Resume for Anders Engstroem, Engineer. Name: Anders Engstroem (Engstrom). Address: Houston, Texas, USA. Telephone: 001 – 281 – 415 – 5685. Email: [email protected] Date of birth: March 1963. Nationality: Norwegian & American. Languages: American, Norwegian, Swedish, Danish & limited German. Present position: Design Engineer with the Twisted Canvas group (short term). Education: Bachelor degree in Engineering, University of Karlstad. Safety training: Valid Offshore Safety Course (Offshore certificate). Offshore medical: Valid offshore health certificate. CAD (3D): PDMS (AVEVA) & SOLIDWORKS (Dassault Systems). Expertise: (see description below): Piping system and plant layout and design according to the ASME B31 standards & NORSOK. Process Plant Layout, (including utility systems and drilling systems) using 3D CAD software. Pipe supports, engineering & design. Documents and drawings for fabrication and installation. Documents and drawings for operation and inspection. Production of PMS and VMS (piping and valves material specifications). 1

Upload: anders-engstroem

Post on 11-Apr-2017

117 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: 1   re sume 2016 anders engstroem piping & layout

Resume for Anders Engstroem, Engineer.

Name: Anders Engstroem (Engstrom).

Address: Houston, Texas, USA.

Telephone: 001 – 281 – 415 – 5685.

Email: [email protected]

Date of birth: March 1963.

Nationality: Norwegian & American.

Languages: American, Norwegian, Swedish, Danish & limited German.

Present position: Design Engineer with the Twisted Canvas group (short term).

Education: Bachelor degree in Engineering, University of Karlstad.

Safety training: Valid Offshore Safety Course (Offshore certificate).

Offshore medical: Valid offshore health certificate.

CAD (3D): PDMS (AVEVA) & SOLIDWORKS (Dassault Systems).

Expertise: (see description below):

Piping system and plant layout and design according to the ASME B31 standards & NORSOK.

Process Plant Layout, (including utility systems and drilling systems) using 3D CAD software.

Pipe supports, engineering & design.

Documents and drawings for fabrication and installation.

Documents and drawings for operation and inspection.

Production of PMS and VMS (piping and valves material specifications).

Piping flexibility and stress analysis based on ASME B31.3.

1

Page 2: 1   re sume 2016 anders engstroem piping & layout

Experience:

December 2015 – April 2016.Employer: PPI San Francisco, CA.Position: Piping & Layout Engineering Lead Client: The Japanesee Government.Project: Floating vind turbines.

Front End Engineering Design (FEED) and front end loading (FEL).

November 2014 – September 2015.Employer: F.V.R. llc. In Dallax, TX.Position: Facility Engineering & Contract Piping & Layout Engineering Lead Client: F.V.R.Project: Extension of F.V.R's auto repair workshop building..

Production of Plot plans and equipment layout drawings for expansion of plant and increased business.

October 2014 – November 2014.Employer: F.V.R. llc. In Dallax, TX.Position: Facility Engineering & Contract Piping & Layout Engineering Lead Client: F.V.R.Project: Short term engineering assignment..

Production of Layout Drawings for a new hydraulic lift system for F.V.R's auto repair workshop building.

October – October 2014.Employer: F.V.R. llc. In Dallax, TX.Position: Facility Engineering & Contract Piping & Layout Engineering Lead Client: F.V.R.Project: Short term engineering assignment..

Implementation and introduction of a new Quality Management System and Marketing Execution Method for Family Vehicle repair>

2

Page 3: 1   re sume 2016 anders engstroem piping & layout

July 2014 - October 2014.Employer: DSME Offshore Engineering Corp. (DOEC).Position: Contract Piping & Layout Engineering Lead / Facility Engineer.Client: Chevron, Ubon Central Processing Platform (CPP).Project: Detail Engineering of the new Ekofisk 2/4Z wellhead production platform.

Performing a deck by deck (Cellar/Mezzanine/main) Layout design review for the Chevron operated Ubon Central Processing Platform (CPP) with respect to Functional Requirements & Design Basis & Safety in design requirements. The subject for the review mainly consists of:

- Pipe Routings, all systems, incuding Methanol for scrubbing* - Pipe racks & supports. - Cable race ways - Panels/Cabinets/Enclosures - Escape/access routes

- Safety equipment/ cabinets - Utility Stations - Monorails - Equipment location & Ancillary arrangement according to area classifications. - Access for Maintenance

- Drip trays/drainage requirements

June 2014-July 2014.Employer: DSME Offshore Engineering Corp. (DOEC).Position: Contract Piping & Layout Engineering Lead / Facility Engineer.Client: DSME Offshore Engineering Corp. (DOEC).Project: ISO9001 certificate.

