+1x5) MVA to (1x6.3/8+1x10) MVA 33/11 kV transformers and continue to be fed from 132 kV substation Chhajpur.

To concur for augmentation of 7.4 km existing 33 kV feeding line from 132 kV substation Chajjpur to 33 kV substation Bapoli from 0.1 Sq" to 130 mm2 ACSR.

The above work are subject to augmentation of capacity at 132 kV substation Chajjpur from 1x12.5 MVA 132/33 kV transformer to 1x20/25 MVA 132/33 kV transformer.

To concur for augmentation of 33 kV substation Sector-1 HUDA Rohtak from 6.3+4 MVA to 6.3+10 MVA 33/11 kV transformer being fed from 132 kV substation MDU Rohtak.

To concur for erection of 1.4 km new 33 kV underground line with 3x400 mm2 cable from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak.

Page 146: 14_List of Works

ANNEXURE-1

document.xls Page 146 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

3B1415*

152 3B1416*

153

154

Creation of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak for new 33 kV underground line from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak.

The above proposal is subject to shifting the load of 33 kV substation Jhajjar Road Rohtak (18 MVA) from 132 kV substation MDU Rohtak to 132 kV substation HSIIDC Rohtak along with erection of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak mentioned at sr. no. 3 above for feeding the second 33 kV undergrpound line from 132 kV substation MDU Rohtak to 33 kV substation Model Town Rohtak.

Creation of one no. 33 kV bay by HVPNL at 132 kV substation MDU Rohtak for new 33 kV underground line from 132 substation MDU Rohtak to 33 kV substation Model Town Rohtak.

1) To concur for creation of 33 kV substation by UHBVNL at village Kheri Gujjar near Ganaur with installed capacity of 1x8 MVA 33/11 kV transformer to be fed from 132 kV substation Ganaur.

2)To concur for creation of about 6 km new 33 kV line with 130 mm2 ACSR from 132 kV substation Ganaur to the site of proposed 33 kV substation Kheri Gujjar.

3)The existing 33 kV bay at 132 kV substation Ganaur feeding 33 kV substation Bega will be utilised by UHBVNL for providing power line to proposed 33 kV substation Kheri Gujjar after the load of 33 kV substation Bega is shifted to 132 kV substation Bega.

4)The proposal is subject to creation and commissioning of 132 kV substation Bega with installed capacity of 1x20/25 MVA 132/33 kV transformer and shifting of the load of 33 kV substation Bega to 132 kV substation Bega after upgradation.

1)To concur creation of new 33 kV substation in sector2 Bahadurgarh with 1x10 MVA 33/11 kV transformer to be fed from 132 kV substation Bahadurgarh.

Page 147: 14_List of Works

ANNEXURE-1

document.xls Page 147 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

155

156 3B1429*

157 3B1428*

2)To concur erection of new 1.5 km 33 kV line with 130 mm2 ACSR from 132 kV substation Bahadurgarh to the proposed site of 33 kV substation sector-2 Bahadurgarh.

3)The 33 kV bay to be spared at 132 kV substation Bahadurgarh after shifting the load of 33 kV substations Jassore Kheri & Bamnouli from 132 kV substation Bahadurgarh to 132 kV substation Assaudha will be utilised by UHBVNL for feeding 33 kV substation sector-2 Bahadurgarh.

The above proposal is subject to shifting of 33 kV load of 33 kV substations Jassore Kheri (10.3 MVA) and Bamnouli (8 MVA) from 132 kV substation Bahadurgarh to 132 kV substation Assaudha after its commissioning by HVPNL.

To concur for augmentation of 33 kV substation Bharawas from (1x6.3+1x4) MVA 33/11 kV to (1x6.3+1x5) MVA 33/11 kV transformer to be fed from existing 220 kV substation Rewari.

The above augmentation is subject to commissioning of 3rd 20/25 MVA 132/33 kV transformer at 220 kV substation Rewari.

Construction of 33 kV bay at 132 kV substation Kurangawali to accommodate feeding line to proposed 33 kV substation Panjamala.

To allow DHBVNL to feed proposed 33 kV substation Panjamala (10 MVA) from 132 kV substation Kurangawali matching with commissioning of 132 kV substation Kurangawali.

To advise DHBVNL to create new 33 kV substation Panjamala matching with commissioning of 132 kV substation Kurangawali.

Creation of 33 kV bay at 220 kV substation Chormar to accommodate 33 kV line to proposed 33 kV substation Jandwala Jattan.

Page 148: 14_List of Works

ANNEXURE-1

document.xls Page 148 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

158

159

160 33 kV Hathira 3B1432*

161

To allow DHBVNL to feed proposed 33 kV substation Jandwala Jattan (10 MVA) from 220 kV substation Chormar matching with commissioning of 220 kV substation Chormar.

To Advise DHBVNL to create new 33 kV substation Jandwala Jattan matching with commissioning of 220 kV substation Chormar.

To allow UHBVNL to feed proposed 33 kV substation Balerkha (10 MVA) from 132 kV substation Narwana (old) matching with the shifting of the load of 33 kV substations Dhanoda (9 MVA) and Lochab (8 MVA) on commissioning of 132 kV substation Dablain.

Advising UHBVNL to create new 33 kV substation Balerkha (10 MVA) matching as per above.

To allow UHBVNL to augment 33 kV substation Pehowa from 2x6.3+1x5 MVA to 2x6.3+1x10 MVA 33/11 kV transformer matching with shifting of load of 33 kV substation Dhand from 220 kV substation Pehowa to 132 kV substation Dhand.

132 kV substation Kirmich

To allow UHBVNL to feed 33 kV substation Hathira (10 MVA) from under construction 132 kV substation Kirmich matching with the commissioning of 2nd 20/25 MVA 132/33 kV transformer at 132 kV substation Kirmich.

construction of 33 kV bay at 132 kV substation Kirmich to feed 33 kV substation Hathira

REC Scheme No.350021 (Rs. 6.03 Crore) Allow UHBVN to create 33 kV substation Sangan with installed capacity of 2x8 MVA 33/11 kV transformers with its feeding from 132 kV substation Dhanouri..

Page 149: 14_List of Works

ANNEXURE-1

document.xls Page 149 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

162

The load shall be restricted to installed capacity of the 132/33 kV transformer.

163

33 kV Khurana 132 kV Khurana 3B1442*

164

To allow DHBVNL to augment 33 kV Pump Houses MC-3, MC-4 and MC-5 from 2x3.5 MVA 33/3.3 kV to 2x3.5 MVA 33/3.3 kV + 4 MVA 33/11 kV each matching with shifting of 33 kV load of Zerpur and Barda from 132 kV substation Mohindergarh to 132 kV substation Satnali.

To allow UHBVNL to create new 33 kV substation Khurana (10 MVA) with feeding from 132 kV substation Khurana (under construction) matching with installation of 2nd 20/25 MVA 132/33 kV transformers at 132 kV substation Khurana.

