TRANSPORTATION CONCEPT REPORT TEMPLATE GENERAL INSTRUCTIONS - This is a companion document to the Transportation Concept Repot (TCR) Guidelines . Please reference the guidelines for more information on completing a TCR. - Delete this cover page, the “Action” boxes, italic text, “Beginning of Template” page, and “End of Template” page. - The information within the data tables are meant as hypothetical examples to communicate an appropriate level of complexity. This information must be deleted before utilizing the tables. The first blank row/column has been included for the planner to start filling out the table. - Keep the “About the TCR/Stakeholder Participation” page to a one page maximum. - The example cells of optional and required as applicable datasets have been shaded for reference. - It is suggested to include a table of contents that has hyperlinks to the corresponding sections of the document, similar to the table of contents found in the TCR Guidelines. For Instructions on creating the hyperlinks in a word and pdf document click here . - Hidden Text O The TCR Template Instructions that are included in the guidelines are also included in the template as hidden text for a quick and easy reference. O It is suggested to turn off the hidden text before beginning to type again. O To see the hidden text just click the paragraph button that is indicated below by the red arrow. STYLE GUIDANCE The style guidelines listed below are mirrored in the TCR Template. These styles are recommended for readability, accessibility, and statewide consistency. If the District has mandated style guidelines they may follow those in lieu of these guidelines. Text Requirements:

Upload: vuongnga

Post on 19-May-2019

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: file · Web view9/13/2012 ·

TRANSPORTATION CONCEPT REPORT TEMPLATE

GENERAL INSTRUCTIONS - This is a companion document to the Transportation Concept Repot (TCR) Guidelines. Please reference

the guidelines for more information on completing a TCR.- Delete this cover page, the “Action” boxes, italic text, “Beginning of Template” page, and “End of

Template” page.- The information within the data tables are meant as hypothetical examples to communicate an

appropriate level of complexity. This information must be deleted before utilizing the tables. The first blank row/column has been included for the planner to start filling out the table.

- Keep the “About the TCR/Stakeholder Participation” page to a one page maximum.- The example cells of optional and required as applicable datasets have been shaded for reference.- It is suggested to include a table of contents that has hyperlinks to the corresponding sections of the

document, similar to the table of contents found in the TCR Guidelines. For Instructions on creating the hyperlinks in a word and pdf document click here.

- Hidden TextO The TCR Template Instructions that are included in the guidelines are also included in the

template as hidden text for a quick and easy reference. O It is suggested to turn off the hidden text before beginning to type again.O To see the hidden text just click the paragraph button that is indicated below by the red arrow.

STYLE GUIDANCE The style guidelines listed below are mirrored in the TCR Template. These styles are recommended for readability, accessibility, and statewide consistency. If the District has mandated style guidelines they may follow those in lieu of these guidelines.Text Requirements:

- All font should be in Calibri. Arial and Tahoma are acceptable as well. The font size suggestions below are for Calibri. Use the District’s discretion when choosing the font size for Arial and Tahoma.

- Primary Header: 16 point font, All Caps, Bold, Centered (see “Corridor Overview” in the template)- Secondary Header: 14 point font, Small Caps, Bold, Underlined, Aligned Left (see “Route Description” in

the template)- Tertiary Header: 12 point font, Bold, Aligned Left (see “Route Location” in the template)- Body Text: 11 point font, Justified

Table Requirements:- Districts have the discretion to rearrange and reformat all of the tables to best meet the need of their

document; however, the following standards must be followed.o Header text in table must be black, bold, and at minimum 9 point.o Cell color of header must alternate between two colors.o Gray out cells that are not applicable and cannot be deleted from the data table.o The template tables have all possible datasets; please delete any rows or columns that are not

applicable to the corridor.

