Damage Assessment MethodologyAn Overview
Prof. Ravi SinhaIndian Institute of Technology Bombay
Seminar on Loss and Damage Assessment Methodologies, Ahmedabad, April 21, 2005
Damage and Loss Assessment Methodology Developed byAsian Disasters Preparedness Centre
Centre for Environmental Planning and TechnologyIndian Institute of Technology Bombay
![Page 2: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/2.jpg)
2
Context of Damage Assessment
• Primary focus is on condition of physical assets:– Buildings (Residential, Office,
Commercial, Lifeline etc.)– Roads and Bridges– Water supply and sanitation structures– Dams and other irrigation structures– Industrial facilities (including power
plants)– Ports and other coastal structures– Electrical and Communications system
structures
![Page 3: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/3.jpg)
3
Objectives of Damage Assessment
• Will depend on the type and intensity of the disaster
• Minor/moderate disasters:– Estimate total losses (for reporting and policy
purposes)– Help develop repair/rehabilitation procedures
• Major disasters:– Same objectives as for minor/moderate
disasters– Also assess extent of damage to buildings
and other structures (and its geographical distribution)
![Page 4: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/4.jpg)
4
Objectives of Damage Assessment
• Short-Term (within a few days):– To quickly identify the safe and unsafe buildings– To quickly estimate total damage losses (for
reporting and policy purposes)– To quickly identify status of lifeline buildings and
other structures
• Medium-Term (within a few weeks):– To assess safety status of doubtful category
structures– To reassess and quantify damage losses
• Long-Term (few months to years):– To help develop rehabilitation/retrofitting
procedures – To help identify deficiencies in prevalent technical
knowledge and its implementation mechanisms
![Page 5: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/5.jpg)
5
Primary Focus for DA• Structures which are owned by multiple
agencies of the government• Structures that may require government
funds for repairs or rehabilitation (including private buildings)
• Structures that affect a large number of people
BuildingsBridgesTanks and storage reservoirs (UGSR, GSR & ESR)
![Page 6: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/6.jpg)
6
Secondary Focus for DA• Structures owned or operated by
specialised agencies• Very complex structures that require
high-level technical skills for assessment
Complex industrial facilitiesPort and harbour structuresPetrochemical infrastructureDamsRoadsElectrical generation & transmission networks, etc.
![Page 7: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/7.jpg)
7
Basic Philosophy of DA
Should be based on international sound-practicesShould consider the types of structures prevalent in GujaratShould consider the technical skills likely to be available after a disasterShould incorporate experiences from recent disasters, particularly the 2001 earthquake and 1998 cyclone disasters
![Page 8: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/8.jpg)
8
Damage Assessment for Buildings
Method should dependent on building typeVery large number of buildings are likely to be damaged in a major disaster – Method should be relatively rapidStructural repairs are based on technically detailed evaluation – Method should be technically rigorousMethod should consider the variations in international “best practices”
![Page 9: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/9.jpg)
9
Damage Level (%) HAZUS-99 FEMA-273 EMS-98 /
MSK-64 ATC-13 ATC-20
0 No-Damage Limit State (Grade 0)
10
Slight DamageImmediate Occupancy
Grade 1 Slight
Green Tag20
Grade 2 Light30
40 Damage Control50
Moderate Damage Grade 3
Moderate
Yellow Tag60
Life Safety70
Heavy80Extensive Damage
Limited Safety
Grade 490 Near CollapseRed Tag
100 Partial Collapse Major
Collapse Limit State (Grade 5)
Approximate Equivalence Between Existing Damage Scales for Buildings
![Page 10: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/10.jpg)
10
Damage Level (%) HAZUS-99 FEMA-273 EMS-98 /
MSK-64 ATC-13 ATC-20
0 No Damage Limit State
10
Slight DamageImmediate Occupancy
Grade 1 Slight
Green Tag20
Grade 2 Light30
40 Damage Control50
Moderate Damage Grade 3
Moderate
Yellow Tag60
Life Safety70
Heavy80Extensive Damage
Limited Safety
Grade 490 Near CollapseRed Tag
100 Partial Collapse Major
Collapse Limit State
Approximate Equivalence Between Existing Damage Scales for Buildings
Intended forrapid safetyassessment
![Page 11: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/11.jpg)
11
Damage Level (%) HAZUS-99 FEMA-273 EMS-98 /
MSK-64 ATC-13 ATC-20
0 No Damage Limit State
10
Slight DamageImmediate Occupancy
Grade 1 Slight
Green Tag20
Grade 2 Light30
40 Damage Control50
Moderate Damage Grade 3
Moderate
Yellow Tag60
Life Safety70
Heavy80Extensive Damage
Limited Safety
Grade 490 Near CollapseRed Tag
100 Partial Collapse Major
Collapse Limit State
Approximate Equivalence Between Existing Damage Scales for Buildings
Intended forestimating Value of damage
![Page 12: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/12.jpg)
12
Damage Level (%) HAZUS-99 FEMA-273 EMS-98 /
MSK-64 ATC-13 ATC-20
0 No Damage Limit State
10
Slight DamageImmediate Occupancy
Grade 1 Slight
Green Tag20
Grade 2 Light30