Creation of one no. 33 kV bay at 132 kV substation Khurana to accommodate proposed 33 kV substation Khurana.

To cancel connectivity of 33 kV substation Kawartan from 132 kV substation Khurana. 33 kV substation Kawartan (14 MVA) being nearer to 132 kV substation Nautch will continue to be fed from 132 kV substation Nautch.

To concur for creation of new 33 kV substation at village Sargathal under operation circle Sonepat with installation of 1x10 MVA 33/11 kV transformer to be fed from approved 220 kV substation Mohana subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL..

To concur for creation of new 33 kV line (16 km) from approved 220 kV substation Mohana to the proposed site of 33 kV substation Sargathal with 130 mm2 ACSR conductor subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL.

Page 150: 14_List of Works

ANNEXURE-1

document.xls Page 150 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

33 kV Sargathal 220 kV Mohana 3B1455*

165

166

Creation of one no. 33 kV bay at 220 kV substation Mohana for feeding the load of new 33 kV substation Sargathal subject to commissioning of 1x100 MVA 220/33 kV transformer proposed at 220 kV substation Mohana by HVPNL.

To concur for augmentation of 33 kV substation Kunjiya from 1x6.3/8 MVA to 1x6.3/8 MVA + 1x10 MVA 33/11 kV transformer being fed from 132 kV substation Jhajjar subject to augmentation of conductor of 33 kV Jhajjar - Kosli line up to T-off point along with creation of new 132 kV substation Machhrauli and shifting of entire load of 33 kV substation Machhrauli from 132 kV substation Jhajjar to 132 kV substation Machhrauli. The UHBVN authorities may also consider feeding of 33 kV Kunjiya from 132 kV substation Machhrauli after its commissioning.

To concur for augmentation of conductor of 22 km 33 kV Jhajjar - Kosli line up to T-off point for 33 kV substation Kunjiya from 0.075 sq" to 130 sq mm ACSR conductor subject to augmentation of conductor of 33 kV Jhajjar - Kosli line up to T-off point along with creation of new 132 kV substation Machhrauli and shifting of entire load of 33 kV substation Machhrauli from 132 kV substation Jhajjar to 132 kV substation Machhrauli. The UHBVN authorities may also consider feeding of 33 kV Kunjiya from 132 kV substation Machhrauli after its commissioning.

To concur for augmentation of 33 kV substation old Bahadurgarh from 2x6.3 MVA to 2x10 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh.

To concur for augmentation of conductor of 5 km existing 33 kV line from 132 kV substation Bahadurgarh to old Bahadurgarh from 0.1 sq" to 130 mm2 ACSR conductor.

Page 151: 14_List of Works

ANNEXURE-1

document.xls Page 151 of 180 33 kV Bays

33 kV bays to be constructed at 132 kV substations by HVPN for feeding new/ proposed 33 kV substations to be constructed by UHBVN/ DHBVN,

Remarks CodeSr. No.

Bay required for feeding new 33 kV substation.

Name of substation, where bay is to be constructed.

i)

ii)

iii)

To concur for augmentation of 33 kV substation Surya Roshni from 6.3/8 + 7.5 MVA 33/11 kV transformer to 10+7.5 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh.

To concur for augmentation of 33 kV substation Badli from 6.3/8 MVA to 6.3/8+5 MVA 33/11 kV transformer being fed from 132 kV substation Bahadurgarh.

The above augmentation of 33 kV substation old Bahadurgarh, 33 kV substation Surya Roshni and 33 kV Badli are subject to augmentation of 132 kV substation Bahadurgarh by HVPNL from 2x20/25 MVA + 1x16/20 MVA 132/33 kV transformer to 3x20/25 MVA 132/33 kV transformer and shifting of load of 33 kV substation Jassor Kheri (10.3 MVA) and Bamnoli (8 MVA) from 132 kV substation Bahadurgarh to 132 kV substation Assaudha.

Availability of space for accommodating the above-mentioned 33 kV bays at HVPN substations will be ensured by Superintending Engineer/ Design HVPNL, Panchkula before processing the purchase of material by CE/ MM, HVPNL Panchkula.

Chief Engineer/ MM, HVPN, Panchkula will initiate the procurement of material for the above works after receiving firm completion schedule from UHBVN/ DHBVN in respect of connected 33 kV substation and 33 kV lines. Chief Engineer/ PD&C UHBVN & Chief Engineer/ PD&C DHBVN, will ensure submission of completion schedule of 33 kV substations and 33 kV lines after getting it duly approved from their respective M.D/ Director/ Projects to Chief Engineer/ MM, HVPN, Panchkula.

Chief Engineer/ PD&C UHBVN amd C.E/ P&D, DHBVN, will ensure completion/ commissioning of 33 kV substations and 33 kV lines matching with the completion/ commissioning of 33 kV bays, so as to ensure that the 33 kV bay/ Bay-material do not remain unutilized.

Page 152: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 152 of 180 Deposit works

Name of Lines Code Remarks

220 kV Works

1 1 2D0802*

2 i) 1x100 220/66 2D0928*

ii) 2D0930* The proportionate cost of work would be borne by HSIIDC.

Sr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

Note :- Deposit works of UHBVN & DHBVN to be carried out after deposit of actual cost as per WTDs' decision dated 7.3.2001 circulated vide letter No. R.No. 150/Ch.117/304/K-166/Vol.III, dated 31.3.2001.

Erection of 220 kV over head line 220 kV substation BBMB, Hisar to M/s Jindal Stainless Ltd for providing independent 220 kV feeder to the firm.

The entire work shall be carried out by M/s Jindal Stainless Ltd. at their cost subject to approval of design and other details drawing by HVPN.

The work shall be executed under the supervision of SE/ TS HVPN Hisar for ensuring and maintaining quality of work.

The supervision charge and all expenditure relating to demolishing of building and other structure in BBMB substation and their reconstruction shall be borne by M/s Jindal Stainless Ltd.

The work in the BBMB yard will be carried out by BBMB as deposit work. M/s Jindal shall deposit the necessary cost or supply the requisite material as directed by BBMB.

Augmentation of 220 kV substation Madanpur (Panchkula) by installation of additional 1x100 MVA 220/66 kV transformer as a deposit work of HSIIDC.

The proportionate cost of augmentation would be borne by HSIIDC.

Shifting of the existing 220 kV bus coupler from bay No. A-2 to A-7 (spare bay) to accommodate 3rd proposed 100 MVA 220/66 kV transformer in 220 kV bay No. A-2 at 220 kV substation Madanpur as deposit work of HSIIDC.

Page 153: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 153 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

iii) 2D0931* The proportionate cost of work would be borne by HSIIDC.

3

4

Provision of fire protection walls on both sides of all the three 100 MVA 220/66 kV transformers at 220 kV substation Madanpur as deposit work of HSIIDC.

