04 | define a software iteration steven borg | co-founder & strategist, northwest cadence...
TRANSCRIPT
04 | Define a Software Iteration
Steven Borg | Co-founder & Strategist, Northwest CadenceAnthony Borton | ALM Consultant, Enhance ALM
• Plan a release
• Define project-tracking process
• Scope a project
Module Overview
Click to edit Master subtitle style
Microsoft Virtual Academy
Plan a release
What the Study Guide says…
• Plan a release.– identifying a flexibility matrix– identifying releases based on priority items in
flexibility matrix and release criteria– resource planning (Scrum team is responsible for
allocating team members)– identifying techniques to optimize a team that is
geographically distributed– selecting a project methodology– risk management
What (the ^&*%#) is a flexibility matrix?• Based on the Iron Triangle – Scope, Resources,
Schedule
Most Flexible
Moderately Flexible
Least Flexible
Scope
Resources
Schedule
“identifying releases based on priority items in flexibility matrix and release criteria”
• No.
• Think agile. Think lean.
• Think delivering business value in small increments, quickly, with high quality.
• Think backlogs, velocity, and forecasting sprints
• Then, if all else fails, think of traditional work breakdowns in Project, with predecessors, external dependencies and critical paths.
Sprint Capacity Planning
Geographically distributed teams
• Use electronic tools to share documents and data– SharePoint, TFS, etc
• Pay close attention to cultural issues
• Use video when possible
• Do not post key documents or data only on the wall of the ‘home office’
Click to edit Master subtitle style
Microsoft Virtual AcademyDefine project-tracking
process
What the Study Guide says…
• Define a project-tracking process.– identifying a project tracking tool and an associated
process (triage process, bug management)– defining how to manage effort– determining team forecast management– defining a prioritization scheme– determining how to validate project health
Identifying an appropriate tool for project management• Primary MS tools for tracking software development
projects are TFS and Project
• TFS is very strong at handling most software development efforts, however it is weak at predecessor/successor relationships, handling efforts outside the development team, and identifying key measures such as the critical path.
• MS Project is strong at many of the things TFS is weak at, however it is weak in gathering data through the normal day to day activities of the team, as well as most other software development project tracking needs.
Forecasting delivery*
Reports – Use them
• Bug Status
• Bug Trends
• Build Quality Indicators
• Build Success Over Time
• Build Summary
• Burndown and Burn Rate
• Reactivations
• Remaining Work
• Requirements Overview
• Requirements Progress
• Status on All Iterations
• Test Case Readiness
• Test Plan Progress
• Unplanned Work
Click to edit Master subtitle style
Microsoft Virtual Academy
Scope a project
What the Study Guide says…
• Scope a project.– scoping the effort for a release– defining an architecture design process– defining scope boundaries (is/is not list)– determining the definition of “done”– defining a process when effort estimates are significantly
inaccurate
Determining effort and release plan
Architectural design – Layer Diagrams
Architectural design – DGML
Architectural design – UML Diagrams
Architectural Diagrams
• Good for sharing knowledge of the design
• Good for collaboration
• Layer diagrams can enforce architectural standards by limiting what is allowed/disallowed inside of a layer (done primarily by namespace)
• Architecture requirements in a layer diagram can be validated during a build.
• DGML diagrams can be extended to include more than just architectural elements.
Definition of Done
• In Scrum, the team agrees on what it means for a task, user story, bug or other item to be ‘done’
• The Definition of Done is generally beyond the acceptance criteria specified in a user story or product backlog item.
• Don’t overthink this section.
• Many of the ideas here are covered directly by the Scrum and process overviews done earlier today.
EXAM BEST BETS
©2013 Microsoft Corporation. All rights reserved. Microsoft, Windows, Office, Azure, System Center, Dynamics and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.