Page 2: file · Web view9/13/2012 ·

BEGINNING OF TEMPLATEDelete this page and the previous page

Page 3: file · Web view9/13/2012 ·

Transportation Concept ReportState Route XX

District XXDate

[Insert Visual]

Disclaimer: The information and data contained in this document are for planning purposes only and should not be relied upon for final design of any project. Any information in this Transportation Concept Report (TCR) is subject to modification as conditions change and new information is obtained. Although planning information is dynamic and continually changing, the (insert District) System Planning Division makes every effort to ensure the accuracy and timeliness of the information contained in the TCR. The information in the TCR does not constitute a standard, specification, or regulation, nor is it intended to address design policies and procedures.

California Department of TransportationCaltrans Improves Mobility Across California

Approvals:

__________________ _______ ____________________ _______ Name Date Name Date [Insert Title] [Insert Title]

Page 4: file · Web view9/13/2012 ·

TABLE OF CONTENTS

ABOUT THE TRANSPORTATION CONCEPT REPORT..................................................................................................1

STAKEHOLDER PARTICIPATION.................................................................................................................................1

EXECUTIVE SUMMARY..............................................................................................................................................2

CORRIDOR OVERVIEW..............................................................................................................................................3

Route Segmentation.............................................................................................................................................3

Route Description.................................................................................................................................................3

Community Characteristics...................................................................................................................................4

Land Use...............................................................................................................................................................4

System Characteristics..........................................................................................................................................5

Bicycle Facility......................................................................................................................................................6

Pedestrian Facility................................................................................................................................................7

Transit Facility......................................................................................................................................................8

Freight..................................................................................................................................................................9

Environmental Considerations...........................................................................................................................10

CORRIDOR PERFORMANCE.....................................................................................................................................11

KEY CORRIDOR ISSUES............................................................................................................................................13

CORRIDOR CONCEPT..............................................................................................................................................13

Concept Rationale..............................................................................................................................................13

Planned and Programmed Projects and Strategies............................................................................................14

Projects and Strategies to Achieve Concept.......................................................................................................14

APPENDIX...............................................................................................................................................................15

Appendix A: Glossary of terms and Acronyms....................................................................................................15

Appendix B: Factsheets......................................................................................................................................15

Appendix C: Additional Corridor Data................................................................................................................15

Appendix D: Resources.......................................................................................................................................15

Page 5: file · Web view9/13/2012 ·

ABOUT THE TRANSPORTATION CONCEPT REPORT

System Planning is the long-range transportation planning process for the California Department of Transportation (Caltrans). The System Planning process fulfills Caltrans’ statutory responsibility as owner/operator of the State Highway System (SHS) (Gov. Code §65086) by evaluating conditions and proposing enhancements to the SHS. Through System Planning, Caltrans focuses on developing an integrated multimodal transportation system that meets Caltrans’ goals of safety, mobility, delivery, stewardship, and service.

The System Planning process is primarily composed of four parts: the District System Management Plan (DSMP), the Transportation Concept Report (TCR), the Corridor System Management Plan (CSMP), and the DSMP Project List. The district-wide DSMP is strategic policy and planning document that focuses on maintaining, operating, managing, and developing the transportation system. The TCR is a planning document that identifies the existing and future route conditions as well as future needs for each route on the SHS. The CSMP is a complex, multi-jurisdictional planning document that identifies future needs within corridors experiencing or expected to experience high levels of congestion. The CSMP serves as a TCR for segments covered by the CSMP. The DSMP Project List is a list of planned and partially programmed transportation projects used to recommend projects for funding. These System Planning products are also intended as resources for stakeholders, the public, and partner, regional, and local agencies.

STAKEHOLDER PARTICIPATION

Action:This is required. Include a high-level summary of the stakeholder coordination effort.

