  • Installation Guide

    Connecting the Primary and Secondary Cabinets

    Safety precautions

    ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1

    Cabinet dimensions: 2250 mm 750 mm 700 mm (H W D)Weight:

    Approximately 100 kgRectifier: 3.8 kg/setMonitoring unit: 2.2 kg

    Connecting AC Input Cables

    1

    Put warning signs in the equipment room, specifically the power distribution box.

    Fully insulate the terminals, contacts and other exposed parts and wear protective gloves during installation/connection process.

    Before connecting any electrical cable, turn OFF all the switches and breakers and turn OFF the protection breaker outside the system.

    Connecting Grounding Cables

    DC Outputbreakers

    AC Input breaker

    AC SPD BATT breakers 3 and 4

    DC SPD

    PE(Groung bolt)

    Connect the grounding cables to the nearest grounding point. The PE length cannot exceed 30 m. The grounding cable should be laid as short and straight as possible.

    1. Connect the PE cable between the grounding bolt and grounding busbar of the equipment room.

    2. Connect the GND cable between the working ground busbar of ZXDU68 W201 and grounding busbar of the equipment room.

    L1L2L3

    Color codeL1: YellowL2: GreenL3: RedN: BlueN

    1. Connect the grounding busbar of the secondary cabinet to that of the primary cabinet.

    2. Connect one of the output breakers (secondary cabinet) to the 63 A DC output breaker of the primary cabinet.

    Configuration AC input voltage MCB/TerminalsThree-phase five-w ire (L1/L2/L3/N/PE) 220 V (80-300 V) 1*63 A/3P MCB

    Do not reverse the live wires and neutral wire.

    Make sure that the AC input power is cut off during the operation to connect theAC input cables.

    .3.3

    22

    4.4

    Installing the Cabinet

    Installed expansion bolt

    Flat washerSpring washerNut

    525

    690

    5

    2

    5

    690

    Cabinet Bottom

    Installation hole

    Drill

    WrenchTools:

    Cabinet front

    Tape measure

    Angle square

    Expansion bolt

    Unit: mm

    1. Prepare four M12 X 100 expansion bolts.2. Drill four holes (70 mm deep) with the same dimensions as the cabinet holes at the bottom.3. Install the four M12 X 100 expansion bolts into the holes (leave 30 mm of the bolt above the ground).4. Mount the cabinet on the floor and into the expansion bolts.5. Fasten the bolts to fix the cabinet in place.

    Limit the vertical inclination of the cabinet to 5o by inserting metal plates at the bottom

    700

    ZXDUFront of cabinet

    1000

    750

    Unit: mmCabinet dimensions: 2250 x 750 x 700

    Cabinet position

    600

    ZXD2400 Rectifiers Monitoring unit

    Signal Interface Board (SIB)

    DC Outputbreakers

    DC Power Distribution (3U)Power supply unit (8U)

    +/GND

    PEPE PE

    Protection ground busbar of installation site

    Color codePE: Yellow greenGND: Black

    DC Power distribution (3U)

    ZXDU68 W201 V4.0R06M03&M04DC Power System

    Secondary Cabinet(V4.0R06M04)

    26U

    1 2

    DC Output

    DC Output

    +/GND(Primary cabinet)

    +/GND(Secondary cabinet)

    Primary cabinet

    Secondary cabinet

    63 A breaker

    1. Turn off the AC input breaker of the AC distribution box that powers the ZXDU68 W201 system.

    2. Turn off the AC input breaker of the ZXDU68 W201 system.

    3. Connect the neutral cable (N) of the AC input.

    4. Connect the phase wires of AC input (L1/L2/L3).

    Connecting Battery Cables

    .5.5

    www.zte.com.cn 1 of 4

    Connect the negative cable first to ensure safety.

    Do not connect positive and negative cables in reverse.

    Tighten any loose detection cable after battery cable connection.