One No. 100 MVA 220/132 kV transformer shall be diverted by HVPNL to APCPL plant site at Jhajjar. The full cost of this transformer shall be initially born by APCPL and it can be later handed over back to HVPNL at depreciated cost.

220 kV Tee-off Charkhi Dadri - Rewari line upto APCPL switch yard will be constructed by HVPNL. The entire cost of erection and dismantlement of this tee-off arrangement will be executed as a deposit work of APCPL

The 220 kV system beyond APCPL switch yard gantry toward plant shall be undertaken by APCPL. All works including civil works and erection etc. required for 220/132 kV transformer shall be under taken by APCPL. HVPNL shall provide supervision of installation and testing & commissioning.

Page 154: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 154 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

132 kV Works

1 132 kV substation Rai (HSIDC) 1x16/20 132/11 1D0692*

2 1D0693*

3 132 kV substation HSIDC Kundli 1x16/20 132/11 1N0864*

4 1L0866*

The work of creation of 132 kV substation Rai will be carried out by HSIDC while the line works will be deposit work of HSIDC to be executed by HVPN

LILO of Sonepat (220 kV) – Rai (132 kV), 132 kV S/C line at 132 kV substation Rai of HSIDC.

The terms and conditions as laid down in this office letter No. Ch. 70 / 407 / K-107 dated 04.04.2002 addressed to Superintending Engineer / Electrical, HSIDC, Gurgaon shall apply in general.

To forward estimate framed by Executive Engineer / TS Division HVPN, Panipat vide memo No. Ch.6/CW-241 dated 30.07.2005 for construction of LILO of Sonepat – Rai 132 kV S/C line to HSIDC.

Creation of 132 kV substation HSIDC Kundli with installed capacity of 1x16/20 MVA 132/11 kV transformer by HSIDC at their own cost. 1x10/16 MVA 132/11 kV transformer would be installed at this substation by HVPN at HVPN cost to take care the load of the area other than that of HSIDC.

As a temporary arrangement, LILO of 132 kV S/C line from 132 kV substation Kundli to 132 kV substation Rai at proposed 132 kV substation HSIDC Kundli as a deposit work of HSIDC to be executed by HVPN. However, the final feeding of proposed 132 kV substation Kundli (HSIDC) would be from proposed 220 kV substation Rai (HSIDC), which would also be carried out at the cost of HSIDC.

The responsibility of providing right of way either through HSIDC land or in vicinity of HSIDC land will rest on HSIDC. HSIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning.

Capacitors Banks of required capacity will have to be installed by HSIDC along with transformer at their cost. Installation of Capacitor Banks forms a part of substation equipment.

Installation of 1x10/16 MVA 132/11 kV transformer at upcoming 132 kV substation Rai (HSIDC) at the cost of HVPN to take care the load of the area other than that of HSIDC (1A0867*)

Page 155: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 155 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

5 Bahadurgarh (HSIIDC) 1x16/20 132/11 1D0871*

The substation after commissioning will be handed over by HSIDC to HVPN ‘at no cost’. HSIDC will transfer the title of land in favour of HVPN at no cost. Additional transformers as and when required as per system requirement would be installed by HVPN at proposed 132 kV substation Kundli (HSIDC) to cater the load of surrounding area other than that of HSIDC at HVPN cost.

Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIDC from CE/ D&P, HVPN, Panchkula.

Installation of additional 1x10/16 MVA 132/11 transformer approved at 132 kV substations Rai vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0659A)

Installation of additional 1x10/16 MVA 132/11 kV transformer approved at 132 kV substations Kundli vide this office Memo No. R.No.346/Ch-9/407/K-190 dated 31.03.2006 may be deleted from the list of works of HVPN for the year 2006-07 (1A0660A)

With its feeding from 220 kV substation Bahadurgarh (Nuna Majra) at the land offered by HSIIDC. The work at Sr. No. 5 will be carried out by HSIIDC while works at Sr. No. 6 & 7 will be deposit work of HSIIDC to be executed by HVPN. Matching with the commissioning of 2nd 100 MVA 220/132 kV transformer at 220 kV substation Bahadurgarh at the cost of HSIIDC.

Page 156: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 156 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6 5 1D0872*

7 1D0873*

8 1x20/25 132/33 1D1025*

9 3D1026*

Construction of new 132 kV S/C line on D/C towers with 0.2 sq. inch ACSR from 220 kV substation Bahadurgarh to the proposed 132 kV substation Bahadurgarh (HSIIDC) at the cost of HSIIDC.

The responsibility of providing right of way either through HSIIDC land or in vicinity of HSIIDC land will rest on HSIIDC. HSIIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning.

Creation of 132 kV bay at 220 kV substation Bahadurgarh to accommodate the above line at the cost of HSIIDC.

Capacitors Banks of required capacity will have to be installed by HSIIDC along with transformer. Installation of Capacitor Banks forms a part of substation equipment.

The substation including land and equipment will be taken over for operation after HSIIDC transfers the title of land and assign the equipment in favour of HVPNL at zero cost. Additional transformers as and when required as per system requirement would be installed by HVPN at proposed 132 kV substation Bahadurgarh (HSIIDC) to cater the load of surrounding area other than that of HSIIDC at HVPN cost.

Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIIDC from CE/ D&P, HVPN, Panchkula.

132 kV substation Bahu (Augmentation)

Or lower capacity transformer, if available, at the time of execution as a deposit work of M/s Aravali Power Company Private Limited.

Creation of one 33 kV bay at 132 kV substation Bahu to feed construction power plant of M/s Aravali Power Company Private Limited at 33 kV level (peak load 4 MVA) as a deposit work of M/s Aravali Power Company Private Limited.

Allow M/s Aravali Power Company Private Limited to feed construction power plant at 33 kV level (peak load 4 MVA) from 132 kV substation Bahu matching with the Sr. No.8 above

Page 157: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 157 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

10 Allow M/s Aravali Power Company Private Limited to feed construction power plant at 33 kV level (peak load 4 MVA) from 132 kV substation Mattenhail by Tap off from 33 kV Mattenhail – Sasroli line matching with the augmentation of 132 kV Mattenhail by providing 1x10/16 MVA 132/33 kV transformer in place of 3 winding 1x8/4/4 MVA 132/33/11 kV transformer. However, the M/s Aravali Power Company Private Limited shall be required to deposit the share cost, if any, for augmentation along with associated control & switching and other equipment etc. as per the prevalent instructions of HVPN & UHBVN and to be decided by SE/ TS, HVPN Rohtak & SE/ OP, UHBVN, Rohtak.

33 kV lines would be constructed by M/s Aravali Power Company Private Limited at their cost.

Full cost of above works at Sr. No. 8 & 9 and share cost as per Sr. No. 10, if any, are required to be got deposited from M/s Aravali Power Company Private Limited in advance before undertaking the work. M/s Aravali Power Company Private Limited will install suitable metering equipment at sending and receiving end as per specification of HVPNL at their cost.