Fully responsible for the DSME Offshore Engineering Corporation's (DEOC's) ISO 9001:2008 implementation and certification in order to define the company's values, vision, strategy, operations & deliverables.

Project planning and (project milestone and baseline plan).

Gap Analyses to establish the scope of work.

Production of DSME Offshore Engineering Corporation's (DEOC) Quality Manual.

Production of governing documents such as procedures, forms & flowcharts, fully written to be used as a foundation and a template for DSME Offshore Engineering Corporation's quality system.

Implementation and introduction of a new DSME Offshore Engineering Corporation's (DEOC's) operating system including a Project Execution Method / Manual (PEM) to include and collect Procedures, work Instructions, flowcharts and activity descriptions in order to achieve one standardized way of working and execute projects.

3

Page 4: 1   re sume 2016 anders engstroem piping & layout

May 2014-June 2014.Employer: DSME Offshore Engineering Corp. (DOEC).Position: Facility Engineer & Piping Coordinator.Client: DSME Offshore Engineering Corp. (DOEC).Project: FEED verifications..

Providing strategic focus in the layout & piping engineering discipline (incuding the Methanol for system)* for FEED verifications of projects being bid for in the offshore arena.

This includes fixed and floating platforms / facilities including FPSO's, FLNG, Semi's, Spars and TLP's

Validate, ensure and confirm required quality & completeness for Pre-FEED and FEED documentation including:

* Definition of the scope of work. * Verification of Equipment location & piping Layout design. * Verification of HSE, SID & QRA requirements being implemented in design. * Verification of design being according to company’s material handling, maintenance

and inspection philosophy. * Verification of the use of correct method for quantification and weight estimate to

ensure required accuracy.

November 2013-May 2014.Employer: DSME Offshore Engineering Corp. (DOEC).Position: Contract Piping & Layout Engineering Lead / Facility Engineer.Client: Chevron.Project: N’dola topside.

DOEC / DSME Offshore Engineering Corporate Representative (Offsite/KBR) for the South N’DOLA Topside Project, Angola, Block 0, (Chevron & CABINDA GULF OIL COMPANY LIMITED).

Employed as the DOEC (DSME Offshore Engineering Corporation), Senior Piping & Layout Engineer, Houston, Texas, representing the DAEWOO INTERNATIONAL CORPORATION, supervising the KBR awarded South N’DOLA Topside EPCI Project, Angola, Block 0.

Work included the monitoring of KBR's execution of the all over platform layout, engineering & design, in order to capture everything not in compliance with Chevron's (the operator ) contract information(incuding the Methanol system)*, Basis of design & platform functional specification and Chevron's technical clarifications documents.

Working also included using their PDMS (Aveva) 3D model in order to monitor & supervise all the disciplines progress.

4

Page 5: 1   re sume 2016 anders engstroem piping & layout

Jan 2011-November 2013..Employer: ConocoPhillips, Houston, Oslo, Norway.Position: Contract Piping & Layout Engineering Lead / Facility Engineer.Client: ConocoPhillips ASA.Project: Ekofisk 2/4 Zulu wellhead production platform.

Detail Engineering of the new Ekofisk 2/4Z wellhead production platform. Employed as Company Representative Senior facility Engineer in ConocoPhillips Site Team at AkerSolutions ASA offices in Oslo, Norway, monitoring AkerSolutions work, providing the detail Engineering and design for the new Ekofisk 2/4Z wellhead production platform. Work included guiding AkerSolutions thru the FEED report (delivered by Mustang Engineering), North Sea design philosophy based primarily on applicable NORSOK standards, ConocoPhillips Technical clarification documents, ConocoPhillips design basis and functional specifications included in the EPCI contract awarded AkerSolutions.

Oct 2008-Jan 2011.Employer: ConocoPhillips, Houston, Texas, USA.Position: Contract Piping & Layout Engineering Lead / Facility Engineer.Client: ConocoPhillips, Houston Texas, USA.Project: Front End Loading study for New Ekofisk 2/4Z wellhead production platform.

(incuding the Methanol system)*

Employed as Senior Piping & Layout Discipline Lead in ConocoPhillips Site Team at Mustang Engineering’s offices in Houston, Texas, monitoring Mustangs work providing the FEED Engineering and design for the new Ekofisk 2/4Z wellhead production platform. Work included guiding Mustang thru the North Sea design philosophy based primarily on applicable NORSOK standards, ConocoPhillips Technical clarification documents, ConocoPhillips design basis and functional specifications.