    Cable colorBATT (+): RedBATT (-): Blue

    BATT input 1 and 2+ +

    Battery pack/rack Battery voltage MCB4*12 V battery cells 48 V 4*100 A MCB

    Connecting plate1 3

    1. Install the batteries into the cabinet.

    2. Turn off the BATT breakers.

    3. Connect the negative cables to the BATT breakers (battery packs of secondary cabinet connects to the battery breakers of primary cabinet power supply unit).

    4. Connect the positive cables to the working ground busbars (GNDs of primary and secondary cabinets).

    5. Install the connecting plates between battery cells.

    6. Label with battery number and polarity. For example, mark battery 1 (+) on the positive cable and battery 1 (-) on the negative cable.

    +/GND of the respectective cabinets

    BATT 3 and 4 (Secondary cabinet)

    2

    1. Turn off the loads.

    2. Turn off the DC output breakers.

    3. Connect the negative terminal of a load to one of the DC output (-) breakers.

    4. Connect the positive cable of a load to the working ground busbar (+/GND).

    Color codeDC output (+):BlackDC output (-): Blue

    DC Output

    DC Power Distribution (Secondary Cabinet)

    Power supply unit (Primary Cabinet)

    The load current MUST NOT exceed the capacity of the breakers to avoid tripping of breakers and shutdown of loads.Tighten any loose detection cable after DC output cable connection.

    -48 V

    +/GND(Primary cabinet)

    +/GND(Secondary cabinet)

    Connecting DC Output Cables

    DC Output

    Load_ +

    _ +Load

    + +BATT input 3 and 4

    The negative cable is the first cable to be connected

    Cabinet MCB DC voltage LLVD1: 1*6A + 3*20A LLVD2: 1*63A (Controls DCoutput of seondary cabinet)

    Secondary cabinet LLVD2: 20*20A+2*10A

    Primary cabinet

    BATT 1 and 2 breakers (Primary cabinet)

    Power supply unit (8U)

    Communication equipment slots (21 U)

    Primary Cabinet(V4.0R06M03

    BATT breakers1 and 2

  • Performing Electrical Check

    AC inputCheck both the AC distribution box and AC input breaker of the system.L1 N L1 - L2 L1 - PEL2 N L1 - L3 L2 - PEL3 N L2 - L3 L3 - PEBatteryCheck the positive and negative terminals of the battery pack for any short circuit.

    DC outputCheck the Load (+) and Load (-) for any short circuit.

    Checking for Short Circuit1Check the following cables for short circuit:

    AC input cablesBattery cablesDC output cables

    3 Checking Battery Voltage

    2 Checking AC Input Voltage

    If the the measured voltage is negative, the positive and negative terminals are reversely connected. Reconnect the cables.

    The measured voltage must be positive and at least 43.2 V.

    Measure the battery voltage between BATT (+) and BATT (-) through terminals of ZXDU68 W201.

    .1.1

    DO NOT install a faulty rectifier in the ZXDU68 W201 system. Make sure that no obstacle is blocked in the air vent of the rectifiers for good heat dissipation.

    The following should be met for normal rectifier operationAC input voltage: 80 V300 VThe ZXD2400 V4.3 working status depends on the AC input voltage:

    Installing the Monitoring Unit

    The batteries and loads have not yet been connected to the system. As a result, the monitoring unit gives the DC Loop Break alarm and Bat Loop Break alarm.

    Setting Output Relays

    L1 L2

    Multimeter

    BATT breaker

    Check in the ZXDU system

    GND (+)

    Black probeRed

    probe

    Installing the Rectifiers.2.2

    2

    Acceptance criteria

    Before checking for short circuit, turn off the corresponding breaker. Locate any short circuit and eliminate it before proceeding to the next step.

    www.zte.com.cn

    .3.3

    Rectifiers

    1 2 3

    1. Turn off the power switch of the monitoring unit.

    2. Insert the monitoring unit into the slot provided and fasten the screw.

    3. Turn on the monitoring unit (RUN indicator should glow and the main menu is displayed on the screen).

    Enter

    1. Set Relays Out

    AC-in Switch Off

    Relay: A2

    1.Setup Para

    Enter

    Ent

    Esc

    EntEsc

    Modify value

    Pass: 0000_Msg Alm Ctrl Rec

    Ent

    Main menu Initial password: 0000

    Output relays can be modified through the following path: Ctrl1.Setup Para3. Alarm ParaSet Relays out

    ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide

    Measure the AC input voltages by referring to the table.