The utility of creating 33 kV level at 132 kV substation Bahu after the utilization of temporary construction load of M/s Aravali Power Company Private Limited to be supplied by DHBVN

The generating plant will be a consumer of the Discom and will hand over 33 kV line to the Discom for operation and maintenance,

Page 158: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 158 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

11 3B1148*

12 IMT Rohtak (HSIIDC) 1D1368*

13 1D1369*

To allow UHBVNL to extend existing load of 1099 kW to 1784 kW for additional facilities at LPG bottling plant of IOC at village Gudha through independent 33 kV feeder from 132 kV substation Munak, matching with already approved augmentation of 132 kV substation Munak from 10/16 MVA 132/11 kV + (10/16 + 20/25) MVA 132/33 kV to 10/16 MVA 132/11 kV + 2x20/25 MVA 132/33 kV transformers and UHBVNL actually restricting total drawl at 33 kV level as per safety standards.

Erection of 1 No. new 33 kV bay at 132 kV substation Munak at the cost of M/s IOC, for connecting the feeding 33 kV line for 33 kV substation of the consumer.

3x20/25 1x0.2

132/33 33/0.4

1x0.2 MVA 33/0.4 kV T/F for auxiliary supply. Out of three 20/25 MVA transformer, one 20/25 MVA 132/33 kV transformer to be provided by HVPNL in future while others to be provided by HSIIDC.

Proposed 132 kV substation HSIIDC IMT Rohtak will be initially commissioned by LILO of one circuit of 132 kV MDU Rohtak - Sampla D/C line. The cost of LILO arrangement will be borne by HSIIDC. Finally, the substation shall be fed from additional D/C line from a new 220 kV substation to be created in the area.

The ownership of land/ building/ equipment of 132 kV substation IMT Rohtak will be handed over/ transferred by HSIIDC to HVPNL immediately after construction of substation is completed.

HSIIDC will provide at least 10 nos. 33 kV bays at 132 kV substation HSIIDC IMT Rohtak while executing the substation.

The scope, feeding arrangement and other details for 220 kV substation to be created by HSIIDC in the area shall be decided separately.

Page 159: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 159 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

66 kV Works.

1 66/11 6D0705A

6D0803*

2 6D0706A

3 6D0707*

Installation of 4th 12.5/16 MVA, 66/11 kV transformer at Q Block with all the associated equipment including bus coupler and extension of control room or any other relocation of equipment needed for this purpose along with civil works as per approved specifications of HVPN (DLF)

1x12.5/16 (Additional)

This T/F shall be energised only after shifting the load of 66 kV S/S Sector 23 Gurgaon from Badshahpur-Sector 56 Gurgaon-Q Block-Dundahera 66 kV D/C line

Amendement of earlier approval conveyed vide Memo. No. R. No. 231/ Ch-96/ 406/ K-147/ Vol.I dated 12.6.2003

Complete arrangement for 2nd bus bar including all associated equipment needed for this purpose along with civil works, foundations etc. (DLF)

M/s DLF and HVPN shall bear the expenses relating to 2nd bus in 3:1 ratio i.e. a) DLF shall bear three fourth expenses relating to 2nd bus arrangement.b). HVPN shall bear one fourth expenses relating to 2nd bus arrangement.

Creation of 66 kV bay at 66 kV substation Sector-46 Faridabad including metering equipment specifications to be approved by C.E / D&P, HVPN, Panchkula.

The work will be executed by HVPN as deposit work of M/s Jotindra Steels & Tubes Ltd. Faridabad. requisite material or its cost could be supplied by the firm as mutually agreed.

66 kV substation will be created by the firm. The GELO shall be approved by C.E / D&P, HVPN Panchkula.

Construction of 66 kV S/C line from 66 kV substation Sector-46 Faridabad by the firm with route plan to be approved by C.E/D&P, HVPN Panchkula. Assistance of HVPN in execution of work could be availed on payment basis.

Before / while execution of works, the following issues need to be attended to:-

Agreement to be signed among DHBVN, firm and HVPN regarding commercial aspects involving security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum / minimum load on feeder, extent use of system / feeder at present or in future at all.

Page 160: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 160 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

4 2x20 66/11 6D0708*

The GELO will be approved by CE / D&P, HVPN, Panchkula.

Firm will arrange clearance / ROW from HUDA CE / and any other agency involved / during construction / commissioning / operation of system.

66 kV substation DLF Phase-V Sector-43, Gurgaon

To allow M/s DLF to construct a 66 kV substation at the site proposed by them in phase-V sector-43 Gurgaon with 2x20 MVA 66/11 kV transformers in the first instance with the provision to add two similar transformers in future by HVPN.

All transformer bays and allied equipment shall be suitable to accommodate 25/31.5 MVA 66/11 kV transformers if required to be installed in place of now planned.

Four incoming bays, two outgoing bays, four transformer bays and at least one spare bay besides bays for bus coupler and may be capacitors need to be considered while finalising GELO.

The busbar be strung with 0.5 sq inch twin ACSR while the number of 11 kV breakers per transformer would also be double of normal setup.

LILO of Sector-56 - Q block section of 66 kV D/C Badshahpur - Sector 56 - Q Block - Dundahera line on 2xD/C line with higher conductor size (0.4 sq inch ACSR) at 220 kV substation sector-52A passing through 66 kV DLF substation proposed above.

One circuit to be LILOed at 66 kV DLF substation in the first instance and the second circuit in future as the system conditions demand.

To change from overhead to underground connectivity in the concerned zone, in case right of way is not available at the time of actual execution of work.

Page 161: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 161 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

5 2x16/20 66/11 6D0709*

a) 2 No. bays for 66 kV Incoming circuits.

b) 2 No. bays for 66 kV ongoing circuits.

c) 2 No. bays for 16/20 MVA 66/11 kV transformers by HLF.

d) 2 No. bays sfor 12.5/16 mVA 66/11 kV transformers by HVPN.

e) 1 No. bay for bus coupler

f) Double bus arrangement with twin 0.5 sq.inch ACSR.

Capacitor banks and metering equipment should be a part of initial setup of substation.

To sign a tripartite agreement among DLF, DHBVN and HVPN persuading DLF to bear the cost of 100 MVA transformer besides making this substationalongwith associated lines described above.

persuading M/s DLF to construct this substation with GIS technology in case of shortage of space.

Works to be executed by M/s DLF and transferred to HVPN free of cost.

66 kV substation HLF Ambience Project Sector-24, Gurgaon

Construction of 66 kV substation in Ambience Project (sector-24, Gurgaon) with provision of following 66 kV bays:

Construction of 66 kV double circuit line with 0.4 Sq. inch ACSR from 220 kV substation sector 52-A to the proposed 66 kV substation. In case of prosblem for right of way for overhead line underground cable connections should be adopted.

Construction of 2 No. 66 kV bays at 220 kV sector 52-A Gurgaon for above line. This work will be carried out by HVPN as deposit work of M/s HLF.

