ّ feb. 2007

31
In The Name of God, The compassionate, The merciful A Report on Using Mobile Digital Systems in “Industrial Producers Price Index” in Tehran ّ Feb. 2007 Statistical Center of Iran

Upload: cili

Post on 26-Jan-2016

34 views

Category:

Documents


0 download

DESCRIPTION

In The Name of God , The compassionate, The merciful A Report on Using Mobile Digital Systems in “Industrial Producers Price Index” in Tehran. Statistical Center of Iran. ّ Feb. 2007. Table of contents:. Introduction Goals and Objectives Executive procedures of the survey - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ّ Feb. 2007

In The Name of God,The compassionate, The merciful

A Report on Using MobileDigital Systems in

“Industrial Producers Price Index”in Tehran

�ّFeb. 2007

Statistical Center of Iran

Page 2: ّ Feb. 2007

Introduction Goals and Objectives Executive procedures of the survey Abstract Introduction to Industrial Producers Price Index Survey Organizational Chart Quality of field workers ( education, training and…) Survey Conduction and supervision procedures �ِDefining Work area Feasibility study on different methods of data transfer to the

head-quarter An example of the field work Assessment of Data enumerator’s view points Major Results of the survey

Table of contents:

Page 3: ّ Feb. 2007

IntroductionStatistical center of Iran has done the best to use

Information Technology (IT) available capabilities in the data gathering and data extraction of yearly statistical surveys.

Considering the fast changing environment of IT recently a survey conducted by adopting PDA. The aim was to evaluate this technique and hardware capabilities in field work.

Major assumptions were the fact that by using PDAs not only the speed and quality of gathered data increases, but also there is a considerable saving on paper-works and questionnaires as well as elevation of IT knowledge in SCI.

Page 4: ّ Feb. 2007

Goals and ObjectivesFeasibility study on PDAs capabilities in

the field work both for software and hardwares involved.

Feasibility study on preparing questionnaires and its data base in PDAs.

Study of the procedures of linking GIS software to compile both digital maps and a separate database of the survey.

Feasibility study to compile GPS systems with GIS and Survey’s database to upgrade the quality of data by linking Geo-referenced data with unique address of the respondents of the survey.

Page 5: ّ Feb. 2007

Executive procedures of the survey Preparation and building necessary environment for

conduction of the pilot project such as:

Formation of a experts committee for conduction of the pilot

project

Selection of GIS programming firm in order to customize the

interface and workspace of the PDAs.

Preparing questionnaires in digital format

Preparing introductory text for field workers

Conducting 3 day training course for the field workers.

Page 6: ّ Feb. 2007

Abstract Introduction to Industrial Producers Price Index Survey

Industrial Producers Price Index (IPPI) is currently conducted on a monthly basis all over the nation.

In this survey a small questionnaire is prepared for selected industrial production.

The questionnaire is comprised of 4 different sections which are as follows:

1- Geographic address of the work shop or factory. 2- Work shop or factory specifications 3- Enumerator’s name, and address 4- Specifications and price of the selected goods in the current

month including: name and unit of production, ISIC code of selected goods, price per unit and reasons for its change (if any).

Page 7: ّ Feb. 2007

Organizational Chart of Pilot Survey

Page 8: ّ Feb. 2007

Quality of Field workers (education, training and…)• Considering the new aspects of the pilot survey, a group field

workers have been selected. This group are mostly youngsters who are well familiar and handy with computer and cell phone as an operator.

• Education degree of the field workers

- BA / Bs 12

- Technicians 2

- Diploma 6

Page 9: ّ Feb. 2007

Content of Training Course:

Introduction to IPPI survey

Techniques of price acquisition

Introduction to using PDAs

Introduction to IPPI data gathering software

Introduction to GIS software and digital mapsIntroduction to GPS and work flow of the survey

Field work Training (1 full day)