    If N-PE voltage is approximately equal to L-N voltage, N and L cables are inversely connected. Reconnect the cables L and N.

    4

    Monitoring unit

    Rectifiers

    1 2 3 4

    Monitoring unit

    The ZXDU68 W201 system can normally work without the monitoring unit. However, the system will have no communication functions and the batteries will be in the floating charge mode.

    Setting System Parameters

    1 Correct parameter setting is very important to ensure that the monitoring unit functions as expected. The default values of the parameter may not meet the requirements. Therefore, some parameters need to be set in the system commissioning.

    The parameters can be modified through the 1. Setup Para interface under the Ctrl menu

    EntModify valueSave setting

    Esc Quit

    System parameter list

    Battery parameter list

    HandleStop pin

    C heck item C riteriaN-PE

  • S/N Alarm Level Relay S/N Alarm Level Relay

    1 Total Alarm - A1 20 DCArrester Brk. Minor alarm A4

    2 AC Aux SW Of f Minor alarm A2 21 DCBreaker Alarm Minor alarm A4

    3 AC Main SW Of f Major alarm A2 22 Battery Fault Major alarm A4

    4 AC Power Of f Major alarm A2 23 Bat Under-Temp Minor alarm A4

    5 ACArrester Brk. Minor alarm A2 24 Bat.Temp.Void Minor alarm A4

    6 AC Under-Vol Minor alarm A2 25 Bat.Discharge Minor alarm A4

    7 AC Ov er-Vol Minor alarm A2 26 Env Under-Temp Minor alarm A5

    8 AC Phase Lost Minor alarm A2 27 Env Ov er-Temp Minor alarm A5

    9 AC Current Ov er Minor alarm A2 28 Env Under-Hum Minor alarm A5

    10 SMR Alarm Minor alarm A3 29 Env Ov er-Hum Minor alarm A5

    11 SMR Abnormal Minor alarm A3 30 Smoke Alarm Minor alarm A5

    12 DC Under-Vol Minor alarm A4 31 Flood Alarm Minor alarm A5

    13 DC Ov er-Vol Minor alarm A4 32 Intrusion Alarm Minor alarm A5

    14 DC Loop Break Minor alarm A4 33 Door Magnet Alm Minor alarm A5

    15 Bat Loop Break Minor alarm A4 34 Glass Broken Minor alarm A5

    16 Bat Under-Vol Major alarm A4 35 Env Un.LostTouch Minor alarm A5

    17 Bat Ov er-Temp Minor alarm A4 36 HeatExch.Alm Major alarm A5

    18 1st Shut-Down Major alarm A4 37 Env .Temp.Void Minor alarm A5

    19 2nd Shut-Down Major alarm A4 38 Start GEN - None

    Charging the Batteries1. Before turning on the battery breaker, measure the voltage of the battery pack and keep a record.2. Set the floating charge voltage equal to the terminal voltage of the battery pack. Menu path: Ctrl 1.Setup Para Batt Para Float Vol..3. Turn on the BATT breaker.4. Reset the floating charge voltage to the default (53.5 V).5. Start the equalized (boost) charge mode in the monitoring unit. Menu path: Ctrl 2. OAM 4.EQUAL...]

    .1.1

    Connecting Loads to the System1. Turn off the load.2. Turn on the corresponding DC output breakers of the system.3. Measure the DC output voltage and make sure that the positive and negative load cables are properly connected.4. Turn on the load.

    .2.2

    Acceptance Criteria

    Negative voltage means the cables are inversely connected. Reconnect the cables.

    + - 48V48V DC input

    Red probeBlack probe

    Check load

    Appendix: System Shutdown and Startup

    Shutdown

    The ZXDU68 W201 shutdown will cause the loads to be shut down.