Page 162: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 162 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6 66/11 6D0710*

7 66/11 6D0711*

Provision of suitable right of way for uanderground 11 kV connections from this substation to HVPN loads.

The colonizer shall enter into an agreem,ent with DHBVN and HVPN for construction of substation and handling it over to HVPN free of cost.

Construction of 66 kV D/C line with 0.4 Sq.inch ACSR from proposed 66 kV substation to proposed 220 kV substation sector 20, Gurgaon or any other suitablef load location as an additional or alternative connection. In this case also, underground connectivity shall be resorted to in case of problem in right of way for overhead line.

The colonizer will arrange requisite clearance / approvals from concerned departments like HUDA for executing above works wherever required.

66 kV substaiton at Air Force site in Ambala Cantt

2x8 or 1x12.5/16

i) Construction of 66 kV substaiton at Air Force site in Ambala Cantt, by Air Force authorities at their own cost with installation of 2x8 or 1x12.5/16 MVA 66/11 kV transfrormer.

66 kV substaiton at MES (Army) site in Ambala Cantt

2x8 or 1x12.5/16

ii) Construction of 66 kV substaiton at MES (Army) site in Ambala Cantt, by MES (army) authorities at their own cost with installation of 2x8 or 1x2.5/126 MVA 66/11 kV transfrormer.

iii) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 220 kV substation Tepla to 66 kV proposed substation MES Ambala Cantt.

iv) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 220 kV substation Tepla to 66 kV proposed Air Force substation, Ambala Cantt.

v) Construction of 66 kV S/C line with 0.2 sq.inch ACSR from 66 kV substation MES (army) Ambala Cantt to 66 kV substation Air Force, Ambala Cantt.

Page 163: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 163 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

8 6D0850*

9

vi) Construction of 66 kV substaiton mentioned at Sr.No. i) & ii) shall be carried out by Air Force & MES authorities respectively.

vii) Construction of 66 kV substaiton mentioned at Sr.No.iii),iv) & v) shall be carried out as two circuits of a D/C line all along the route with the line terminating at farther substation and LILO of one circuit at the other substation enroute.

viii) Construction of 2 No. 66 kV bays at 220 kV substation Tepla as a deposit work (one bay each for line to MES and Air Force substation) for feeding two substations mentioned at Sr.No.i) & ii).

ix) Installation of metering equipment both at consumer end and sending end (both as main and check meters) for proper energy accounting since Air Force and MES authorities shall remain consumers of UHBVN with energy supplied directly from HVPN substation.

x) All these parties (Air Force, MES, UHBVN, and HVPN) shall enter into a formal agreement specifying all technical and commercial clauses for supply, maintenance, operation of transmission works and energy accounting of power handled.

xi) Construction of works at Sr.No. iii),iv),v),vi) & ix) shall be carried out by HVPN as a joint deposit work of MES and Air Force authorities to be shared equally by them.

Allowing 66 kV connection to M/s Starwire by providing a 66 kV bay at 66 kV substation Globe Steel Faridabad.

All construction activity both in HVPN and consumer’s premises shall be as per design and specifications approved by CE/ D&P, HVPN.

66 kV bay at 66 kV substation Globe Steel and line section to their works will be at the cost of M/s Starwire. The works in HVPN substation will be deposit work of the consumer by HVPN.

Consumer will be responsible for any clearance required from CEI, HUDA or any other agency.

Page 164: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 164 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

10 6D0826*

11 6D0827*

66 kV bay at 66 kV substation Globe Steel and line section to their works will be at the cost of M/s Starwire. The works in HVPN substation will be deposit work of the consumer by HVPN.

Capacitor bank, metering equipment shall be part of initially set up of consumer substation.

To enter into tripartite agreement between consumer M/s Starwire, DHBVN and HVPN clearly spelling out details of commercial issues like security, contract demand, deposit work cost, ACD, revenue collection, joint meter readings, maximum/ minimum load on feeder, extent use of feeder at present/ in future, energy accounts, meters/ check meters etc.

M/s Starwire will remains consumer of DHBVN with energy directly supplied by HVPN.

Partial load of 11 kV feeders from 66 kV substations Pratap Steel, N India and Idgah shall be shifted to 66 kV substations Globe Steel to uitlise capacity spared by M/s Starwire on 11 kV.

To allow M/s Laser Shaving Products Pvt. Ltd. to construct 66 kV substation in their premises for a load of 10.5 MVA to be fed over underground cable connection from 66 kV substation Jharsetly.

The GELO of substation, route of cable and all other technical specifications & design shall be approved by the CE/ D&P, HVPN, Panchkula.

Entire work of substation, cable laying, sending end bay and associated works shall be carried out by the consumer at its own cost or by HVPN as deposit work of the consumer.

Work to be taken up only after signing tripartite agreement among M/s Laser Shaving Product Pvt. Ltd., DHBVN & HVPN covering issues like security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum/ minimum load on feeder, use of system in future etc.

Capacitor bank and metering equipment shall be a part of initial set up of the substation.

Consumer shall arrange all clearances required from different agencies like HUDA, CEI etc.

Page 165: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 165 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

The consumer shall remain consumer of DHBVN with energy supplied directly by HVPN

12 i)

The request of M/s RICO Auto Industries Ltd for extension of load from 9000 kW to 18000 kW with a corresponding increase in contract demand from 10 MVA to 20 MVA, may be allowed by DHBVNL from 66 kV substation Mehrauli Road Gurgaon as a temporary arrangement in view of SE/TS Gurgaon recommendation conveyed by memo No. Ch-36/Load dated 23.12.2005 subject to management of load by the field office within the capacity of feeding line. The final arrangement shall be as under:

Before/ while execution of works, M/s RICO shall attend the following issues: i) Agreement to be signed among DHBVN, firm and HVPN regarding commercial aspects involving security, contract demand, deposit work cost, ACD, revenue collection, joint meter reading on regular basis, maximum/ minimum load on feeder, extent of use of system/ feeder at present or in future et all. ii) M/s RICO will arrange clearance, right of way from HUDA, CEI and any other agency involved / during construction/ commissioning/ operation of system. iii) Assistance of HVPN on execution of works can be availed by the firm on payment basis. iv) Assistance of HVPN in execution of works can be availed by the firm on payment basis.

12 ii)

Construction of 66 kV S/C line on D/C towers from 66 kV substation Sector 38 Gurgaon to M/s RICO Auto Industries Ltd. With 0.2 sq" ACSR by the firm (M/s RICO Auto Industries Ltd.) The part route of proposed 66 kV line from sector-38 Gurgaon to M/s RICO Auto will follow the same route presently feeding from Mehrauli Road to RICO, implies that M/s shall have to augment present feeding arrangement on single rail pole to tower structure with 0.2 sq" ACSR from T-point (connectivity from sector-38 substation) upto the firm's premises.

Page 166: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 166 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

13 1x10/12.5 66/33 6D0868*

12 iii)

Creation of one number 66 kV bay at 66 kV substation Sector-38 Gurgaon for accommodating above line as deposit work of M/s RICO Auto Industries Ltd.