40 Damage Control50
Moderate Damage Grade 3
Moderate
Yellow Tag60
Life Safety70
Heavy80Extensive Damage
Limited Safety
Grade 490 Near CollapseRed Tag
100 Partial Collapse Major
Collapse Limit State
Approximate Equivalence Between Existing Damage Scales for Buildings
Intended forearthquake
intensityestimation
![Page 13: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/13.jpg)
13
Damage Level (%) HAZUS-99 FEMA-273 EMS-98 /
MSK-64 ATC-13 ATC-20
0 No Damage Limit State
10
Slight DamageImmediate Occupancy
Grade 1 Slight
Green Tag20
Grade 2 Light30
40 Damage Control50
Moderate Damage Grade 3
Moderate
Yellow Tag60
Life Safety70
Heavy80Extensive Damage
Limited Safety
Grade 490 Near CollapseRed Tag
100 Partial Collapse Major
Collapse Limit State
Approximate Equivalence Between Existing Damage Scales for Buildings
Multiple methods arerequired to satisfy
overlapping objectives
![Page 14: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/14.jpg)
14
Proposed Procedure for Damage Assessment for Buildings
International experience clearly shows that a single “fit-all” methodology not feasible to satisfy all short, medium and long-term objectivesThree-step methodology has been proposed:
Rapid Safety AssessmentDetailed Safety AssessmentEngineering Evaluation
![Page 15: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/15.jpg)
15
Proposed Procedure for Damage Assessment for Buildings
Rapid Safety AssessmentRequired for ALL damaged buildings after a disasterMethod is based on ATC-20 with suitable modifications
Detailed Safety AssessmentRequired for all doubtful buildingsRequired for all buildings being considered for compensationMethod is based on international best practices after elimination of deficiencies in existing practice
Engineering EvaluationRequired for buildings considered for engineered rehabilitation/retrofitting
![Page 16: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/16.jpg)
16
Damage Assessment for Bridges
Low redundancy structures – collapse may be sudden and catastrophicStructural repairs are based on technically detailed evaluation – Method should be technically rigorousDamage assessment likely to be carried out by technical persons from the responsible line departmentsDamage assessment procedure developed based on these considerations
![Page 17: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/17.jpg)
17
Damage Assessment for Roads
Damage assessment based on visual evaluationsDamage assessment likely to be carried out by technical persons from the responsible line departmentsDamage assessment procedure developed based on these considerations
![Page 18: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/18.jpg)
18
Damage Assessment for Storage Reservoirs
Low redundancy structures – collapse may be sudden and catastrophicRepairs are based on technically detailed evaluation – Method should be technically rigorousInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 19: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/19.jpg)
19
Damage Assessment for Irrigation Structures
Damage assessment mainly based on visual observationsInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 20: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/20.jpg)
20
Damage Assessment for Surface Pipelines
Damage assessment mainly based on visual observationsInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 21: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/21.jpg)
21
Damage Assessment for Water Supply and Sewerage
Damage assessment mainly based on visual observationsInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 22: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/22.jpg)
22
Damage Assessment for Ports and Harbours
Damage assessment initially based on visual observationsRepairs are based on technically detailed evaluation – Method should be technically rigorousInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 23: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/23.jpg)
23
Damage Assessment for Electricity Generation
Structures Damage assessment initially based on visual observationsRepairs are based on technically detailed evaluation – Method should be technically rigorousInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 24: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/24.jpg)
24
Damage Assessment for Electricity Transmission and
Distr. Damage assessment mainly based on visual observationsInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 25: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/25.jpg)
25
Damage Assessment for Industrial Structures
Damage assessment initially based on visual observationsRepairs are based on technically detailed evaluation – Method should be technically rigorousInitial damage assessment likely to be carried out by owners or users with limited technical skillsDamage assessment procedure developed based on these considerations
![Page 26: 04 damage assessment methodology](https://reader033.vdocuments.mx/reader033/viewer/2022061220/54bc08b74a7959d8398b45ed/html5/thumbnails/26.jpg)
26
Damage Assessment for Environmental Impact
Environmental Impact assessment needs to consider the environmental and social impact of the disasterAssessment needs to be carried out over long-term to quantitatively evaluate the impactDamage assessment procedure developed based on these considerations