    1. Turn off the loads.2. Turn off all DC Output breakers.3. Turn off the BATT breakers.4. Turn off the monitoring unit.5. Turn off the AC Input breaker of the system.6. Turn off the AC input breaker powering the system.

    Startup1. Turn on the AC input breaker powering the system.2. Turn on the AC input of the system.3 Turn on the monitoring unit.4. Turn on the BATT breakers.5. Turn on all DC output breakers.

    The measured voltage should be positive (+) and within the range of 42-58 V

    Alarms and their default output relays

    Avoid DC short circuit during operation.

    A large difference between the voltage of the battery pack and the floating charge voltage of the system can cause sparks and could result in flames.

    Follow the sequence to connect the battery packs: Connect a battery pack with lower voltage > Connect a battery pack with higher voltage.

    ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide

    ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1

    www.zte.com.cn 3 of 4

  • ZXDU68 W201 V4.0R06M03&M04DC Power System Installation Guide

    ZTE Corporation Address NO. 55, Hi-tech Road South, ShenZhen, P.R.China Area code518057 Website http://ensupport.zte.com.cn [email protected] Document versionSJ-20101011152815-002/ 2010-11-16 R1.1

    www.zte.com.cn 4 of 4

    12 11 14

    VL+ VL-X2-1

    RL1

    C1

    C2

    X3-B6X3-C6 X10-1

    X11-1

    ACDC

    LNPE

    RMT ALM COM EX PWM SBCUT

    282726

    1711 12 13 14 15 16

    1(2)

    3(4)

    M2

    ACDC

    LNPE

    RMT ALM COM EX PWM SBCUT

    282726

    1711 12 13 14 15 16

    1(2)

    3(4)

    M3

    ACDC

    LNPE

    RMT ALM COM EX PWM SBCUT

    282726

    1711 12 13 14 15 16

    1(2)

    3(4)

    M4

    ACDC

    LNPE

    RMT ALM COM EX PWM SBCUT

    282726

    1711 12 13 14 15 16

    1(2)

    3(4)

