02 ace 2010 lear global plm aras implementation

18
Aras Innovator Implementation Lear Corporation Aras Community Event Aras Community Event May 2010

Upload: prodeos

Post on 26-Jun-2015

686 views

Category:

Documents


0 download

DESCRIPTION

Lear presentation about their Aras Innovator Implementation

TRANSCRIPT

Page 1: 02 Ace 2010 Lear Global Plm Aras Implementation

Aras Innovator ImplementationpLear Corporation

Aras Community EventAras Community EventMay 2010

Page 2: 02 Ace 2010 Lear Global Plm Aras Implementation

About Lear...About Lear...

• Major automotive parts supplier with 2009 sales of $9.7Bj p pp $

• 75,000 employees at 197 locations in 35 countries

H d t d i S thfi ld Mi hi• Headquartered in Southfield, Michigan

• Two large product segments:– Seating Systems– Electrical Power Management Systems

• Electrical Distribution• Electronics

Page 3: 02 Ace 2010 Lear Global Plm Aras Implementation

Objective No. 1: Make the product data available to every function for their own useto every function for their own use

Page 4: 02 Ace 2010 Lear Global Plm Aras Implementation

Objective No. 2: Use best-in-class processes to manage the product datamanage the product data

Problem Report Problem Report Problem Report

Change Request

Change Notice

CMII Compliance

Page 5: 02 Ace 2010 Lear Global Plm Aras Implementation

Objective No. 3: Create the necessary linkages to enable automationenable automation

Page 6: 02 Ace 2010 Lear Global Plm Aras Implementation

Before Aras Innovator Implementation

)Hom

e-g ill (

PTC)

grown

Win

dchi

CMTS

(Cross-Functional Change Workflow)

GCDB

(Part Attributes and Docs)

W

Workflow)

(Aras Innovator)Components ~100,000D i 30 000Drawings ~30,000

Page 7: 02 Ace 2010 Lear Global Plm Aras Implementation

Roadmap

Project and Phase III

Assembly Quality tracking and document

management

Assembly Mfg Process and

document management

Deliverables Management

Phase III

Preferred Components and Suppliers

Tooling Documents, Attributes, Management, and

Linkages to Components

Quality Doc Management and Linkages to

Components

Assembly Product Structure, Engineering Workflow, and Related Document Management

Cross-Functional Change

Management

Phase II

Component Definition and Management

Linkages to ComponentsComponents

Phase I

Page 8: 02 Ace 2010 Lear Global Plm Aras Implementation

Significant Factors in Choosing Aras Innovator

• CMII Compliancep

• No-cost licensing

– Everybody that deals with product change must have access (over 1,000 users)

• Configurability

• User Interface

Page 9: 02 Ace 2010 Lear Global Plm Aras Implementation

Current and Planned Infrastructure

• One global database in Southfield, MIg ,• Accessed from:

– Spain – US– Mexico– Honduras– Argentina

– Poland– Romania– Germany

– Philippines– China

y– Sweden– Japan– and Others

• Regional Vaults to be deployed during Phase 2 for CAD data

– and Others

Page 10: 02 Ace 2010 Lear Global Plm Aras Implementation

Phase 2 Planned CAD Integrations

• MCAD– CATIA v5– UG NX

• ECAD (PCB Design)ECAD (PCB Design)– PADS– PCAD

Th fil l• Three file vaults– North American region (U.S.)– European regionp g– Asia-Pacific region

Page 11: 02 Ace 2010 Lear Global Plm Aras Implementation

Phase 1 Scope

Page 12: 02 Ace 2010 Lear Global Plm Aras Implementation

Phase 1 Functionality

• Part Class Tree

M th 400 t b– More than 400 part sub-classifications

– Purposefully made FlatPurposefully made FlatNo distinction between component or assembly

Page 13: 02 Ace 2010 Lear Global Plm Aras Implementation

Phase 1 Functionality

• Customized form-to-part relationship functionality• Shows only properties that apply to a certain part type

Compliance Spec Ref

• Customer specs

• Industry specs

• Other specs

Part # Cross Ref

• Supplier part#’s• Supplier part# s

• Customer part#’s

• Old legacy part#’s

Many have 15+ x-ref

Page 14: 02 Ace 2010 Lear Global Plm Aras Implementation

Phase 1 Functionality

• Windows Live Search incorporated for document searches

• All documents are converted to PDF and OCR’d through• All documents are converted to PDF and OCR d through use of third-party tool

Page 15: 02 Ace 2010 Lear Global Plm Aras Implementation

Configuration vs. Customization

• Configuration– Workflows– Basic formsBasic forms– Users

• Customizations– Normalized data model– Enhancements to improve performance (Open Contribution)– Part forms related to part classificationsp

• Some customizations performed by Lear IT team• Lear IT team has started doing sophisticated

customizations• “Core” items done with support of Aras development

teamteam

Page 16: 02 Ace 2010 Lear Global Plm Aras Implementation

“Cool” Customization

Part Class Rel FormPart Class Rel Form

• Part Class Rel Form enables the proper association of• Part Class Rel Form enables the proper association of forms to different part classes

• Enables the automation of part properties based on class and on other part attributes

Page 17: 02 Ace 2010 Lear Global Plm Aras Implementation

“Cool” Customization

Part Class Rel FormPart Class Rel Form

Page 18: 02 Ace 2010 Lear Global Plm Aras Implementation

Conclusions and Observations

• Aras Innovator enables the Lear desired processes– CMII compliance– Linkages of all CM itemsLinkages of all CM items

• Primary Documents to Parts• Secondary Documents to Tools

Unlimited access to one database from global user base– Unlimited access to one database from global user base

• Learning how to configure Aras Innovator started slow but going through initial deployment allowed us to become proficient

• Lear is now able to do a lot more customizations internally to enable a cost-effective deploymentinternally to enable a cost-effective deployment