12 iv)

The above approved works shall be executed by the firm matching with the commissioning of 66 kV substation sector-38 Gurgaon, targetted in June 2006.

Installation of 1x10/12.5 MVA 66/33 kV transformer along with associated control & switching and other equipment, bay etc. and 33 kV feeding line to the site of M/s RPS Associates at the cost of M/s RPS associates to feed their load of 10.5 MVA. 33 kV substation at its premises of the firm & 33 kV line would be constructed by M/s RPS Associates. Full cost of 1x10/12.5 MVA 66/33 kV transformer at 66 kV substation USA Faridabad along with associated control & switching and other equipment, bay etc. and 33 kV feeding line to site of M/s RPS Associates is required to be got deposited from M/s RPS Associates in advanced before undertaking the work.

As recommended by SE/ TS, HVPN, Faridabad vide Memo. No. Ch-130/ S-31 dated 4.12.2006, for maintaining the continuity of power supply first new transformers shall be energized with the new control room & yard. The existing 1x10/12.5 MVA 66/11 kV transformer shall be dismantled thereafter.

Page 167: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 167 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

14

15 1x12.5/16 66/11 6A0869*

16

Creation of new control room and new switch yard by dismantlement of four houses of category II and two houses of Category III (six numbers residential quarters) as recommended by SE/ TS, HVPN, Faridabad vide Memo. No. Ch-130/ S-31 dated 4.12.2006 to accommodate new control room building & Yard at 66 kV substation USA, Faridabad.

The proportionate civil cost of new control room , new switch yard , dismantlement works, system comprising of sump pit, pump- motor and pump to drain out the rainy water from switchyard and other misc. works etc. to be borne by M/s RPS associates would be decided by CE/ D&P, HVPN in consultation with CE/ TS, HVPN, Hisar. This amount is also required to be got deposited from M/s RPS Associates in advanced before undertaking the work.

Allocation of alternate accommodation on priority for the staff residing in the colony of 66 kV substation USA Faridabad.

Installation of 1x12.5/16 MVA 66/11 kV transformer at 66 kV substation Universal Steel Faridabad (USA) to enable to release 3 MVA load to NHPC

Proportionate cost of installation of 1x12.5/16 MVA 66/11 kV transformer would be shared by NHPC.

Allocation of alternate accommodation on priority for the staff residing in the colony of 66 kV substation USA Faridabad.

The cost of civil works exclusively carried out for releasing the connection of M/s RPS Associates would be borne by M/s RPS.

The cost of civil works which are required for common purpose i.e. for the use of M/s RPS as well as for HVPNL (including NHPC) would be borne proportionately with respect to the MVA capacity of the transformer by the respective user.

The cost of electrical works including cost of material and equipments exclusively to be used by M/s RPS Associates would be borne by M/s RPS.

The electrical works, material and electrical equipments which are required to be used for common purpose between M/s RPS Associates and HVPNL (including NHPC) would be shared in the ratio of their MVA capacity of the transformer of each user.

Page 168: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 168 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

3x16/20 66/11 6D0892*

6D0893*

6D0894*

17 i)

Construction of 66 kV substation with 3x16/20 MVA 66/11 transformers with space for fourth transformer to be installed in future in South City-II (Sector-47 Gurgaon) at the site to be given by colonizer (M/s Unitech) as a deposit work of coloniser M/s Unitech.The title of site and other associated assets including equipment, residential/ non-residential buildings shall be got transferred by the developer to HVPN free of cost without any rider

To enter into tripartite agreement between M/s Unitech, DHBVNL & HVPNL after concurrence of its contents from Legal Wing to accept land and residential & non-residential buildings along with substation, line and bays mentioned at Sr. No. 17 i) to 17 iii) from the colonizer for operation and maintenance as asset of HVPN as per normal procedure in vogue. • Total load of 59.9 MVA shall be allowed to the colonizer as follows. • Load not exceeding 33.6 MVA through two transformers at this substation shall be for area developed by M/s Unitech while the other two transformers (one to be installed in first instance and the other to be added later) shall be for use by HVPNL/ DHBVNL for general consumption by its consumers.• Load not exceeding 26.3 MVA in lieu of spare 1x16/20 MVA transformer being installed by colonizer shall be supplied to M/s Unitech or its associates by HVPNL/ DHBVNL from other substations of HVPN wherever feasible as per system conditions and margins available but no new substation shall specially be constructed by HVPN exclusively for this purpose. • If the unified load of colonizer exceeds 75 MVA at any stage then the colonizer would construct 220 kV substation or shall share the cost of 220 kV substation as per rates/ norms fixed by HVPN.

17 ii)

Construction of 66 kV double circuit line with 0.4 □” ACSR from 220 kV substation Badshahpur to proposed 66 kV substation in South City-II Gurgaon as a deposit work of coloniser M/s Unitech.

17 iii)

Construction of two 66 kV bays at 220 kV substation Badshahpur for accommodating outgoing 66 kV double circuit line at Sr. No. 17 ii) as a deposit work of coloniser M/s Unitech..

17 iv)

Carrying out works at Sr. No.17 i) to 17 iii) as deposit work of colonizer M/s Unitech.

Page 169: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 169 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

South City-II

18 2x12.5/16 66/11 6D0925*

19 6D0926*

20 6D0927*

To enter into tripartite agreement between M/s Unitech, DHBVNL & HVPNL after concurrence of its contents from Legal Wing to accept land and residential & non-residential buildings along with substation, line and bays mentioned at Sr. No. 17 i) to 17 iii) from the colonizer for operation and maintenance as asset of HVPN as per normal procedure in vogue. • Total load of 59.9 MVA shall be allowed to the colonizer as follows. • Load not exceeding 33.6 MVA through two transformers at this substation shall be for area developed by M/s Unitech while the other two transformers (one to be installed in first instance and the other to be added later) shall be for use by HVPNL/ DHBVNL for general consumption by its consumers.• Load not exceeding 26.3 MVA in lieu of spare 1x16/20 MVA transformer being installed by colonizer shall be supplied to M/s Unitech or its associates by HVPNL/ DHBVNL from other substations of HVPN wherever feasible as per system conditions and margins available but no new substation shall specially be constructed by HVPN exclusively for this purpose. • If the unified load of colonizer exceeds 75 MVA at any stage then the colonizer would construct 220 kV substation or shall share the cost of 220 kV substation as per rates/ norms fixed by HVPN.

17 v)

Creation of 66 kV GIS substation at IT Park, Sector-22 Panchkula (HSIIDC) by HSIIDC at their own cost and land with 2x12.5/16 MVA 66/11 kV transformers matching with the commissioning of 3rd 100 MVA 220/66 kV transformer at 220 kV substation Madanpur

Capacitors Banks of required capacity will have to be installed by HSIIDC at 66 kV substation sector 22 Panchkula. Installation of Capacitor Banks forms a part of substation equipment.