    M1QFB1

    100A

    BATT 1

    BATT 2

    ST1

    T1

    +12V

    ST2

    T2

    +12V

    X3-C7X3-B7

    1QFD1 6A

    1QFD2 20A

    1QFD3 20A

    QFB3 100A

    QFB4 100A

    KMD1

    KMD2

    123456

    X6

    1

    123456

    X7

    2

    123456

    X8

    3

    123456

    X9

    4

    123

    X10

    123

    X11

    1 2 3

    X1

    1 2

    X2

    1A1B1C

    32A32B32C

    X3EX1

    EX2

    EX3

    EX4

    ALM1

    ALM2

    ALM3

    ALM4

    RMT1

    RMT2

    RMT3

    RMT4

    CUT1

    CUT2

    CUT3

    CUT4

    PWM

    PWM

    PWM

    PWM

    COM

    COM

    COM

    COM

    V

    B

    1

    V

    B

    2

    V

    L

    +

    V

    L

    -

    X3-C12X3-C9

    48V-

    12 11 14NL

    -12VGND+12VVa

    1

    2

    3

    4

    1

    2

    X1

    X2

    TRB

    X1-1

    X1-3

    X4

    BACK

    Class B

    DC SPD

    Distribution

    LLVD1 LLVD2

    THUNDERACAIR0

    1234567891011121314151617181920212223242526272829303132

    X3A

    1234567891011121314151617181920212223242526272829303132

    X3B

    1234567891011121314151617181920212223242526272829303132

    X3C

    RS6

    IB2+IB1+

    IB2-IB1-

    IL+ IL-ACVa

    RS1RS2RS3

    RS4RS5

    -12VFL-DC

    +12VAGND AGND

    AGND

    PEN

    AC Input380V 50Hz/60Hz

    12

    1X26-1X26-2 12

    2

    1QFD4 20A

    X3-C11RS1

    X3-B11RS2

    X3-A9RS3

    X3-C10RS4

    X3-B10RS5

    X3-A13

    X3-B13

    LLVD1

    LLVD2

    L1L2L3

    11 14

    QFA1 63A

    L1' L2' L3' NX3-A15

    X3-C14X3-B15X3-C15X3-A7

    X2-2QFB2

    100A

    AC Input

    AC SPD

    AC Transducer

    Rectifier

    DC Bus Bar

    Shunt and DC SPD

    DC Contactor

    AC Switch of Battery

    DC Output

    Battery

    Battery ST

    1 2

    X4

    1 2

    X5

    1 2

    X12

    12

    X21RS485

    AB

    T

    1

    T

    2

    +

    1

    2

    V

    +

    1

    2

    V

    G

    N

    D

    T

    C

    1 2

    X24

    1 2

    X25

    1 2 3 4

    X23

    1 2

    X26

    +

    1

    2

    V

    +

    1

    2

    V

    +

    1

    2

    V

    S

    M

    O

    K

    E

    T

    E

    M

    P

    A

    G

    N

    D

    A

    G

    N

    D

    D

    O

    O

    R

    V

    C

    C

    -

    W

    W

    A

    T

    E

    R

    SIB X1

    1 2 3 4 5 6

    X17

    1 2 3 4 5 6

    X15

    1 2 3 4 5 6

    X16

    1 2 3 4 5 6

    X14

    S

    3

    A

    G

    N

    D

    S

    2

    S

    4

    S

    1

    A

    G

    N

    D

    4

    N

    C

    3

    C

    O

    M

    4

    C

    O

    M

    3

    N

    O

    4

    N

    O

    3

    N

    C

    6

    N

    C

    5

    C

    O

    M

    6

    C

    O

    M

    5

    N

    O

    6

    N

    O

    5

    N

    C

    2

    N

    C

    1

    C

    O

    M

    2

    C

    O

    M

    1

    N

    O

    2

    N

    O

    1

    N

    C

    123456789

    X22RS232

    L+

    L+2QFD 63A

    BATT 3

    BATT 4ZXDU68 W201(V4.0R06M04)

    MV+

    COMSIG

    FAN2

    MV+

    COMSIG

    FAN3

    MV+

    COMSIG

    FAN1

    LLVD2VL+

    LLVD2VL+

    LLVD2VL+

    ZXDU68 W201(V4.0R06M04)3U

    QFB3 100A

    QFB4 100A

    12

    1X26-1X26-2 12

    2

    BATT 3

    BATT 4ZXDU68 W201(V4.0R06M03)

    1N5404

    1N5404

    1N5404

    MV+

    COMSIG

    FAN2

    MV+

    COMSIG

    FAN3

    MV+

    COMSIG

    FAN1

    1N5404LLVD2

    VL+

    LLVD2VL+

    T1 40

    T2 40

    LLVD2VL+

    T4 40

    T3 30

    RS62QFD1 20A

    2QFD2 20A

    VD3

    VD4

    2QFD3 20A

    VD52QFD5 20A

    2QFD6 20A

    VD7

    VD8

    2QFD7 20A

    2QFD8 20A

    VD9

    VD10

    2QFD9 20A

    VD11

    2QFD10 20A

    2QFD11 20A

    VD12

    VD13

    2QFD12 20A

    2QFD13 20A

    VD14

    VD15

    2QFD14 20A

    VD16

    2QFD15 20A

    2QFD16 20A

    VD17

    VD18

    2QFD17 20A

    2QFD18 20A

    VD19

    VD20

    2QFD19 20A

    VD21

    2QFD4 20A

    VD6

    2QFD20 20A

    2QFD21 10A

    VD22

    VD1

    2QFD22 10A

    VD2

    L+

    2QFD3 63ALLVD2

    X3-A8

    Electrical Connection Diagram of Secondary Cabinet (V4.0R06M04)

    Electrical Connection Diagram of Primary Cabinet (V4.0R06M03)

    -1-2

    Page-3

    Page-4