Key Roles and responsibilities:

- Regulatory and Company compliance.

- Attend and actively contribute in technical piping discipline meetings.

- Day-to-day contact with Mustang Engineering’s piping engineers.

- Selection and evaluation of technology, identifying integration and infrastructure issues.

- Implement procedures and standards.

- Follow up contractors’ evaluation of technology and provide necessary interface with Operations during design stages.

- Report technical deviations.

- Present proposals and alternative solutions when required.

- Attend inter-discipline technical meetings.

- Attend technical audits as requested by management.

5

Page 6: 1   re sume 2016 anders engstroem piping & layout

- Process and follow up technical queries from contractors and Operations.

- Actively support other disciplines to ensure inter-discipline coherence and experience transfer.

- Participate in project risk management process.

- Participate in HAZID and HAZOP meetings.

May2006-Oct2008. Employer: AKER Solutions A/S, Stavanger, NorwayPosition: Project Engineer.Client: ConocoPhillips Norway.Project: Ekofisk Tank Cleaning Continuation.

Full responsibility for all engineering/design within the Piping & Layout discipline for a treatment plant designed for retrieval of the oily fluid floating on top of the cells on the Ekofisk 2/4 T platform to be exported to EKO X platform for re-injection. Including Studies/Pre-Engineering.

Jan2006-may2006 Employer: AKER Offshore Partner A/S, Stavanger, NorwayPosition: Discipline lead – Layout and Piping.Client: Exxon Mobile, Norway.Project: Low NOx conversion of Balder Generators - Study.

Responsible to conduct a feasibility study for conversion of the balder Wartsila generators to low NOx service. The objective of this study was to verify feasibility of and refine the selected modification concept of reducing the NOx emission from the generator sets by installing selective catalytic reduction systems (SCR). The study also included indications of the OPEX implications for operating the SCR systems and provide class 4 cost and schedule estimate for the required modifications.

6

Page 7: 1   re sume 2016 anders engstroem piping & layout

May2003-jan2006 Employer: AKER Offshore Partner A/S, Stavanger, NorwayPosition: Discipline lead – Layout and Piping.Client: ConocoPhillips, Norway.Project: Eldfisk Upside Project - Study.

Preparation of the piping cost estimate for new infrastructure alternatives evaluation.

(incuding the Methanol system)*

Apr2002-May2003 Employer: AKER Offshore Partner A/S, Stavanger, NorwayPosition: Discipline lead – Layout and Piping.Client: ConocoPhillips Norway.Project: Ekofisk 2/4 FTP BYPASS Topside Modifications.

Responsible for defining all pipe work in order to disconnect or/and blind off all lines required to isolate and make safe all redundant produced water equipment within the produced water handling system on the 2/4 K platform after shutdown in 2006.

Responsible for the design of new pipe work to the existing production manifolds at 2/4 B in order to transfer the multiphase flow directly to the new 2/4 M platform, the produced water system on 2/4 M will replace the 2/4 K produced water facilities after shutdown in 2006.

Feb2001-Apr2002 Employer: AKER OFFSHORE PARNER A/S, Stavanger, NorwayPosition: Discipline lead – Layout and Piping.Client: ExxonMobile.Project: ESSO BSSA (Broad Scope Services Agreement).

Full responsibility for all engineering/design within the Piping & Layout discipline. Tasks delegated to the discipline include: Studies/Pre-Engineering.

Technical proposals/S.O.W. definition/cost estimation/execution model preparation. Detail engineering and design.

Work preparations (methods and jobcards). Experience transfer within discipline and training.

Interface with project engineers, Operation leads, admin lead, vendors and others. Manpower resource planning.

Offshore surveys. Prefabrication, installation, vendor support/follow up. Interface with ENAS through the nominated project engineer.

7

Page 8: 1   re sume 2016 anders engstroem piping & layout

Jan 2000-Feb 2001 Employer: AKER OFFSHORE PARNER A/S, Stavanger, NorwayPosition: Piping discipline leader.Client: BP Amoco Norway.Project: Valhall Water Injection Project & Drilling Facilities Platform.

