01.project beverage transportation

Upload: rajesh-radhakrishnan

Post on 09-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 01.Project Beverage Transportation

    1/43

    INTERNATIONALSCHOOLofINFORMATICS

    & MANAGEMENT

    A Heritage of Vision .A Legacy of Innovation

    SynopsisOf

    Beverage transportation system

    eam membersDITYA GANDHITUL CHOUBISA under the guidance oHEELA JAIN prof. JYOTI KHURAN

  • 8/8/2019 01.Project Beverage Transportation

    2/43

    Introduction

    Purpose

    Beverage transportation system is required to provide a computerized system which could be hoisted by plants

    bottle filling factories to manage the inns and outs of the beverages and more efficient use of the resources. Tshould help the all the managers to administrate the transportation and employee status.

    He should be able to access the information about

    Dispatch details of the filled bottles.

    Cost of the dispatched bottles.

    Details of incoming empty bottles.(Quantity, type, size of bottles etc.)

    Details of product dispatched in bottles.

    He should be able to keep track of all the distributors and compare the standard of services provided tothem.

    A separate track of all the trucks which are in use or might be required in future of the organization canmanaged.

    Employee Information about all truck drivers, assistant labors etc can be stored and retrieved as per the

    requirements.

    AIM

    Aim of the project is to provide a software solution for the purpose of management of the transports of a plant efficient handling of the beverage items by providing all the above mentioned features.

  • 8/8/2019 01.Project Beverage Transportation

    3/43

    Scope of the software

    The scope of the software depends upon present and future use of the software. It also depends upon whether tcurrent system could be modified according to

    Different future needs

    Competitive environment in future

    Present scenario

    At present not only the system is fully ready it can also perform all needs of the system

    It can maintain the records of brands.

    Searching, modifying and deleting of the existing records easily.

    The search of records of clients.

    It can produce a lot of useful Reports.

    Administrator can change his password whenever he wants.

    Administrator and other users can get their lost password through the system.

    .

    Future scenario

    System can be modified according to different regions and as per the requirement to fit the system

    Project requirement

    When the business expands, the number of records grows in millions. Therefore many times the system

  • 8/8/2019 01.Project Beverage Transportation

    4/43

    not handle such an overhead of data, sometimes crashes and the whole work stops due to the load of da

    Full dependency on physical records and human being makes the searching and fetching of data verycomplex.

    Everyday records are increasing in multiples so record maintaining is tough.

    It does not exhibit the platform independent features.

    No protection & authentication is provided so that to control the threats arising from theft of data anddestruction of data.

    Technologies to be used

    This Software is developed with Front End as

    Asp.net, VB script, HTML.

    Back End as My Sql, IIS web server.

    Interfaces

    a) Software Interface:

    Client on Intranet : Client Software, LAN Connectivity with Server,Operating System (any)

    Web Server : IIS, Operating System (any) Data Base Server : Mysql, Operating System (any)

  • 8/8/2019 01.Project Beverage Transportation

    5/43

    b) Minimum Hardware Interface:

    Client Side

    ProcessorRAM Disk Space

    Internet Explorer 6.0Pentium III at 500

    MHz 128 Mb 1GB

    Server Side

    IIS web server Pentium III at 1 GHz 1GB 5GB

    My sql Pentium III at 1 GHz 1GB2GB(Excluding Data

    Size)

    c) Communication Interface:

    Client on Internet will be using HTTP/HTTPS protocol. Client on Intranet will be using TCP/IP protocol.

  • 8/8/2019 01.Project Beverage Transportation

    6/43

    Feasibility Study

    feasibility study phase we had undergone through various steps, which are described as under:How feasible is the system proposed? This was analyzed by comparing the following factors with bo

    sting system and proposed system:-

    a) What are the users needs and how does a beverage transportation system meet them?b) What resources are available to give this transportation system? Is the problem worth solving?c) What is the likely impact of this transportation system on the organization? How well does it fit with

    organizations plans?

    asibility analysis:-

    s done so that an ill-conceived system is recognized early in definition phase of software engineering. This phally important as it finds out whether the idea thought is possible or not.

    Economic analysis:this is an in-house project for the firm, to be used for its own convenience and also it is not that big a project. So nequires a huge amount of money or nor any infrastructure need to be set up for it.

    Technical analysis:uring Technical analysis, the technical merits of the system are studied and at the same time collecting additformation about performance, reliability, maintainability and predictability.