Question and answer of the whole training course

Training exam and selection of 20 field workers for the survey

Page 10: ّ Feb. 2007

Survey Conduction and supervision procedures Teaming of the field workers. Assigning a survey district to each field worker. Supervision and Monitoring: - Direct supervision by the members of conducting

committee. - Gathering Daily reports as well as finished units

of work from all field workers. - On-site and remote problem solving of the field

workers. - Data verification and modification by the

provincial expert of the survey in at most 12-18 hours

Page 11: ّ Feb. 2007

STANDING POINT TO STANDING POINT TO LOCATION LOCATION

Page 12: ّ Feb. 2007

DATA GHATHERING BY FIELD WORKERDATA GHATHERING BY FIELD WORKER

جمع آوري جمع آوري داده هاي داده هاي آماري آماري

مرتبط به مرتبط به داده هاي داده هاي

مكانيمكاني

جمع آوري جمع آوري داده هاي داده هاي آماري آماري

مرتبط به مرتبط به داده هاي داده هاي

مكانيمكاني

ثبت نقطه مورد نظر برای ثبت نقطه مورد نظر برای آمار گيريآمار گيري

ثبت نقطه مورد نظر برای ثبت نقطه مورد نظر برای آمار گيريآمار گيري

فرم مخصوص سرشماري فرم مخصوص سرشماري طرح جمع آوري قيمت طرح جمع آوري قيمت

توليدكننده محصوالت صنعتيتوليدكننده محصوالت صنعتي

فرم مخصوص سرشماري فرم مخصوص سرشماري طرح جمع آوري قيمت طرح جمع آوري قيمت

توليدكننده محصوالت صنعتيتوليدكننده محصوالت صنعتي

محل محل استقرارآمار استقرارآمار

گيرگير

محل محل استقرارآمار استقرارآمار

گيرگير

Page 13: ّ Feb. 2007

ماه

سال

روز

استان

شهرستان

شهر/دهستان

رديف كارگاه

Questionnaire fill up by the field workerQuestionnaire fill up by the field worker

Page 14: ّ Feb. 2007

كارگاه

آدرس

تلفن

دفتر مركزي

Questionnaire fill up by the field workerQuestionnaire fill up by the field worker

Page 15: ّ Feb. 2007

مشخصات پاسخگو

پاسخگو

سمت

تلفن

مشخصات كاال

ورود اطالعات

نام كاال

مشخصات كاال

واحد

قيمت

تغيير علت تغيير قيمت

قيمت

Questionnaire fill up by the field workerQuestionnaire fill up by the field worker

Page 16: ّ Feb. 2007

X

Y

T

3956273.1871116

12/02/2007 09:39:23 Õ

546741.91867355

Recording Geographic coordination of the statistical

unit and questionnaire fill up date and time

Questionnaire fill up by the field workerQuestionnaire fill up by the field worker

Page 17: ّ Feb. 2007

Delimitation of survey area by work units

Page 18: ّ Feb. 2007

Map of Work Unit assignment to field workers

Page 19: ّ Feb. 2007

Feasibility of different methods of Feasibility of different methods of data Transfer to the head quarterdata Transfer to the head quarter

1. Data transfer to the head quarter by the field worker

2. Using internet for data transfer i.e.: coffee nets,

personal internet access …

Page 20: ّ Feb. 2007

Internet link on provincial website for remote connection

Page 21: ّ Feb. 2007

Pictures of some major field activities

Page 22: ّ Feb. 2007

Field work districts and GPS tracking

Page 23: ّ Feb. 2007

Field work districts and GPS tracking

Page 24: ّ Feb. 2007

موقعيت كارگاه

Field work districts and GPS tracking

Page 25: ّ Feb. 2007

Relationship of Address database and GIS maps

Page 26: ّ Feb. 2007

Movement track of the field worker (by GPS)

Relationship of address database, GIS maps and GPS tracking

Page 27: ّ Feb. 2007

Picture of changed or dislocated workshops

Page 28: ّ Feb. 2007

Picture of changed or dislocated workshops

Page 29: ّ Feb. 2007

Relationship of address database, GIS maps, GPS tracking and questionnaire database

Page 30: ّ Feb. 2007

Results and Outcomes• In addition to large amount of budget cuts, use of

PDAs does have an extensive effect on quality of data.• By using intelligent techniques of data gathering, on

site verification as well as necessary data modifications and corrections are easily accessible.

• By adopting this technique and proper communication infrastructure, on-line monitoring, supervision and problem solving is possible and easy.

• To ensure the coverage as well as updating with IT techniques needs preparation of GIS ready maps for address geo-referencing which in turn will exerts huge burden for the mapping unit of SCI.

Page 31: ّ Feb. 2007

Thank for your patience