1. the process rubrics (40 or 90) should be open soon. 2. the 2011-12 data profile and si plan are...

10
1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will be on-line this year. Three Parts * School Data Profile and Analysis * School Process Profile and Analysis * Summary Report (Goals Management) 4. The State will not be adjusting cut scores this year – schools are encouraged to compare their scores to the college-ready targets. 1 School Improvement Update

Upload: everett-richards

Post on 25-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

1. The Process Rubrics (40 or 90) should be open soon.

2. The 2011-12 Data Profile and SI Plan are expected to open in December.

3. The complete CNA will be on-line this year.Three Parts* School Data Profile and Analysis* School Process Profile and Analysis* Summary Report (Goals Management)

4. The State will not be adjusting cut scores this year – schools are encouraged to compare their scores to the college-ready targets.

1

School Improvement Update

Page 2: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

EdYes! is becoming MI-SAAS (Michigan School Accreditation and Accountability System)

Category 1: Student Proficiency and Improvement (Statewide Top to Bottom Ranking) on all tested content areas

• Proficiency - Two-year average• Improvement – 2-year average increasing or decreasing in ELA and math or

four-year slope for writing, science, and social studies (elementary/middle) or all-subjects (HS)

• * Ranking less than 5% - unaccredited• * Ranking greater than 5% and less than 20% - interim • * Ranking 20% or greater - accredited

Category 2: Persistently Lowest Achieving (PLA) Schools list – If a school is on the PLA list, the initial accreditation status becomes “unaccredited”.

Category 3: Adequate Yearly Progress (AYP) status – If a school fails to make AYP AND the initial accreditation status is “Accredited” THEN the initial accreditation status is lowered to “Interim.” AYP alone cannot drop you to “Unaccredited.”

2

Page 3: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

Category Four

1. Do 100% of school staff hold Michigan certification (different from highly qualified)?

2. Is the school's annual School Improvement Plan published?

3. Are required curricula offered: Grade Level Content Expectations in grades K-8, MMC in grades 9 - 12?

4. Is a fully compliant Annual Report published?

5. Have the School Performance Indicators (40 or 90) been submitted?

6. Are literacy and math tested annually in grades 1 – 5?

7. Is the five-year high school graduation rate 80% or above OR Is the attendance rate 90% or above if the school does not have a graduation rate?

8. If the school was selected to participate in NAEP, did it do so?

9. Did the school test 95% of all students in every tested content area?

If the answer is "no" to any question in two consecutive years, the accreditation status is lowered one level, even if the "no" is for a different question each year. 

It is expected that these nine items will be assurances located in the School Improvement plan.

3

Page 4: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

Why should we monitor our school improvement efforts?

4

Page 5: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

Leadership and Learning Center 2010

Page 6: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

What should we be monitoring in our school improvement efforts?

How should we be monitoring our school improvement efforts?

What are you currently doing in your school to monitor your school improvement efforts?

6

Page 7: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

One Common Voice – One PlanStep 10 - Monitor Plan Implementation

MONITOR IMPLEMENTATION OF THE PLAN (FORMATIVE)

1. HOW ARE THESE PILLARS BEING IMPLEMENTED WITH FIDELITY BY ALL STAKEHOLDERS?

2. HOW IS STUDENT ACHIEVEMENT BEING IMPACTED?

EVALUATE THE PLAN (SUMMATIVE)

1. DID ALL STAKEHOLDERS IMPLEMENT THE PLAN WITH FIDELITY?

2. DID IT IMPACT STUDENT ACHIEVEMENT IN THE WAY WE THOUGHT IT WOULD?

ARE PEOPLE COMPLETING

THEIR ASSIGNED TASKS?

ARE WE IMPLEMENTING

THE PLAN CORRECTLY AND CONSISTENTLY?

ARE WE REGULARLY ANALYZING STUDENT

DATA?

DO WE HAVE THE RIGHT TOOLS TO

MEASURE OUR MEASURABLE

OBJECTIVES OR DO WE NEED

OTHERS?

ARE WE GIVING THE PROCESS ENOUGH

TIME?

ENOUGH RESOURCES?

Page 8: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

One Common Voice – One PlanStep 11 Evaluate The Plan

MONITOR IMPLEMENTATION OF THE PLAN (FORMATIVE)

1. HOW ARE THESE PILLARS BEING IMPLEMENTED WITH FIDELITY BY ALL STAKEHOLDERS?

2. HOW IS STUDENT ACHIEVEMENT BEING IMPACTED?

EVALUATE THE PLAN (SUMMATIVE)

1. DID ALL STAKEHOLDERS IMPLEMENT THE PLAN WITH FIDELITY?

2. DID THE PLAN IMPACT STUDENT ACHIEVEMENT IN THE WAY WE THOUGHT IT WOULD?

DID PEOPLE COMPLETE

THEIR ASSIGNED TASKS?

DID WE IMPLEMENT THE

PLAN CORRECTLY AND CONSISTENTLY?

DID WE REGULARLY

ANALYZE STUDENT

DATA?

DID WE HAVE THE RIGHT TOOLS TO

MEASURE OUR MEASURABLE OBJECTIVES?

DID WE GIVE THE PROCESS ENOUGH

TIME?

ENOUGH RESOURCES?

Page 9: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

9

Data Profile: Four Types of DataDemographic Data Achievement/

Outcome DataProcess Data Perception

Data

•Enrollment•Subgroups of students•Staff•Attendance (Students and Staff)•Mobility•Graduation and Dropout•Conference Attendance•Education status•Student subgroups•Parent Involvement•Teaching Staff•Course enrollment patterns•Discipline referrals•Suspension rates•Alcohol‐tobacco‐drugs violations•Participation extra‐curriculars•Physical, mental, social and health

•Local assessments: District Common Assessments, Classroom Assessments, Report Cards•State assessments: MME, ACT, MEAP, MIAccess, MEAP Access, ELPA• Nationalassessments: ACT Plan, ACT Explore, ACT WorkKeys, NWEA, ITBS, CAT, MET NAEP, PSAT•GPA•Dropout rates•College acceptance

•Policies and procedures (e.g. grading, homework, attendance, discipline)•Academic and behavior expectations•Parent participation – PT conferences, PTO/PTA, volunteers•Suspension dataSchool Process Profile Rubrics(40 or 90) or SA/SAR (NCA)•Event occurred: Who, what, when,where, why, how•What you did forWhom: Eg. All 8th gradersreceived violencePrevention

•Survey data (student, parent, staff, community)•Opinions•Clarified what others think•People act based on what they believe•How do they see you/us?

Page 10: 1. The Process Rubrics (40 or 90) should be open soon. 2. The 2011-12 Data Profile and SI Plan are expected to open in December. 3. The complete CNA will

Building Your Data Profile

1. What data was lacking in last year’s data profile?

2. What needs to be done to fill the gap?

3. What could/should you be doing NOW to begin filling the gap?

10