    Operational analysis:e project is operationally feasible. This project is being made for the convenience of the any of the firms users executing beverage transportation and wish to have it managed efficiently.

    orking of the Present System:

    always manual systems may seem to be easy at the initial stage but becomes hectic when the system grows. This the record maintenance and stock verifications handled in various soft drink and beverage plants.

    lot of attention and experience was required to deal with the manual system. As there were bottlenecks that were hu

    the smooth and efficient functioning of processing of records, thus there was a need for change in the system.

    e idea for change originates from within the organization top management, the user, the analyst. As the organianges its operation or faces advances in computer technology, some one within the organization may feel the nedate existing system or application.

    rious problems in operations, a high rate of labor turnover, labor intensive activities, and high rejection rates oducts, also prompt top management to initiate an investigation.

  • 8/8/2019 01.Project Beverage Transportation

    7/43

    xisting system had following bottlenecks and drawbacks:-

    Various hard copies and registers were maintained for day to day work.

    The queries regarding the status of the stock and work order required a lot of manual work, which was an ovein the expense of time and money.

    The paper work and registers occupy a lot of space.

    No security of records as any one can access them and extract the important details.

    Reporting was prepared manually in excel or by pen and paper, which is time consuming and tedious job foemployee.

    Manual reporting can raise error due to iterative work and human involvement.

    Searching records to get any details was very difficult.

    A lot of attention and experience was required to deal with the manual system.

    roposed System:-

    It is a window application and user can work on it using any platform.

    Report generation time will be reduced.

    It reduces the time for manual errors and their corrections.

    Highly secured system, Easy user interface and timeliness

    Transportation charges will be reduced.

    It requires less Man power.

    Cost

    The cost required in the proposed system is comparatively less to the existing system.

  • 8/8/2019 01.Project Beverage Transportation

    8/43

    Time

    Also the time required generating a report or for doing any other work will be comparatively very less than existing system. Record finding and updating will take less time than the existing system.

    Labor

    In the existing system the number of staff required for completing the work is more while the new systemrequire quite less number of staff.

  • 8/8/2019 01.Project Beverage Transportation

    9/43

    Database

  • 8/8/2019 01.Project Beverage Transportation

    10/43

  • 8/8/2019 01.Project Beverage Transportation

    11/43

    SNAPSHOTS

  • 8/8/2019 01.Project Beverage Transportation

    12/43

  • 8/8/2019 01.Project Beverage Transportation

    13/43

  • 8/8/2019 01.Project Beverage Transportation

    14/43

  • 8/8/2019 01.Project Beverage Transportation

    15/43

  • 8/8/2019 01.Project Beverage Transportation

    16/43

  • 8/8/2019 01.Project Beverage Transportation

    17/43

  • 8/8/2019 01.Project Beverage Transportation

    18/43

  • 8/8/2019 01.Project Beverage Transportation

    19/43

  • 8/8/2019 01.Project Beverage Transportation

    20/43

  • 8/8/2019 01.Project Beverage Transportation

    21/43

  • 8/8/2019 01.Project Beverage Transportation

    22/43

  • 8/8/2019 01.Project Beverage Transportation

    23/43

  • 8/8/2019 01.Project Beverage Transportation

    24/43

  • 8/8/2019 01.Project Beverage Transportation

    25/43

  • 8/8/2019 01.Project Beverage Transportation

    26/43

  • 8/8/2019 01.Project Beverage Transportation

    27/43

  • 8/8/2019 01.Project Beverage Transportation

    28/43

  • 8/8/2019 01.Project Beverage Transportation

    29/43

  • 8/8/2019 01.Project Beverage Transportation

    30/43

  • 8/8/2019 01.Project Beverage Transportation

    31/43

  • 8/8/2019 01.Project Beverage Transportation

    32/43

  • 8/8/2019 01.Project Beverage Transportation

    33/43

  • 8/8/2019 01.Project Beverage Transportation

    34/43

  • 8/8/2019 01.Project Beverage Transportation

    35/43

  • 8/8/2019 01.Project Beverage Transportation

    36/43

  • 8/8/2019 01.Project Beverage Transportation

    37/43

  • 8/8/2019 01.Project Beverage Transportation

    38/43

  • 8/8/2019 01.Project Beverage Transportation

    39/43

  • 8/8/2019 01.Project Beverage Transportation

    40/43

  • 8/8/2019 01.Project Beverage Transportation

    41/43

  • 8/8/2019 01.Project Beverage Transportation

    42/43

  • 8/8/2019 01.Project Beverage Transportation

    43/43