Liaison and co-ordination with other disciplines to produce final design. Direction of equipment layout and piping conceptual and detail design. Supervision of piping engineering and layout group during production of PDS Platform 3D-model. System responsible engineer for all seawater systems including layout & engineering, Valve selection, material selection, detail design, estimating quantities of material and Man-hour estimates. Conceptual and detail design of all pipe work for Interceptors in order to freeze nozzl locations for Vendor input. Estimating material and labour cost for fabrication and installation of all small bore Piping. Supervision of detail design of minor systems such as Methanol*, Hypochlorite, Hydraulic Oil, Jet Water, Water Mist, Wash Water & Chemical Injection.

Nov1998-Jan2000Employer: AKER OFFSHORE PARTNER A/S, Stavanger, NorwayPosition: Contract Piping Engineer.Client: Den Norske Stats Oljeselskap (Statoil), Norway.Project: Snorre ‘B’ tie-in to statfjord ‘B’

Responsible for the engineering, layout and design of the following systems:- Liquid flare.- Heating medium.- Open & closed drains.- Ballast water.

Also responsible for the engineering of all tie-ins to existing systems.

Jan1997-Nov1998Employer: KVÆRNER INSTALLASJON A/S, Stavanger, NorwayPosition: Contract Piping Engineer / PDMS Designer.Client: Den Norske Stats Oljeselskap (Statoil), Norway.Project: Gullfaks Satelitt prosjekt / Gullfaks ‘A’ Modifikasjoner.

Responsible for the engineering, layout and design for the integration of various systems in between the new M35 module and the existing platform, i.e. :Cooling Medium, Fuel Gas, glykol, Methanol system* , Firewater, etc. etc.Also responsible for the design of utility lines for new chemical injection package and all pipe work involved within the installation of New Firewater Pumps.Detailing of tie-ins and subsequent 3D modelling of pipelines using the PDMS,clash checking and isometric extraction.Also participated in concept optimizing study for the gullfaks satellite phase II.

8

Page 9: 1   re sume 2016 anders engstroem piping & layout

1996-Jan1997Employer: AKER OFFSHORE PARTNER A/S, Stavanger, NorwayPosition: Contract Piping Engineer.Client: Den Norske Stats Oljeselskap (Statoil), Norway.Project: Z2B/Norfra, Draupner (16/11) modifications.

Responsible for the engineering, layout and design of the following systems:- Hydraulic oil for the operations of miscellaneous process valves.- Nitrogen for purging.- Methanol system for scrubbing*- Open drains (oily) for new pig receiver.- Instrument air for the operations of miscellaneous valves for the flare and

pressurization gas systems.- 20” crossover line in between process gas manifolds.

1995-1996.Employer: TRANSOCEAN ENGINEERING & CONSTRUCTION, Stavanger, NorwayPosition: Contract Piping Lead Engineer.Client: Phillips Petroleum Company Norway.Project: Eldfisk 2/7 Bravo long term rig upgrade.

Responsible for initial piping offshore survey, production of CTR's and definition of scope of work for clients approval. Also being responsible for and supervise the detail engineering for the installations for the upgrade of the drilling facilities.

1994Employer: KVÆRNER INSTALLATION A/S, Stavanger, NorwayPosition: Contract Piping Engineer.Client: Conoco A/S, Norway.Project: Heidrun Field Development Contract (Inshore hook-up).

Production of installations tasks (packages) for inshore hook-up work transferred from module site using the "krokims" estimating norms covering the fabrication, installation and erection for completion performed inshore.

1993Employer: TRANSOCEAN ENGINEERING & CONSTRUCTION, Stavanger, NorwayPosition: Contract Piping EngineerClient: Phillips Petroleum Company, NorwayProject: Ekofisk 2/4 Charlie Conceptual Grade Estimate

Conceptual study for the potential upgrade of the drilling facilities and associated systems on Ekofisk 2/4 Charlie based on an expected rig life span of up to and including the year 2005 that comprises the following:

- Removal of the existing derrick mast and substructure (DDS).- Removal of the existing drilling system.- Installation of a new derrick mast and substructure (DMS) of approximately

1100 tons.- Installation of new improved drilling systems.- Upgrade of existing modules and systems (where necessary).