Page | 1

TCR PurposeCalifornia’s State Highway System needs long range planning documents to guide the logical development of transportation systems as required by CA Gov. Code §65086 and as necessitated by the public, stakeholders, and system users. The

Page 6: file · Web view9/13/2012 ·

EXECUTIVE SUMMARY

Action:Include a narrative that very briefly summarizes the setting of the route, any notable characteristics, and notes the base year and horizon year for the document. In addition, include a concept summary, concept rationale, and a description of the proposed strategies

Concept Summary

Segment Segment Description

Existing Facility

20-25 Year Capital Facility

Concept

20-25 Year System Operations and Management

Concept

20-25 Year Facility Concept

Post-25 Year

Concept

1 Solano/Yolo County line to County Road 87 2C 2C Maintain Only 2C, Maintain Only 2C

2 County Road 87E to I-505 2C 3C

Park and Ride Facility, Highway Advisory Radio

3C, Park and Ride Facility, Highway Advisory Radio

4C

Concept Rationale

Proposed Projects and Strategies

Page | 2

Page 7: file · Web view9/13/2012 ·

CORRIDOR OVERVIEW

ROUTE SEGMENTATION

Action: Segment the route, complete the segmentation data table, and provide a map of the segmentation

Segm

ent #

Location Description County_Route_Beg. PM

County_Route_End PM

1Solano/Yolo County line to County Road

87EYOL_128_0.000 YOL_128_7.550

2 County Road 87E to I-505 YOL_128_7.550 YOL_128_9.835

ROUTE DESCRIPTION

Action: Provide an introduction and summary of the route and its major characteristics. Include the following topics: Route Location, Route Purpose, Major Route Features, and Route Designations.

Route Location:

Route Purpose:

Major Route Features:

Route Designations and Characteristics:

Segment # 1 2

Freeway & Expressway Yes YesNational Highway System

No No

Strategic Highway Network

No No

Scenic Highway No NoInterregional Road System

Yes Yes

High Emphasis No No

Focus Route No NoFederal Functional Classification Minor Arterial Other Principal Arterial/ Minor

Arterial

Page | 3

Page 8: file · Web view9/13/2012 ·

Goods Movement Route

No No

Truck Designation CA Legal Advisory/ CA Legal/

Terminal Access Terminal Access

Rural/Urban/Urbanized Rural Urban ClusterMetropolitan Planning Organization SACOG SACOG

Regional Transportation Planning Agency

SACOG SACOG

Congestion Management Agency Yolo County Transportation District Yolo County Transportation

DistrictCounty Transportation Commission N/A N/A

Local Agency Yolo County, City of Winters Yolo County, City of Winters

Tribes N/A N/A

Air District Yolo Solano Air Quality Management District

Yolo Solano Air Quality Management District

Terrain Mountainous/Rolling Flat

COMMUNITY CHARACTERISTICS

Action:Develop a brief community profile, a summary of the social and economic characteristics of the area along the corridor. Determine demographic characteristics, economic base, location of major trip generating community facilities in close proximity to the route (e.g. convention center, amusement park, theater), and other relevant characteristics.

LAND USE

Action:Summarize the existing and expected land use at the route level. The following items must be discussed at the level appropriate for the setting and type of route:

1. Local and regional land use, environmental, and development plans. (Describe the land use types. These could include: residential, commercial/industrial, recreational, institutional/public services, community/emergency services, transportation, utilities, agriculture, undeveloped land, and tribal lands)

2. This item is optional. Place types and strategies as identified by the Smart Mobility Framework3. Existing growth trends and development4. Anticipated major growth affecting the corridor and the source of growth (significant traffic generators)5. Long-term right of way needs6. The economic significance of the route to the state and region7. Commute patterns in relation to land use8. Noise and air quality sensitive land uses located along the corridor

Segment Place Type

1 Urban Core2 Close-in Centers

Page | 4

Page 9: file · Web view9/13/2012 ·

SYSTEM CHARACTERISTICS

Action:Complete the System Characteristics data table. Include a narrative that explains and summarizes the information included in the template table.

Page | 5

Page 10: file · Web view9/13/2012 ·

BICYCLE FACILITY

Action:Complete the data table and include a narrative summarizing the facility, opportunities for improvement, and any related issues or projects.

