1 | Energy Efficiency and Renewable Energy eere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013 Andrew Nicholls George Hernandez PNNL

Upload: yessenia-downing

Post on 28-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1 | Energy Efficiency and Renewable Energy eere.energy.gov

GridWise Architecture Council Meeting Edison Electric Institute Washington, DCAugust 28, 2013 Andrew Nicholls

George HernandezPNNL

Page 2: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

2

• Driver: EERE Grid Integration Initiative in FY 2014 Congressional Budget Request

• Outreach and Engagement– Sept. 2012 Participated in “Electricity Distribution System Workshop”– Nov. 2012 Participated in “Electricity Transmission System Workshop”– Dec. 2012 Building to Grid Technical Meeting at NREL with industry and DOE labs

to obtain input on EERE draft vision, establish community of thought, document state of art, identify barriers and opportunities

– Feb. 2013 GWAC Workshop in Atlanta – present EERE draft vision to GWAC Council, set stage for request of input on upcoming report

– Feb-May 2013 Engage GWAC to ensure strong bldgs. focus at May Conference– May 2013 GWAC Workshop: Overview of EERE Grid Integration Initiative and

DOE Technical Opportunities report, call for authors to help complete report– May 2013 GWAC TE Conference in Portland: plenary (Risser and Parks) and

buildings-focused sessions– June 2013 IEE (Edison Foundation) hosts Washington, DC meeting with

members with innovative utility projects (Con Ed, Pepco, NV Energy)– August 2013 GWAC Meeting at EEI

DOE Buildings Grid Engagement

Page 3: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

3

BTO Grid Integration Portfolio

• Buildings-to-Grid Reference Document (PNNL) – Define general characteristics of transaction-based framework needed

to form information backbone to realize vision; establish distinction between physical/financial transactions, define who can participate and how and value thereby; define functional requirements of solutions that could scale.

– Draft due end of Fiscal Year, Final end of Calendar Year

• Case Studies of Transactions-Based Approaches (DOE labs, industry)– Compile list of case studies with range of transactions-based elements to

understand state of art, lessons learned, and gaps. Include relevant buildings controls projects.

– Federal Register Request for Information– Your input would be greatly appreciated– End Product: Searchable online database

Page 4: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

4

Page 5: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

5

• Evaluate Demand & Renewable Energy Response in building technologies (PNNL) (Heat pump water heaters, commercial building rooftop HVAC units)– Project goals - Evaluate degree to which

• Demand response/ancillary services can be provided • Response provides substantial added value to consumers• Effective accommodation of variable generation assets is feasible• Response compromises ability to provide traditional peak load management

services, reduces equipment life, or reduces delivered energy efficiency

• Grid-Ready Building Equipment (PNNL, LBNL, Navigant) – Address data/communication/interoperability protocols/standards for device

engagement & control as part of a demand management strategy

• Talk to Rob Pratt if you would like more information about these projects

BTO Grid Integration Portfolio

Page 6: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

6

• Process– Define BTO vision, broadly characterize barriers and challenges, identify

attributes of solutions: DOE, LBNL, NREL, ORNL, PNNL – Examine challenge from three points of view: Grid-to Buildings;

Buildings-to-Grid; enabling Communications and information technology– Define technical, market and policy gaps between the vision and today’s

solutions – Identify participant-specific value propositions for engaging in

transactions-based approach to energy

• Timeline– Draft V1 of report with lab input completed May 2013– Draft V2 with industry input by Sept. 2013– Post report for public comment (Request for Information) in Federal

Register by Oct. 2013

Buildings-to-Grid Technical Opportunities Report

Page 7: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

7

B2G Technical Opportunities Report – Vision

To achieve the nation’s objectives for utilities to accommodate high levels of clean energy generation while improving reliability and maintaining the cost effectiveness of the power grid, this new installed grid infrastructure must be used in a continuously optimized manner. The framework DOE proposes will therefore need to enable the harnessing and coordination of millions of small, distributed assets such as demand response (DR) in buildings, distributed generation and storage, and EVs to provide valuable grid services. The purpose of transaction-based control schemes for these assets is to seamlessly integrate them into a collaborative, incentive-based network that, from the perspective of grid operations, functions as a virtual control system, and enables and motivates them to transact and deliver energy services to the grid at the lowest possible cost while providing building owners and occupants new value streams.

Page 8: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

8

Thank you to reviewers from following entities

1. Caron Consulting2. Carrier3. Cisco 4. Emerson5. Enernex6. GE Appliances7. Honeywell

8. Joule Assets9. MIT10.NIST11.Quality Logic12.Sensus Metering

Systems 13.Trane

Page 9: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

9

Sample Input on Gaps from Utility POV

• Lack of a comprehensive grid control architecture that provides means to perform B2G integration– Federations, disaggregation, constraint fusion, boundary deference,

coordinated local “selfish” optimization

• Lack of grid communications infrastructure that would support a comprehensive grid control architecture

• Present regulatory environment does not support necessary local or distributed energy market elements

• Utility business models do not encourage B2G adoption• Unclear impact of utility cyber and physical security

requirements on B2G control integration• Distribution level grid connectivity may be poorly known,

leading to power and control integration difficulties

Page 10: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

10

What DOE Requests from GWAC Members

• Industry help in identifying Significant Gaps (between Barriers and Vision) from Grid, Buildings, Communications perspectives. – Where do challenges exist for which no or very little work is being

conducted today? – What gaps must to be addressed to take promising solutions to scale?