9

Page 10: 1   re sume 2016 anders engstroem piping & layout

1993Employer: TRANSOCEAN DRILLING A/S, Stavanger, NorwayPosition: Contract Piping EngineerClient: Phillips Petroleum Company NorwayProject: Ekofisk 2/4-E (Tor) feasibility Grade Estimate

Feasibility study to identify and quantify all aspects of the engineering offshore, hook-up and remedial maintenance work, pertaining to a limited upgrade of the drilling facility and associated systems which includes:

- Offshore site survey- Production of CTR's- Scope of Work

1993Employer: TRANSOCEAN DRILLING A/S, Stavanger, NorwayPosition: Contract Piping EngineerClient: Phillips Petroleum Company NorwayProject: Eldfisk 2/7-B Mud Additive/Dosing System

Being responsible for the detail engineering for installation of a mud additive dosing system in the 2/7 Bravo Sack Storage Area, within the pump module including:

- Preparation of the area to facilitate the new dosing system.- Re-routing of existing pipe work and modification to existing components.- Resolution of all interface areas to the vendor package.- Production of detail engineering package.

1993Employer: TRANSOCEAN DRILLING A/S, Stavanger, NorwayPosition: Contract Piping EngineerClient: Conoco Norway Inc. - Transocean No. 8 Operation Department.Project: Modification to ballast system, L.P. Mud System and Bilge System to provide storage

for mud in ballast tank.

- Offshore surveys to provide information for the pre- and detail engineering.

- Layout study for installation of complete system for transferring mud from either storage tank to the mud pits/pumps at the same time as mud is being transferred back to storage from the mud pits.

- Layout study for new installation of pump package with associated pipe work.

- Provide information to construction department for obtaining bids for pre-fabrication and estimating offshore hook-up and installation costs.

- Production of detail engineering package complete with scope of work for the offshore hook-up.

- Provide engineering assistance to the construction department relating to site queries during the construction/installation phase.

10

Page 11: 1   re sume 2016 anders engstroem piping & layout

1993 Employer: TRANSOCEAN DRILLING A/S, Stavanger, NorwayPosition: Contract Piping EngineerClient: Phillips Petroleum Company NorwayProject: Ekofisk 2/4 Charlie

Short Term Upgrade

Production of installation packages (prefab. + offshore hook-up) for modifications of the drilling facilities and associated systems for operational and maintenance requests.

1992-1993Employer: KVÆRNER INSTALLATION A/S, Stavanger, NorwayPosition: Contract Piping Engineer.Client: Statoil, Norway.Project: Sleipner 'A' atshore, inshore, offshore hook-up.

Work included production of test packages that covers the requirements for flushing, pressure testing, chemical cleaning, preservation and final cleaning of the piping systems of all process and utility piping, including piping within packaged or skid mounted units. (incuding the Methanol system)*

1991-1992Employer: VERITEC A/S, Stavanger, NorwayPosition: Contract Piping Engineer.Client: Phillips Petroleum Company, Norway.Project: Ekofisk Complex Firewater System Upgrade/Renovation-2/4 FTP Platform.

Employed as an Engineer being responsible for the upgrading of the firewater deluge systems on the 2/4 FTP Platform.

- Site surveys for relocating of deluge valves to safe location, replacing corroded pipe work and new design for added protection confirmed by design basis from "safety" and hydraulic analyses from "process".

- Being responsible for that the construction work packages and the prefabrication work packages includes all necessary information required for the new installations for the deluge systems.

- Supervision of the production of new firewater arrangement drawings produced on CAD.

- Responsible for the updating of progress reports, ctr's, document registers and general co-ordination with other disciplines.

11

Page 12: 1   re sume 2016 anders engstroem piping & layout

1990-1991Employer: VERITEC A/S - KALDNES DE GROOT, Stavanger, NorwayPosition: Contract Piping DesignerClient: StatoilProject: Snorre/Statfjord Tie-In.

Responsible for the design of installations such as:

- 4th stage compressor recycle line phase I and II.- Sample system and jet mix system for flow lines.- New bridles for level gauges, level switches and

transmitters for flash drum.- PSV's for gas backpressure control stations.- Snorre crude start-up facilities.

This includes offshore site surveys (stat 'A'), design studies and production of general arrangement drawings, fabrication isometrics, sections, support drawings and composite isometrics for the testing and flushing procedures.

1990Employer: VERITEC A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: British PetroleumProject: BP Gyda Fracturing of Water Injection Wells

Provide construction work package for fabrication and installation of pipe work required to complete thermally induced fracturing of Gyda W.I. wells.

1990Employer: VERITEC A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: Phillips Petroleum Company, NorwayProject: 2/4 T Area Classification and Ekofisk Complex Firewater System Modifications

(ACFW) Project.

Responsible for the AFE Cost Report for 2/4 T Deluge Systems. This included quantification of the remedial work necessary for the correct operation of the Deluge Systems.