Page | 1

Segment # 1Existing Facility

Facility Type FGeneral Purpose Lanes 6

Lane Miles 15.10

Centerline Miles 2.5

Median Width 10Median Characteristics Paved

HOV Lanes 2

HOV Characteristics

2 or more persons

per vehicle

HOT/Express Lanes 0HOT/ Express Lanes Characteristics N/A

Toll Lanes 0Toll Lane Characteristics N/A

BRT Lanes 0

Auxiliary Lanes 25%

Passing Lanes 0

Truck Climbing Lanes 0

Distressed Pavement 5%

Current ROW 90-110 ft

Concept Facility

Facility Type FGeneral Purpose Lanes 8

Lane Miles 25.330

Centerline Miles 2.500

HOV Lanes 2

HOT Lanes 0

BRT Lanes 0

Toll Lanes 0

Aux Lanes 35%

Passing Lanes 0

Truck Climbing Lanes 0

Post 25 Year facility

Facility Type FGeneral Purpose Lanes 8

Lane Miles 25.33

Centerline Miles 2.5

HOV Lanes 0

HOT Lanes 2

BRT Lanes 0

Toll Lanes 0

Aux Lanes 40%

Passing Lanes 0

Truck Climbing Lanes 0

ROW Needs 130-150 ft

TMS Elements

TMS Elements (BY)

Mainline Detection

, Fwy Ramp Meter

Page 11: file · Web view9/13/2012 ·

Seg

State Bicycle FacilityParallel Bicycle Facility

Seg

ID

Post

Mile

Loca

tion

Desc

riptio

n

Bicy

cle

Acce

ss

Proh

ibite

d

Faci

lity

Type

Out

side

Pave

d Sh

ould

er W

idth

Faci

lity

Desc

riptio

n

Dist

ress

ed

Shou

lder

Vol.

Role

Post

ed S

peed

Li

mit

Para

llel F

acili

ty

Pres

ent

Seg

ID

Nam

e

Loca

tion

Desc

riptio

n

Faci

lity

Type

1

A 0.000-0.230

Junction with SR-

65 to the

Junction with SR-

175

No Bike Lane

>8 ft.

no obstacle

s5% 50 45

mph.

B 0.230-1.045

Junction with SR-175 to

Milliken Ave.

Yes Yes

1 Main St.

3rd St. - 12th St. II

2 Main St.

12th - 30th I

3 Main St.

30th - 40th II

4 Main St.

40th - 60th III

2

C1.045

- 5.067

Milliken Ave. to

Junction with SR-

99

No Shared

4-8 ft.

Few obstacle

s10% 20 45mp

h

D5.067-10.25

0

Junction with SR-

99 to County

Line

Yes No

PEDESTRIAN FACILITY

Action:Complete the data table and include a narrative summarizing the facility, opportunities for improvement, and any related issues or projects.

Seg

Seg

ID

Post

mile

Loca

tion

Desc

riptio

n

Ped.

Acc

ess

Proh

ibite

d

Side

wal

k Pr

esen

t

Side

wal

k W

idth

Cros

sing

Dist

ance

Faci

lity

Desc

riptio

n

Role

Vol.

Junction

Alt.

Faci

lity

Loca

tion

Role

Type

Larg

e Co

rner

1

E 0.000-0.230

Junction with SR-65 to the Junction with SR-175

No Yes 4-8 ft.

30 ft.

No obstruction, sidewalk

cafes

200

SR-65 major Grade separated, not signalized Yes

Baseline Ave. minor

At-grade, signalize,Nocrosswalks &

sidewalks

SR-175 minor

Grade separated, signalize, Yescrosswalks & sidewalks

F R0.230-1.502

Junction with SR-175

to Milliken

Ave.

No Yes <4 ft.

30 ft.

Few obstacles 150

No Interchang

e

2 G 1.502- Milliken No No 30 Many 100 SR-99 major Ped/Bike No

Page | 2

Page 12: file · Web view9/13/2012 ·

5.650

Ave. to Junction with SR-99

ft. obstacles. Over/Undercrossing

TRANSIT FACILITY

Action:Complete the data table and include a narrative summarizing the facility, opportunities for improvement, and any related issues or projects.