• Industry help in describing potential participant-specific value propositions for actively engaging in buildings-to-grid integration from Grid, Buildings, Communications perspectives. – Why will IOUs, investor-owned utilities, publicly owned power systems,

and load-serving entities and others want to participate, given their own motivations?

– Why will building owners want to participate? What specific benefits might they see?

• Case Studies• Send Comments to Andrew Nicholls [email protected]

Page 11: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1111

Page 12: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

12

Project Objectives and Team

• The transactional network enables energy saving retrofit solutions AND the networked systems to transact with the grid to mitigate variable distributed renewable energy sources

• Initially, the transactional concept is demonstrated using networked RTUs

• In the future, the concept can be extended to network other building systems, interaction between buildings and electric vehicles

• Work is being done at the three national laboratories– Pacific Northwest– Oak Ridge – Lawrence Berkeley

Page 13: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1313

What is the Transactional Network?

• Transactional network enables:– Interactions among networked systems (e.g. RTUs and other building

systems) and the electric power grid– software applications on the platform or in the Cloud

• Embedded automated diagnostics and advanced controls on the transactional platform and the RTU controller

• Applications running in the Cloud in cases where the transactional platform and controller resources (i.e. processing) are inadequate

• Applications that provide continuous monitoring and verification, automated energy management, etc.

Page 14: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1414

• Packaged air conditioners and heat pumps (RTUs) are used in about 58% of all cooled commercial buildings, serving about 69% of the cooled commercial building floor space (EIA 2003)– Packaged A/C uses 0.9 quads of electricity for cooling

annually and 0.4 quads of heating (source)

• Operating efficiency is low due to lack of:– advanced controls to improve part load performance– equipment maintenance

• RTUs cannot easily interact with the grid to be more responsive to grid needs

Why RTUs?

Page 15: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1515

• Challenge: Most RTUs operate inefficiently – lack of advanced controls

• constant supply speed fan, integrated economizer controls and constant ventilation

• Objective: Improve operational efficiency of RTUs through use of advanced RTU controls leading to energy and carbon emission reductions between 30% and 50%

• Implementation: Install variable frequency drives on supply fans and retrofit the RTU with an advanced controller having following control strategies: – integrated economizers

– variable or multiple speed fan

– variable capacity control and

– demand controller ventilation

• Verification of Performance: Comparison of consumption between standard and advanced RTU control modes

Embedded Advanced RTU Controls

Page 16: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1616

• Inputs: DR signal from an external source• Outputs: Modifies RTU control sequences by changing space set

point temperatures, controls supply fan speed (if the fan has a variable frequency drive), limits compressor staging

• Verification of Performance: Comparison of estimated expected consumption with actual measured

Demand Response Agent

• Control Actions:– Pre-cooling, set point adjustments

and fan speed changes– Post-DR recovery will be gradual

to avoid “rebound” effect

Page 17: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1717

• AFDD Capabilities:– Comparing discharge air temperature with

mixed air temperature (AFDD0)– Checking damper modulation (AFDD1)– Sensor faults (outdoor, mixed and return air

temperature) (AFDD2)– Not economizing when RTU should (AFDD3)– Economizing when RTU should not (AFDD4)– Excess outdoor air (AFDD5)– Inadequate outdoor ventilation air (AFDD6)

• Unique: Diagnostics algorithms will initiate proactive tests (e.g. commanding damper, etc.)

• Energy Impacts: Energy impacts will be estimated for AFDD3, AFDD4 and AFDD5 faults

Automated Fault Detection and Diagnostics: Air Side Agent

Page 18: 1 | Energy Efficiency and Renewable Energyeere.energy.gov GridWise Architecture Council Meeting Edison Electric Institute Washington, DC August 28, 2013

1818

Microsoft Azure Cloud

Data-base

SMDSWeb UI- Server

Smart Monitoring + Diagnostics System

VOLTTRON Lite

Information Exchange Bus

RTU 1 RTU nRTU 2 RTU 3 …

Web Access

Controller Controller Controller Controller

AgentDevice Driver

Agent Agent

Agent

•Inputs: Uses only three data points sampled at 1 minute intervals

–Outdoor air temperature– Total RTU power

– Fan speed signal

•Outputs: Automatically detects and reports

–Refrigerant-side performance degradation (or improvement)

–Energy and cost impacts of the degradation (or improvement)

–Operation schedule changes–Selected operation faults, such as

compressor short cycling, 24/7 operation, system never on, and inadequate ventilation