1990Employer: KVÆRNER ENGINEERING A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: Phillips Petroleum Company, NorwayProject: 2/4D Remote Operation Project

Piping design study & cost estimate for Annuli Bleed System, Sea Sump System, Potable Water System & Winterization of Systems In Living Quarters to allow remote Operation from the Ekofisk Centre Control Room.

12

Page 13: 1   re sume 2016 anders engstroem piping & layout

1990Employer: MOSS ROSENBERG VERFT, Stavanger, NorwayPosition: Contract Piping DesignerClient: Saga Petroleum, NorwayProject: Snorre Sub Sea Template & Manifold

Production of fabrication isometrics.

1990Employer: SØRCO A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: StatoilProject: Statfjord Draughting Project

Design of Sand Jet Water Systems for separators on the Statfjord 'A' and 'B' Platform.

1989Employer: NORWEGIAN PETROLEUM CONSULTANTS A/S (NPC), Stavanger, NorwayPosition: Contract Piping DesignerClient: British Petroleum (BP), NorwayProject: Gyda Field Development Project

Production of completion system isometrics (composite isometrics).

1989Employer: MOSS ROSENBERG VERFT, Stavanger, NorwayPosition: Contract Piping DesignerClient: StatoilProject: Veslefrikk-B

Production of flushing and pressure testing isometric diagrams for the Veslefrikk-B Platform.

1988Employer: SØRCO ENGINEERING A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: Phillips Petroleum Company, NorwayProject: E & P

Design of 12 3/4" Gyda Gas Riser. Design study of routing within the jacket structure. draughting work included riser isometric, arrangement drawings and protective coating detail drawing.

13

Page 14: 1   re sume 2016 anders engstroem piping & layout

1988Employer: SØRCO ENGINEERING A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: StatoilProject: Veslefrikk-A

Layout within the wellhead area of the Veslefrikk-A Platform to determine routing of major flow lines with consideration being given to clash analysis of ancillary piping and structural steelwork.

1987-1988Employer: SØRCO ENGINEERING A/S, Stavanger, NorwayPosition: Contract Piping DesignerClient: Phillips Petroleum Company, NorwayProject: E & P

Mechanical flowsheet As-Built project. This included offshore site surveys, the producing of new drilling flowsheets for all drilling platforms, update or redraw all flowsheets for all platforms & supervision of the CAD draughting procedure.

Work also included production of layout and isometric drawings based on computer data for halon 1301 total flooding fire protection systems.

1986-1987Employer: SIGMA ENGINEERING AB, Gothenburg, SwedenPosition: Piping DesignerClient: Kema Nord, Columbus, Mississippi, USAProject: Kema Nord, Chemical Plant, Columbus, Mississippi, USA.

Piping design study & cost estimate for hydrogen gas, nitrogen gas, electrolyte & electrolyte return lines for installation of 2 new electrolyte cells with hydrogen gas separator, production of equipment layout, layout of general arrangement drawings, sections, mechanical flowsheets, isometric detailing, pipe support design & bills of material.

1985-1986Employer: NORWEGIAN PETROLEUM CONSULTANTS A/S, Oslo, NorwayPosition: Contract Piping DesignerClient: Norsk Hydro, Oslo, NorwayProject: Oseberg 'B'

Layout of general arrangement drawings & isometric detailing for Oseberg 'B' Topside.

14

Page 15: 1   re sume 2016 anders engstroem piping & layout

1985Employer: SIGMA ENGINEERING AB, Gothenburg, SwedenPosition: Piping Draughtsman. (Staff)Client: Purete OY, FinlandProject: Purete OY, Chemical Plant, Finland

Pipe support design & draughtingwork such as mechanical flowsheets, assembly drawings & detail drawings for new installation of chemical plant in Finland.

1985Client: BEROL KEMI AB, Gothenburg, SwedenProject: Revamp for Berol Ethylene oxide Plant, Stenungsund, Sweden

Site surveys & design study for firewater systems & sprinkler systems. Production of general arrangement drawings, pipe support design and isometric detailing.

1984Client: GEVEKO CHEMICALS AB, Gothenburg, SwedenProject: Geveko Chemical Plant, Gothenburg

Pipe support design & draughting work such as mechanical flowsheets, general arrangements, plot plans, isometrics, assembly drawings, vessel drawings & detail drawings for tank farm.

1984Client: SVENSKA VATTENFALL AB, Gothenburg, SwedenProject: Ringhals Nuclear Power Plant, Gothenburg, Sweden

Site surveys, design studies for process and utility systems, updating of general arrangement drawings, pipe support design, isometric detailing & bills of material.

15