S e

g

Mod

e &

Co

llate

ral

Faci

lity

Nam

e

Rout

e En

d Po

ints

Ride

rshi

p

Head

way

Ope

ratin

g Pe

riod

ITS

&

Tech

nolo

gy Stations

Amen

ities

Bike

s Allo

wed

on

Tra

nsit

Loca

tion

Desc

riptio

n

# Pa

rkin

g Sp

aces

Citie

s

Post

mile

s

1

Rail

Amtrak: CA

Zephyr

San Francisco to

Chicago## Long Real-

timeDavis,

Sacramento

Amtrak: Capitol

Corridor

San Jose to Auburn ## Long Real-

timeDavis,

Sacramento

Light Rail

Regional Transit:

Gold Line

Sacramento to Folsom ## Shor

t

Transit signal

prioritySacramento

Express Bus/BRT

Yolobus Dixon to Sacramento

## Med Transit signal

priority, Real-time info

Davis 2.365

Bike Locks,

Lighting,

Shelter, BRT

3

Page | 3

Page 13: file · Web view9/13/2012 ·

Lane

Davis 3.421

Bike locks,

No shelter,

BRT Lane

3

Sacramento 5.375

Bus pad, BRT Lane

3

Traditional Bus Yolobus Dixon to

Sacramento ## Long N/A

Davis(multiple stops),

Sacramento (multiple

stops)

3

CA High Speed Rail

CA High Speed

Rail

San Diego to Sacramento

/ San Francisco

## Med N/A Sacramento

Park & Ride

Unitrans, Amtrak

Real-time Davis

Bike Lockers, 2 Bike Racks

Davis Amtra

k Depot

130

Yolobus Real-time Davis

Bike Lockers, 2 Bike Racks

Mace Blvd. 147

FREIGHT

Action:Describe the freight system as it exists within the corridor.

Provide a map that depicts the freight system within the corridor. Include a narrative that characterizes the freight system. Complete the table provided in the template

Facility Type/Freight

GeneratorLocation Mode Name Major Commodity/

Industry Comments/Issues

Port [Location] Ship, Rail, truck POLA/LB

Electronics, Manufactured

Products, Agriculture

- Environmental constraints- Air Quality

Intermodal Freight Facility [Location] Truck, Rail Hobart Yard

Electronics, Manufactured

Products, Agriculture

Rail yard [Location] Rail Maersk Rail Yard

Electronics, Manufactured

Products, Agriculture

Rail Line [Location] Rail Burlington Northern Santa Fe

Electronics, Manufactured

- Grade-crossing @ R0.987, 1.045, 1.734

Page | 4

Page 14: file · Web view9/13/2012 ·

Railway (BNSF) (Class I)

Products, Agriculture

Rail Line [Location] Rail Union Pacific (UP) (Class I)

Electronics, Manufactured

Products, Agriculture

Air Cargo Airport [Location] Airplane LAX Agriculture

Highway [Location] Truck I-10 (National Network) Agriculture

-Bottleneck at Central St.-Truck VMT predicted to

double-Potential for dedicated

Truck Lane-Weigh-in-motion located

@ 1.538

Freight Generator [Location] Truck Manufacturing District Food

ENVIRONMENTAL CONSIDERATIONS

Action:-Consult with information sources from applicable State and federal resource agencies, local planning or conservation entities, and public stakeholders.-Consider the following resources:

Recreational Land (Section 4(f)) Waters and Wetlands Coastal Zone Wild and Scenic Rivers Farmland/Timberland Species Considerations (Special Status, Air Quality Threatened, Endangered, Critical Habitat)Community Impacts/Environmental Justice Fish PassageVisual Aesthetics Habitat ConnectivityCultural Resources Hazardous Materials Floodplain NoiseClimate Change and Sea Level Rise Naturally Occurring Asbestos

Geology/Soils/Seismic/Topography

-Complete an environmental scan-Provide a summarizing narrative-Use conclusions to inform concept rationale and project recommendations

Page | 5

Page 15: file · Web view9/13/2012 ·

S e

g

Secti

on 4

(f) L

and

Coas

tal Z

one

Farm

land

/ Ti

mbe

rland

Env.