Lying of 66 kV D/C underground cable from 220 kV substation Madanpur to proposed 66 kV substation at IT park, Sector-22 Panchkula by HSIIDC at their cost.

The responsibility of providing right of way either through HSIIDC land or in vicinity of HSIIDC land will rest on HSIIDC. HSIIDC will arrange clearance from HUDA/ CEI and any other agency involved during construction/ commissioning.

Creation of two numbers 66 kV bays at 220 kV substation Madanpur for accommodating of Madanpur (220 kV) - IT park, Sector-22 Panchkula (66 kV), 66 kV D/C underground cable as deposit work of HSIIDC by HVPN.

The substation and associated line after commissioning will be handed over by HSIIDC to HVPN ‘at no cost’. HSIIDC will transfer the title of land in favour of HVPN at no cost. Additional transformers and lines as and when required as per system requirement would be installed by HVPN at proposed 66 kV substation IT park, Sector-22 Panchkula (HSIIDC) to cater the load of surrounding area other than that of HSIIDC at HVPN cost.

Page 170: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 170 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

21 6D0999*

22 6D0932* The proportionate cost of work would be borne by HSIIDC.

23 6D1000*

Augmentation of both 66 kV bus bar from Twin Zebra ACSR to twin Tarantula Conductor to have interchangeability of load on both the buses at 220 kV substation Madanpur to carry the additional load of proposed 3rd 100 MVA 220/66 kV transformer as deposit work of HSIIDC. The proportionate cost of work would be borne by HSIIDC

Lay out plan & Design drawings, equipment specification etc. will have to be got approved by HSIIDC from SE/ Design, HVPN, Panchkula.

Shifting of the existing 66 kV incomer for 100 MVA 220/66 kV transformer (T-2) from bay no. C-5 to C-6 to accommodate incoming 66 kV bay of proposed 3rd 100 MVA 220/66 kV transformer in 66 kV bay no. C-5 at 220 kV substation Madanpur as deposit work of HSIIDC.

Shifting of existing 66 kV capacitor bank from bay No. C-6 to C-3 (spare bay) in place of from bay No. C-6 to C-9 (spare bay) to avoid crossing of 66 kV incomers at 220 kV substation Madanpur as deposit work of HSIIDC. The proportionate cost of work would be borne by HSIIDC. This will facilitates the erection of two nos 66 kV outgoing circuits for IT park from bays C-8 and C-9.

Page 171: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 171 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

24

25

Extension of load at 66 kV level by M/s BSL (P) Ltd. Faridabad from 4000 kW to 6500 kW with CD 4444 kVA to 7222 kVA.

Before execution of the work, the consumer will enter into fresh tripartite agreement with HVPNL/ DHBVNL as per the new terms and conditions of supply imposed by HVPNL/ DHBVNL for granting the approval for extension of load.

The consumer shall be required to deposit the share cost for providing additional 12.5/16 MVA 66/11 kV transformer at 66 kV substation Dabriwala with its controlling bay along with full cost of 66 kV lines, metering CTs and other protection equipments etc. required to be augmented to facilitate extension of load as per cost estimate to be prepared by SE/ TS HVPNL Faridabad.

Page 172: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 172 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

26 6A1005*M/s Crown Buildtech may be allowed to avail contract demand of 6 MVA with augmentation from 8 MVA to 20 MVA 66/33 kV transformer at 220 kV substation Palla after the connectivity of 66 kV substation NH-3 with 66 kV ring main, facilitating the injection of additional power from 220 kV Palli. However, the consumer shall be required to deposit the share cost for augmentation with new transformer along with associated control & switching and other equipment etc. as per the prevalent instructions of HVPN & DHBVN and to be decided by SE/ TS, HVPN, Faridabad & SE/ OP, DHBVN, Faridabad. M/s Crown Buildtech would bear full cost of 33 kV bay to feed their load of 6 MVA. 33 kV substation at its premises of the firm & 33 kV line would be constructed by M/s Crown Buildtech. The above cost is required to be got deposited from M/s Crown Buildtech in advance before undertaking the work. Further the consumer will execute the required tripartite agreement with DHBVN and HVPN and they will install suitable metering equipment at sending and receiving end as per specification of HVPNL at M/s Crown Buildtech cost.

Page 173: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 173 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

27

28 6A1006*

6D1227*

The 10/16 MVA 66/33 kV transformer at present lying spare at 66 kV substation Badraula after commissioning of 66 kV substation Fatehpur Biloch may be utilized at 220 kV substation Palla in place of existing 8 MVA 66/33 kV transformer till transformer of 20 MVA capacity is arranged by the Nigam.

The 8 MVA 66/33 kV transformer which shall be spared at 220 kV substation Palla after aforesaid augmentation may be utilized at 66 kV substation Nagina in place of existing 6 MVA 66/33 kV transformer after augmentation to set off overloading of T/F at Nagina.

The 12.5 MVA 66/33 kV transformer going to be spared at 66 kV substation A-4 Faridabad with the augmentation of 33 kV substation Escort-I to 66 kV level may be utilized at 66 kV substation USA to provide approved capacity of 12.5 MVA at 66 kV level.

29 i)

Creation of 66 kV substation by M/S Sunbeam Auto Limited Gurgaon at their cost facilitating extension of load from 7000 KW to 9000 KW and contract demand from 7500 KVA to 10000 KVA. The necessary supervision charges will be paid by the firm to HVPNL.

29 ii)

HVPNL will construct one bay at 66 kV substation Sector-34 Gurgaon as a deposit work of M/S Sunbeam Auto Limited to provide 66 kV take out arrangement for M/S Sunbeam Auto Limited.

Page 174: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 174 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6D1228*

6D1229*

29 iii)

The proposed 66 kV substation of M/S Sunbeam will be fed by 66 kV S/C line with 0.4 Sq” ACSR conductor erected on D/C towers from 66 kV substation Sector-34 Gurgaon to 66 kV substation Sunbeam to be constructed by HVPNL. The firm will bear proportionate cost of 66 kV S/C line on D/C towers.

29 iv)

M/S Sunbeam will make available one no. 66 kV bay space at their S/S to HVPN for take out arrangement for further connectivity to other 66 kV S/S.

29 v)

The firm will provide 1x12.5/16 MVA, 66/11 kV T/F in their substation for feeding their load.

29 vi)

The firm will provide help in securing ROW for the feeding line with concerned government agencies.

29 vii)

The firm will carry out O&M of 66 kV substation at their own cost after commissioning of the same. The applicable supervision charges for O&M will be paid by the firm to HVPNL.

29

viii)

The firm will pay for underground XLPE power cable wherever ROW is not feasible for erecting 66 kV overhead feeding line.

Page 175: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 175 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

29 ix)

The firm will enter into detailed tripartite agreement with DHBVNL and HVPNL for construction of the substation by them before start of work.