Justi

ce

Cultu

ral

Reso

urce

sVi

sual

Aes

theti

cs

Geol

ogy/

Soils

/Se

ismic

Floo

dpla

in

Clim

ate

Chan

ge

and

Sea

Leve

l Ri

se V

ulne

rabi

lity

Haza

rdou

s M

ater

ials

Nat

ural

ly

Occ

urrin

g As

best

os

Air

Qua

lity

Noi

se

Wat

ers a

nd

Wet

land

sW

ild a

nd S

ceni

c Ri

vers

Spec

ial S

tatu

s Sp

ecie

s

Fish

Pas

sage

Habi

tat

Conn

ectiv

ity

Ozo

ne PM

CO

2.5 10

1

High

No

High

Low

Med Lo

w

Low

N/A

N/A

Low

Low

Attai

nmen

t/Un

clas

sified

Non

-Atta

inm

ent

Non

-Atta

inm

ent

Attai

nmen

t/M

aint

enan

ce

Low

Med

N/A

Low

N/A

Med

2M

ed

100

yr.

High

High

3

Med

High

Med

High

4

N/A

High

N/A

N/A5

Med

Med

6

Med

Low M

ed

7 Low

Low

Low

Low

Med

High

Med

Med

Low

CORRIDOR PERFORMANCE

Action:Complete the Corridor Performance data table. Include a narrative that explains and summarizes the information included in the template table.

Segment # 1Basic System Operations

AADT (BY) 9200

AADT (HY) 13340

AADT: Growth Rate/Year 1.55%

LOS Method HCM

LOS (BY) E

LOS (HY) E

LOS Concept E

VMT (BY) 21022

VMT (HY) 30482

Vehicle Occupancy Rate (BY) 1.1

Vehicle Occupancy Rate (HY) 1.2

Daily Vehicle Hours of Delay (35 MPH)(BY)

50

Daily Vehicle Hours of Delay (35 MPH)(HY)

70

Daily VHD (35 MPH) Method PeMS

Page | 6

Page 16: file · Web view9/13/2012 ·

Daily Vehicle Hours of Delay (60 MPH)(BY)

N/A

Daily Vehicle Hours of Delay (60 MPH)(HY)

N/A

Daily VHD (60 MPH) Method N/ATruck Traffic

Total Average Annual Daily Truck Traffic (AADTT) (BY)

322

Total Average Annual Daily Truck Traffic (AADTT) (HY)

700

Total Trucks (% of AADT) (BY) 3.5%

Total Trucks (% of AADT)(HY) 5.2%

5+ Axle Average Annual Daily Truck Traffic (AADTT)(BY)

129

5+ Axle Average Annual Daily Truck Traffic (AADTT)(HY)

300

5+ Axle Trucks (as % of AADT)(BY)

1.40%

5+ Axle Trucks (as % of AADT)(HY)

2.2%

Bottlenecks

Bottleneck Existing Yes

Bottleneck Location SR-128 and I-505 Junction

Bottleneck Queue (length) 3 miles

Bottleneck Causality Merging

trafficPeak Hour Traffic Data

Peak Period Length 1

Peak Hour Direction N/A

Peak Hour Time of Day am

Peak Hour Directional Split (BY)

70/30

Peak Hour Directional Split (HY)

80/20

Peak Hour VMT (BY) 10000

Peak Hour VMT (HY) 20000

Peak Hour V/C (BY) 1

Peak Hour V/C (HY) 1

Peak Hour Avg. Speed (mph)(BY)

30

Peak Hour Avg. Speed (mph)(HY)

25

Peak Hour Vehicle Hours of Delay (35 mph) (BY)

100

Peak Hour Vehicle Hours of Delay (35 mph) (HY)

140

Peak Hour VHD (35 MPH) Method

PeMS

Page | 7

Page 17: file · Web view9/13/2012 ·

Peak Hour Vehicle Hours of Delay (60 mph) (BY)

N/A

Peak Hour Vehicle Hours of Delay (60 mph) (HY)

N/A

Peak Hour VHD (60 MPH) Method

N/A

Managed Lane Performance

AADT (BY) 200

AADT (HY) 400

AADT Method

LOS Method HCS

LOS (BY) B

LOS (HY) C

LOS Concept C

VMT (BY) 500

VMT (HY) 1000

Daily Vehicle Hours of Delay (35 MPH)(BY)

N/A

Daily Vehicle Hours of Delay (35 MPH)(HY)

N/A

Daily VHD (35 MPH) Method N/A

Daily Vehicle Hours of Delay (45 MPH)(BY)

0

Daily Vehicle Hours of Delay (45 MPH)(HY)

0

Daily VHD (45 MPH) Method PeMS

Daily Vehicle Hours of Delay (60 MPH)(BY)

N/A

Daily Vehicle Hours of Delay (60 MPH)(HY)

N/A

Daily Vehicle Hours of Delay (60 MPH) Method

N/A

Reliability

Reliability (%)(East/Northbound)(BY)

98%

Reliability (%)(West/Southbound)(BY)

98%

95th percentile (East/Northbound)(BY)

N/A

95th percentile (West/Southbound)(BY)

N/A

Median Free Flow Travel Time (East/Northbound)(BY)

N/A

Median Free Flow Travel Time (West/Southbound)(BY)

N/A

Page | 8

Page 18: file · Web view9/13/2012 ·

ADDITIONAL TOPICS

Action:If there are any additional topics that the District would like to discuss they may do so at this point in the template.

KEY CORRIDOR ISSUES

Action: Include a summary of key issues within the corridor.

CORRIDOR CONCEPT

CONCEPT RATIONALE

Action: Include a narrative that describes the concept rationale.

PLANNED AND PROGRAMMED PROJECTS AND STRATEGIES

Action: Use the table provided in the template to list the planned and programmed projects that have been identified for the corridor.

Page | 9

Page 19: file · Web view9/13/2012 ·

Seg. Description Planned or Programmed Location Source Purpose Implementation

Phase

2

South Side of SR 128 (Grant Ave.), from St. Anthony Parish

Hall to West Main St: fill in

missing sidewalks

Planned

St. Anthony Parish Hall

to West Main St.

SACOG MTP/SCS 2035 Appendix A.1.

Project List

Pedestrian Circulation Long Term

PROJECTS AND STRATEGIES TO ACHIEVE CONCEPT

Action: Use the table provided in the template to list the projects and strategies to achieve the concept.

Seg. Description Location Source Purpose Implementation Phase

1Widen Shoulder to

accommodate bicyclist and meet min. facility concept

West of City of Winters and Putah

Creek Bridge

Caltrans District 3Circulation and

Operational Enhancement

Long Term

2 Interchange Improvements at SR 128/I-505. PM 9.835

City of Winters General Plan,

1992

Operational Enhancement Long Term

2Pedestrian circulation at the intersection of SR 128/Grant Avenue and Morgan Street.

PM 9.100

SACOG Regional Bicycle,

Pedestrian, and Trails Master Plan

Pedestrian Circulation and

Operational Enhancement

Long Term

Page | 10

Page 20: file · Web view9/13/2012 ·

APPENDIX

APPENDIX AGLOSSARY OF TERMS AND ACRONYMS

Action:This is a required appendix. Provide a glossary of terms and acronyms that are used within the report. This is critical in providing outreach to internal and external stakeholders.

APPENDIX BFACTSHEETS

This is an optional appendix to include any State, District, route, segment, or miscellaneous factsheets. The content and format is left completely to the District’s discretion.

APPENDIX CADDITIONAL CORRIDOR DATA

This is an optional appendix to include any additional data, analysis, or graphs that are not included within the report but are pertinent to the corridor.

APPENDIX DRESOURCES

Action:This is a required appendix. Provide a bibliography of the works cited and resources used throughout the document. The format is up to the District’s discretion. The District may also use footnotes in lieu of Appendix D.

Page | 11

Page 21: file · Web view9/13/2012 ·

END OF TEMPLATEDelete this page and the following pages

Page | 12

Page 22: file · Web view9/13/2012 ·

TEMPLATE RESOURCES

Page | 13