30 i)

Creation of 66 kV substation for M/S Vipul Limited for their residential colony at Vipul World in Sector-71 Gurgaon to be constructed by HVPNL as a deposit work of the firm. A provision of 9 no. 66 kV bays will be made in the 66 kV substation at the cost of firm which will include one no. bay for future expansion.

30 ii)

To provide 2x16 MVA, 66/11 kV transformers for M/S Vipul Limited which includes 1x16 MVA, 66/11 kV spare transformer for future upcoming projects for which load requirement will be submitted by the firm separately. Similarly 2x16 MVA, 66/11 kV transformer will be provided for use by HVPNL and 1x0.2 MVA, 11/0.4 kV transformer will be provided for auxiliary supply.

6D1230* 6A1231*

Page 176: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 176 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6D1232*

6D1233*

6D1234*

30 iii)

The proposed 66 kV substation of M/S Vipul Limited will be fed by 66 kV S/C line with 0.4 Sq” ACSR conductor from 220 kV substation Sector-72 Gurgaon to 66 kV substation of M/S Vipul Limited erected on multi circuit towers. The proportionate cost of 66 kV S/C line will be borne by the firm. The firm will also pay the cost of 66 kV underground XLPE power cable wherever ROW is not feasible for providing overhead towers.

30 iv)

The proposed 66 kV substation of M/S Vipul Limited will also be supplied power by LILO of one circuit of 66 kV Badshahpur-Sector 72-Sector-34 line with 0.15 Sq” INVAR conductor. The total cost of this LILO line will be borne by the firm.

30 v)

The proportionate cost of 66 kV bay of feeding line at 220 kV substation Sector-72 Gurgaon will also be borne by M/S Vipul Limited.

30 vi)

The residential accommodation for 8 no. O&M staff (Class-III) shall be provided by the firm at 66 kV substation of M/S Vipul Limited.

30 vii)

The ROW for all the 66 kV lines in their land will be provided by M/S Vipul Limited.

Page 177: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 177 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6D1297*

6D1298*

30

viii)

The firm will enter into detailed tripartite agreement with DHBVNL and HVPNL for construction of the substation. The firm will deposit the cost for construction of 66 kV substation to be intimated by SE/TS HVPNL Gurgaon before the start of work.

31 i)

Creation of 66 kV Substation by M/S Star Wire (India) Limited at their cost for availing load of 5859.936 kW with CD 6000 KVA for their plant-II at village Chhainsa Tehsil Ballabgarh (Faridabad). The necessary supervision charges, if any, will be paid by the firm to HVPNL.

31 ii)

The proposed 66 kV Substation of M/S Star Wire (India) Limited for Plant-II at village Chhainsa will be fed by 66 kV underground connection consisting of 4 no. single core XLPE cables or 400 sq mm size. The cables will be laid by firm at their own cost and the ROW will also be arranged by the firm.

31 iii)

The firm will provide space for a bay in their substation for additional 66 kV connectivity to some other substation of HVPNL in nearby area in future.

The firm will bear all the expenses for construction of 66 kV outgoing bay at 66 KV substation Chhainsa required for release of their load at 66 KV level.

Page 178: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 178 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

6D1299*

32

31 iv)

The firm will provide 1x20 MVA, 66/11 kV transformer in their substation for feeding their load with future provision for 1x20 MVA, 66/11 KV transformer depending upon increased requirement of load in future.

31 v)

The firm will carry out O&M of their 66 kV Substation at their own cost after commissioning of the same. The applicable supervision charges will be paid by the firm to HVPNL.

31 vi)

The required metering equipment along with CTs of matching capacity will be provided by the firm at their own cost as per specification and design of Nigam at both sending end and receiving end 66 KV substation.

31 vii)

The firm will enter into tripartite agreement with HVPNL & DHBVNL for construction of substation by them before start of work.

Approval for re-alignment of a portion of 66 kV S/C Gurgaon - Manesar - Pataudi line which is passing through the area of group housing society in sector-1 IMT Manesar.

Page 179: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 179 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

33

34

35 6D1365*

36 6D1366*

37 6D1367*

HSIIDC authorities will rpovide 4 no. S/C 630 mm2 XLPE cables for re-alignment work at their own cost and all the work will be carried out by HSIIDC.

The re-alignment work will be carried out in the land of HSIIDC in sector-1 IMT Manesar and the concerned drawings/ specifications for lying the 66 kV underground cables will be got approved by HSIIDC from design wing of CE/MM, HVPNL, Panchkula before execution of work.

66 kV substation by M/s Canton Buildwell Pvt. Ltd. New Delhi

For establishment of SEZ at Gawal Pahari on Gurgaon-Faridabad Road Gurgaon at their own cost. Necessary supervision charges will be paid by the firm to HVPNL.

Construction of a new 66 kV D/C line with 0.4 Sq" ACSR from 220/66 kV substation sector-56 Gurgaon at the cost of the firm to feed the proposed 66 kV substation.

The cost of feeding line from proposed 220 kV substation Sector-56 Gurgaon to the proposed 66 kV substation (of SEZ developer) shall be borne by the firm. The firm will also bear the cost of underground XLPE power cable equivalent to 0.4 Sq" ACSR conductor wherever RoW is not feasible for construction of overhead line.

Construction of a 2 no. 66 kV bays by HVPN at 220/66 kV substation sector-56 Gurgaon as a deposit work of M/s Canton Buildwell Pvt. Ltd. To accommodate 66 kV D/C outgoing feeders to the proposed substation.

The firm will make available space for future 2 no. 66 kV bays at their substation to HVPNL for providing arrangement for future connectivity to other 66 kV substations.

Page 180: 14_List of Works

DETAIL OF WORKS TO BE EXECUTED BY OTHER AGENCIES AND DEPOSIT WORK BY HVPNL

document.xls Page 180 of 180 Deposit works

Name of Lines Code RemarksSr. No.

Route Length

km.

T/F Capacity (MVA)

Voltage Ratio (kV)

38 Sector-8 IMT Manesar 2x16/20 66/11

The firm will provide and utilise (1x25/31.5 + 1x16/20 ) MVA 66/11 kV transformers in this substation for feeding their load. HVPNL will provide and utilise 1x16/20 MVA, 66/11 kV transformer for its use at the 66 kV substation being created by the firm. Further capacity addition shall be planned as the load grows.

The firm will hand over the 66 kV substation to HVPNL for operation & Maintenance purpose after its construction.The firm will enter into tripartite agreement with DHBVNL & HVPNL for construction of the substation & associated issues before start of work.

The share cost of 220/66 kV transformer to be installed at 220 kV substation Sector-56 Gurgaon shall be borne by the firm.

The builder SEZ shall supply an affidavit on NJSP to the effect that they would develop power load as per actual requirement shown in their proposal.

To allow the creation of 66 kV substation Sector-8 IMT Manesar with 2x16/20 MVA 66/11 kV transformers by HSIIDC subject to the finalization of feeding connectivity of this substation by HVPNL.